W16ROE30770529
a. Project: Ballistics Evaluation Center at Picatinny, NJ. The authority for this action is FAR Part 15.101-2 Low est Price Technically Acceptable.
b. The project is being solicitated as a 100% Small Business Set Aside
c. The magnitude for this project is Betw een $5,000,000 and $10,000,000
d. NAICS Code: 236210, Size Standard $33,500,000.00
e. Contract Specialist: Rippert P. Roberts III (917) 790-8166
RIPPERT P ROBERTS III 212 264-0238
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
16-May-2013
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______5 calendar days and complete it w ithin ________480 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section 008000
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________6 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________17 Jun 2013 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
212 264-3013FAX:TEL: 212 264-0238 TEL: FAX:
W912DS-13-R-0027 149
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912DS-13-R-0027
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Base Bid
FFP
Basis of Bid for Item 0001 shall be the entire work complete in accordance with the drawings and specifications, but not including the work indicated or specified to be provided under any Option Item.
FOB: Destination
MILSTRIP: W16ROE30770529
PURCHASE REQUEST NUMBER: W16ROE30770529
NET AMT
0002 1 Job OPTION Option 1
FFP
Demolition of Building 630.
FOB: Destination
0003 1 Job OPTION Option 2
FFP
Demolition of Buildings 620 and 620C.
0004 1 Job OPTION Option 3
FFP
Construction of the 617 Parking Area, complete as shown on the civil and electrical drawings.
TOTAL
TOTAL BASE PROPOSAL ITEMS (CLIN 0001): _____________________
TOTAL OPTIONAL ITEMS (CLINS 0002-0004): _____________________
TOAL BASE PROPOSAL ITEMS PLUS (+) OPTIONAL ITEMS: _____________________
NOTES TO BIDDERS
Note 1: No additional time will be added to the contract if option (s) is exercised.
Note 2: Options may be exercised at the time of award or within 120 calendar days after contract award.
Note 3: A firm fixed bid price is required for the options, no provision is made for economic price adjustment.
Note 4: The low offeror for purposes of award will be the offeror providing the lowest total for base bid plus (+) all options.
CCASS
The Federal Acquisition Regulation (FAR) requires that Past Performance Information (PPI) be collected on DoD contracts. The Construction Contractor Appraisal Support System (CCASS) module is a web-enabled application that supports the completion, distribution, and retrieval of Construction contract performance evaluations (DD Form 2626). Contractor Representatives are responsible for reviewing and commenting on evaluations submitted on Contractor Performance Assessment Reporting System (CPARS) website at https://www.cpars.csd.disa.mil/ccassmain.htm
Section 00100 - Bidding Schedule/Instructions to Bidders
GENERAL INSTRUCTIONS
Electronic Submission. In addition to the hard copies required in paragraph 3.5, all bidders shall submit their bid on a CD-ROM. Written portions of the bid shall be in MS Word or Adobe Acrobat PDF format. The electronic version shall be either a single file tabbed in the same order as the hard copy or multiple files hyperlinked to a single table of contents. Any portion of the bid not available in electronic format, i.e. cut sheets, if applicable, should be scanned in Adobe Acrobat PDF format, thus making it available electronically. The CDROM must be clearly labeled by solicitation number, project name, installation, and offeror’s name. The CD-ROM shall be marked with a label stating “Unclassified//Controlled Unclassified Info.” In the event of any conflict between the electronic submission and the hard copy submission, the hard copy submission will govern and will be the material upon which the Government bases its evaluation and ultimately, its decision. Electronic media may be submitted in an un-editable format.
NOTE: Bidders are requested to submit the CD-ROM with their bid but no later than 24 hours after the time and date for receipt of bids. Failure to submit the CD-ROM may impact the timeliness of the award.
SECTION 00 22 10
SECTION 00 22 10
SECTION IV
NOTICE TO OFFERORS, PROPOSAL SUBMISSION REQUIRMENTS AND INSTRUCTIONS,
EVALUATION PROCEDURES, BASIS OF AWARD, REVELANT PROJECT INFORMATION
SHEET & PAST PERFORMANCE QUESTIONARE (FROM THE 00 22 11 SECTION) - BEST
VALUE LPTA
1.0 NOTICE TO OFFERORS
1.1 Acquisition
1.1. This is a “Best Value - Lowest Price Technically Acceptable” solicitation, in accordance with FAR 15.101-2, for the Ballistic Evaluation Center (BEC) at Picatinny Arsenal, Picatinny, NJ. The Government will evaluate the proposals in accordance with the criteria described herein, and award a firm fixed price contract to the responsible Offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value, lowest price technically acceptable, to the Government.
1.2 Target
NOT USED
1.3 Who May Submit - Any Small Business or Large Business
1.4 Professional Registration - Not Used.
1.5 Page Limit and Size of Printed Materials
In order to effectively and equitably evaluate all proposals, the Contracting Officer/PCO must receive information sufficiently detailed to clearly address submission requirements as outlined below. The written portion of the proposal (Volume I - Technical Proposal), however, shall not exceed 100 pages. A page printed on two sides will be counted as two pages. Pages containing text shall be submitted on 8-1/2 x 11 inch paper. Drawings or sketches may be submitted on paper not exceeding 11 x 17 inch paper, folded to not exceed 9 x 11 inch. Each 11 x 17 inch sheet will counted as two pages and two sided counted as four. Use of ‘TAB’ pages are encouraged to identify each section of the proposal and shall not count against proposal’s total page count. Each page of text shall be minimally single spaced with a minimum 12-point font and one inch margins all around.
2.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
2.1 Proposal Requirements and Submission
Proposals should be submitted initially on the most favorable terms from a price and technical standpoint. Two (2) separate volumes shall be submitted as Volume I - Technical Proposal and Volume II - Price Proposal. Do not assume that Offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.
Do not submit any material not required by this solicitation (such as company or system brochures).
2.2 Where to Submit
Offerors shall submit their proposal packages to the Corps of Engineers (USACE) at the address shown in Block 7 of Standard Form 1442.
2.3 Submission Deadline
The USACE must receive proposals not later than the time and date specified in Block 13 of Standard Form 1442.
2.4 Incurring Costs
The Government is not liable for any costs incurred by the Offerors submitting an offer in response to this solicitation.
2.5 Format Requirements
Submit one (1) original plus six (6) copies. All proposals shall contain the volume number and the name, address and telephone number of the Prime and Subcontractors, Joint Venture, or other entity identified on the cover. The original proposal must be clearly marked as “ORIGINAL” and the original signatures must be in blue ink. Copies of the proposals must also be clearly marked as “COPY x of y (i.e. COPY 1 of 6)”. Proposal clarity and material organization in each volume are mandatory. No material shall be incorporated by reference. Each volume will be submitted separately bound. The proposal shall address and contain the information listed below.
The information will be used by the Source Selection Board to evaluate each proposal. Offerors are advised that conciseness and relevance of the proposal is important and unrelated information will not be evaluated. Proposals that provide only superficial coverage of the information required below, may not receive additional consideration and may be excluded from the competitive range. Additionally, should the proposal include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the proposal may be determined to be "unacceptable" and thus ineligible for award.
3.0 EVALUATION FACTORS
3.1 VOLUME 1 – TECHNICAL PROPOSAL
3.1.1. FACTOR 1 - CONTRACTOR PAST RELEVANT EXPERIENCE –
The Offeror will demonstrate past experience of construction by providing recent and relevant Design- Build Experience or Design-Bid-Build Experience. Prime Contractor shall submit projects that demonstrate not less than two (2) but no more than five (5) examples of projects similar in scope, magnitude, and complexity that are not less than 90% complete or physically completed within the last seven (7) years of the date the contractors proposal was submitted. If using subcontractor experience, the subcontractor experience must submit at least one (1) project demonstrating the Offeror's recent and relevant experience meeting the scope, magnitude and complexity requirements of this factor to be considered acceptable. If the offeror is a joint venture, each firm shall provide information demonstrating experience relevant to their role on this project, and a signed/executed joint venture agreement must be provided. If the offeror uses subcontractor experience, a signed/executed teaming agreement must be provided.
Scope is defined as the construction of a new facility or complex of facilities of 8,000 square feet or greater that is planned and engineered for government, commercial or industrial use. Subcontractor scope will be defined as a facility of at least 4,000 square feet.
Magnitude is defined as the construction of a facility with a contract value of at least $5M.
Physical completion is defined as the date the facility was turned over to, or occupied by the owner.
Complexity is defined as the management and coordination of multi-disciplined construction teams to complete projects that include the majority (3 of the 5 items) of the following types of work: poured in place reinforced concrete, reinforced concrete masonry, structural steel, site work, and paving. A facility or complex that had reinforced concrete footings will be given credit for complexity.
A minimum of two (2) and no more than five (5) total project information sheets shall be submitted. If more than five (5) project information sheets are submitted, only the first five (5) will be considered.
Information shall be provided on the form found in Paragraph 6.0, Relevant Project Information Sheet.
Rating Guidelines for Factor 1:
The government will not award to an Offeror that receives an unacceptable rating for this factor.
Acceptable: Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable: Proposal does not clearly meet the minimum requirements of the solicitation.
3.1.2. FACTOR 2 - CONTRACTOR PAST PERFORMANCE
Offerors are required to provide a Past Performance questionnaire to their previous Client(s) for their past Client’s input regarding their firm’s and/or that of any past Team Association or sub-contractor’s Past Performance. A copy of the Questionare (PPQ-0) that shall be used is attached in Attachment/ SECTION 7.0 PAST PERFORMANCE CUSTOMER QUESTIONAIRE. Offerors shall submit Past Performance questionnaires for each project submitted under factor 1. The completed questionnaires are to be submitted by the previous Client DIRECTLY via fax or Email to the Corps of Engineers, Contract Specialist/PCO.
In addition to the questionnaires, the Offeror is required to provide information on past projects (within the past seven (7) years) in which they have been issued a CURE NOTICE and provide accompanying information as to the details for such action(s) with an explanation of why they were issued a cure notice.
Rating Guidelines for Factor 2
The Government will review the relative risk of the contractors ratings but normally not award to an Offeror that receives unacceptable rating in this factor:
Acceptable: Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable: Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral): If no recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned this factor will be assigned a rating of “Unknown Confidence (Neutral).
3.1.3 FACTOR 3 - QUALIFICATIONS OF THE OFFEROR’S TEAM
The Offeror shall provide the following to show qualifications of the team:
The Offeror shall identify the areas and percent of work (construction) they intend to self perform and the areas and percent of work (construction) intend to subcontract along with the names of significant subcontractors.
Provide an Organization Chart showing Key Personnel for the Offeror's Construction Team. At a minimum, the organizational chart shall identify the Key Personnel, the contractor and significant subcontractor entities, their responsibilities, structure and lines of authority. At a minimum, the following Key personnel shall be identified by name within the chart: Contractor’s (Offeror’s) Project Manager;
Construction Quality Control Manager; and Superintendent,. Individual resumes in the format found in Attachment/SECTION 8.0, KEY PERSONAL RESUME FORM, shall be provided and that includes the following information:
a. Name.
b. Management title on this project.
c. Number of years with firm and other firms.
d. Number of years in this management title or role.
e. Specialization.
f. Education, apprenticeship, and relevant training.
g. Professional registration.
h. Specific experience and qualifications relevant to this project. Show dates so that the
Government can determine if the minimum number of years required for the position is met. Indicate the scope, magnitude and complexity of the experiences.
Expected roles and responsibilities of Key Personnel:
Contractor's Project Manager: (Overall Manager of the Project)
(1) Performs all project management duties of the project.
(2) Serves as the Governments' sole point of contact in all matters relating to work including, but not limited to, contract compliance, progress of work, overall project scheduling, financial matters, and change orders.
(3) Attends all job meetings.
(4) On-site a minimum of 80% of the time.
(5) The Overall Project Manager shall have a minimum of six years of project management experience in construction on projects of comparable complexity, scope and cost.
Construction Quality Control Manager: (Principal in Charge of Construction Quality Issues and Coordination of Construction Quality Control)
(1) The Contractor shall identify the Construction Quality Control Manager as an individual within his organization that is completely responsible for all Construction Quality Issues and shall perform coordination between the contractor, subcontractors, and any Independent Testing Labs and have the authority to act in all construction quality control matters for the prime contractor.
During construction this person shall be onsite at all times performing Construction Quality Control duties to include, but not limited to, implementation of the three-phase inspection system for all aspects of the construction work specified. This person shall have complete authority in all aspects of Construction Quality control.
(2) The Construction Quality Control Manager shall meet one of the following requirements:
a) Have a Bachelors of Science from an accredited engineering, architecture, or a construction management college and a minimum of two years experience in construction.
OR
b) Shall have a minimum of four years of construction experience at a minimum level of a project superintendent.
(3) Attends a bi-monthly coordination meeting during the construction phase to discuss coordination and quality issues.
(4) On-site at all times during construction performing construction quality control duties.
(5) Has no other duties except construction Quality Control but they may also serve as the safety manager.
(6) Directly employed by the prime contractor, or will be at the time of award with a signed letter of intention included.
(7) Reports directly to the President/Owner of the Prime Contractor.
Superintendent / Subcontractor Manager: (Overall Field Manager Responsible for Construction)
(1) Performs all superintendent duties required of the Contractor.
(2) Serves as the Governments’ On-site point of contact in all matters relating to the work including, but not limited to, scheduling of work, utility interruptions, and testing.
(3) Attends all job meetings.
(4) On-site at all time during all construction activities.
(5) Serves under, and reports directly to, the Contractor's Project Manager.
(6) The On-Site Construction Superintendent shall have a minimum of six years construction experience on projects of comparable complexity, scope and cost.
(7) Shall have no other duties except Superintendent.
Rating Guidelines for Factor 3
The government will not award to an Offeror that receives an unacceptable rating for this factor.
Acceptable: Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable: Proposal does not clearly meet the minimum requirements of the solicitation.
3.3. VOLUME 2 - PRICE PROPOSAL AND PRO FORMA INFORMATION*
Factor/Sub Factor
Location Description
N/A Vol. 2 TAB A Price (Standard Form 1442 and Proposal Bid Schedules)
N/A Vol. 2 TAB B Bid Bond N/A Vol. 2 TAB C Required Pre-Award Information N/A Vol. 2 TAB D Price Breakdown Sheet N/A Vol. 2 TAB E Representations and Certifications
*NOTE - The Government will evaluate price independently from the technical evaluation. Price will not be rated, but will be evaluated for fairness and reasonableness through the use of a price analysis. T 3.3.1
GENERAL
The price proposal shall be submitted in a separate binder labeled "Volume II – Price Proposal". The sections shall parallel the submission requirements identified in the bid schedule. Provide six copies of bound written material (folded and bound in Volume II).
Submit the Pro Forma information in a separate envelope labeled: “Volume II - Pro Forma Requirements.”
3.3.2 TAB A - PRICE (STANDARD FORM 1442, PROPOSAL DATA SHEET AND CONTRACT
LINE ITEM SCHEDULE)
3.3.2.1. Submission Requirements:
3.3.2.2. Submit the properly filled out and executed SF 1442, along with the CLIN Schedule, containing proposed line item and total pricing, as well as the proposed contract duration.
3.3.2.3. Supplemental Price Breakdown. If deemed necessary to evaluate the price proposals, the Government’s will request a cost breakdown of the Contract Line items in a sealed envelope marked “Cost Breakdown Information”, in Excel format. The Government will provide details on where and how to send the breakdown. This information will not be needed sooner than three working days after the proposal submission due date. This information may be required for the initial proposal and, if requested, for any revised proposals. This information is not an opportunity for an Offeror to revise its non-price or price proposal.
3.3.2.4. Evaluation Criteria:
3.3.2.5. Price will not be rated or scored, but will be evaluated for fairness and reasonableness through the use of a price analysis. The price evaluators will also check for appearance of unbalanced line item prices. Offerors are cautioned to distribute direct costs, such as material, labor, equipment, subcontracts, etc. and to evenly distribute indirect costs, such as job overhead, home office overhead, bond, etc., to the appropriate contract line items. Both parties shall presume that field overhead costs through the proposed contract duration are inclusive in the offered price for the contract.
3.3.2.6. If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluations described above.
3.3.3 TAB B - BID BOND
3.3.3.1. Submission Requirements:
3.3.3.2. Submit the Bid Bond in accordance with the Request for Proposal.
3.3.3.3. Evaluation requirements:
This item is not rated. The Government will review the Bid Bond for legal sufficiency.
3.3.4 TAB C - REQUIRED PRE-AWARD INFORMATION
3.3.4.1 Submission Requirements:
Submit this information for the Contracting Officer/PCO’s determination of Offeror responsibility, which includes, but is not limited to the following:
(1) A list of present commitments, including the dollar value thereof, and name of the organization under which the work is being performed. Include names and telephone numbers of personnel within each organization who are familiar with the prospective contractor’s performance.
(2) A certified statement listing; (1) each contract awarded within the preceding three month period exceeding $1,000,000.00 in value with a brief description of the contract; and (2) each contract awarded within the preceding three year period not already physically completed and exceeding $5,000,000.00 in value with a brief description of the contract.
(3) If the prospective contractor is a joint venture, each joint venture member will be required to submit the above defined certification.
(4) 8(a) Joint Venture Offeror or Offeror submitting Proposal as HubZone Joint Venture shall submit evidence from Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business Opportunity Specialist
(5) If the offeror is a joint venture, submit a signed/executed joint venture agreement.
3.3.4.2 One copy of the following information shall be provided:
(1) Proof of Financial Ability (Most recent financial statement covering assets and liabilities)
(2) Number of years the firm has been in business
(3) Name, address and telephone number of firm’s bonding company
(4) Information showing Offeror’s bondability for this project. Include the bond rate.
(5) Name, address and telephone numbers of two credit/trade references.
3.3.4.3 Evaluation Criteria:
In addition to the other proposal information, the Contracting Officer/PCO shall use this information in making a responsible determination for award to the Successful Offeror, in accordance with FAR Part 9.
3.3.5 TAB D – PRICE BREAKDOWN SHEET
3.3.5.1. Submission Requirements:
3.3.5.2. Supplemental Price Breakdown. If deemed necessary to evaluate the price proposals, the Government’s will request a price breakdown of the Contract Line items in a sealed envelope marked “Price Breakdown Information”, in Excel format. The Government will provide details on where and how to send the breakdown. This information will not be needed sooner than three working days after the proposal submission due date. This information may be required for the initial proposal and, if requested, for any revised proposals. This information is not an opportunity for an Offeror to revise its non-price or price proposal.
3.3.5.3. Evaluation Criteria:
3.3.5.4. Price will not be rated or scored, but will be evaluated for fairness and reasonableness through the use of a price analysis. The price evaluators will also check for appearance of unbalanced line item prices. Offerors are cautioned to distribute direct costs, such as material, labor, equipment, subcontracts, etc. and to evenly distribute indirect costs, such as job overhead, home office overhead, bond, etc., to the appropriate contract line items. Both parties shall presume that field overhead costs through the proposed contract duration are inclusive in the offered price for the contract.
3.3.5.5 If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluations described above.
3.3.6 TAB E - REPRESENTATIONS & CERTIFICATIONS
3.3.6.1 SUBMISSION REQUIREMENTS: Confirm that the Offeror’s representations and certifications have been completed and also include hard copies under this Tab or proof that the offeror is registered in the Online Representations and Certifications Application (ORCA).
3.3.6.2 EVALUATION CRITERIA: The representations and certifications submitted under this tab and online will be reviewed to ensure the Offeror’s representations are consistent, accurate, and in accordance with regulation. It will not be rated.
4.0 EVALUATION PROCEDURES
4.1. SOURCE SELECTION EVALUATION BOARD (SSEB)
4.1.1. The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal and any subsequent discussions required, as well as information obtained from other sources, e.g. past performance information. The SSEB will not consider any information incorporated by reference.
4.2. EVALUATION
4.2.1. The SSEB will evaluate the proposals and assign a consensus rating for each evaluation factor, except that performance risk ratings are assigned to past performance (see below).
4.2.3. If discussions are held, the Government may engage in meaningful discussions with each technically acceptable offeror in accordance with FAR 15.306 (d). The Contracting Officer/PCO will tailor the discussions to each offeror’s proposal relative to the solicitation requirements and evaluation factors. To be meaningful, at a minimum, discussions must include identification of all evaluated deficiencies, significant weaknesses, weaknesses, and any adverse past performance information to which the offeror has not yet had an opportunity to respond. The Contracting Officer/PCO also is encouraged to discuss other aspects of the offeror’s proposal that could, in the opinion of the Contracting Officer/PCO, be altered or explained to enhance materially the proposal’s potential for award. However, the Contracting Officer/PCO will not discuss with individual offerors how their proposal compares to other offerors proposals (technical leveling and/or technical transfusion is not allowed). The Government will provide the Offeror an advance agenda for the discussions. During discussions, the Government may ask the Offeror to further explain its proposal and to answer questions about it.
4.2.4. Upon conclusion of discussions Offerors will be afforded an opportunity to submit their proposal revisions for final evaluation and selection.
4.3. DEFINITIONS
4.3.1. Deficiency
A material failure of a proposal to meet a Government requirement, where correction of this error is not possible without major revisions to the proposal, or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level or when a failure to meet the RFP requirements is a life/safety issue.
4.3.2. Weakness
A flaw in the proposal that increases the risk of unsuccessful contract performance but is easily correctable. Successful contract performance is defined by customer satisfaction.
4.3.3. Significant Weakness
As flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.
Successful contract performance is defined by customer satisfaction.
4.3.4 Uncertainty
Any aspect of the proposal for which the intent of the Offeror is unclear because there may be more than one way to interpret the offer or because inconsistencies in the offer indicate that there may be an error, omission, or mistake.
4.3.6. Deviation
Proposal implies or specifically offers a deviation below the specified criteria. The Offeror may or may not have called the deviation to the Government’s attention. A deviation is a deficiency. The proposal must conform to the solicitation requirements for award.
4.4. EVALUATION RATING SYSTEM -
4.4.1. General: The Government will review the proposals and rate the quality of each evaluation factor.
The SSEB will rate each proposal against the specified evaluation criteria in the Solicitation requirements.
They will not compare proposals.
4.4.2. Review Write-up: The Government will support each rating with a narrative, separately listing all strengths or advantages, weaknesses or disadvantages, deficiencies, and required clarifications.
5.0 BASIS OF AWARD
5.1. The Government will award a firm fixed price contract to the responsible Offeror whose technically acceptable proposal represents the lowest price.
5.2. The basis of award will be the Government’s assessment as to which proposal is determined to be technically acceptable and is the lowest price determined fair and reasonable through the use price analysis. Offerors that do not receive an acceptable rating (technically acceptable), will not be selected, regardless of their price (lowest Offeror may not be selected).
5.3. Offerors have been reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of an acceptable proposal without discussions, if deemed to be in the best interests of the Government.
5.4. A successful large business offeror will be required to submit and negotiate a Small Business Subcontracting Plan acceptable to the Contracting Officer/PCO.
6.0 REVELANT PROJECT INFORMATION SHEET
PRIME CONTRACTOR/SUBCONTRACTOR EXPERIENCE
Offeror’s Name: _______________________________________________________________________
Project Name: ________________________________________________________________________
Project Location: ______________________________________________________________________
Project Size (i.e.; square foot area): ________________________________________________________
Project Description (scope and complexity): _________________________________________________
Facility Type (i.e.; office, educational, etc.): _________________________________________________
Role (i.e. prime, joint venture, sub-contractor) and work Company/Firm self-performed on this project:
Project Award Amount: _________________ Project Completion Amount: ______________________
Project Original Contract Duration and Completion Date: ______________________________________
Project Final Contract Duration and Completion Date: _________________________________________
Client/Agency (if Government, give contract number and name of Contracting Officer/PCO):
Client/Agency Point of Contact, Phone Number and Address (if Government, give contract number and name of Contracting Officer/PCO):
Construction Contractor and Subcontractor(s): ______________________________________________
7.0 PAST PERFORMANCE CUSTOMER QUESTIONNAIRE
The Offeror/Contractor listed is being considered in a Source Selection by the US Army Corps of Engineers, New York District. This is a request for past performance information on a project the Offeror has identified as being relevant to this solicitation. This information will be used in the evaluation of the Offeror's performance of that project. The following information, once submitted, will be treated as confidential and will not be released. This information will only be used to evaluate this Offeror for this solicitation. Please complete and return the forms to the US Army Corps of Engineers, New York District at the following mailing address or via fax to
US Army Corps of Engineers, New York District Attn: Contracting Division, Room 1843 (Rippert Roberts) Jacob K. Javits Federal Building 26 Federal Plaza New York, NY 10278-0090
Rippert.P.Roberts@usace.army.mil Phone: 917-790-8166 Fax: 212-264-3013
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO TO USACE AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE
SOLICITATIONS.
CLIENTS MUST SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION.
THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE EVALUATION FACTORS
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer/PCO in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks.
Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
8.0 KEY PERSONNEL RESUME FORM
Name:________________________________________________________________________
Title:_________________________________________________________________________
Number of Years: With this firm _______________________ With other firms______________
Number of Years in this position or role: ___________________________________________
Specialization: _________________________________________________________________
Professional Registration (Type and State of Registration): _____________________________
Experience and Qualifications Relevant to this Project (provide dates and how it is comparable to the solicitation): ___________________________________________________________________
APPENDIX A
Sample Organizational Chart
CONTRACTOR
(Owner)
PROJECT MANAGER
SUPERINTENTDENT
SUBCONTRACTOR
MANAGER
CONSTRUCTION
QUALITY CONTROL
MANAGER
SUBCONTRACTORS
CLAUSES INCORPORATED BY REFERENCE
52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II APR 1984 52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
FEB 2012
52.217-5 Evaluation Of Options JUL 1990 52.222-35 Equal Opportunity for Veterans SEP 2010 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.228-2 Additional Bond Security OCT 1997 52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995 52.232-16 Progress Payments APR 2012 52.233-1 Alt I Disputes (Jul 2002) - Alternate I DEC 1991 52.236-27 Site Visit (Construction) FEB 1995 52.249-2 Alt II Termination For Convenience Of The Government (Fixed
Price) (Apr 2012) - Alternate II
SEP 1996
CLAUSES INCORPORATED BY FULL TEXT
52.204-6 DATA UNIVERSAL NUMBERING SYSTEM NUMBER (DEC 2012)
(a) Definition. Data Universal Numbering System (DUNS) number, as used in this provision, means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities, which is used as the identification number for Federal Contractors.
(b)The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS number or “DUNS+4” that identifies the offeror's name and address exactly as stated in the offer. The DUNS number is a nine-digit number assigned by Dun and Bradstreet, Inc. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see Subpart 32.11) for the same concern.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number--
(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(End of provision)
52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)
(a) Definitions. As used in this provision--
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.
“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time”, if stated as a number of days, is calculated using calendar days, unless…