W912DS-15-B-0013-AMENDMENT 0003

View the file

Other files

File Type Posted
W912DS-15-B-0013_BID_ABSTRACT.pdf PDF
W912DS-15-B-0013-AMENDMENT_0008.pdf PDF
W912DS-15-B-0013-AMENDMENT_0007.pdf PDF
W912DS-15-B-0013-0006.pdf PDF
W912DS-15-B-0013-AMENDMENT_0005.pdf PDF
W912DS-15-B-0013-0004.pdf PDF
Memo_Style.pdf PDF
Amend_3_plans.pdf PDF
01_22_00.00_18.pdf PDF
35_20_23.00_18.pdf PDF
4360-mapped-data-over-sewage-tunnel-ELEVATION.xyz XYZ file
DeepWater-sh1.dgn —
IDC204_TO0027_SPJ4_e4Report.pdf PDF
W912DS-15-B-0013-0002_AMENDMENT.pdf PDF
IDC209_TO001_SPJ4-QA_e4Rpt_Final_PrintVersion.pdf PDF
WQC-Waiver_Requests_and_email_and_ATP-Nov2015.pdf PDF
4360-hit-map_color.pdf PDF
Median_2x2.tif TIF image
PreBid_Conference_Sign-In_Sheet_12_Nov_15.pdf PDF
AS_Built_WM_PDF.zip ZIP file
Presentation__and_MFR__and_QA_NOV12_V_FINAL.pdf PDF
01_35_30.00_18.pdf PDF
35_20_23.10_18.pdf PDF
AMENDMENT_0001_W912DS-15-B-00013.pdf PDF
RNARROWSSIPHON2RECORDPROFILESTATION.zip ZIP file
IDC209_TO10_Anchorage_e4Report_20150408_opt.pdf PDF
Final_Data_Report_KVK_AC_HARS_2013.pdf PDF
GrainsizeSAN.pdf PDF
AN-BoringsdDoc.pdf PDF
abbreviated-summary.pdf PDF
4364-3x3med_ELEVATION.7z 7Z file
W912DS-15-B-0013_SOLICITATION.pdf PDF
IFB_0013_specs.pdf PDF
FINAL-REPORT-TO12.pdf PDF
USACECCRcalculatorSANUC9Feb15.xlsx XLSX spreadsheet
Survey4364.7z 7Z file
IFB_B00013_plansopt.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Revise the Specifications and Draw ings

2. Revise the Bid Schedule CLINs 0003 and 0012

3. Answ er Bidders questions for information purposes only. Responses do not revise the solicitation, plans or specifications.

The Bid Opening date remains 24 November 2015 at 10:00 AM Eastern Standard Time.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Nov-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-B-0013

X 9B. DATED (SEE ITEM 11)

26-Oct-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Nov-2015

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-15-B-0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION/CONTRACT FORM

CLIN 0003

The pricing detail quantity has increased by 10,000.00 from 60,000.00 to 70,000.00.

CLIN 0012 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0012 10,000 Cubic

Yard

OPTION Optional Item - Option 6

FFP

Dredging of Shoaling Material and Placement At THE HARS. THIS CLIN IS

FOR ESTIMATED QUANTITIES.

FOB: Destination

NET AMT

The following have been deleted:

TOTALS

SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS

The following Acceptance/Inspection Schedule was added for CLIN 0012:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following have been added by full text:

AMENDMENT 0003

Section Supplies or Services and Price

0001 1 Job Base Bid Item

FFP

Mobilization and Demobilization

0002 55,000 Cubic

Base Bid Item

Dredging and Placement at the HARS Work Area 2 and 4 (Sipon 1 and 2) No physical construction work on this CLIN shall be performed until directed bt the ACO/COR in writing which is expected on/about 1 March 2016. THIS CLIN IS

FOR ESTIMATED QUANTITIES.

0003 70,000 Cubic

Dredging and Placement at the HARS Work Area 1,3,5 and 6 THIS CLIN IS FOR

ESTIMATED QUANTITIES.

0004 1 Job Base Bid Item

FFP

Additional Cost for Insurance (The amount is the maximum that can be reimbursed, only actual expenses will be reimbursed) (Refer to Section 00 73 00 paragraph 1.32).

0005 2,500 Cubic

Dredging, and Placement at the Hars: Port Jersey PVSC Corridor Shoaling. THIS

CLIN IS FOR ESTIMATED QUANTITIES.

0006 1 Job Base Bid Item

FFP

Debris Removal and Disposal Port Jersey Steel Piles

0007 1 Job OPTION Optional Item -Option 1

FFP

Debris Removal and Disposal Stapleton Area

0008 50 Ton OPTION Optional Item -Option 2

FFP

Additional Debris Removal and Disposal. THIS CLIN IS FOR ESTIMATED

QUANTITIES.

0009 100 Ton OPTION Optional Item -Option 3

FFP

Additional Debris Removal and Disposal. THIS CLIN IS FOR ESTIMATED

0010 150 Ton OPTION Optional Item -Option 4

FFP

Additional Debris Removal and Disposal. THIS CLIN IS FOR ESTIMATED

0011 15 Each OPTION Optional Item -Option 5

FFP

Subsurface Drilling and Sampling If Option is exercised, payment will be made for each boring/sample taken as needed.

0012 10,000 Cubic

Option Optional Item - Option 6

Dredging of Shoaling Material and Placement At THE HARS. THIS CLIN IS FOR

ESTIMATED QUANTITIES.

TOTAL BASE BID: CLINS 0001 – 0006 $_____________________

TOTAL OPTIONAL ITEMS CLINS 0007 – 0012 $______________________

TOTAL BASE +OPTIONS CLIN 0001 – 0012 $______________________

NOTES FOR PRICE SCHEDULE:

1 Bidders are required to bid on both the Base Bid Items and the Optional Items on the Price Schedule or their bid will be rejected.

2 The low bidder for the purpose of award will be the conforming responsible bidder offering the lowest amount for the Total Base Bid & Optional Items. The Government is under no obligation to award any Optional Item.

3 Any bid which is materially unbalanced as to the price for the Base Bid Item and Optional Item may be rejected. An unbalanced bid is one, which is based on price significantly less than the cost for some work and prices are significantly overstated for other work.

4 Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidders thereto may render the bid non-responsive and be cause for its rejection.

5 The Government is under no obligation to award any Optional Item. Optional Items may be awarded individually within 120 calendar days from NTP and no additional time will be added.

6 Optional Item CLIN 0012. Option 6 may be awarded within 90 calendar days from NTP and 90 days will be added to the contract period of performance.

7 CONTRACTOR COMPLIANCE

The apparent low bidder shall submit the documents specified in Section 00 73 00: Special Contract Requirements in paragraph 1.45, CONTRACTOR’S Site Compliance. If the apparent low bidder does not submit the information required to be submitted within the times specified, the apparent low bidder will be considered non-responsible and its bid rejected.

Amendment No.3 USACE, Department of the Army, NYD Corps of Engineers New York, NY 10278-0090 AMENDMENT NO.3 for IFB NO. W912DS-15-B-0013

1. The following changes shall be made to the Plans and specifications The New York District has received questions about the contract.

2-SPECIFICATIONS:

-Section 00 73 00 1.15.1 next to last paragraph Revise paragraph as below

“When the acceptance area is found to be cleared to the required project depth elevation, it will be accepted. If work areas 1, 3, 5 and 6 are cleared to the required depth prior to the start of the environmental window they will be accepted as if they were an acceptance area. Should shoals occur within 100ft of work areas 2 and 4 after they are dredged those shoals will be removed along with any cleanup of work areas 2 and 4 at the Contractor’s expense.

Should more than two sounding or sweeping operations by the Government over an area be necessary by reason of work for the removal of shoals disclosed at a prior sounding or sweeping, the cost of such third and any subsequent sounding or sweeping operations will be charged against the Contractor at the rate of $12,500.00 per occurrence.

Surveys performed by the Government shall utilize shoalest depth for clearance and/or acceptance to the required project depth as described in Table 11-2 page 11-44 Dredge Clearance & Acceptance Surveys (Shoal/Strike detection) of EM 1110-2-1003.”

-Specification Section 35 20 23.00 18 Section is revised and issued in entirety.

-SECTION 35 20 23 05 “DREDGING AND PLACEMENT PVSC CORRIDOR”

Replace paragraph 5.1.1 in its entirety as below:

“5.1.1 Paid Dredge Tolerance To cover the inaccuracies of the dredging process, material actually removed from within the specified areas to be dredged (pay template), including paid dredge tolerance as specified below, will be estimated and paid for at the contract unit price. Paid dredge tolerance will only be paid in those areas where material exists above project grade of -50.0 ft MLW.

Paid dredge tolerance dredging will be permitted to a depth of not more than 1.5 ft Paid dredge tolerance dredging will be measured and paid for at the applicable contract price in the same manner as specified for the overlying material.”

2-DRAWINGS AND REPORTS:

Plans sheets revised and re- issued: G-101, C-101, C-102 and C-105

The existing survey data in XYZ and other reports are placed on the FBO website

Available information will be included in the FBO website with this amendment Any additional files provided or were provided in the solicitation other than the Plans and Specifications is/are for bidder’s reference only, and is/are not to be considered as a part of the Contract Documents. Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided. No representation is made as to availability of this data, its convertibility with user’s system.

3-Questions and Answers:

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.

This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents. Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided. Questions and answers are issued to the Bidders for information only.

Q1. According to contract drawings [Drawing Sheet G-001, GENERAL NOTES (4)]:

“Soundings refer to the Plane of C.O.E. Mean Low Water. The Plane of Mean Low Water is 3.4 feet Below

NAVD88.”

A1. "C.O.E. Mean Low Water" does not equal NOAA's "MLW of epoch 1983-2001".

Q2. Permit No.2-6500-00053/00001 (Anchorage Channel, State of NY Permit) does not include a quotation that allows overflowing in NY. Can we overflow while dredging Anchorage Channel?

A2. This was addressed in amendment 2.

Q3. There is no amended NJ Permit included with the specifications. Was the NJ WQC Permit amended for the current project?

A3. NJDEP WQC applies to this specification also. Also see amendment 2.

Q4. Are we allowed to dredge Port Jersey Channel from February 1st through May 31st?

A4. See amendment 2.

Q5. If no dredging is allowed between February 1st and May 31st, does the 150 day dredging window include the environmental (no dredging) winter flounder period?

A5. The performance period includes the environmental window. See also the discussion of schedule in amendment 2, and also the meeting MFR included in amendment 2.

Q6. Are we allowed to use a TSHD (Trailing Suction Hopper Dredge) in the Port Jersey Channel?

A6. See amendment 2.

Q7. Are we allowed to dredge Anchorage Channel from February 1st through May 31st?

A7. This window was modified in amendment 2.

Q8. If no dredging is allowed between February 1st and May 31st, does the 150 day dredging window include the environmental (no dredging) winter flounder period?

A8. The performance period includes the environmental window. See also the discussion of schedule in amendment 2, and also the meeting MFR included in amendment 2.

Q9. No coordinates were provided for Hempstead Reef. Should the contractor anticipate using this area? Are we expected to dredge / transport / dispose of rock (with quantities up to over 75% of container vessel)? Are we expected to do any rock blasting?

A9. The Government does not anticipate encountering rock in this contract.

Q10. Please provide the PowerPoint presentation that was shown during the Pre-Bid Conference.

A10. This was provided in amendment 2.

Q11. Please confirm that once dredging is allowed over the north and south water siphons (Work Areas 2 and 4), the old siphons will be treated as debris, if encountered.

A11. Confirmed.

Q12. Please modify the Port Jersey Channel plan sheet C-105 to better depict the exact limits of the work to be performed under this contract (beginning and ending stations and widths, if appropriate).

A12. Updated in this amendment.

Q13. Please confirm that the portion of the Port Jersey Channel that is in this contract is not subject to any environmental windows.

A13. Confirmed.

Q14. It was mentioned that the Corps is working on obtaining a waiver allowing Work Areas 2 and 4 to be done during the Feb 1 to May 31 environmental window. Please provide a status on this request. Also, please provide the ramifications to the contract if a waiver is obtained or denied.

A14. See amendment 2

Q15. Since start of the no-dredge environmental window will occur prior to the required completion date (NTP + 150 days), how will the Corps account for the window? Will only days outside of the window count towards the 150 days allowed?

A15. The performance period includes the environmental window. See also the discussion of schedule in amendment 2, WQC and plan sheet amendments, and also the meeting MFR included in amendment 2.

Q16. Will the Corps allow box-cutting of the slopes? For clarity, it is defined in other Districts’ specifications as follows: “The material may be dredged from the original position or by "boxcut" dredging the space below the pay slope plane at the bottom of the slope for upslope material capable of falling into the cut. Payment will not be made for material in excess of the amount originally lying above the pay slope plane.”

A16. Box cutting is permitted, but the Contractor is still required to meet the slopes and dredging limits in this contract.

Q17. It was mentioned that the Corps may consider changing the overdepth language to allow overdepth material to be paid even if there is no overlying material in the required prism (above grade). As this contract has numerous locations where there is very little material above grade, we ask that the Corps change the overdepth language to pay for all overdepth material removed.

A17. See amendment 2

Q18. Please confirm that buckets will be allowed for the entire project, with the understanding that no teeth will be allowed over the utility corridors (Work Area 6).

A18. The use of buckets is are un-restricted in work areas 1-5, and 7. Permits allow the use of buckets in Port Jersey, but with restrictions. See the permits further details. When working in Port Jersey be careful of underlying utility protection in place measures. Per 35 20 23.00 18-5.3 the Contractor will prepare a plan for removing the material in Work Area 6. This plan requires various approvals. See the referenced clause for further details.

Q19. Please confirm that spuds and anchors are allowed over the entire work area, with the exception of Work Area 6 and the remaining portions of the Utility Corridors.

A19. Confirmed for the Anchorage work areas. In the PJ work area, spuds and anchors are not allowed in the PVSC 100 ft. wide corridor.

Q20. Please confirm that the steel piles to be removed from the Port Jersey Channel slope can be either removed completely or cut off below the Required Prism.

A20. Confirmed.

Q21. Does the Corps have any information that would indicate how deep the above referenced steel piles are driven?

A21. No.

Q22. Please provide a description of the debris west of Anchorage Channel to be removed under Bit Item 7. How will acceptance of the debris removal be determined?

A22. See amendment 2.

Q23. Section 00 73 00.00 18(f) of the Solicitation describes direction for Contractors in areas of encounter rock with a regard to blasting. Should the Contractor expect to encounter material within the scope of W912DS-15-B- 0013 that requires blasting? Does the Government expect the Contractor to include blasting as a potential portion of works to be executed?

A23. The Government does not anticipate encountering rock. Bidders are to determine their own means and methods.

Q24. Specification Section 35 10 00.00 18, Clause 5.2 describes Coordination with Adjacent Worksites. Could the Government describe and/or provide additional detail to the nature of adjacent worksites which will be operationally concurrent with W912DS-15-B-0013 and will require coordination?

A24. There is no Section 35 10 00.00 18. It is possible that the question means to refer to the similar 00 73 00-1.5.8, “Other Work in Area.” At this time there are no adjacent new work contracts scheduled for this area. Future maintenance contracts are a possibility.

Q25. Section 35 20 23, Clause 2.1.2 of the specification states: "Offerors are invited to examine Corps of Engineers subsurface exploration logs and to decide for themselves the character of the materials. The subsurface investigation and other reports are available for review at the New York District and some are posted in the FBO with the plans and specifications."

Please provide names of investigations and reports available for review that have not been posted to FBO under the W912DS-15-B-0013 FBO site.

A25. Several reports have not been posted, as they contain information describing a no longer existing pre-construction condition, or have their data included or otherwise superseded in subsequent reports. Also note that additional reports were posted in a prior amendment.

W912DS-06-D-0001-0013 Summary of Utility Crossings Anchorage Channel, New York 1 Sep 08 W912DS-06-D-0001-0002 Subsurface Exploration Port Jersey Contract S-PJ-3 Mar 06 W912DS-12-D-0002-0010 Anchorage Channel (S-AN-1) investigations 16 Dec 13 W912DS-06-D-0001-0003 Geophysical investigation of the New York Bay shaft of PVSC Tunnel in PJ, Bayonne, NJ Aug 06 DACW51-02-D-0005-0001 Subsurface Geophysical Exploration – PJ Channel PVSC Tunnel Oct 02

W912DS-09-D-0001-0001 Subsurface exploration for Contracts S-NB-2, S-AK ½ & S-PJ-4

Q26. The Main Table of Contents within the Specification lists "35 10 00.00 18 WATER SIPHONS PROTECTIVE MEASURES AND REP AIRS" as a specification section, yet there does not appear to be a section with the specification for Section 35 10 00.00 18. Please confirm that Specification Section 35 10 00.00 18 has been removed from the Contractual Documents.

A26. Confirmed.

Q27. Section 35 20 23 23.05 (sic), Clause 2.2.1.2 of the specification describes a dredge tolerance of 1.5 feet.

Paragraph 5.1.1 of the same section states "paid dredge tolerance will be permitted to a depth of not more than 1.5 ft.

". Please confirm the dredge location for which the 1.5 feet of tolerance applies.

A27. The requirements of 35 20 23.05, as per the section title, apply to the PJ work area in Port Jersey Channel.

Q28. Please provide as-built drawings of:

Siphon 1, including information regarding any material backfilled in the vicinity of the Siphon 1.

Siphon 2, including information regarding any material backfilled in the vicinity of the Siphon 2.

Utility 1, including information regarding any material backfilled in the vicinity of the Utility 1.

Utility 2, including information regarding any material backfilled in the vicinity of the Utility 2.

Port Jersey tunnel project with respect to the final plate and gravel placement.

A28. See the data provided in Amendment 2.

Q29. Please provide detail regarding the Stapleton Area Debris (Pay Item 0007) identified on C- 101.

a. What material(s) does the USACE believe the debris is composed of?

b. How did the USACE discover the Stapleton Area Debris?

c. How many tons of debris are anticipated to be removed in this area?

d. Please specify the acceptance criteria of the debris removal.

A29. See the data provided in amendment 2 for survey information. NYPD divers dove on the obstruction this afternoon and report it to be “a pile of concrete rubble (been there a while - covered with growth) approximately 4-5 feet high, 12-15 ft. wide.” The Sandy Hook Pilots identified the high spot as a concern. The mass of the concrete is not identified. Bidders should prepare their own estimates. Payment will be by “job” as this is a small element of the contract. Acceptance criteria are added in this amendment.

Q30. On Page G-0001 of the Plans, it is stated that "existing utilities shall be protected during construction by the contractor". Please provide detail regarding required protection of existing utilities.

A30. The Contractor is expected develop their own means and methods to protect utilities and any protection-in-place measures that they have, which are appropriate to their means and methods of excavation. The Contractor is expected to not damage the utilities or their protection-in-place measures and are to take appropriate steps to ensure they are not harmed.

Q31. Section 01 35 26, Clause 3.8.2 states the Contractor is to: "physically verify underground utility locations, including utility depth, by hand digging using wood or fiberglass handled tools when any adjacent construction work is expected to come within three feet of the underground system." This language appears to be intended for land construction, does the USACE intend for the Contractor to physically verify underground utility locations, including utility depth, by hand digging using wood or fiberglass handled tools when any adjacent construction work is expected to come within three feet of the underground system with divers?

A31. No. The cited clause is intended for on land utilities.

Q32. When does the USACE anticipate to issue the Project (sic) Award?

A32. The Government desires to award as quickly as possible. Barring unanticipated delays in December.

Q33. When does the USACE anticipate to issue the Notice to Proceed?

A33. Pending bonds by the winning offeror, mid-December (ASAP).

Q34. The provided NYSDEC permits for Port Jersey and SANUC both state: "For protection of winter flounder, dredging is prohibited between February 1 and May 31 ", yet this language is not provided in the Environmental sections of the Specification (01 57 20 & 01 57 23). Please confirm that dredging is not allowed between February 1 and May 31.

A34. The window was revised in amendment 2.

Q35. Within Section 00 10 00, Pay Item 0002 (Siphon 1 & 2), it is stated that "No physical construction work on this CLIN shall be performed until directed by the ACO/COR in writing which is expected on/about 1 March 2016".

Could the USACE please provide detail regarding the specified date of March 1st 2016 regarding the anticipated start for the work associated with Pay Item 0002?

A35. NYCDEP anticipates abandoning Siphons 1 & 2 on or around 29 February 2016. Completion of the new siphon may be advanced or delayed which would result in a change in the date of the notification to the Contractor.

The contractor is not to perform any physical construction work in work areas 2 and 4 until directed in writing by the ACO/COR.

Q36. Please provide additional information regarding Port Jersey Steel Pilings (Pay Item 0006).

a. When were the pilings installed?

b. What depth were the pilings installed to?

c. What are the pilings made of?

d. Are the pilings currently exposed above existing grade?

e. What type of pilings were used and how are the pilings connected?

f. Please provide the USACE provide as-built drawings of the pilings?

g. Please specify the acceptance criteria of piling removal.

A36. Information as to the location and height above the slope of these piles was provided in amendment 2. There is no available as built information on the piles. It is possible that they are the same as nearby steel H-piles that are above the water surface, but this hasn’t been verified.

Q37. Please provide survey data (x, y, z) for the Port Jersey section of work.

A37. Included in this amendment

Q38. The Contract performance period requires completion within 150 days from Notice to Proceed. Our interpretation of the New York and New Jersey permits are that dredging is prohibited from February 1st through May 31st.

a. How will the 120 day dredge prohibition period affect the project schedule?

b. Will the 120 day dredge prohibition period count against the contract performance period?

A38. See the discussion of schedule in amendment 2, WQC and plan sheet amendments, and also the meeting MFR included in amendment 2.

Q39. Within Section 35 20 23.05, Clause 5.1.1, it appears there are some internal notes within the specification, please clarify.

A39. Clause is revised in this amendment.

Q40. Section 35 20 23.05 Clause 5.1 states that protective plates and gravel below the project prism are not to be "disturbed". Please define "disturbed".

A40. “Disturbed” in this context means physically altered or moved from its current position. If the contractor has reason to believe that the steel plates (which are protection-in-place measures for the underlying PVSC utility) current position is other than the documented “as-built” steel plate locations, the contractor is to raise this issue (and data supporting it) to the Government prior to performing any physical construction in the PJ work area.

Q41. Please provide the required dredge limits (coordinates) for digging within Port Jersey.

A41. Provided in this amendment.

Q42. On page C-102 of the provided plans, the required dredging depth for Siphon 1 and Siphon 2 is stated as "el. -52 plus 1 ft overdredge", yet Note #5 on the same page states "required dredging depth in Siphon 1 and 2 is -50 and two ft over dredge". These statements conflict, please specify the required dredge depth and the allowed over dredge depth for Siphon 1 and Siphon 2.

A42. Corrected in this amendment.

Q43. Is the contractor only going to be held responsible for removing those shoals that appear on the pre-dredge survey?

A43. No, the Contractor must achieve acceptance within the work area. A smaller work areas has been defined for Port Jersey.

Q44. If additional (new) shoals appear on the post-dredge survey and they are located outside of the contractor’s area of influence, it was conveyed at the pre-dredge meeting that those shoals would be dredged if mutually agreeable to both the Corps and the contractor. Please confirm that this is correct. Would the dredging of these new shoals be paid for under the associated bid item for the Work Area wherein the shoal resides?

A44. Yes.

Q45. Regarding Stapleton debris removal, Option 1, what is the criteria for acceptance, i.e. how will the Contractor know that he’s removed all of the debris? Will the Contractor be required to remove debris to a certain elevation?

If so, what elevation is required to be considered clear for acceptance?

A45. This has been revised in this amendment.

(End of Summary of Changes)