W912DS-09-B-0015 Amendment 0007.pdf

PDF 63 KB Posted

Attached to
Gerritsen Creek Ecosystem Tidal Marsh & Coastal Upland Community Restoration in Brooklyn, New York
Solicitation number
W912DS-09-B-0015
Issued by

About this file

Amendment 0007 to Solicitation W912DS-09-B-0015.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL WORKS TEAM

26 FEDERAL PLAZA

NEW YORK NY 10278-0090

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Provide revised w age decision NY080003.

The Bid Opening Date remains unchanged at 22 SEP 2009 at 2PM EST.

NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: in the space provided on the SF 30, by separate letter, by telegram or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF BID IN ACCORDANCE WITH THE LATE BID, LATE

MODFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 34

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-09-B-0015

X 9B. DATED (SEE ITEM 11)

07-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Sep-2009

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE E3H0610

FACILITY CODECODE

EMAIL:TEL:

W912DS-09-B-0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

WAGE RATES

General Decision Number: NY080001 10/03/2008 NY1

Superseded General Decision Number: NY20070001

State: New York JG 01 May 2009

Construction Type: Heavy Dredging

Counties: New York Statewide.

STATEWIDE

New York

All dredging, excpt self-propelled hopper dredges, on the

Atlantic Coast and tributary waters emptying into ther Atlantic

Ocean.

Modification Number Publication Date

0 02/08/2008

1 10/03/2008

* ENGI0025-001 10/01/2008

STATEWIDE

Rates Fringes

Dredging:

CLASS A.....................$ 32.89 7.85+a+b

CLASS B1....................$ 28.49 7.85+a+b

CLASS B2....................$ 26.84 7.85+a+b

CLASS C1(a).................$ 25.55 7.55+a+b

CLASS C1....................$ 26.14 7.55+a+b

CLASS C2....................$ 25.29 7.55+a+b

CLASS D(a)..................$ 20.43 7.25+a+b

CLASS D.....................$ 21.09 7.25+a+b

CLASSIFICATIONS:

CLASS A: Lead Dredgeman, Operator, Leverman.

CLASS B1: Licensed Tug Operator over 1000 HP, Derrick

Operator, Spider/Spill Barge Operator, Engineer, Electrician. Chief Welder, Cheif Mate, Fill Placer, Operator II, Maintenance Engineer.

CLASS B2: Licensed Boat Operator, Certified Welder.

CLASS C1: Mate, Drag Barge Operator, Steward, Assistant Fill

Placer.

CLASS C1(a): Welder.

CLASS C2: Boat Operator

CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Porter/Janitor.

CLASS D(a) Oiler.

PREMIUMS: Additional 20% for hazardous material work

FOOTNOTES APPLICABLE TO ABOVE CRAFTS:

a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s

Birthday, Memorial Day, Good Friday, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day

b. VACATION: Seven percent (7%) of the straight time rate, plus $.20, multiplied by the total hours worked.

INCENTIVE PAY: (Add to Hourly Rate)

Operator (NCCCO License/Certification) $0.50 Licensed Tug

Operator over 1000 HP (Assigned as Master) (USCG licensed

Master of Towing Vessels (MOTV) $1.00;

Licensed Boat Operator (Assigned as lead boat captain) USCG licensed boat operator $0.50;

Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $0.50

Oiler (QMED and Tankerman endorsement (USCG) $0.50; All classifications (Tankerman endorsement only) USCG $0.25;

Deckhand or Mate (AB with Lifeboatman endorsement (USCG)

$0.50; All classifications (lifeboatman endorsement only

(USCG) $0.25; Welder (ABS certification) $0.50

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: NY080003 09/18/2009 NY3

Superseded General Decision Number: NY20070003

State: New York JR 18 September 2009

Construction Types: Building, Heavy, Highway and Residential

Counties: Bronx, Kings, New York, Queens and Richmond

Counties in New York.

BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS (includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 02/08/2008

1 02/15/2008

2 02/22/2008

3 02/29/2008

4 03/14/2008

5 03/21/2008

6 07/04/2008

7 07/18/2008

8 07/25/2008

9 08/08/2008

10 08/22/2008

11 08/29/2008

12 09/19/2008

13 10/03/2008

14 10/24/2008

15 11/28/2008

16 01/02/2009

17 02/06/2009

18 03/06/2009

19 04/24/2009

20 06/05/2009

21 06/19/2009

22 06/26/2009

23 07/03/2009

24 07/10/2009

25 07/17/2009

26 08/07/2009

27 08/21/2009

28 09/18/2009

ASBE0012-001 06/29/2009

Rates Fringes

Asbestos Workers/Insulator includes application of all insulating materials, protective coverings,coatings and finishing to all types of mechanical systems..........$ 50.04 28.22

HAZARDOUS MATERIAL HANDLER.......$ 24.45 8.50

BOIL0005-001 01/01/2007

Rates Fringes

BOILERMAKER......................$ 44.98 28.95+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial

Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0001-001 07/01/2009

Rates Fringes

BRICKLAYER.......................$ 48.50 20.94

MASON - STONE....................$ 55.34 22.13

* BRNY0001-002 07/01/2009

Rates Fringes

Pointer, cleaner and caulker.....$ 41.19 20.39

BRNY0003-001 07/01/2006

Rates Fringes

TERRAZZO FINISHER................$ 38.75 21.75

TERRAZZO WORKER/SETTER...........$ 40.09 21.75

* BRNY0004-001 07/01/2009

Rates Fringes

MARBLE SETTER....................$ 50.53 24.00

* BRNY0020-001 07/01/2009

MARBLE FINISHER..................$ 41.30 23.83

BRNY0024-001 01/01/2007

Rates Fringes

BRICKLAYER

MARBLE POLISHERS............$ 35.66 17.40

* BRNY0052-001 06/08/2009

Rates Fringes

Tile Layer.......................$ 46.42 24.56

* BRNY0088-001 06/08/2009

Rates Fringes

TILE FINISHER....................$ 37.27 21.31

CARP0001-009 07/01/2008

Rates Fringes

Carpenters:

Carpenters & Soft floor layers......................$ 43.02 35.96

CARP0740-001 07/01/2005

Rates Fringes

MILLWRIGHT.......................$ 38.13 35.40

CARP1456-004 07/01/2008

Rates Fringes

Dock Builder & Piledrivermen

DOCKBUILDERS................$ 43.61 38.06

CARP1456-005 07/01/2008

Diver Tender.....................$ 39.18 38.06

Diver............................$ 54.63 38.06

CARP1536-001 07/01/2003

Rates Fringes

Carpenters:

TIMBERMEN...................$ 34.47 26.05

ELEC0003-001 05/14/2009

Rates Fringes

ELECTRICIAN

Electricians................$ 49.00 34.81

Jobbing, and maintenance and repair work.............$ 25.30 15.13+a

PAID HOLIDAYS:

a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day

ELEC1049-001 04/06/2008

QUEENS COUNTY

Rates Fringes

Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;

Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment)

Groundman...................$ 24.83 17.91

Heavy Equipment Operator....$ 33.10 17.91

Lineman and Cable Splicer...$ 41.38 17.91

Tree Trimmer................$ 23.06 9.84

ELEV0001-002 03/17/2008

Rates Fringes

ELEVATOR MECHANIC

Elevator Constructor........$ 48.19 21.085+a+b

Modernization and Repair....$ 38.46 20.935+a+b

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Good Friday, President's

Day, Memorial Day, Independence Day, Labor Day, Columbus

Day, Veteran's Day, Thanksgiving Day, Friday after

Thanksgiving, and Christmas Day.

b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;

an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.

ENGI0014-001 07/01/2009

Rates Fringes

Pavement equipment operator

Asphalt Plants..............$ 44.04 27.35+a

Asphalt roller..............$ 52.55 27.35

Asphalt spreader............$ 54.03 27.35+a

Power Equipment Operator

(HEAVY & HIGHWAY)

GROUP 1....................$ 70.63 27.35+a

GROUP 2....................$ 57.77 27.35+a

GROUP 3....................$ 59.69 27.35+a

GROUP 4....................$ 58.22 27.35+a

GROUP 5....................$ 57.02 27.35+a

GROUP 6....................$ 54.64 27.35+a

GROUP 7....................$ 55.69 27.35+a

GROUP 8....................$ 54.03 27.35+a

GROUP 9....................$ 52.81 27.35+a

GROUP10....................$ 50.40 27.35+a

GROUP11....................$ 46.89 27.35+a

GROUP12....................$ 47.97 27.35+a

GROUP13....................$ 48.40 27.35+a

GROUP14....................$ 35.82 27.35+a

GROUP15....................$ 33.07 27.35+a

Steel erector

Compressors, Welding

Machines....................$ 35.03 27.35+a

Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 60.37 27.35+a

Three drum derricks.........$ 62.92 27.35+a

Utility Laborer

Horizontal boring rig.......$ 51.24 27.35+a

Off shift compressors.......$ 42.12 27.35+a

Utility Compressors.........$ 32.85 27.35

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Tower crane

GROUP 2: Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type

GROUP 3: Mine hoists and crane, etc. used as mine hoists

GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature

GROUP 5: Piledrivers, derrick boats, tunnel shovels

GROUP 6: All drills, and machines of a similar nature

GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers

GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps

GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)

GROUP 10: Concrete mixers

GROUP 11: Elevators

GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons

GROUP 13: Vibratory console

GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill

GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.

PREMIUMS ON CRANES (Crawler or Truck):

100' to 149' boom - add .50

150' to 249' boom - add .75

250' to 349' boom - add 1.00

350' to 450' boom - add 1.50

Premiums for Cranes on Steel Erection:

100' to 149' boom - add 1.75

150' to 249' boom - add 2.00

250' to 349' boom - add 2.25

350' to 450' boom - add 2.75

Tower crane - add 2.00

FOOTNOTE:

a. Paid Holidays: New Year's Day; Lincoln's Birthday;

Washington's Birthday; Memorial Day; Independence Day;

Labor Day; Veterans Day; Columbus Day; Election Day;

Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.

ENGI0014-002 07/01/2009

Rates Fringes

Power Equipment Operator

BUILDING & RESIDENTIAL

GROUP 1....................$ 56.58 27.35+a

GROUP 2....................$ 60.04 27.35+a

GROUP 3....................$ 54.58 27.35+a

GROUP 4....................$ 49.47 27.35+a

GROUP 5....................$ 36.56 27.35+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Double drum

GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks

GROUP 3: 4 pole Hoist, Single Drum Hoists

GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material

GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers

Premiums for Cranes:

100'-149' boom - add 1.75

150'-249' boom - add 2.00

250'-349' boom - add 2.25

350'-450' boom - add 2.75

Tower cranes add 2.00

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas

Day, provided the employee works one day in the payroll week in which the holiday occurs

IRON0040-002 07/01/2009

BRONX, NEW YORK, RICHMOND

IRONWORKER, STRUCTURAL...........$ 41.05 43.91

IRON0046-003 07/01/2009

Rates Fringes

IRONWORKER

METALLIC LATHERS............$ 39.00 41.37

IRON0197-001 07/01/2009

Rates Fringes

IRONWORKER

STONE DERRICKMAN............$ 40.50 38.32

IRON0361-002 07/01/2009

KINGS, QUEENS

Rates Fringes

Ironworkers:

(STRUCTURAL)................$ 41.05 43.91

IRON0580-001 01/01/2009

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 39.85 39.67

LABO0006-001 07/01/2003

Rates Fringes

Laborers:

BUILDING CONSTRUCTION

CEMENT AND CONCRETE

WORKERS....................$ 31.50 15.27

LABO0029-001 07/01/2001

Rates Fringes

Laborers:

Heavy

Blasters (hydraulic trac drill).....................$ 32.08 16.70

Blasters...................$ 31.53 16.70

Hydraulic Trac Drill.......$ 28.38 16.70

Jackhammers, Chippers, Spaders, Concrete

Breakers, All Other

Pneumatic Tools, Walk

Behind Self-Propelled

Hydraulic Asphalt and

Concrete Breaker...........$ 27.14 16.70

Powder Carriers............$ 24.50 16.70

Wagon; Airtrac; Quarry

Bar Drill Runners..........$ 27.83 16.70

LABO0078-001 12/01/2008

Rates Fringes

LABORERS

BUILDING CONSTRUCTION

ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &

HAZARDOUS WASTE LABORERS

(Hazardous Waste, Hazardous Materials, Biochemical and Mold

Remediation, HVAC, Duct

Cleaning, Re-spray

Fireproofing, etc).........$ 31.50 11.31

LABO0079-001 07/01/2009

Rates Fringes

Laborers Building Construction

Demolition Laborers

Tier A.....................$ 30.38 18.91

Tier B.....................$ 20.74 12.41

Mason Tenders...............$ 32.99 20.56

CLASSIFICATIONS

TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.

TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.

LABO0147-001 07/01/2003

Rates Fringes

Laborers:

LABORERS....................$ 28.86 30.51

FREE AIR TUNNEL WORKERS Tunnel Workers (including

Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men

Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout

Men, Gravel Men, Form Workers, Concrete Workers, Tunnel

Laborers, Mole Nipper (one (1) Mole Sipper per Working

Shaft per Shift for up to and including Two (2) Moles)

LABO0731-001 07/01/2009

Rates Fringes

Laborers:

Building, Heavy and

Residential Construction

UNSKILLED..................$ 36.64 26.21

UTILITY LABORER............$ 36.49 26.21

Heavy & Highway

Construction

LABORER/EXCAVATION

{Asbestos, Lead, Hazardous Waste Removal

(including soil)..........$ 36.64 26.21

Paid Holidays: Labor Day and Thanksgiving Day

LABO1010-001 07/01/2001

Rates Fringes

Laborers:

HIGHWAY CONSTRUCTION

Fence Installer & Repairer.$ 28.84 15.55+a

FORMSETTERS................$ 32.04 15.55+a

LABORERS...................$ 28.94 15.55+a

Landscape Planting &

Maintenance................$ 28.84 15.55+a

Maintenance Safety Surface.$ 28.44 15.55+a

Slurry/Sealcoater/Play

Equipment Installer........$ 28.69 15.55+a

Small Equipment Operator

(Not Operating

Engineer)..................$ 28.94 15.55+a

Small Power Tools Operator.$ 28.44 15.55+a

FOOTNOTES:

a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.

LABO1018-001 07/01/2001

Rates Fringes

Laborers:

Asphalt Rakers.............$ 32.36 15.55+a

Asphalt Tampers............$ 29.92 15.55+a

Landscape Planting &

Maintenance Fence

Installer/Maintenance......$ 29.81 15.55+a

Line Striping Installers...$ 29.56 15.55+a

Play Equipment/Safety

Surface Installer......$ 29.31 15.55+a

Screedman/Micropaver.......$ 32.73 15.55+a

Shoveler, General

Laborers/ All other incidental work............$ 29.81 15.55+a

Slurry/Sealcoater..........$ 29.31 15.55+a

Small Equipment Operator...$ 29.56 15.55+a

FOOTNOTE:

a. Paid Holidays: Memorial Day, Independence Day, Labor

Day, Columbus Day, Election Day, Veterans Day, and

Thanksgiving Day

PAIN0009-001 05/01/2008

Rates Fringes

GLAZIER..........................$ 38.00 29.59

Painters:

Painters, Drywall

Finishers, Lead Abatement

Worker......................$ 34.50 19.84

Spray, Scaffold and

Sandblasting................$ 37.50 19.84

PAIN0806-001 10/01/2008

Rates Fringes

Painters:

Structural Steel and Bridge.$ 45.25 27.58

PAIN1974-001 07/02/2008

Rates Fringes

Painters:

Drywall Tapers/Pointers.....$ 39.82 20.19

PLAS0260-001 07/01/1999

BRONX, NEW YORK AND RICHMOND COUNTIES:

PLASTERER........................$ 27.91 15.55

PLAS0260-002 07/01/1999

KINGS AND QUEENS COUNTIES

Rates Fringes

PLASTERER........................$ 27.91 15.16

PLAS0530-001 08/03/2005

Rates Fringes

PLASTERER

DRYWALL PLASTERERS..........$ 37.03 18.30

PLAS0780-001 07/01/2007

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 44.40 26.10

* PLUM0001-001 07/01/2009

Rates Fringes

PLUMBER

MECHANICAL EQUIPMENT AND

SERVICE

Any repair and/or replacement of the present plumbing system that does not change the existing roughing..........$ 31.61 14.45

PLUMBERS:...................$ 49.11 35.26

PLUM0638-001 07/05/2006

PLUMBER

SERVICE FITTERS.............$ 26.30 2.55

SPRINKLER FITTERS,

STEAMFITTERS................$ 43.82 32.72

Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.

ROOF0008-003 07/01/2008

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 36.25 26.34

* SHEE0028-002 07/30/2009

Rates Fringes

Sheet metal worker...............$ 45.40 37.40

TEAM0282-001 07/01/2008

Truck drivers:

TRUCK DRIVERS:

Asphalt....................$ 35.40 29.2025+a+b

Euclids & Turnapulls.......$ 35.50 29.2025+a+b

High Rise..................$ 41.81 27.1025+a+b

FOOTNOTES:

PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day and

Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.

b. VACATION: For each 15 days worked within the contract year an employee will receive one day's vacation with pay with a maximum vacation of 3 weeks per year.

TEAM0813-001 12/01/1998

Rates Fringes

Truck drivers:

GROUP 1....................$ 19.49 3.61+a

GROUP 2....................$ 19.76 3.61+a

GROUP 3....................$ 19.90 3.61+a

GROUP 4....................$ 20.23 3.61+a

GROUP 5....................$ 20.40 3.61+a

GROUP 6....................$ 21.29 3.61+a

GROUP 7....................$ 22.40 3.61+a

GROUP 8....................$ 19.90 3.61+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s

Birthday, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Thanksgiving Day, Christmas Day, Employee's Birthday, Two (2) Personal Days, and any holiday or day of mourning proclaimed as such by the State or

Federal Government.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Closed body trucks with self contained loading unit up to and including 22 yard capacity

GROUP 2: Open trucks, rack body or trucks with no self contained mechanical loading device, up to 22 yard capacity. One-container tractor hoist

GROUP 3: 10 wheel, open trucks, container loaders, dino-master, over-cab loaders, rack body trucks, or any trucks 22 yards to and including 25 yards capacity

GROUP 4: Rubbish and garbage trucks, 26 yards to and including 31 yards

GROUP 5: Single axle working non-compactor containers up to

15 yards capacity on rubbish and garbage removal

GROUP 6: Roll-off trucks up to and including 42 yard capacity

GROUP 7: Roll-off truck with more than 42 yard capacity or any tractor trailer trucks

GROUP 8: One-container tractor hoist on construction and alteration debris removal

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

General Decision Number: NY080030 02/08/2008 NY30

Superseded General Decision Number: NY20070030

State: New York JG 01 May 2009

Construction Type: Heavy Dredging

Counties: Bronx, Kings, Nassau, Queens, Richmond, Suffolk and

Westchester Counties in New York.

HOPPER DREDGE CONSTRUCTION PROJECTS

Modification Number Publication Date

0 02/08/2008

SUNY1993-003 05/24/1993

Self-Propelled Hopper Dredge, Drag Tender......................$ 8.21

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

U.S. Department of Labor

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .