W912DS-13-R-0027-0001_AMENDMENT.pdf

PDF 46 KB Posted

Attached to
Ballistic Evaluation Center, Phase III, Picatinny NJ
Solicitation number
W912DS-13-R-0027
Issued by

About this file

W912DS-13-R-0027-0001 AMENDMENT

View the file

Other files

File Type Posted
W912DS-13-R-0027_AMENDMENT_0010.pdf PDF
W912DS-13-R-0027_Amendment_0009.pdf PDF
W912DS-13-R-0028_AMENDMENT_0008.pdf PDF
Section_31_21_13_Radon_Mitigation_June_24_2013.pdf PDF
IMG_0142.JPG JPG image
IMG_0141.JPG JPG image
IMG_0143.JPG JPG image
IMG_0140.JPG JPG image
130624_BEC_Phase_III_-_Amendment_No_7_-_Full_Size_Dwgs.pdf PDF
07_27_00_45_10.pdf PDF
IMG_0155.JPG JPG image
130624_BEC_Phase_III_-_Amendment_No_7_-_Half_Size_Dwgs.pdf PDF
IMG_0138.JPG JPG image
IMG_0139.JPG JPG image
W912DS-13-R-0027_Amendment_0007.pdf PDF
W912DS-13-R-0027_AMENDMENT_0006.pdf PDF
BEC_Phase_III_-_Amendment_No_5_-_Full_Size_Dwgs.pdf PDF
BEC_PH_III_-_Amendment_0005.pdf PDF
W912DS-13-R-0027_AMENDMENT_0004.pdf PDF
130422_BEC_Phase_III_-_RTA_Drawings_-_Full_Size.pdf PDF
W912DS-13-R-0027-0003_AMENDMENT_0003.pdf PDF
Pre_Propsal_Site_Visit_31_May_13.pdf PDF
W912DS-13-R-0027-0002_Amendment.pdf PDF
W912DS-13-R-0027_Solicitation.xlsx.pdf PDF
00_80_00_00_18_Attachment_Project_Identification_Sign_Details.pdf PDF
130422_BEC_Phase_III_-_RTA_Drawings_-_Half_Size.pdf PDF
130422_BEC_Phase_III_-_Specifications_-_Volume_II.pdf PDF
00_80_00_00_18_Attachment_Soil_Management_Procedures.pdf PDF
130422_BEC_Phase_III_-_Specifications_-_Volume_I.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE30770529

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make changes to multiple sections in the solicitation.

See the attached SF 30 Continuation Page for further information.

Proposal due date has not been extended and remains 17 June 2013 at 2:00 PM (Eastern Standard Time).

NOTE: Offerors must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR PROPOSAL IN ACCORDANCE WITH THE LATE PROPOSAL, LATE MODIFICATION OF PROPOSAL, OR LATE WITHDRAWAL OF PROPOSAL (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-May-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-13-R-0027

X 9B. DATED (SEE ITEM 11)

16-May-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-May-2013

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-13-R-0027

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

The purpose of this amendment is to incorporate the following:

A) Correct the set-aside category for this solicitation. This action is for full and open competion and not set aside for small business participation. Any small business or large business may participate.

B) Display FAR CLause 52.236-27 SITE VISIT in Full Text in Section 00100 Bidding Schedule/ Instructions to Bidders.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required performance has changed

FROM a. Project: Ballistics Evaluation Center at Picatinny, NJ. The authority for this action is FAR Part 15.101-2 Lowest Price Technically Acceptable.b. The project is being solicitated as a 100% Small Business Set Asidec. The magnitude for this project is Between $5,000,000 and $10,000,000d. NAICS Code: 236210, Size Standard $33,500,000.00e. Contract Specialist:

Rippert P. Roberts III (917) 790-8166

TO a. Project: Ballistics Evaluation Center at Picatinny, NJ. The authority for this action is FAR Part 15.101-2 Lowest Price Technically Acceptable.b. The project is being solicitated for Full and Open competitionc. The magnitude for this project is Between $5,000,000 and $10,000,000d. NAICS Code: 236210, Size Standard $33,500,000.00e. Contract Specialist:

Rippert P. Roberts III (917) 790-8166.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following were previously included by reference and are now included by full text:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

W912DS-13-R-0027

Name: Robert T. Moran (Robert.T.Moran@usace.army.mil) and Doug Leite (Douglas.F.Leite@usace.army.mil)

(c) Site visit will take place at 9:30 AM (Eastern Standard Time) on 31 May 2013 at Picatinny Arsenal, New Jersey.

(d) Contractors planning on attending shall complete the attached Visitor Notification/Registration form and camera pass if they plan on bringing a camera and submit the completed forms via e‐mail to the points of contact listed above.

(e) Directions to Picatinny are attached. Visitors shall assemble in Building B‐3002 Conference Room A at 9:30 AM on 31 May 2013 for a bus ride to the site.

(f) The project site is an active construction site, bring personal protective equipment (safety shoes, hard hat) in order to participate in the site visit.

(End of provision)

(End of Summary of Changes)