SPECIFICATIONS VOLUME 1
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Property of the United States Government
Ballistics Evaluation Center Phase III
Picatinny Arsenal, NJ
US Army Corps of Engineers New York District
Contract Number: W912DS-10-D-0002
Jacobs Project Number FDWD5936
April 22, 2013
Property of the United States Government
COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DOCUMENTS
TO UNAUTHORIZED PERSONNEL IS PROHIBITED
SPECIFICATIONS
VOLUME I
RTA Submittal
BEC - PHASE III READY TO ADVERTISE
NEW YORK DISTRICT USACOE - PICATINNY 22 APRIL 2013
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 31 32 GEOTECHNICAL DATA
DIVISION 01 - GENERAL REQUIREMENTS
01 12 00.00 18 DESIGN AND RECORD DRAWING REQUIREMENTS
01 32 01.00 18 PROJECT SCHEDULE
01 33 00.00 18 SUBMITTAL PROCEDURES
01 33 00.12 SUBMITTAL TRANSMITTAL FORM
01 33 00.15 SUBMITTAL REGISTER
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 02.00 18 QUALITY CONTROL SYSTEM (QCS)
01 45 04.00 18 CONTRACTOR QUALITY CONTROL
01 45 04.12 18 CONTRACTOR QUALITY CONTROL FORMS
01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS
01 45 30.00 18 CONTRACTOR WARRANTY MANAGEMENT
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23.00 18 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 41 01 DEMOLITION ATTACHMENT
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 82 14.12 10 ASBESTOS REPORT
02 83 13.00 20 LEAD IN CONSTRUCTION
02 83 13.12 LEAD PAINT REPORTS
DIVISION 03 - CONCRETE
03 20 00.00 10 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 41 16.08 PRECAST CONCRETE SLABS
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 16 LONGSPAN STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
PROJECT TABLE OF CONTENTS Page 1
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 00.45 10 BUILDING AIR BARRIER SYSTEM
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 67 23.14 CHEMICAL RESISTIVE RESINOUS FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 02 INTERIOR SIGNAGE
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 51 14 METAL TOOL CABINETS
10 51 15 METAL FLAME PROOF CABINETS
10 56 13 STEEL SHELVING
10 56 29.16 PALLET STORAGE RACK
DIVISION 12 - FURNISHINGS
12 31 00 MANUFACTURED METAL CASEWORK
12 48 13.13 ENTRANCE FLOOR MATS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
PROJECT TABLE OF CONTENTS Page 2
23 05 15 COMMON PIPING FOR HVAC
23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 16.00 40 PANELBOARDS
26 27 13.10 30 ELECTRIC METERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 33 55 CENTRAL INVERTER SYSTEM
26 41 01.00 10 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 55 53.00 10 EXTERIOR LIGHTING INCLUDING SECURITY AND CCTV APPLICATIONS
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 21 00.00 20 INTERCOMMUNICATION PUBLIC ADDRESS SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 21 13 RADON MITIGATION
31 23 00.00 20 EXCAVATION AND FILL
31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS
32 11 23 AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS
32 17 23.00 20 PAVEMENT MARKINGS
32 31 14 CHAIN LINK CAGES AND GATES
32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
PROJECT TABLE OF CONTENTS Page 3
33 61 13 PRE-ENGINEERED UNDERGROUND HEAT DISTRIBUTION SYSTEM
33 71 02.00 20 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 - TRANSPORTATION
34 71 13.16 TRAFFIC GUARD RAILS
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
41 34 60 INDUSTRIAL PARTS WASHING EQUIPMENT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 00 31 32
GEOTECHNICAL DATA
02/13
PART 1 GENERAL
1.1 SUMMARY
The attached reports are provided for information only:
a. Subsurface Investigation Services dated February 22, 2013, prepared by Atlantic Testing Laboratories, Canton, NY (ATL No. CD7139D-01-06-12 Rev 1)
b. Subsurface Investigation and Geotechnical Evaluation dated February 22, 2013 prepared by Atlantic Testing Laboratories, Canton, NY (ATL No.
CD7226E-01-10-12 Rev 1).
c. Subsurface Investigation and Technical Evaluation dated February 22, 2013, prepared by Atlantic Testing Laboratories, Canton, NY (ATL No.
CD7139E-02-06-12 Rev.1).
PART 2 PRODUCTS
NOT USED.
PART 3 EXECUTION
NOT USED.
-- End of Section --
DOCUMENT 00 31 32 Page 1
Albany ♦ B
February
Jacobs-A 299 Mad Morristow
Attn: M
Re: S P P D A
Ladies a
Enclosed Soil Clas Logs. AT
Please n were bac monitore Whitney, The soil and subs
Please c we may successf
Sincerely
ATLANT
Matthew Engineer
MTT/CFW
Enclosur
Binghamton ♦
ATLA
y 22, 2013
Ammann & W ison Avenue wn, New Jer
Mr. Jerry King
Subsurface In Proposed BE Picatinny Ars Dover, Morris ATL No. CD7 nd Gentleme d is one cop ssification Sy TL appreciat note that upo ckfilled with d for settlem JV and/or t samples ob sequently dis contact our o be of furth ful completio y, TIC TESTING
T. Trodler, I r
W/mtt res
♦ Elmira♦ Pla
ANTIC
Whitney, JV e, Suite 1 rsey 07962 g, PE nvestigation EC - Phase I senal s County, Ne 7226E-01-10 en:
py of the refe ystem (USC tes the oppo on completi on-site soi ment or sub heir client. A btained durin scarded, unl office should her service.
on of this pro
G LABORAT
IE
attsburgh ♦ P
C TEST
and Geotec
II
ew Jersey 0-12 Rev. 1 erenced rep
CS) group sy ortunity to pr on of the su
il. It is imp bsidence. T ATL assume ng this inves less otherwis d you have a We look oject.
TORIES, Lim
Poughkeepsie ♦
TING LA
chnical Evalu port. The re ymbols on th rovide geote ubsurface in portant that This will be es no liability stigation wil se instructed any question forward to mited
♦ Rochester ♦
ABORA
T F uation eport was rev he Subsurfac chnical serv nvestigation, the backfille the respons y for borehol l be retained d.
ns or comme our continu
♦ Syracuse ♦
ATORI
Canton
6431 U.S. Highw P.O. Box 29
Canton, NY 13 315-386-4578 315-386-1012
Telephone:
Facsimile:
vised to incl ce Investiga vices for you
, the boreho ed borings sibility of Ja le or test pit d for a perio ents on this ued associa
Utica ♦ Wate
IES
way 11 (T) (F)
571-218-1 571-218-1 lude the Un ation and Te r project.
oles and tes and test pit cobs-Amma settlement.
od of six mo information ation to obta ertown ificed est Pit st pits ts be ann & onths
, or if ain a
SUBSURFACE INVESTIGATION
AND
GEOTECHNICAL EVALUATION
PROPOSED BEC - PHASE III
PICATINNY ARSENAL
DOVER, MORRIS COUNTY, NEW JERSEY
JACOBS - AMMANN & WHITNEY JV
PREPARED FOR: Jacobs-Amman & Whitney, JV 299 Madison Avenue, Suite 1 Morristown, New Jersey 07962
PREPARED BY: Atlantic Testing Laboratories, Limited 6431 U.S. Highway 11 P. O. Box 29 Canton, New York 13617
ATL Report No. CD7226E-01-10-12 Rev. 1
February 22, 2013
TABLE OF CONTENTS
SECTION PAGE
NUMBER
1.0 INTRODUCTION 1
2.0 PROJECT DESCRIPTION 1
3.0 SITE SURFACE CONDITIONS 2
4.0 SUBSURFACE INVESTIGATION & SAMPLING METHODOLOGY 2
5.0 SITE SUBSURFACE CONDITIONS 3
5.1 Soil Borings
5.2 Test Pits
5.3 Groundwater
6.0 LABORATORY ANALYSES 4
7.0 GEOTECHNICAL ENGINEERING DISCUSSION 6
7.1 Proposed Retaining Wall
7.2 Frost Protection
7.3 Asphalt Pavement Design
7.4 General
8.0 SUMMARY 10
APPENDICES
A. Site Location Plan B. Boring and Test Pit Location Plan C. Subsurface Investigation Logs D. Laboratory Test Reports E. Pace Analytical Services, Inc. Reports
PROPOSED BEC - PHASE III
DOVER, MORRIS COUNTY, NEW JERSEY
JACOBS - AMMANN & WHITNEY, JV
1.0 INTRODUCTION
At the request of Mr. Jerry King, PE, representing Jacobs – Ammann & Whitney, JV (Jacobs), and in accordance with our proposal (ATL File No. CD998-188X-05-12, dated June 1, 2012) Atlantic Testing Laboratories, Limited (ATL) performed a subsurface investigation and geotechnical evaluation for the referenced project. The subsurface investigation was performed on October 10 and 11, 2012.
The purpose of the investigation was to ascertain the general subsurface soil and groundwater conditions at the site, to evaluate the engineering significance of these findings, and to provide geotechnical recommendations related to the proposed retaining wall and asphalt pavement design and construction, in support of the Ballistics Evaluation Center - Phase III project. The proposed project scope included the advancement of four soil borings and the excavation of two test pits. Due to access limitations, soil boring B-3 was not completed during this subsurface investigation.
The proposed project is located on Twentieth Circle south of Twentieth Avenue at Picatinny Arsenal in Dover, Morris County, New Jersey. The approximate project coordinates are N 40º57′09″ latitude and W 74º33′21″ longitude. A Site Location Plan is included in Appendix A.
All dimensions and elevations referenced in this report are in units of feet, unless otherwise noted.
2.0 PROJECT DESCRIPTION
The project consists of razing the existing, abandoned B620 building. The project area will generally be developed into asphalt-paved parking for the existing B617 building. A retaining wall is proposed along the east property line, adjacent to the existing B620 building, to raise the site grade for additional parking.
Jacobs-Ammann & Whitney, JV Page 2 of 10 ATL No. CD7226E-01-10-12 Rev. 1 February 22, 2013
3.0 SITE SURFACE CONDITIONS
The proposed site is generally developed within the proposed parking area and retaining wall footprints. The existing building B620 is surrounded by lawn area, an existing retaining wall and concrete sidewalks along the north and west walls, and a French-drain located between building B617 and B620. A gravel vehicle pathway is located along the southern portion of the site that allows access to exterior septic cisterns located at the existing southeast building corner. The site generally slopes from north to south from approximately elevations 860 to 840. There is a steep downward slope located to the east of the project site.
4.0 SUBSURFACE INVESTIGATION & SAMPLING METHODOLOGY
The boring and test pit locations were selected and staked by representatives of Jacobs. The boring and test pit surface elevations were not provided to ATL. A Boring and Test Pit Location Plan, prepared by Jacobs, is included in Appendix B.
Three borings (Borings B-1, B-2, and B-4) were advanced utilizing 4¼-inch inside diameter hollow stem augers. Soil sampling and standard penetration testing was performed utilizing a 2-inch outside diameter split spoon sampler in accordance with ASTM D 1586. Soil sampling was generally performed continuously to boring termination at depths ranging from 8 to 10.3 feet beneath the surface. Auger refusal was encountered at depths ranging from 4.3 to 10.3 feet.
Rock coring was not performed to verify the presence of boulders or bedrock at the auger refusal depths.
The soil samples were visually classified in the field by a geotechnical engineer in general accordance with the Burmister Soil Classification System and in the laboratory using the Unified Soil Classification System. The split spoon sampler does not recover material larger than 1⅜-inch in nominal dimension; therefore, the soil classifications may not be representative of the entire soil matrix. The visual classifications and standard penetration test results are presented on the Subsurface Investigation Logs included in Appendix C.
A temporary observation well was installed in boring B-2 utilizing 1-inch PVC machine slot screen with sand pack and a bentonite seal, to facilitate future water readings.
Two test pits were excavated utilizing a Yanmar ViO Universal 35 rubber tracked excavator to facilitate field percolation testing. The test pits were logged by an ATL Geotechnical Engineer.
During soil boring and test pit advancement, recovered soil samples were collected and field screened for the measurable presence of volatile organic compounds (VOC) using a photoionization detector (PID) equipped with a 10.6 eV lamp. No visual and olfactive evidence of petroleum-impacted soil were observed in the recovered soil samples.
The boreholes and test pits were backfilled with on-site soils upon completion. It is important that the backfilled borings and test pits be monitored for settlement or subsidence. This will be the responsibility of Jacobs and/or their client. ATL assumes no liability for loss or damage resulting from borehole or test pit settlement.
Jacobs-Ammann & Whitney, JV Page 3 of 10
5.0 SITE SUBSURFACE CONDITIONS
The following description of subsurface conditions is based on the soil and groundwater conditions encountered during this subsurface investigation. Actual subsurface conditions may vary across the site in both the horizontal and vertical dimensions. Detailed subsurface descriptions are provided on the Subsurface Investigation Logs.
5.1 Soil Borings
The borings generally encountered nil to 4 inches topsoil, organics, and or crushed stone at the surface. At boring locations B-1 and B-2, the surficial materials were generally underlain by medium compact (N values 10 to 30) to very compact (N values greater than 50) gravelly sand with varying proportions of silt and cobbles that extended to boring termination at depths ranging from 8 to 10.3 feet below the surface. Auger refusal was encountered at depths ranging from 4.3 and 10.3 feet on possible bedrock or boulders. Boring B-4 encountered approximately 6 feet of gravelly sand fill with varying proportions of organics, wood fragments, and foam and paper debris, underlying the surficial materials. The fill was underlain by very compact gravelly sand with varying proportions of silt that extended to auger refusal at a depth of 10.2 feet.
Boring B-1 encountered auger refusal at a depth of approximately 4.3 feet. Soil sampling was performed to a depth of 8 feet with the augers at 4.3 feet. An additional soil boring was performed at a 6-foot offset to the west where auger refusal was encountered at a depth of approximately 5 feet.
5.2 Test Pits
Test pits TP-1 and TP-2 generally encountered 8 to 10 inches of topsoil and organic material that was underlain by gravelly, silty sand with cobbles and boulders that extended to test pit termination at depths of 5 and 5.7 feet, respectively. Trace roots and root hairs were observed in the test pits that extended to a maximum depth of approximately 2 and 3.5 due the presence of surrounding trees. One percolation test was performed adjacent to the excavated test pit locations at a depth of approximately 3 feet below the surface. The testing was performed within the test pit, in general accordance with New Jersey State Department of Health (NJDOH) guidelines. The percolation test results are summarized in the following table:
Location Depth
(ft) Soil Classification
Percolation Rate
(minutes/inch)
TP-1B
~5’ WNW
of staked location
0 - 0.7 TOPSOIL & ORGANIC MATERIAL --
0.7 - 3.0
Rusty-Brown cmf SAND; some cmf GRAVEL;
some SIILT; trace CLAY (moist, non-plastic) SM
-soil matrix contained approx. 10 % COBBLES.
-roots/root hairs extended to approximately 1.7′
44.2
TP-2B
~10’ E of stake location
0 - 0.8 TOPSOIL & ORGANIC MATERIAL --
0.8 - 3.0
Rusty-Brown cmf SAND; some cmf GRAVEL;
some SIILT; trace CLAY (moist, non-plastic) SM
-soil matrix contained approx. 10% COBBLES -roots/root hairs extended to approximately 2′
46.0
Jacobs-Ammann & Whitney, JV Page 4 of 10
5.3 Groundwater
Groundwater measurements were performed during the subsurface investigation through cased and open boreholes, the temporary observation well installed in boring B-2, and through test pit observations. The soil samples were also classified for coloration and relative moisture conditions.
Based on groundwater measurements and soil moisture content, freestanding groundwater was not encountered in the boreholes or test pits during this subsurface investigation. Isolated water seepage was observed in the southwest corner of TP-2 at a depth of approximately 4.5 feet below the surface.
Fluctuations in water levels may occur due to seasonal and climatic variations, changes in surface runoff patterns, construction activity, and subsequent development of the site along with other interrelated factors. Due to the underlying very compact soils present at the site, perched water should be anticipated in shallow foundation and utility excavations, especially during wetter periods of the year.
6.0 LABORATORY ANALYSES
Select soil samples were submitted to ATL’s geotechnical laboratories for physical analyses.
Moisture Content
Water Content Determination of Soil (ASTM D 2216) was performed on nine (9) soil samples.
The test results are located on the subsurface investigation logs included in Appendix C.
Particle Size Determination
A Particle Size Analysis without Hydrometer (ASTM D 422) was performed on four (4) soil samples. The Particle Size Distribution Curves are included in Appendix D.
Atterberg Limits
Three (3) soil samples were selected for Atterberg Limits determination at boring locations B-2 and B-4. The tests were performed in accordance with ASTM D4318 “Liquid Limit, Plastic Limit, and Plasticity Index of Soils.” The test results are located on the subsurface investigation logs and summarized in the following table:
Boring Location Sample No. Depth
(ft) Moisture Content
LL PL PI
B-2 S-4 6.0 - 8.0 9.6 NP NP NP
B-4 S-4 6.0 - 8.0 6.7 NP NP NP
TP-1 S-1 1.0 - 5.0 9.6 NP NP NP
Jacobs-Ammann & Whitney, JV Page 5 of 10
Soluble Sulfate Determination
Four (4) soil samples were selected for soluble sulfate determination. The Laboratory Test Reports, prepared by Pace Analytical Services, Inc., are included in Appendix E. The results are summarized in the following table:
Boring/Test Pit No. Sample No. Depth
(ft) Soluble Sulfate
Content
B-1 S-2 2.0 - 4.0 <0.001 B-2 S-3 4.0 - 6.0 <0.001 B-4 S-3 4.0 - 6.0 <0.001
TP-2 S-1 1.0 - 5.0 <0.001
Based on the laboratory test results of the samples analyzed, the sulfate exposure to concrete is considered negligible.
Corrosivity
Four (4) soil samples were selected for corrosive properties determination in accordance with AWWA C105.A2.1 Appendix A. The test results are summarized in Appendix D. The test results indicate that the soils analyzed are not corrosive to ductile iron.
Laboratory CBR
A 1-Point Laboratory California Bearing Ratio (CBR) test (ASTM D 1883) was performed on three (3) soil samples collected from test pit excavations and auger cuttings. The tests were performed on soils compacted to 95-percent of the maximum dry density as determined by ASTM D698. The laboratory test reports are included in Appendix D. The results are summarized in the following table: A CBR of Laboratory Compacted Soils in accordance with ASTM D 1883 was performed on three soil samples. The CBR samples were remolded at 95% of the maximum dry density as determined by ASTM D 698 and at optimum moisture content.
The samples were then soaked, with 10 pounds of surcharge weight, for 96 hours. The test results are summarized in the following table:
Boring/Test Pit No.
Sample No.
Compaction
ASTM
D 698
Laboratory CBR
ASTM D 1883
Remolded Moisture Content
Remolded Dry
Density (pcf)
Top 1 Inch After Soaking Moisture Content
Swell
CBR at
0.100 in.
CBR at
0.200 in.
B-1 S-1 Comp. 95 10.0 119.3 14.6 0.20 15 13 B-2 S-1 Comp. 95 7.3 126.7 11.5 0.13 7 6
TP-2 S-1 95 7.0 129.2 10.3 0.07 20 19
Comp. = Composite sample collected from borehole auger cuttings
Jacobs-Ammann & Whitney, JV Page 6 of 10
Laboratory Compaction
One (1) soil sample was selected for Laboratory Compaction - Modified Effort (ASTM D 1557) and three (3) soil samples were selected for Laboratory Compaction - Standard Effort (ASTM D 698). The laboratory test reports are included in Appendix D.
7.0 GEOTECHNICAL ENGINEERING DISCUSSION
The Geotechnical Engineering Discussion is based on information provided by Jacobs, and the subsurface conditions outlined in this report.
7.1 Proposed Retaining Wall
7.1.1 Site Work
Site work for the proposed retaining wall will require the removal of the existing building, septic cisterns, abandoned site utilities, topsoil, trees, and miscellaneous fill materials. The existing building foundations should be completely removed, within the wall footprint. The excavations created to remove the building foundations, utilities, and deleterious fill materials should be backfilled with compacted Granular Fill.
7.1.2 Foundations
Based on the findings of this subsurface investigation, it is recommended that foundations for the retaining wall be founded on the medium compact to very compact native, gravelly sand encountered in the soil borings and test pit excavations.
The foundation excavations should be advanced to a minimum of 3 feet below final exterior grade. Where encountered, deleterious fill/organic soils identified in the area of boring B-4 should be completely removed, under the direction of a Geotechnical Engineer, to the underlying very compact, native, gravelly sand soils. The over excavations to remove the deleterious fill/organic materials should extend 1 foot horizontally on each side of the proposed footing for each 1 foot of over excavation beneath the planned footing elevation.
The exposed footing subgrade should be proof-compacted under the direction of a Geotechnical Engineer. Footing subgrades that become saturated or unstable, should be over excavated and replaced with a 6-inch layer of NJDOT Number 4, crushed stone. The NJDOT Number 4, crushed stone should be compacted with four passes of a dual-drum walk-behind vibratory roller; a Wacker DPU 6055 vibrating plate tamper; or equivalent, under the direction of a Geotechnical Engineer. The Number 4, crushed stone will provide a stable working surface and dewatering media if ground or surface water enters the excavation during foundation subgrade preparation and construction.
7.1.3 Soil Bearing Capacity and Settlement
Footings founded on the medium compact to very compact gravelly sand with silt, and/or compacted Granular Fill may be designed using an allowable soil bearing capacity of 4000 psf, provided the recommendations in this report are followed.
Jacobs-Ammann & Whitney, JV Page 7 of 10
Estimated total and differential settlements should not exceed 1-inch and ½-inch, respectively.
Since the foundation subgrade soils are granular, settlement is expected to occur as each new load is applied to the foundations.
7.2 Frost Protection
Shallow foundations must be founded a minimum of 3 feet below final exterior grade to provide adequate frost protection.
7.3 Asphalt Pavement Design
7.3.1 Site Work
Site work for pavement areas will require the removal of the existing building, septic cisterns, abandoned site utilities, asphalt, concrete, and French-drain. The existing building foundations and slabs should be removed to a minimum of 2 feet fellow proposed subgrade elevations. The existing basement concrete slab-on-grade should be removed or broken up to promote drainage beneath the proposed pavement. Where encountered, deleterious fill/organic soils identified in the area of boring B-4 should be completely removed, under the direction of a Geotechnical Engineer, to the underlying very compact, native, gravelly sand soils. The excavations to remove the building foundations and deleterious fill should be backfilled with compacted Granular Fill. After performing the cuts and prior to placing fill, the exposed subgrade soils should be proof-compacted with a minimum of a 10-ton vibratory roller, under the observation of a Geotechnical Engineer. The subgrade should also be proof rolled using a tandem axle truck with a minimum gross weight of 40,000 lbs. The proof rolling must be conducted under the observation of a Geotechnical Engineer. Any areas noted to weave or deflect should be excavated to stable material, at the direction of a Geotechnical Engineer, and replaced with compacted Granular Fill. Granular Fill should be used to raise the pavement areas to the proposed subgrade elevations.
Due to the moderate percentage of fines, the subgrade soils encountered in the soil borings and test pits are considered moderately moisture sensitive and frost susceptible. To minimize frost action in the asphalt structures, a minimum of 12 inches of Granular Fill is recommended beneath the granular subbase. If this is not possible, based on economic considerations, the depth of Granular Fill can be reduced. If the depth of Granular Fill is reduced, premature pavement deterioration and/or maintenance should be anticipated. Consideration should be given to the installation of drainage in the Granular Fill layer to reduce the potential for a bath tub effect.
Proper drainage and control of surface water will be important to the longevity of the pavement structures.
Jacobs-Ammann & Whitney, JV Page 8 of 10
Light Duty Asphalt Pavement (Passenger Cars and Light Truck) structure should consist of the following:
Thickness Course NJDOT Item No.
1 ½” Bituminous Top Course Table 902.02.03-1, Type 12.5 mm
3” Bituminous Binder Course Table 902-02.03-1, Type 37.5 mm 12” * Granular Subbase Table 901.10.01-1 12” Granular Fill ---
* The product of crushed ledge rock.
Heavy Duty Asphalt Pavement (Trucks and Buses) structure should consist of the following:
Thickness Course NJDOT Item No.
2” Bituminous Top Course Table 902.02.03-1, Type 12.5 mm 4” Bituminous Binder Course Table 902-02.03-1, Type 37.5 mm
12” * Granular Subbase Table 901.10.01-1 12” Granular Fill ---
* The product of crushed ledge rock.
7.4 General
Care must be exercised while excavating in the vicinity of the existing structures and utilities, which are to remain in-place, to prevent their disturbance.
The in-situ soils are moderately moisture sensitive and frost susceptible. Construction traffic should be limited on exposed subgrades, especially during wetter periods of the year. Where possible, pavement subgrades and foundation excavations should be sloped or crowned to drainage swales or a sump and pump system during construction to prevent surface run-off and perched groundwater from ponding on the subgrades.
Cobbles, boulders and/or bedrock, and man-made fill should be anticipated in shallow foundation and utility excavations. The granular in-situ soils may be susceptible to side wall sloughing in open excavations especially when exposed to excessive moisture.
The soil parameters presented in the following table may be used for the following backfill materials:
Table of Soil Properties
Soil Property Granular Fill
Engineered Structural
Fill Angle of Internal Friction (°) 32 34 Active Earth Coefficient (Ka)* 0.31 0.28 At Rest Earth Coefficient (Ko)* 0.47 0.44 Passive Earth Coefficient (Kp)* 3.25 3.54 Ultimate Coefficient of Sliding Friction 0.44 0.47 Wet Unit Weight (pcf) 135-145 140-150
*The Rankine earth pressure coefficients are for level backfill placed in a fully drained condition.
Jacobs-Ammann & Whitney, JV Page 9 of 10
Granular Fill should consist of a clean, screened, crushed, or bank-run gravel conforming to the following gradation:
Sieve Size Percent Passing
4” 100 ¼” 35-65
#200 0-10
Engineered Structural Fill should consist of a screened, crushed gravel or crushed ledge rock conforming to the following gradation:
3” 100 1” 80 - 95 ½” 45 - 75 #4 30 - 60
#40 10 - 40 #200 0 - 7
The on-site soils, excluding deleterious organics and oversize material (particles larger than 4 inches in diameter), may be used for general site fill. Granular Fill should be utilized as retaining wall backfill.
All fill and backfill should be placed and compacted in lifts not exceeding eight inches in loose thickness, at a moisture content of ± 2% of the Optimum Moisture Content, and to densities in excess of 95%, as determined by ASTM D1557, or as directed by the Geotechnical Engineer.
Compaction should be performed with vibratory rollers unless there is concern for damage to adjacent structures or underground utilities.
Jacobs-Ammann & Whitney, JV Page 10 of 10
8.0 SUMMARY
The subsurface investigation logs and this report in its entirety should be provided to the contractors for information and interpretation. The subsurface investigation logs may not be representative of the entire site subsurface conditions, but only what was found at the individual test locations at the time the investigation was made. The subsurface soil and groundwater conditions may be different from those described on the subsurface investigation logs and summarized in this report.
This report was prepared to present the findings of our subsurface investigation and engineering evaluation, and to outline concepts to be utilized in foundation design and construction. These concepts may require alterations to meet the specific design and economic considerations for this project.
Prepared by: Reviewed by:
Matthew T. Trodler, IE Christopher F. Ward, PE Engineer Senior Engineer
MTT/CFW/mtt
APPENDIX A
SITE LOCATION PLAN
BEC - Phase III Picatinny Arsenal
Dover, Morris County, New Jersey ATL Report No. CD7226E-01-10-12
CD7226 October 2012
SITE LOCATION
mtrodler Text Box ATL Report No. CD7226E-01-10-12 Rev. 1
APPENDIX B
BORING AND TEST PIT LOCATION PLAN
TP-1
B-3
B-1
B-2
B-4
TP-2
aschneider Typewritten Text mtrodler Rectangle mtrodler Line mtrodler Line mtrodler Text Box Not Performed mtrodler Line mtrodler Line mtrodler Rectangle mtrodler Oval mtrodler Oval mtrodler Text Box B-4 Relocated due to existing septic cistern mtrodler Line
APPENDIX C
SUBSURFACE INVESTIGATION LOGS
Soil Boring Logs
SS
SS
SS
SS
A U G E R S
Boring terminated at 8 feet due to auger refusal on possible bedrock or boulder at 4.3 to 5 feet.
Notes:
1) Borehole backfilled with on-site soils.
2) Auger refusal encountered at a depth of 4.3 feet. After obtaining split spoon sample B-4, boring was off-set boring 6 feet west where auger refusal was encountered at a depth of approximately 5 feet.
3) Composite soil sample collected from auger cuttings between 1 and 5 feet below the surface.
0.0
2.0
4.0
6.0
50/2"
4" TOPSOIL
Rusty Brown cmf SAND; some SILT; little cmf GRAVEL; trace
CLAY (wet, non-plastic) SM
Rusty Brown cmf SAND; some cmf GRAVEL; little SILT (moist, non-plastic) SM, some ROCK fragments, w=4.3%
Rusty Brown Similar Soil (moist, non-plastic) SM, w=6.0%
Rusty Brown Similar Soil (moist, non-plastic) SM, some ROCK fragments
2.0
3.7
6.0
8.0
0.3
2.5
8.0 fine
ATLANTIC TESTING LABORATORIES, Limited
CD7226-01-10-12
BEC - Phase III
Project:
Finish Date:10/10/2012
S A
M P
L E
N O
Automatic
Boring No.:
medium coarse of
Inspector:
DRY
0-10%
10/10/2012
Time
BLOWS ON
SAMPLER
PER 6"
2" O.D.
SAMPLER
Coordinates
Client:
DRY
Ground Elev.:
Northing
Easting
35-50%
Picatinny, New Jersey
Sheet
10/10/2012 f
Sampler Hammer
See Boring Location Plan
~5'SW of Staked location due to buried electrical line.
D E
P T
H
SH
Tony Mallory; Matthew Trodler
20-35%
Weight:
c
4 1/4" Auger
R ec o ve ry (I n ch es in.
Report No.:
Matthew Trodler
Boring Advance By:
140140140
Undisturbed Sample (Shelby Tube)
OPEN
Jacobs - Ammann & Whitney, JV
To 10-20%
Subsurface Investigation and -
Rock Core lbs.
S
A M
P L
E T
Y P
E
DEPTH
OF
SAMPLE
trace
Subsurface Investigation
Groundwater Observations
10/10/2012 PM
littlem
CLASSIFICATION OF MATERIAL
some
4.3'
Split Spoon Sample
DepthDate
Start Date:
Boring Location:
SS
M E
T H
O D
O F
A D
V A
N C
E
From
Drillers:
Estimated Groundwater
NX
D E
P T
H O
F C
H A
N G
E
Borehole caved at 4 feet.
PM
B-1
Fall:
Hammer Type:
Casing
A T
L-
LO
G
C D
-0 1-
0-
.G
P J
L O
G -W
E
LL
.G D
T
/2
/1
75/3"
SS
SS
SS
SS
SS
SS
A U G E R S
Boring terminated at 10.3 feet due to auger refusal on possible bedrock or boulders.
Notes:
1) Temporary observation well installed to a depth of 10.3 feet.
2) Composite soil sample collected from auger cuttings from 1 to 5 feet below the surface.
0.0
2.0
4.0
6.0
8.0
10.0
Brown cmf SAND; some SILT; little cmf GRAVEL; trace CLAY;
trace ORGANIC MATERIAL (root hairs) (moist, non-plastic) SM
Rusty Brown cmf GRAVEL; some cmf SAND; some SILT
(moist, non-plastic) GM, w=5.9%
Rusty Brown cmf SAND; some cmf GRAVEL; little SILT (moist, non-plastic) SM, w=6.4%
Rusty Brown Similar Soil (moist, non-plastic) SM, w=9.6%
PL=NP, LL=NP, PI=NP
Rusty Brown Similar Soil (moist, non-plastic) SM
Rusty Brown Similar Soil (moist, non-plastic) SM, ROCK fragments
2.0
4.0
6.0
8.0
10.0
10.3
4.0
10.3 fine
ATLANTIC TESTING LABORATORIES, Limited
CD7226-01-10-12
BEC - Phase III
Project:
Finish Date:10/11/2012
S A
M P
L E
N O
Automatic
Boring No.:
medium coarse of
Inspector:
DRY
0-10%
10/11/2012
Time
BLOWS ON
SAMPLER
PER 6"
2" O.D.
SAMPLER
Coordinates
Client:
DRY
Ground Elev.:
Northing
Easting
35-50%
Picatinny, New Jersey
Sheet
10/11/2012 f
Sampler Hammer
See Boring Location Plan
D E
P T
H
SH
Tony Mallory; Matthew Trodler
20-35%
Weight:
c
4 1/4" Auger
R ec o ve ry (I n ch es in.
Report No.:
Matthew Trodler
Boring Advance By:
140140140
Undisturbed Sample (Shelby Tube)
OPEN
Jacobs - Ammann & Whitney, JV
To 10-20%
Subsurface Investigation and -
Rock Core lbs.
S
A M
P L
E T
Y P
E
DEPTH
OF
SAMPLE
trace
Subsurface Investigation
Groundwater Observations
10/11/2012 AM
littlem
CLASSIFICATION OF MATERIAL
some
4'
Split Spoon Sample
DepthDate
Start Date:
Boring Location:
SS
M E
T H
O D
O F
A D
V A
N C
E
From
Drillers:
Estimated Groundwater
NX
D E
P T
H O
F C
H A
N G
E
AM
B-2
Fall:
Hammer Type:
Casing
A T
L-
LO
G
C D
-0 1-
0-
.G
P J
L O
G -W
E
LL
.G D
T
/2
50/2"
SS
SS
SS
SS
SS
SS
A U G E R S
Boring terminated at 10.2 feet due to auger refusal on possible bedrock or boulders.
Notes:
1) Borehole backfilled with on-site soils.
2) A composite soil sample was collected from auger cuttings from 0 to 5 feet below the surface.
0.0
2.0
4.0
6.0
8.0
10.2
2" TOPSOIL, ORGANIC MATERIAL, and Crushed Stone
Dark Brown cmf SAND; little cmf GRAVEL; little SILT; little
ORGANIC MATERIAL (topsoil, root hairs) (moist, non-plastic)
SM, [Fill]; little styrofoam fragments
Dark Brown cmf SAND; some SILT; little cmf GRAVEL; little
ORGANIC MATERIAL (roots, root hairs,wood) (moist, non-plastic) SM, [Fill]
Rusty Brown cmf SAND; and cmf GRAVEL; little SILT; trace
WOOD fragments (moist, non-plastic) SM, [Possible Fill], w=5.2%
Rusty Brown cmf SAND; some SILT; little cmf GRAVEL (moist, non-plastic) SM, w=6.7%, PL=NP, LL=NP, PI=NP
Rusty Brown Similar Soil (moist, non-plastic) SM, w=7.4%
Brown- Grey cmf GRAVEL; little cmf SAND (moist, non-plastic)
GP, ROCK fragments
2.0
4.0
6.0
8.0
10.0
10.4
0.2
4.0
6.0
10.2 fine
ATLANTIC TESTING LABORATORIES, Limited
CD7226-01-10-12
BEC - Phase III
Project:
Finish Date:10/10/2012
S A
M P
L E
N O
Automatic
Boring No.:
medium coarse of
Inspector:
DRY
0-10%
10/11/2012
Time
BLOWS ON
SAMPLER
PER 6"
2" O.D.
SAMPLER
Coordinates
Client:
DRY
Ground Elev.:
Northing
Easting
35-50%
Picatinny, New Jersey
Sheet
10/10/2012
10'30 f
10/11/2012
10/10/2012
Sampler Hammer
See Boring Location Plan
~50' SSW of Staked location
~8' SE of existing SE building corner
D E
P T
H
SH
Tony Mallory; Matthew Trodler
20-35%
Weight:
OPEN
c
4 1/4" Auger
R ec o ve ry (I n ch es in.
Report No.:
Matthew Trodler
DRY
Boring Advance By:
140140140
Undisturbed Sample (Shelby Tube)
OPEN
Jacobs - Ammann & Whitney, JV
DRY
To 10-20%
Subsurface Investigation and -
Rock Core lbs.
S
A M
P L
E T
Y P
E
DEPTH
OF
SAMPLE
trace
Subsurface Investigation
Groundwater Observations
10/10/2012 PM
littlem
CLASSIFICATION OF MATERIAL
some
4'
AM
Split Spoon Sample
DepthDate
Start Date:
Boring Location:
SS
M E
T H
O D
O F
A D
V A
N C
E
From
Drillers:
Estimated Groundwater
NX
D E
P T
H O
F C
H A
N G
E
Borehole caved at 5 feet.
PM
PM
B-4
Fall:
Hammer Type:
Casing
A T
L-
LO
G
C D
-0 1-
0-
.G
P J
L O
G -W
E
LL
.G D
T
/2
Test Pit Logs
CD-03
pdrive:Forms\Geotechnical\Test Pit Log rev 3: 10/07
ATLANTIC TESTING LABORATORIES
TEST PIT LOG
Client: Jacobs - Ammann & Whitney, JV Project No.: CD7226 Project: BEC - Phase III Test Pit No.: TP-1 Test Pit Location: Picatinny Arsenal, New Jersey Date: 10/10/2012 See Boring/Test Pit Location Plan Elevation: Not Determined
GROUNDWATER OBSERVATIONS
Date Time Hole Depth Water Depth
10/10/2012 9:30 AM 5′ DRY
10/10/2012 10:30 AM 5′ DRY
SOIL STRATIGRAPHY
Sample Number
Depth of Sample Depth of
Change
CLASSIFICATION OF MATERIALS
(‘C’ COARSE, ‘M’ MEDIUM, ‘F’ FINE)
(‘AND’ 35-50%, ‘SOME’ 20-35%, ‘LITTLE’ 10-20%, ‘TRACE’ 0-10%) From To 0.7′ 8″ TOPSOIL and ORGANIC MATERIAL
S-1
1′
5′
Rusty-Brown cmf SAND; and cmf GRAVEL; little SILT; trace CLAY (wet, non-plastic) SM, w = 9.6%
PL = NP, LL = NP, PI = NP
- roots/root hairs extended to approximately 2′
- soil matrix became moist at approximately 2′
- soil matrix contained approximately 10 to 15% COBBLES
- soil matrix contained less than 5% BOULDERS
Test pit terminated at 5.0 feet.
NOTES
1. Type of Excavator: Yanmar Universal ViO 35 Rubber-Track Excavator
2. Observed COBBLES and BOULDERS were sub-angular to sub-rounded.
3. Maximum Nominal Aggregate Size of observed BOULDERS was approximately 3 feet.
4. Test pit backfilled with on-site soils, upon completion.
ATL Representative: Matthew Trodler, IE
ATLANTIC TESTING LABORATORIES
TEST PIT LOG
Client: Jacobs - Ammann & Whitney, JV Project No.: CD7226 Project: BEC Phase III Test Pit No.: TP-1B
10/10/2012 9:45 AM 2′ DRY
Number
Depth of Sample Depth of
Change
CLASSIFICATION OF MATERIALS
(‘C’ COARSE, ‘M’ MEDIUM, ‘F’ FINE)
0.7′ 8″ TOPSOIL and ORGANIC MATERIAL
2′
Rusty-Brown cmf SAND; and cmf GRAVEL; little SILT; trace CLAY (wet, non-plastic) SM
- roots/root hairs extended to approximately 1.7′
- soil matrix became moist at approximately 2′
Rusty Brown Similar Soil (moist, non-plastic) SM
- Excavation advanced by hand to facilitate in-place percolation testing
Test pit terminated at 3.0 feet.
2. Observed COBBLES and BOULDERS were sub-angular to sub-rounded.
3. Observed Percolation Rate = 45 minutes per inch
ATLANTIC TESTING LABORATORIES
TEST PIT LOG
Client: Jacobs - Ammann & Whitney, JV Project No.: CD7226 Project: BEC Phase III Test Pit No.: TP-2
10/10/2012 10:30 AM 5′ See Note 2
10/10/2012 2:30 PM 5′ See Note 2
Number
Depth of Sample Depth of
Change
CLASSIFICATION OF MATERIALS
(‘C’ COARSE, ‘M’ MEDIUM, ‘F’ FINE)
0.8′ 10″ TOPSOIL and ORGANIC MATERIAL
S-1
1′
5′
Rusty-Brown cmf SAND; some cmf GRAVEL; little SILT; trace
- roots/root hairs extended to approximately 3.5′
- soil matrix became moist at approximately 2.5′
- soil matrix contained less than 5% BOULDERS
Test pit terminated at 5.0 feet.
2. Slight groundwater seepage observed in SW test pit corner at a depth of 4.5 to 5 feet.
3. Observed COBBLES and BOULDERS were sub-angular to sub-rounded.
4. Maximum Nominal Aggregate Size of observed BOULDERS was approximately 2.5 feet.
5. Test pit backfilled with on-site soils, upon completion.
ATLANTIC TESTING LABORATORIES
TEST PIT LOG
Client: Jacobs - Ammann & Whitney, JV Project No.: CD7226 Project: BEC Phase III Test Pit No.: TP-2B
10/10/2012 11:00 AM 2′ DRY
Number
Depth of Sample Depth of
Change
CLASSIFICATION OF MATERIALS
(‘C’ COARSE, ‘M’ MEDIUM, ‘F’ FINE)
0.8′ 10″ TOPSOIL and ORGANIC MATERIAL
2.5′
Rusty-Brown cmf SAND; some cmf GRAVEL; little SILT; trace
- roots/root hairs extended to approximately 2′
- soil matrix became moist at approximately 2.5′
- soil matrix contained approximately 10% COBBLES
Rusty Brown Similar Soil (moist, non-plastic) SM
- Excavation advanced by hand to facilitate in-place percolation testing
Test pit terminated at 3.5 feet.
2. Observed COBBLES and BOULDERS were sub-angular to sub-rounded.
3. Observed Percolation Rate = 47 minutes per inch
APPENDIX D
LABORATORY TEST REPORTS
Particle Size Distribution Curves
(no specification provided)
PL= LL= PI=
D85= D60= D50= D30= D15= D10= Cu= Cc=
USCS= AASHTO=
Reviewed by: Date:
Rusty brown cmf SAND; some mf GRAVEL; little SILT .75 .50
.375 .25 #4
#10 #20 #30 #40 #50 #100 #200
10.9078 2.3599 0.9805 0.1826
* The split spoon sampler does not recover particles larger than 1 3/8". The results may not be representative of the entire in-situ soil matrix. Natural Moisture Content: 4.3%
OUT OF
SPEC. (X)
SIEVE PERCENT SPEC.*
SIZE FINER PERCENT
P E
R C
E N
T
FI
N E
R
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel Fine Coarse Medium
% Sand Fine Silt
% Fines Clay
0 0 30 12 18 19 21 in in in
1½ in in
¾ in
½ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
Date:
Sample No: Source of Sample:
Location: Elev./Depth:
Soil Description
Atterberg Limits
Coefficients
Classification
Remarks
Figure
ATLANTIC TESTING LABORATORIES, LIMITED
Proposed BEC, Phase III, Picatinny Arsenal CD7226SL-05-10-12
Jacobs - Ammann & Whitney, JV 10-26-12
CD7226S05 Boring B-1, Split Spoon S-2 In-situ 2.0'-3.7'
Project: Report No.:
Client:
Particle Size Distribution Report
D85= D60= D50= D30= D15= D10= Cu= Cc=
USCS= AASHTO=
Reviewed by: Date:
Rusty brown cmf SAND; some mf GRAVEL; little SILT .75 .50
.375 .25 #4
#10 #20 #30 #40 #50 #100 #200
13.2798 1.2012 0.7898 0.3269
* The split spoon sampler does not recover particles larger than 1 3/8". The results may not be representative of the entire in-situ soil matrix. Natural Moisture Content: 6.4%
OUT OF
SPEC. (X)
SIEVE PERCENT SPEC.*
SIZE FINER PERCENT
P E
R C
E N
T
FI
N E
R
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel Fine Coarse Medium
% Sand Fine Silt
% Fines Clay
0 0 21 10 34 19 16 in in in
1½ in in
¾ in
½ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
Date:
Sample No: Source of Sample:
Location: Elev./Depth:
Soil Description
Atterberg Limits
Coefficients
Classification
Remarks
Figure
ATLANTIC TESTING LABORATORIES, LIMITED
Proposed BEC, Phase III, Picatinny Arsenal CD7226SL-06-10-12
Jacobs - Ammann & Whitney, JV 10-26-12
CD7226S06 Boring B-2, Split Spoon S-3 In-situ 4.0'-6.0'
Project: Report No.:
D85= D60= D50= D30= D15= D10= Cu= Cc=
USCS= AASHTO=
Reviewed by: Date:
Rusty browm cmf SAND; some SILT; little mf GRAVEL 1.00 .75 .50
.375 .25 #4
#10 #20 #30 #40 #50 #100 #200
NP NV NP
8.1167 0.9648 0.4626 0.0844
SM A-2-4(0)
* The split spoon sampler does not recover particles larger than 1 3/8". The results may not be representative of the entire in-situ soil matrix. Natural Moisture Content: 6.7 %
OUT OF
SPEC. (X)
SIEVE PERCENT SPEC.*
SIZE FINER PERCENT
P E
R C
E N
T
FI
N E
R
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel Fine Coarse Medium
% Sand Fine Silt
% Fines Clay
0 6 14 11 20 20 29 in in in
1½ in in
¾ in
½ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
Date:
Sample No: Source of Sample:
Location: Elev./Depth:
Soil Description
Atterberg Limits
Coefficients
Classification
Remarks
Figure
ATLANTIC TESTING LABORATORIES, LIMITED
Proposed BEC, Phase III, Picatinny Arsenal CD7226SL-07-10-12
Jacobs - Ammann & Whitney, JV 10-29-12
CD7226S07 Boring B-4, Split Spoon S-4 In-situ 6.0'-8.0'
Project: Report No.:
Laboratory Compaction Test Reports
Soil Corrosivity Analysis Results
C
P
Bor N
B-
B-
TP
TP
CLIENT: Jacob
PROJECT: Prop ring o.
Sample No.
-1 S-1Com
-2 S-1Com
P-1 S-1
P-2 S-1
• Points are b attached tab
** Ten points i bs - Ammann & posed BEC - Ph e Sample Depth p 1.0-5.0 p 1.0-5.0
1.0-5.0
1.0-5.0 ased on AWWA ble ndicate that soi
ATLAN
Whitney, JV hase III, Picatinn
Resistivity (ohm-cm) Po
A Specification C l is corrosive to
NTIC TE
ny Arsenal
Soil Corrosi oints* pH
5 6.8
2 6.7
2 6.4
5 7.1
C105/A21.5-99 ductile-iron pip
ESTING L
REPORT
DATE: No vity Analysis
Points* Red
0 11
0 16
0 13
0 14
Appendix A, Po e and protection
LABORA
NO.: CD7266E
ovember 7, 201
Results dox Points*
18 0
60 0
35 0
42 0 olyethylene Enc n is recommend
ATORIE
E-01-10-12 Rev.
Sulfides P trace trace trace trace casement for Du ded.
ES
Points* Moistu Point
2 1
2 1
2 1
2 1 uctile-Iron Pipe S ure ts
Total Points**
Systems, see
AWWA Specification C105/A21.5-99 – Polyethylene Encasement for Ductile-Iron Pipe Systems
Table A.1 Soil-test Evaluation
Soil Characteristics Based on Samples Taken Down to Pipe Depth Points*
Resistivity – ohm-cm (based on water saturated soil box) < 1,500 10 > 1,500 to 1,800 8 > 1,800 to 2,100 5 > 2,100 to 2,500 2 > 2,500 to 3,000 1 > 3,000 0 pH:
0 to 2 5 2 to 4 3 4 to 6.5 0
6.5 to 7.5 0**
7.5 to 8.5 0 >8.5 3
Redox Potential:
> +100 mV 0 +50 to +100 mV 3.5 0 to +50 mV 4 Negative 5
Sulfides:
Positive 3.5 Trace 2 Negative 0
Moisture:
Poor drainage, continuously wet 2 Fair drainage, generally moist 1 Good drainage, generally dry 0
* Ten points indicates that soil is corrosive to ductile-iron pipe and protection is recommended.
** If sulfides are present and low or negative redox potential results are obtained, add three points for this range.
Pace Analytical Services, Inc. e-Reports
Pace Analytical e-Report
Report prepared for:
ATLANTIC TESTING LABORATORIES, LTD
22 CORPORATE DR
CLIFTON PARK, NY 12065
CONTACT: MATTHEW TRODLER
Project ID: PICATINNY ARSENAL-BEC PHASE III Sampling Date(s): October 10, 2012 Lab Report ID: 12100472 Client Service Contact: Kelly Miller (518) 346-4592 ext. 23 Analysis Included:
Soluble Sulfate - Sub
Dan Pfalzer Laboratory Director
Certifications: NYS (EPA: NY00906, ELAP: 11078), NJ (NY026), CT (PH-0337), MA(M-NY906), NC (668)
Pace Analytical Services, Inc.| 2190 Technology Drive | Schenectady, NY 12308 Phone: 518.346.4592 | internet: www.pacelabs.com
Test results meet all National Environmental Laboratory Accreditation Conference (NELAC) requirements unless noted in the case narrative. The results contained within this document relate only to the samples included in this report. Pace Analytical is respondsible only for the certified testing and is not directly responsible for the integrity of the sample before laboratory receipt. This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.
Pace Analytical Services, Inc. 12100472 Page 1 of 16
This page intentionally left blank.
Pace Analytical Services, Inc. 12100472 Page 2 of 16
Table of Contents
Section 1: CASE NARRATIVE
Section 2: QUALIFIERS
Section 3: SAMPLE CHAIN OF CUSTODY
Section 4: Subcontract Analysis
Pace Analytical Services, Inc. 12100472 Page 3 of 16
CASE NARRATIVE
Pace Analytical Services, Inc. 12100472 Page 4 of 16
S:\Lims Data\1210\12100472\Package\CN_12100472_Rev00.doc
November 09, 2012
CASE NARRATIVE
This data package (SDG ID: 12100472) consists of 3 soil samples received on 10/26/2012. The samples are from Project Name: PICATINNY ARSENAL-BEC PHASE III.
This sample delivery group consists of the following samples:
Lab Sample ID Client ID Collection Date
AP33855 B-1; S-2 10/10/2012 14:15
AP33856 B-2; S-3 10/10/2012 10:45
AP33857 B-4; S-3 10/10/2012 13:30
Sample Delivery and Receipt Conditions
(1.) All samples were delivered to the laboratory via DROP OFF delivery service on 10/26/2012.
(2.) All samples were received at the laboratory intact and within holding times.
(3.) The following cooler temperature was recorded at sample receipt (Control limits are between 0-6 Degrees Celsius): 5.0 (IR) degrees Celsius. Please see Chain of Custody for details.
Soluable Sulfate Analysis
Analysis for soluble sulfate was performed by 9056. The following technical and administrative items were noted for the analysis:
(1.) Please see attached Phoenix Environmental Laboratory report for quality assurance details.
Respectfully submitted, Kelly A. Miller Project Manager
Pace Analytical Services, Inc. 12100472 Page 5 of 16
QUALIFIERS
Pace Analytical Services, Inc. 12100472 Page 6 of 16
� � ��������������� ������������ ��� �� PCB �����������
Pace Analytical Services, Inc. 12100472 Page 7 of 16
SAMPLE CHAIN OF CUSTODY
Pace Analytical Services, Inc. 12100472 Page 8 of 16
Pace Analytical Services, Inc. 12100472 Page 9 of 16
Subcontract Analysis
Pace Analytical Services, Inc. 12100472 Page 10 of 16
Sample Information Custody Information
Matrix:
Location Code:
Rush Request:
P.O.#:
Collected by:
Received by:
Analyzed by:
SOIL
NEASTANY
Standard
10/10/12
BA
see "By" below
Laboratory Data
B-1 S-2
Phoenix ID: BC89712
10/27/12
14:15
5:38
Parameter Result
RL/
PQL Units Date/Time By Reference
FOR: Attn: Kelly Miller Pace Analytical Services Inc.
2190 Technology Drive Schenectady, NY 12308
Analysis Report November 05, 2012
Date Time
587 East Middle Turnpike, P.O.Box 370, Manchester, CT 06045 Tel. (860) 645-1102 Fax (860) 645-0823
Environmental Laboratories, Inc.
SDG ID: GBC89712
Client ID:
Project ID: 12100472
< 10ASTM Sulfate 10 11/01/12 BS/EG 300.0/9056mg/l 1
CompletedASTM Extraction 10/30/12 X D 3987 85
Comments:
Phyllis Shiller, Laboratory Director
November 05, 2012
1 = This parameter is not certified by NY NELAC for this matrix. NY NELAC does not offer certification for all parameters at this time.
If there are any questions regarding this data, please call Phoenix Client Services at extension 200.
This report must not be reproduced except in full as defined by the attached chain of custody.
Reviewed and Released by: Johanna Harrington, Project Manager
RL/PQL=Reporting/Pratical Quantitation Level (Equivalent to NELAC LOQ, Limit of Quanitation) ND=Not Detected BRL=Below Reporting Level
Page 1 of 3 Ver 1
Pace Analytical Services, Inc. 12100472 Page 11 of 16
Location Code:
Rush Request:
P.O.#:
Collected by:
Received by:
Analyzed by:
SOIL
NEASTANY
Standard
10/10/12
BA
see "By" below
Laboratory Data
B-2 S-3
Phoenix ID: BC89713
10/27/12
10:45
5:38
Parameter Result
RL/
PQL Units Date/Time By Reference
FOR: Attn: Kelly Miller Pace Analytical…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .