W912DS-13-R-0027-0002_Amendment.pdf
PDF 70 KB Posted
- Solicitation number
- W912DS-13-R-0027
About this file
Amendment W912DS-13-R-0027-0002
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE30770529
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make changes to multiple sections in the solicitation.
See the attached SF 30 Continuation Page for further information.
Proposal due date has not been extended and remains 17 June 2013 at 2:00 PM (Eastern Standard Time).
NOTE: Offerors must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR PROPOSAL IN ACCORDANCE WITH THE LATE PROPOSAL, LATE MODIFICATION OF PROPOSAL, OR LATE WITHDRAWAL OF PROPOSAL (FAR 15.208)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-May-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-13-R-0027
X 9B. DATED (SEE ITEM 11)
16-May-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-May-2013
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-13-R-0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to incorporate the following:
1. 00 80 00 18 Special Contract Requirements Paragraph 1.47 shall be replaced in its entirety with the following paragraph
1.47 UTILITY SERVICE INTERRUPTIONS (USI) AND SHUTDOWNS
Disconnections and shutdowns of existing utilities for tie-ins, and/or demolition, and/or other work requiring disconnection of existing utilities (e.g. such as work that presents a hazard to existing utilities) shall be coordinated as follows. The Contractor shall submit written notification not less than 15 business days in advance of each USI/shutdown and/or utility tie-in and/or utility demolition required to perform the work of this contract. All USI/shutdowns shall be planned such that it will not exceed 4 hours, unless it can be demonstrated that additional time is required. The Contractor shall coordinate time and duration of all outages with the Army Installation (Base), through the Contracting Officer Representative (COR).
Underground utility work shall be prepared within 2 days prior to the scheduled date of the USI/shutdown by excavating/exposing the utility, and covering the open excavation with a steel road plate to accommodate traffic, as applicable. Prior to each USI/shutdown, the Contractor shall be required to: 1) attend a USI/shutdown coordination meeting, 2) demonstrate that all possible work associated with the USI/shutdown that can be performed without the USI/shutdown, has been performed, 3) demonstrate that all materials needed to perform the work during the USI/shutdown are on hand. Failure to comply with this requirement will result in the Government's cancellation of the USI/shutdown. Natural gas and electrical interruptions shall not be permitted when the ambient air temperature is expected to be below 60 degrees F.
Note: Where electrical lines and equipment are energized at a potential of 30 volts or more to ground, or where de-energized circuits are in close proximity to energized circuits (30 volts or more to ground), the energized circuits, electrical lines, and equipment must be disconnected from the power source, properly grounded and proven to be de-energized, before work is performed. For example, with regard to the term "close proximity", all circuits on utility poles or towers (two pole, four pole, etc.) must be disconnected from the power source, properly grounded and proven to be de-energized, before any work is performed on the structure(s).
2. 00 80 00 18 Special Contract Requirements Paragraph 1.53 shall be replaced in its entirety with the following
1.53 HOUSEKEEPING
Daily construction site clean-up shall be accomplished by the Contractor. This clean up shall include, but not be limited to, the placing of construction material and equipment in a neat and orderly arrangement on the site. Equipment and materials must not block access to existing facilities. The Contractor shall inspect the site and area on a daily basis to ensure that all rubbish, debris, rubble, garbage paper, cardboard, demolition products and similar materials removed to provide a litter-free appearance. On- Base access routes/roads (including roads within construction sites) utilized by construction equipment and/or delivery vehicles shall be maintained free from clay or mud balls, clods and mud. During the growing season (April through October), all grass and vegetation areas in the Contractor's construction area or within ten feet of Contractor construction areas or within ten feet of buildings or portions of buildings under construction shall be mowed and trimmed to maintain neat areas of reasonable height, by the Contractor. Grass and vegetation height shall never be allowed to exceed six (6) inches. Stockpiled excess soils and materials shall be removed within 30 days. Excess soils shall be disposed of in accordance with the contractors soil management plan (if applicable and prepared in accordance with Appendix A)
3. 00 80 00 18 Special Contract Requirements Paragraph 1.56.1 shall be replaced in its entirety with the following
1.56.1 General Compliance
The Contractor in prosecution of the contract, and all persons working at ARDEC in connection with the contract, including employees of the Contractor and all subcontractors and suppliers, shall comply with all applicable Federal, State, and Local laws and regulations, and the applicable rules and regulations of Picatinny
4. 00 80 00 18 Special Contract Requirements Paragraph 1.56.2 shall be replaced in its entirety with the following
1.56.2 Traffic Rules and Regulations
Picatinny traffic rules and regulations are consistent with the motor vehicle laws of the State of New Jersey and are enforced by Picatinny Security Police and the U.S. Commissioner.
5. 00 80 00 18 Special Contract Requirements Paragraph 1.56.3.3 shall be replaced in its entirety with the following paragraph
1.56.3.3 Security Checks
All employees of the Contractor who will be performing work at Picatinny shall undergo a standard security check conducted by the Picatinny Security Police, to include:
a. Issuance of an identification badge.
b. Completion of a short personal history.
Fingerprinting of the employee's, and other procedures deemed necessary for the security of the Center.
At the time of the fingerprinting, the employee will be asked if he/she has ever been convicted of a crime other than a motor vehicle violation. Should a felony or a high misdemeanor be revealed, he/she may not be permitted to work on the project.
6. 00 80 00 18 Special Contract Requirements Paragraph 1.56.4 shall be replaced in its entirety with the following
1.56.4 Compliance
The Contractor in prosecution of the contract, and all Contractor employees working on the U.S. Army installation, Picatinny in the State of New Jersey, in connection with this contract, shall conform to all applicable local, federal or state laws and regulations, and published rules and regulations of the Departments of Defense and Army, as well as any applicable regulations promulgated by RDECOM- ARDEC and/or Picatinny, including but not limited to traffic regulations. Contractor employees and vehicles entering Picatinny are subject to search, and this may result in a wait of 15-30 minutes if traffic is heavy. Contractor employees may only enter Picatinny through the main gate and truck gate, which are accessed via Route 15. Additionally, all Contractor employees working on classified contracts shall comply with the requirements of the National Industrial Security Program (NISPOM) and Army Regulation 380-5, Department of the Army Information Security Program. The term "Contractor employee" includes employees, agents, guests, or representatives and all employees, agents or representatives of all subcontractors and suppliers. Contractors are responsible for obtaining/returning identification badges /passes and vehicle decals/passes for each Contractor employee who will work on the contract or enter Picatinny. The badges/passes/decals are required for the term of the contract until completion or until release of the employee. Procedures are subject to change. Prior to bidding, the Contractor(s) shall consult with the Security Division of Picatinny and be fully cognizant of any and all security requirements, which may be in addition to those listed herein. Prior to entering, and while on Picatinny, the Contractor(s) shall be subject to random identification checks of personnel and searches of personnel, vehicles, and their content. The Contractor should also be cognizant that if the Base implements heightened security measures, up to two hour delays should be anticipated for entry and deliveries to Picatinny, or areas within Picatinny.
a. To obtain proper identification, Contractor employees requiring recurring access (more than 90 days), must complete an application identification form (SMCAR Form 3058) for access to the installation. The form can be obtained from the Contracting Officer Representative (COR). The form must be signed by the COR and also identify the contract number and expiration date before the badge can be issued. This form is brought to the Security Division, Badge and Identification Section, Visitor Control Center, for processing of proper identification required per terms of the contract. Badge & ID Office operating hours Monday through Friday are 0700 - 1200 hrs. Vehicle Decals shall also be obtained and displayed as required. Contractors requiring access for less than 90 days will be required to obtain a pass (Visitor Registration Form) from the Visitor Control Center at the Main Gate Passes will be issued for dates access is required, not to exceed 90 days. The Contractor must notify the COR, and copy two members of the Resident Office staff, between 8:00 AM and 11:00 AM on the business day that precedes the day of arrival of any Contractor employee without a valid badge/pass, seeking access to Picatinny (Notification outside of this timeframe is not acceptable). The notification shall be submitted via email and Fax Memo, and with an attached electronic visitor notification form (MS Word file). One visitor notification form per Contractor employee. The visitor notification form shall include basic identification information, and shall be obtained from the COR. Some of the basic identification information required includes: Name, US Citizenship status, Employer name, address, telephone #, Vehicle make, model, license plate #. Status change in any information provided to obtain a visitor pass/ID Badge will render that visitor pass/ID Badge invalid, and require re-notification, and re-processing at the Visitor Control Center. The subject header of the email shall include the contract title, "visitor notification", and the arrival date of the visitors.
Only one arrival date is permitted per email message and vice versa.
b. For the performance of this contract, the Contractor shall employ only employees who are U.S. Citizens or Lawful Permanent Residents.
c. Before Contractor employees and vehicles will be granted a vehicle decal, badge or pass, and be allowed to access/work on Picatinny, the Contractor shall, at his own expense, furnish the COR and the Picatinny Security Division the following at the time of processing:
1) Evidence of compliance with paragraph 1.4b above, including but not limited to supplying a copy of each employee's Employment Eligibility Form, INS Form I-9.
2) A completed background check (including fingerprinting) by the New Jersey (NJ) State Police for NJ Residents, or a completed background check (including fingerprinting) by the State Police of the State that the Contractor employee resides, or a completed background check (including fingerprinting) by the Federal Bureau of Investigation for Lawful Permanent Residents.
3) Driver's license with photo, or other type of approved photo identification.
4) Compliance with subparagraph 1.4a.
5) Current vehicle registration, insurance, DMV inspection sticker, and driver's license.
6) Paper copy of the notification email and notification form, described above.
d. Any delay in the furnishing of the above, including any delay in the obtaining of the background checks, is at the sole risk of the Contractor and will not be the basis of any equitable adjustment or other change to the contract.
e. The Contractor shall utilize only qualified, responsible, and capable employees in the performance of the work on the contract. The Contractor shall not employ persons for contract work to be conducted on the installation who have criminal history. The Contracting Officer will require that the Contractor remove from performance of work, employees who have a criminal history, endanger persons or property, or whose continued employment under this contract is inconsistent with the interests of military security.
Additionally, the TACOM-ARDEC Commander may bar such employees from the installation.
f. The identification badge or pass issued to each employee of the Contractor is for his own use only.
Misuse of the badge or pass, such as permitting others to use it will result in criminal charges under Title 18 USC 499 and 701; and barring the employee from Picatinny. Should the employee lose the badge or pass, the Contractor may be charged for the cost of re-issuance of the badge or pass. Additionally, the employee and the Contractor must submit a sworn affidavit as to the circumstances of the loss before a new badge or pass is issued.
g. Fingerprinting of employee and any other procedure deemed necessary for the security of Picatinny may be required at the discretion of Picatinny Security.
7. 00 80 00 18 Special Contract Requirements Paragraph 1.56.13 shall be replaced in its entirety with the
1.56.13 Environmental
Hazardous wastes shall be manifested in accordance with NJDEP and Picatinny Public Safety & Environmental Directorate rules and regulations. The Contractor shall comply with all applicable Federal, State, and Local environmental laws and regulations.
UNEXPECTED CULTURAL RESOURCES DISCOVERIES DURING CONSTRUCTION. The contractor or project manager shall notify the COR immediately who will notify Picatinny Cultural Resources Coordinator (CRC) immediately of the cultural resources discovery (who will then consult with the New Jersey State Historic Preservation Office (SHPO). All construction work shall cease in the area of discovery, until the CRC has made an assessment of significance, and if needed certain actions to resolve potential impacts (adverse effects) (ie. photographs, limited excavation, stabilization, written documentation, SHPO/Tribal consultation, etc.). Depending on the significance of the discovery, this work could take longer than 1 working day (other Cultural Resources SOPs may be sought for further guidance). In the event human remains are encountered, the contractor or project manager will cease activities in the immediate area of discovery and make an effort to protect the resources while notifying the CRC and the Installation Police (724-6666). The project manager and/or CRC will monitor the contractor's activities to ensure the integrity of the identified Cultural Resources. The Point of Contact for
Cultural Resources SOPs is Mr. Jason Huggan, Chugach Industries, Inc, at (973) 724-3664 or by email at jason.j.huggan@us.army.mil
8. 00 80 00 18 Special Contract Requirements Paragraph 1.56.13.6 shall be replaced in its entirety with the
1.56.13.6 Soil Management Plan
The Contractor shall prepare a Soil Management Plan that specifies the procedures the Contractor will implement to account for excavated soil. Excavated soil that is stockpiled shall be labeled to indicate the location it was excavated from. Any surplus soils and rock; shall be removed, transported and disposed of at a authorized solid waste landfill. Disposal in a hazardous waste landfill is not required based on the Atlantic Testing Laboratories soil analytical testing results done between 16 Aug & 4 Nov 2010. Contractor must comply with all Federal and State and local regulations in disposing soils at authorized landfills. It is expected that the landfill will ask for qualifying data hence the contractor will be responsible for obtaining that date. The Bill of Laden for the soils will be handled consistently with this Supplement. However, if unexpected noticeably (i.e visual or presence of odors) contaminated soils are encountered during an excavation, those soils will be put aside on plastic and soils erosion fences put around them.
These soils will be sampled consistent with Appendix A and with guidance from the Corps Representative and Picatinny Garrison Environmental Office.
9. 00 80 00 18 Special Contract Requirements Paragraph 1.56.14 shall be replaced in its entirety with the
1.56.14 Electrical
In addition to compliance with other contract-specified criteria, the Contractor shall also design and install its portion of the electrical distribution system to comply with all local utility (Sussex Rural Electrical Cooperative) standards and requirements.
a. Cable spans between utility poles shall not exceed 150 feet. Only copper cable shall be utilized.
b. Underground grounding system connections shall be accomplished by exothermic welding, only.
c. All distribution panelboards shall be provided with a minimum 30% spare space for future loads.
d. All light fixtures provided shall be the energy efficient type.
e. As a minimum, GFCI protected weatherproof receptacles shall be installed: adjacent to any roof-mounted utility equipment, within 25 feet of any graded utility equipment, and onto each exterior building wall spaced no greater than 25 feet apart.
f. Communications: The Contractor shall provide and install a minimum of four (4) one-inch diameter inner ducts within any new and/or existing underground conduit that is to be utilized to install communications cable.
g. In office buildings and control rooms, all electrical/communication/control conduit/cable shall be concealed behind finished surfaces, and junction-boxes/panels shall be recess-mounted. In all other areas, all electrical/communication/control conduit/junction-boxes/cable shall be installed above ceilings, or at the roof structure elevation, to the maximum extent possible. Cable/wire shall not be installed exposed to view in any area.
h. The Picatinny electrical distribution system has been privatized and is now the sole property of the Sussex Rural Electrical Cooperative (SREC).
i. All contractors are now required to coordinate the connection and/or disconnection of temporary and permanent power (trailers, temporary power connections for construction, building electrical service, etc.) with SREC through the Government COR. There will be an application that is required to be filled out and submitted to SREC with an approximate $300.00 fee, to be paid by the contractor, associated with each connection and/or disconnection of electrical services (temporary or permanent). All electrical inspections of the temporary and permanent electrical services to certify compliance with SREC requirements shall be the responsibility of the contractor.
j. SREC is responsible for the purchase and installation of all primary electric components up to and including exterior electrical transformers that are required to supply power to new and renovated facilities.
k. For pad mounted transformers, the contractor will be responsible to provide and install the reinforced concrete pad and electrical grounding in accordance with SREC requirements. The contractor shall be responsible to provide and install all conduit and cable from the building electrical service to the point of connection at pole-mounted and pad-mounted exterior electrical transformers.
The contractor will be required to provide written certification to SREC that the electrical service(s) meets all the appropriate electrical codes in force at the time of his contract. The contractor shall coordinate any proposed utilization of existing utility poles with SREC.
10. 00 80 00 18 Special Contract Requirements Paragraph 1.56.14 shall be replaced in its entirety with the
1.72.1 Munitions and Explosives
Construction site is located within an area designated to possibly contain munitions and explosives of concern (MEC). Prior to soil disturbance by the Contractor, a subsurface MEC removal action was completed by qualified UXO personnel within the identified construction footprint and operating areas required for support of construction activities. No Munitions of Explosive Concern were located, but there still exists the possibility of uncovered Munitions Debris (MD) which will be the responsibility of the MEC Contractor. Excavation activities might encounter more significant amounts of MD. Of particular note are areas below exiting buildings and paved surfaces, as these areas were not subject to a removal action. For all phases of earth works including soil fill and cutting, stand-by construction support shall be required. During fill activities, the Contractor shall push material ahead of the dozer in lieu of dragging material to prevent unearthing potential MD. This method shall be employed until the native soil surface is covered, then normal fill activities may commence. During excavation or digging work, Contractor shall coordinate closely with the COR and the MEC contractor who shall provide construction support in accordance with DoDM 6055.09-M, Volume 7 and USACE EP 75-1-2. The MEC contractor shall be under a separate contract with the Government/Picatinny Arsenal and is not part of this Contract. A minimum of one Unexploded Ordnance (UXO) Technician III and one UXO Technician II qualified per DDESB Tech Paper 18 shall be on site to provide construction support during all intrusive soil activities within the construction footprint as required by the Corps of Engineer COR and Picatinny Safety Office.
If required, multiple teams of UXO Technicians will be on site to support intrusive activities in separate locations. Contractor shall incorporate the construction support work plan provide by the MEC contractor into the Contractor's Site Safety and Hazardous Waste Work Plan. During performance of intrusive activities, Contractor shall obey instructions provided by the MEC contractor to ensure that the work is performed in a safe manner. In the event that MD or MEC is found, the MEC contractor shall be prepared to dispose of the items at a location other than the work site, and shall direct the COR and Contractor concerning safe activities and evacuation procedures. The Contractor is advised that it may take up to 2 to 4 hours from notification of MEC to the removal of and/or MEC rendered inert, and the Contractor should be prepared to adjust the construction schedule accordingly. The Contractor shall incorporate these requirements into its construction schedule. Contractor shall ensure that the MEC contractor is on site as required to prevent unnecessary delay to the contract schedule for Munitions and Explosives.
11. 00 80 00 18 Special Contract Requirements Paragraph 1.84 is deleted in its entirety
Questions:
1. I had a question about the Section 27 under the Fiber Optic Cable on page 11…. Will this project need any cabling to install?
Response:
Refer to Drawing C-000 Drainage & Utility Notes Number 1 & 22 and Drawing ET-601 regarding fiber optics.
2. Kindly clarify the scope of work in this project. There appear to be conflicts throughout the drawings where is states an area is not in contract (NIC), yet there are areas shown bold potentially indicating new work.
For example, Drawings C-004 indicates the following:
- The bottom left note "The existing conditions information shown in grey on this sheet is in accordance with the Phase I/II Design Plans entitled "ballistic evaluation center", dated September 5, 2012"
- Then, on this sheet, there are areas with a dashed line indicated "Work in this area NIC"
- However, within this dashed line area, there are solid lines potentially indicating new work. In addition, these 'dark lined' buildings are not shown on the existing site plan C-003.
- On the key plan in the top right of the C-004, notes "Proposed Phase III shown dark". Buildings 636M and 636E canopy, and 636G are all shown dark, yet they are within the areas circled 'NIC'
Response:
All work associated with Structure 636M, Building 636E Canopy and Building 636E Canopy are Not In Contract (NIC) and are to be assumed as "existing" from the BEC Phase I&II construction project, regardless of whether it is shown graphically as solid lines or not, and regardless of these being shown as dark on the Key Plan.
Information:
Visitor Request Form and Camera Pass Request are attached for convenience
Army Corps of Engineers – Picatinny Residency Visitor Notification/Registration Form
Visitor’s Name(s):
Visitor’s Employer:
Employer’s Address:
Employer’s Telephone #:
Purpose of Visit:
Location of Work / Visit:
U.S. Citizen? Yes: No:
Enclosure Access Needed? Yes: No:
Duration of Visit:
(Arrival date to end date)
Will visitor have a vehicle?
(If yes, fill-in vehicle info below)
Yes: No:
Vehicle Year & Make:
Vehicle Model:
License Plate No:
PRIME CONTRACTOR POC:
Name of Government POC Roberto Maldonado Office of Government POC U.S. Army Corps of Engineers – Picatinny Residency Phone # of Government POC 917-790-6254 Location of Government POC Bldg 3002-North, Picatinny Arsenal, NJ 07806-5000
Please note that all visitor requests must be submitted at least 48 hours prior to the scheduled visit to Picatinny Arsenal. Failure to adhere to all requirements shall be cause for the Security Division to deny entrance the base.
Note: Visitors and/or vehicles will not be permitted access to Picatinny Arsenal without prior registration and the following: Employment Eligibility Form, INS Form I-9 (if not a US citizen), Driver’s license or other type of approved photo identification. Vehicle operators must possess current vehicle registration, insurance, DMV inspection sticker, and driver’s license.
Cameras of any type are prohibited within Picatinny Arsenal without prior authorization via email (4 days in advance). (Info required: Name of person operating camera, location and purpose of photos, camera make, model #, and serial #).
Request for a Visitor Camera Pass
1. Name, address, and phone number of the Government Representative who is sponsoring the Visitor.
(Name of Project Engineer – in this case, Roberto Maldonado) US Army Corps of Engineers, Main Road, Bldg 3002-North, Picatinny, NJ 07806-5000
(917) 790-6254
2. Name of the person who will be issued the Visitor Camera Pass.
3. Name & address of the Company the Visitor represents.
4. Name of the Area(s) at Picatinny in which the Visitor will be taking photos.
5. Dates for which the Visitor Camera Pass will be issued.
6. Purpose of photos:
7. Camera Information:
a. Manufacturer.
b. Model Number.
c. Serial Number of the Camera.
Submit the above information as soon as you are aware that a visitor would like to obtain a Visitor Camera Pass, AT LEAST 4 DAYS IN ADVANCE OF ANTICIPATED NEED. To follow up on the status of the Visitor Camera Pass, Police Chief Gough and Deputy Chief Mertz may be reached at (973) 724-6666. Once the Visitor’s Camera Pass is processed, it may be picked up at the Police Headquarters located in the basement of Building 173.
(End of Summary of Changes)