W912DS-09-B-0015 Amendment 0007.pdf
PDF 63 KB Posted
- Attached to
- Gerritsen Creek Ecosystem Tidal Marsh & Coastal Upland Community Restoration in Brooklyn, New York
- Solicitation number
- W912DS-09-B-0015
About this file
Amendment 0007 to Solicitation W912DS-09-B-0015.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL WORKS TEAM
26 FEDERAL PLAZA
NEW YORK NY 10278-0090
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Provide revised w age decision NY080003.
The Bid Opening Date remains unchanged at 22 SEP 2009 at 2PM EST.
NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: in the space provided on the SF 30, by separate letter, by telegram or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF BID IN ACCORDANCE WITH THE LATE BID, LATE
MODFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 34
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Sep-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-09-B-0015
X 9B. DATED (SEE ITEM 11)
07-Aug-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Sep-2009
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE E3H0610
FACILITY CODECODE
EMAIL:TEL:
W912DS-09-B-0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE RATES
General Decision Number: NY080001 10/03/2008 NY1
Superseded General Decision Number: NY20070001
State: New York JG 01 May 2009
Construction Type: Heavy Dredging
Counties: New York Statewide.
STATEWIDE
New York
All dredging, excpt self-propelled hopper dredges, on the
Atlantic Coast and tributary waters emptying into ther Atlantic
Ocean.
Modification Number Publication Date
0 02/08/2008
1 10/03/2008
* ENGI0025-001 10/01/2008
STATEWIDE
Rates Fringes
Dredging:
CLASS A.....................$ 32.89 7.85+a+b
CLASS B1....................$ 28.49 7.85+a+b
CLASS B2....................$ 26.84 7.85+a+b
CLASS C1(a).................$ 25.55 7.55+a+b
CLASS C1....................$ 26.14 7.55+a+b
CLASS C2....................$ 25.29 7.55+a+b
CLASS D(a)..................$ 20.43 7.25+a+b
CLASS D.....................$ 21.09 7.25+a+b
CLASSIFICATIONS:
CLASS A: Lead Dredgeman, Operator, Leverman.
CLASS B1: Licensed Tug Operator over 1000 HP, Derrick
Operator, Spider/Spill Barge Operator, Engineer, Electrician. Chief Welder, Cheif Mate, Fill Placer, Operator II, Maintenance Engineer.
CLASS B2: Licensed Boat Operator, Certified Welder.
CLASS C1: Mate, Drag Barge Operator, Steward, Assistant Fill
Placer.
CLASS C1(a): Welder.
CLASS C2: Boat Operator
CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Porter/Janitor.
CLASS D(a) Oiler.
PREMIUMS: Additional 20% for hazardous material work
FOOTNOTES APPLICABLE TO ABOVE CRAFTS:
a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s
Birthday, Memorial Day, Good Friday, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day
b. VACATION: Seven percent (7%) of the straight time rate, plus $.20, multiplied by the total hours worked.
INCENTIVE PAY: (Add to Hourly Rate)
Operator (NCCCO License/Certification) $0.50 Licensed Tug
Operator over 1000 HP (Assigned as Master) (USCG licensed
Master of Towing Vessels (MOTV) $1.00;
Licensed Boat Operator (Assigned as lead boat captain) USCG licensed boat operator $0.50;
Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $0.50
Oiler (QMED and Tankerman endorsement (USCG) $0.50; All classifications (Tankerman endorsement only) USCG $0.25;
Deckhand or Mate (AB with Lifeboatman endorsement (USCG)
$0.50; All classifications (lifeboatman endorsement only
(USCG) $0.25; Welder (ABS certification) $0.50
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: NY080003 09/18/2009 NY3
Superseded General Decision Number: NY20070003
State: New York JR 18 September 2009
Construction Types: Building, Heavy, Highway and Residential
Counties: Bronx, Kings, New York, Queens and Richmond
Counties in New York.
BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS (includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 02/08/2008
1 02/15/2008
2 02/22/2008
3 02/29/2008
4 03/14/2008
5 03/21/2008
6 07/04/2008
7 07/18/2008
8 07/25/2008
9 08/08/2008
10 08/22/2008
11 08/29/2008
12 09/19/2008
13 10/03/2008
14 10/24/2008
15 11/28/2008
16 01/02/2009
17 02/06/2009
18 03/06/2009
19 04/24/2009
20 06/05/2009
21 06/19/2009
22 06/26/2009
23 07/03/2009
24 07/10/2009
25 07/17/2009
26 08/07/2009
27 08/21/2009
28 09/18/2009
ASBE0012-001 06/29/2009
Rates Fringes
Asbestos Workers/Insulator includes application of all insulating materials, protective coverings,coatings and finishing to all types of mechanical systems..........$ 50.04 28.22
HAZARDOUS MATERIAL HANDLER.......$ 24.45 8.50
BOIL0005-001 01/01/2007
Rates Fringes
BOILERMAKER......................$ 44.98 28.95+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial
Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve
BRNY0001-001 07/01/2009
Rates Fringes
BRICKLAYER.......................$ 48.50 20.94
MASON - STONE....................$ 55.34 22.13
* BRNY0001-002 07/01/2009
Rates Fringes
Pointer, cleaner and caulker.....$ 41.19 20.39
BRNY0003-001 07/01/2006
Rates Fringes
TERRAZZO FINISHER................$ 38.75 21.75
TERRAZZO WORKER/SETTER...........$ 40.09 21.75
* BRNY0004-001 07/01/2009
Rates Fringes
MARBLE SETTER....................$ 50.53 24.00
* BRNY0020-001 07/01/2009
MARBLE FINISHER..................$ 41.30 23.83
BRNY0024-001 01/01/2007
Rates Fringes
BRICKLAYER
MARBLE POLISHERS............$ 35.66 17.40
* BRNY0052-001 06/08/2009
Rates Fringes
Tile Layer.......................$ 46.42 24.56
* BRNY0088-001 06/08/2009
Rates Fringes
TILE FINISHER....................$ 37.27 21.31
CARP0001-009 07/01/2008
Rates Fringes
Carpenters:
Carpenters & Soft floor layers......................$ 43.02 35.96
CARP0740-001 07/01/2005
Rates Fringes
MILLWRIGHT.......................$ 38.13 35.40
CARP1456-004 07/01/2008
Rates Fringes
Dock Builder & Piledrivermen
DOCKBUILDERS................$ 43.61 38.06
CARP1456-005 07/01/2008
Diver Tender.....................$ 39.18 38.06
Diver............................$ 54.63 38.06
CARP1536-001 07/01/2003
Rates Fringes
Carpenters:
TIMBERMEN...................$ 34.47 26.05
ELEC0003-001 05/14/2009
Rates Fringes
ELECTRICIAN
Electricians................$ 49.00 34.81
Jobbing, and maintenance and repair work.............$ 25.30 15.13+a
PAID HOLIDAYS:
a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day
ELEC1049-001 04/06/2008
QUEENS COUNTY
Rates Fringes
Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;
Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment)
Groundman...................$ 24.83 17.91
Heavy Equipment Operator....$ 33.10 17.91
Lineman and Cable Splicer...$ 41.38 17.91
Tree Trimmer................$ 23.06 9.84
ELEV0001-002 03/17/2008
Rates Fringes
ELEVATOR MECHANIC
Elevator Constructor........$ 48.19 21.085+a+b
Modernization and Repair....$ 38.46 20.935+a+b
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Good Friday, President's
Day, Memorial Day, Independence Day, Labor Day, Columbus
Day, Veteran's Day, Thanksgiving Day, Friday after
Thanksgiving, and Christmas Day.
b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;
an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.
ENGI0014-001 07/01/2009
Rates Fringes
Pavement equipment operator
Asphalt Plants..............$ 44.04 27.35+a
Asphalt roller..............$ 52.55 27.35
Asphalt spreader............$ 54.03 27.35+a
Power Equipment Operator
(HEAVY & HIGHWAY)
GROUP 1....................$ 70.63 27.35+a
GROUP 2....................$ 57.77 27.35+a
GROUP 3....................$ 59.69 27.35+a
GROUP 4....................$ 58.22 27.35+a
GROUP 5....................$ 57.02 27.35+a
GROUP 6....................$ 54.64 27.35+a
GROUP 7....................$ 55.69 27.35+a
GROUP 8....................$ 54.03 27.35+a
GROUP 9....................$ 52.81 27.35+a
GROUP10....................$ 50.40 27.35+a
GROUP11....................$ 46.89 27.35+a
GROUP12....................$ 47.97 27.35+a
GROUP13....................$ 48.40 27.35+a
GROUP14....................$ 35.82 27.35+a
GROUP15....................$ 33.07 27.35+a
Steel erector
Compressors, Welding
Machines....................$ 35.03 27.35+a
Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 60.37 27.35+a
Three drum derricks.........$ 62.92 27.35+a
Utility Laborer
Horizontal boring rig.......$ 51.24 27.35+a
Off shift compressors.......$ 42.12 27.35+a
Utility Compressors.........$ 32.85 27.35
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Tower crane
GROUP 2: Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type
GROUP 3: Mine hoists and crane, etc. used as mine hoists
GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature
GROUP 5: Piledrivers, derrick boats, tunnel shovels
GROUP 6: All drills, and machines of a similar nature
GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers
GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps
GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)
GROUP 10: Concrete mixers
GROUP 11: Elevators
GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons
GROUP 13: Vibratory console
GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill
GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.
PREMIUMS ON CRANES (Crawler or Truck):
100' to 149' boom - add .50
150' to 249' boom - add .75
250' to 349' boom - add 1.00
350' to 450' boom - add 1.50
Premiums for Cranes on Steel Erection:
100' to 149' boom - add 1.75
150' to 249' boom - add 2.00
250' to 349' boom - add 2.25
350' to 450' boom - add 2.75
Tower crane - add 2.00
FOOTNOTE:
a. Paid Holidays: New Year's Day; Lincoln's Birthday;
Washington's Birthday; Memorial Day; Independence Day;
Labor Day; Veterans Day; Columbus Day; Election Day;
Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.
ENGI0014-002 07/01/2009
Rates Fringes
Power Equipment Operator
BUILDING & RESIDENTIAL
GROUP 1....................$ 56.58 27.35+a
GROUP 2....................$ 60.04 27.35+a
GROUP 3....................$ 54.58 27.35+a
GROUP 4....................$ 49.47 27.35+a
GROUP 5....................$ 36.56 27.35+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Double drum
GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks
GROUP 3: 4 pole Hoist, Single Drum Hoists
GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material
GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers
Premiums for Cranes:
100'-149' boom - add 1.75
150'-249' boom - add 2.00
250'-349' boom - add 2.25
350'-450' boom - add 2.75
Tower cranes add 2.00
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas
Day, provided the employee works one day in the payroll week in which the holiday occurs
IRON0040-002 07/01/2009
BRONX, NEW YORK, RICHMOND
IRONWORKER, STRUCTURAL...........$ 41.05 43.91
IRON0046-003 07/01/2009
Rates Fringes
IRONWORKER
METALLIC LATHERS............$ 39.00 41.37
IRON0197-001 07/01/2009
Rates Fringes
IRONWORKER
STONE DERRICKMAN............$ 40.50 38.32
IRON0361-002 07/01/2009
KINGS, QUEENS
Rates Fringes
Ironworkers:
(STRUCTURAL)................$ 41.05 43.91
IRON0580-001 01/01/2009
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 39.85 39.67
LABO0006-001 07/01/2003
Rates Fringes
Laborers:
BUILDING CONSTRUCTION
CEMENT AND CONCRETE
WORKERS....................$ 31.50 15.27
LABO0029-001 07/01/2001
Rates Fringes
Laborers:
Heavy
Blasters (hydraulic trac drill).....................$ 32.08 16.70
Blasters...................$ 31.53 16.70
Hydraulic Trac Drill.......$ 28.38 16.70
Jackhammers, Chippers, Spaders, Concrete
Breakers, All Other
Pneumatic Tools, Walk
Behind Self-Propelled
Hydraulic Asphalt and
Concrete Breaker...........$ 27.14 16.70
Powder Carriers............$ 24.50 16.70
Wagon; Airtrac; Quarry
Bar Drill Runners..........$ 27.83 16.70
LABO0078-001 12/01/2008
Rates Fringes
LABORERS
BUILDING CONSTRUCTION
ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &
HAZARDOUS WASTE LABORERS
(Hazardous Waste, Hazardous Materials, Biochemical and Mold
Remediation, HVAC, Duct
Cleaning, Re-spray
Fireproofing, etc).........$ 31.50 11.31
LABO0079-001 07/01/2009
Rates Fringes
Laborers Building Construction
Demolition Laborers
Tier A.....................$ 30.38 18.91
Tier B.....................$ 20.74 12.41
Mason Tenders...............$ 32.99 20.56
CLASSIFICATIONS
TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.
TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.
LABO0147-001 07/01/2003
Rates Fringes
Laborers:
LABORERS....................$ 28.86 30.51
FREE AIR TUNNEL WORKERS Tunnel Workers (including
Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men
Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout
Men, Gravel Men, Form Workers, Concrete Workers, Tunnel
Laborers, Mole Nipper (one (1) Mole Sipper per Working
Shaft per Shift for up to and including Two (2) Moles)
LABO0731-001 07/01/2009
Rates Fringes
Laborers:
Building, Heavy and
Residential Construction
UNSKILLED..................$ 36.64 26.21
UTILITY LABORER............$ 36.49 26.21
Heavy & Highway
Construction
LABORER/EXCAVATION
{Asbestos, Lead, Hazardous Waste Removal
(including soil)..........$ 36.64 26.21
Paid Holidays: Labor Day and Thanksgiving Day
LABO1010-001 07/01/2001
Rates Fringes
Laborers:
HIGHWAY CONSTRUCTION
Fence Installer & Repairer.$ 28.84 15.55+a
FORMSETTERS................$ 32.04 15.55+a
LABORERS...................$ 28.94 15.55+a
Landscape Planting &
Maintenance................$ 28.84 15.55+a
Maintenance Safety Surface.$ 28.44 15.55+a
Slurry/Sealcoater/Play
Equipment Installer........$ 28.69 15.55+a
Small Equipment Operator
(Not Operating
Engineer)..................$ 28.94 15.55+a
Small Power Tools Operator.$ 28.44 15.55+a
FOOTNOTES:
a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.
LABO1018-001 07/01/2001
Rates Fringes
Laborers:
Asphalt Rakers.............$ 32.36 15.55+a
Asphalt Tampers............$ 29.92 15.55+a
Landscape Planting &
Maintenance Fence
Installer/Maintenance......$ 29.81 15.55+a
Line Striping Installers...$ 29.56 15.55+a
Play Equipment/Safety
Surface Installer......$ 29.31 15.55+a
Screedman/Micropaver.......$ 32.73 15.55+a
Shoveler, General
Laborers/ All other incidental work............$ 29.81 15.55+a
Slurry/Sealcoater..........$ 29.31 15.55+a
Small Equipment Operator...$ 29.56 15.55+a
FOOTNOTE:
a. Paid Holidays: Memorial Day, Independence Day, Labor
Day, Columbus Day, Election Day, Veterans Day, and
Thanksgiving Day
PAIN0009-001 05/01/2008
Rates Fringes
GLAZIER..........................$ 38.00 29.59
Painters:
Painters, Drywall
Finishers, Lead Abatement
Worker......................$ 34.50 19.84
Spray, Scaffold and
Sandblasting................$ 37.50 19.84
PAIN0806-001 10/01/2008
Rates Fringes
Painters:
Structural Steel and Bridge.$ 45.25 27.58
PAIN1974-001 07/02/2008
Rates Fringes
Painters:
Drywall Tapers/Pointers.....$ 39.82 20.19
PLAS0260-001 07/01/1999
BRONX, NEW YORK AND RICHMOND COUNTIES:
PLASTERER........................$ 27.91 15.55
PLAS0260-002 07/01/1999
KINGS AND QUEENS COUNTIES
Rates Fringes
PLASTERER........................$ 27.91 15.16
PLAS0530-001 08/03/2005
Rates Fringes
PLASTERER
DRYWALL PLASTERERS..........$ 37.03 18.30
PLAS0780-001 07/01/2007
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 44.40 26.10
* PLUM0001-001 07/01/2009
Rates Fringes
PLUMBER
MECHANICAL EQUIPMENT AND
SERVICE
Any repair and/or replacement of the present plumbing system that does not change the existing roughing..........$ 31.61 14.45
PLUMBERS:...................$ 49.11 35.26
PLUM0638-001 07/05/2006
PLUMBER
SERVICE FITTERS.............$ 26.30 2.55
SPRINKLER FITTERS,
STEAMFITTERS................$ 43.82 32.72
Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.
ROOF0008-003 07/01/2008
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply
Roofs............................$ 36.25 26.34
* SHEE0028-002 07/30/2009
Rates Fringes
Sheet metal worker...............$ 45.40 37.40
TEAM0282-001 07/01/2008
Truck drivers:
TRUCK DRIVERS:
Asphalt....................$ 35.40 29.2025+a+b
Euclids & Turnapulls.......$ 35.50 29.2025+a+b
High Rise..................$ 41.81 27.1025+a+b
FOOTNOTES:
PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day and
Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.
b. VACATION: For each 15 days worked within the contract year an employee will receive one day's vacation with pay with a maximum vacation of 3 weeks per year.
TEAM0813-001 12/01/1998
Rates Fringes
Truck drivers:
GROUP 1....................$ 19.49 3.61+a
GROUP 2....................$ 19.76 3.61+a
GROUP 3....................$ 19.90 3.61+a
GROUP 4....................$ 20.23 3.61+a
GROUP 5....................$ 20.40 3.61+a
GROUP 6....................$ 21.29 3.61+a
GROUP 7....................$ 22.40 3.61+a
GROUP 8....................$ 19.90 3.61+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s
Birthday, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Thanksgiving Day, Christmas Day, Employee's Birthday, Two (2) Personal Days, and any holiday or day of mourning proclaimed as such by the State or
Federal Government.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Closed body trucks with self contained loading unit up to and including 22 yard capacity
GROUP 2: Open trucks, rack body or trucks with no self contained mechanical loading device, up to 22 yard capacity. One-container tractor hoist
GROUP 3: 10 wheel, open trucks, container loaders, dino-master, over-cab loaders, rack body trucks, or any trucks 22 yards to and including 25 yards capacity
GROUP 4: Rubbish and garbage trucks, 26 yards to and including 31 yards
GROUP 5: Single axle working non-compactor containers up to
15 yards capacity on rubbish and garbage removal
GROUP 6: Roll-off trucks up to and including 42 yard capacity
GROUP 7: Roll-off truck with more than 42 yard capacity or any tractor trailer trucks
GROUP 8: One-container tractor hoist on construction and alteration debris removal
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
General Decision Number: NY080030 02/08/2008 NY30
Superseded General Decision Number: NY20070030
State: New York JG 01 May 2009
Construction Type: Heavy Dredging
Counties: Bronx, Kings, Nassau, Queens, Richmond, Suffolk and
Westchester Counties in New York.
HOPPER DREDGE CONSTRUCTION PROJECTS
Modification Number Publication Date
0 02/08/2008
SUNY1993-003 05/24/1993
Self-Propelled Hopper Dredge, Drag Tender......................$ 8.21
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
U.S. Department of Labor
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .