W912DS-09-B-0015 Amend 0001 Specification revisions.pdf
PDF 274 KB Posted
- Attached to
- Gerritsen Creek Ecosystem Tidal Marsh & Coastal Upland Community Restoration in Brooklyn, New York
- Solicitation number
- W912DS-09-B-0015
About this file
Specification revisions associated with Amendment 0001 to Solicitation W912DS-09-B-0015.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Marine Park: Tidal Marsh & Coastal Upland Ecosystem Restoration GERRITSN
SECTION 12 93 00
SITE FURNISHINGS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALUMINUM ASSOCIATION (AA)
AA DAF-45 (2003) Designation System for Aluminum Finishes
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 611 (1998) Voluntary Specification for Anodized Architectural Aluminum
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 303 (2005) Code of Standard Practice for Steel Buildings and Bridges
AISC 360 (2005) Specification for Structural Steel Buildings, with Commentary
AMERICAN INSTITUTE OF TIMBER CONSTRUCTION (AITC)
AITC A190.1 (2002) Structural Glued Laminated Timber
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.3 (2006) Operations - Safety Requirements for Powder Actuated Fastening Systems
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2006; Errata 2006) Structural Welding Code - Steel
AMERICAN WOOD-PRESERVERS' ASSOCIATION (AWPA)
AWPA C1 (2003) All Timber Products - Preservative Treatment by Pressure Processes
AWPA C9 (2003) Plywood - Preservative Treatment by Pressure Processes
AWPA M2 (2001) Standard for Inspection of Treated Wood Products
SECTION 12 93 00 Page 1
ASME INTERNATIONAL (ASME)
ASME B18.2.1 (1996; Addenda A 1999; Errata 2003; R 2005) Square and Hex Bolts and Screws (Inch Series)
ASME B18.2.2 (1987; R 2005) Standard for Square and Hex Nuts (Inch Series)
ASME B18.21.1 (1999; R 2005) Lock Washers (Inch Series)
ASME B18.21.2M (1999; R 2005) Lock Washers (Metric Series)
ASME B18.22.1 (1965; R 2003) Plain Washers
ASME B18.22M (1981; R 2005) Metric Plain Washers
ASME B18.6.2 (1998; R 2005) Slotted Head Cap Screws, Square Head Set Screws, and Slotted Headless Set Screws: Inch Series
ASME B18.6.3 (2003) Machine Screws and Machine Screw Nuts
ASTM INTERNATIONAL (ASTM)
ASTM A 123/A 123M (2002) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A 153/A 153M (2005) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A 185/A 185M (2007) Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete
ASTM A 307 (2007b) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
ASTM A 36/A 36M (2005) Standard Specification for Carbon Structural Steel
ASTM A 47/A 47M (1999; R 2004) Standard Specification for Steel Sheet, Aluminum-Coated, by the Hot-Dip Process
ASTM A 48/A 48M (2003) Standard Specification for Gray Iron Castings
ASTM A 500/A 500M (2007) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A 501 (2007) Standard Specification for Hot-Formed Welded and Seamless Carbon
SECTION 12 93 00 Page 2
Steel Structural Tubing
ASTM A 53/A 53M (2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A 615/A 615M (2007) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A 653/A 653M (2007) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A 780 (2001; R 2006) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM B 108 (2006) Standard Specification for Aluminum-Alloy Permanent Mold Castings
ASTM B 209 (2007) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B 209M (2007) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate (Metric)
ASTM B 221 (2006) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM B 221M (2007) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)
ASTM B 26/B 26M (2005) Standard Specification for Aluminum-Alloy Sand Castings
ASTM B 429/B 429M (2006) Standard Specification for Aluminum-Alloy Extruded Structural Pipe and Tube
ASTM B 62 (2002) Standard Specification for Composition Bronze or Ounce Metal Castings
ASTM C 1048 (2004) Standard Specification for Heat-Treated Flat Glass - Kind HS, Kind FT Coated and Uncoated Glass
ASTM C 150 (2007) Standard Specification for Portland Cement
ASTM C 260 (2006) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C 33 (2007) Standard Specification for Concrete Aggregates
SECTION 12 93 00 Page 3
ASTM C 94/C 94M (2007) Standard Specification for Ready-Mixed Concrete
ASTM C 979 (2005) Pigments for Integrally Colored Concrete
ASTM D 1187 (1997; R 2002e1) Asphalt-Base Emulsions for Use as Protective Coatings for Metal
ASTM D 2990 (2001) Tensile, Compressive, and Flexural Creep and Creep-Rupture of Plastics
ASTM D 3451 (2006) Testing Coating Powders and Powder Coatings
ASTM D 4060 (2007) Abrasion Resistance of Organic Coatings by the Taber Abraser
ASTM D 4802 (2002) Poly(Methyl Methacrylate) Acrylic Plastic Sheet
ASTM D 648 (2007) Deflection Temperature of Plastics Under Flexural Load in the Edgewise Position
ASTM E 488 (1996; R 2003) Standard Test Methods for Strength of Anchors in Concrete and Masonry Elements
ASTM F 1487 (2007ae1) Playground Equipment for Public Use
NATIONAL HARDWOOD LUMBER ASSOCIATION (NHLA)
NHLA Rules (2003) Rules for the Measurement & Inspection of Hardwood & Cypress
PRECAST/PRESTRESSED CONCRETE INSTITUTE (PCI)
PCI MNL-117 (1996) Quality Control for Plants and Production of Architectural Precast Concrete Products
PCI MNL-128 (2001) Glass Fiber Reinforced Concrete Panels
REDWOOD INSPECTION SERVICE (RIS) OF THE CALIFORNIA REDWOOD
ASSOCIATION (CRA)
RIS Grade Use (1998) Redwood Lumber Grades and Uses
SOUTHERN PINE INSPECTION BUREAU (SPIB)
SPIB 1003 (2002) Standard Grading Rules for Southern Pine Lumber
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC Paint 25 (1997; E 2004) Paint Specification No.
SECTION 12 93 00 Page 4
25Zinc Oxide, Alkyd, Linseed Oil Primer for Use Over Hand Cleaned Steel Type I and Type II
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS A-A-1925 (Rev A; Notice 1) Shield, Expansion (Nail Anchors)
WEST COAST LUMBER INSPECTION BUREAU (WCLIB)
WCLIB 17 (2000) Standard Grading Rules
WESTERN WOOD PRODUCTS ASSOCIATION (WWPA)
WWPA G-5 (1998) Western Lumber Grading Rules
1.2 SCOPE OF WORK
Work under this section shall include: reinstallation of specified park amenities that were removed during site clearing; furnishing and installing Cor-Ten Steel Beam Guide Rail; furnishing and installing Custom Granite Bollards; furnishing and installing Permanent Photo Point Monuments; and furnishing and installing new benches along the Nature Trail, in accordance with the plans, specifications and directions of the Contracting Officer.
Work shall also include the restoration of any areas damaged during the work, clean-up of work areas, and disposal of any excess materials to the satisfaction of the Contracting Officer.
The Contractor shall carefully protect all preserved areas as shown on the plans, and shall also be liable for any and all damages to property caused by the work under this section. Any damages to property or to vegetation within preserved areas shall be restored to the original conditions to the satisfaction of the Contracting Officer.
1.3 MEASUREMENT AND PAYMENT
1.3.1 Payment Item - Reinstallation of Park Signs
Work under this item shall be measured by the number of Park Signs installed in accordance with the plans, specifications, and directions of the Contracting Officer.
The price bid shall be the unit price per each Park Sign installed including the cost of all labor, materials, equipment, and incidental expenses necessary to complete the work under this item, including excavation and backfilling, in accordance with the plans and specifications, and to the satisfaction of the Contracting Officer. The price bid shall also include the restoration of any areas damaged during the work, clean-up of work areas, and disposal of any excess materials to the satisfaction of the Contracting Officer.
Any existing Park Signs or associated materials that are damaged during removal under Section 31 00 00 SITE CLEARING that are to be reinstalled under this item shall be replaced by the Contractor to the satisfaction of the Contracting Officer at no cost to the U.S. Army Corps of Engineers-New York District.
SECTION 12 93 00 Page 5
1.3.2 Payment Item - Reinstallation of Park Benches
Work under this item shall be measured by the number of Park Benches installed in accordance with the plans, specifications, and directions of the Contracting Officer.
The price bid shall be the unit price per each Park Bench installed including the cost of all labor, materials, equipment, and incidental expenses necessary to complete the work under this item, including excavation and backfilling, in accordance with the plans and specifications, and to the satisfaction of the Contracting Officer. The price bid shall also include the restoration of any areas damaged during the work, clean-up of work areas, and disposal of any excess materials to the satisfaction of the Contracting Officer.
Any existing Park Bench or associated materials that are damaged during removal under Section 31 00 00 SITE CLEARING that are to be reinstalled under this item shall be replaced by the Contractor to the satisfaction of the Contracting Officer at no cost to the U.S. Army Corps of Engineers-New York District.
1.3.3 Payment Item - Removal and Resetting Existing Guiderail
Work under this item shall be measured by the number of linear feet of Guiderail installed in accordance with the plans, specifications, and directions of the Contracting Officer.
The price bid shall be the unit price per linear foot of Guiderail installed including the cost of all labor, materials, equipment, and incidental expenses necessary to complete the work under this item, including excavation and backfilling, in accordance with the plans and specifications, and to the satisfaction of the Contracting Officer. The price bid shall also include the restoration of any areas damaged during the work, clean-up of work areas, and disposal of any excess materials to the satisfaction of the Contracting Officer.
Any existing Park Backless Bench or associated materials that are damaged during removal under Section 31 00 00 SITE CLEARING that are to be reinstalled under this item shall be replaced by the Contractor to the satisfaction of the Contracting Officer at no cost to the U.S. Army Corps of Engineers-New York District.
1.3.4 Payment Item - Resetting of Existing Park Boulders
Work under this item shall be measured by the number of Park Boulders removed and reinstalled in accordance with the plans, specifications, and directions of the Contracting Officer.
The price bid shall be the unit price per each Park Boulder removed and reinstalled including the cost of all labor, materials, equipment, and incidental expenses necessary to complete the work under this item, including excavation and backfilling, in accordance with the plans and specifications, and to the satisfaction of the Contracting Officer. The price bid shall also include the restoration of any areas damaged during the work, clean-up of work areas, and disposal of any excess materials to the satisfaction of the Contracting Officer.
Any existing Park Boulder or associated materials that are damaged during removal under Section 31 00 00 SITE CLEARING that are to be reinstalled under
SECTION 12 93 00 Page 6 this item shall be replaced by the Contractor to the satisfaction of the Contracting Officer at no cost to the U.S. Army Corps of Engineers-New York District.
1.3.5 Payment Item - Custom Granite Bollards for Rock Bumpout
This item will be measured by the number of Custom Granite Bollards installed in accordance with the plans, specifications, and directions of the Contracting Officer.
The price bid shall be the unit price per each Custom Granite Bollard installed and shall include the cost of all labor, materials, equipment, and incidentals necessary to complete the work, including excavation and backfilling, in accordance with the plans and specifications, to the satisfaction of the Contracting Officer. The price bid shall also include the restoration of any areas damaged during the work, clean-up of work areas, and disposal of any excess materials to the satisfaction of the Contracting Officer.
Any existing park amenities or associated materials that are damaged during removal under Section 31 10 00 SITE CLEARING that are to be reinstalled under this item shall be repaired and replaced by the Contractor to the satisfaction of the Contracting Officer at no cost to the U.S. Army Corps of Engineers-New York District.
1.3.6 Payment Item - Cor-Ten Steel Box Beam Guide Rails
This item will be measured as the number of linear feet of Cor-Ten Steel Box Beam Guide Rail erected, measured along axis of the railing, from end of end cover to end of end cover, in accordance with the plans, specifications, and directions of the Contracting Officer.
The unit price bid per linear foot of guide rail installed shall include the cost of all labor, materials, equipment, and incidentals necessary to complete the work under this item, including excavation, backfilling, and welding and welding materials, in accordance with the plans and specifications, and to the satisfaction of the Contracting Officer.
1.3.7 Payment Item - Permanent Photo Point Monuments
This item will be measured by the number of Permanent Photo Point Monuments installed in accordance with the plans, specifications, and directions of the Contracting Officer.
The price bid shall be the unit price per each 39-inch bollard installed and shall include the cost of all labor, materials, equipment, and incidentals necessary to complete the work, including excavation and backfilling, in accordance with the plans and specifications, to the satisfaction of the Contracting Officer. The price bid shall also include the restoration of any areas damaged during the work, clean-up of work areas, and disposal of any excess materials to the satisfaction of the Contracting Officer.
1.3.8 Payment Item - Osprey Nest Platforms
Work under this item shall be measured by the number of Osprey Nest Platforms installed in accordance with the plans, specifications, and directions of the Contracting Officer.
SECTION 12 93 00 Page 7
The price bid shall be the unit price per each Osprey Nest Platform furnished and installed including the cost of all labor, materials, equipment, and incidental expenses necessary to complete the work under this item, including excavation and backfilling, in accordance with the plans and specifications, and to the satisfaction of the Contracting Officer. The price bid shall also include the restoration of any areas damaged during the work, clean-up of work areas, and disposal of any excess materials to the satisfaction of the Contracting Officer.
1.3.9 Payment Item - Benches (new if nedeed)
Work under this item shall be measured by the number of Park Benches installed in accordance with the plans, specifications, and directions of the Contracting Officer.
The price bid shall be the unit price if needed per each New Park Bench installed including the cost of all labor, materials, equipment, and incidental expenses necessary to complete the work under this item, including excavation and backfilling, in accordance with the plans and specifications, and to the satisfaction of the Contracting Officer. The price bid shall also include the restoration of any areas damaged during the work, clean-up of work areas, and disposal of any excess materials to the satisfaction of the Contracting Officer.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00.00 18 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Reinstalled Park Amenities Drawings; G, RO Cor-Ten Steel Box Beam Guide Rails Drawings; G, RO Granite Bollards and Monuments Drawings; G, RO Benches Drawings; G, RO Osprey Nest Platforms Drawings; G, RO
Submit drawings showing scaled details of site furnishings, including elevations; dimensions; details; mounting methods; shape and thickness of materials; and details of construction and/or installation. Drawings shall be submitted 30 days prior to start of construction.
SD-03 Product Data
Cor-Ten Steel Box Beam Guide Rails; G, RO Granite Bollards and Monuments Granite; G, RO Benches; G, RO
Submit product information 30 days prior to starting work.
Recycled HDPE Lumber; G, RO
Submit product specification data, providing test information
SECTION 12 93 00 Page 8 for deflection and creep in accordance with ASTM D 648 and ASTM D 299. The data shall provide a comparison of deflection and creep measurements to other comparable materials.
SD-06 Test Reports
Testing
Submit a report of post-installation test results for each site furnishing within 3 days of installation of the last site furnishing of each type.
SD-07 Certificates
Testing Laboratory Qualifications; G, RO
Submit qualifications of the commercial testing laboratory when test reports are submitted.
1.5 DELIVERY, INSPECTION, STORAGE, AND PROTECTION
Materials shall be delivered, handled, and stored in accordance with the manufacturer's recommendations. Site furnishings shall be inspected upon arrival at the job site for conformity to specifications and quality in accordance with paragraph MATERIALS. The Contractor shall protect materials from corrosion, staining, and other types of damage, store items in designated areas free from contact with soil and weather, and remove and replace any damaged items with new items.
PART 2 PRODUCTS
2.1 MATERIALS
Materials shall be the standard products of a manufacturer regularly engaged in the manufacture of such products. The materials provided shall be of a type with proven satisfactory usage for at least 2 years.
2.1.1 Reinstalled Park Amenities
Specified park amenities removed during Section 31 10 00 SITE CLEARING shall be the materials to be reinstalled.
Cast-in-place concrete materials and products used for support piers for reinstalled benches and signs shall conform to Section 03 31 01.00 10
CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS.
2.1.2 Cor-Ten Steel Box Beam Guide Rails
Custom guide rails shall be furnished with no sharp edges or protruding hardware. Beams and posts shall be straight and uniform in section; warped or deformed elements will be rejected. Wherever Cor-Ten is shown on the plans, all components including posts, rails, and end sections shall be Cor-Ten steel (also known as Weathering Steel). All guide rail materials shall conform to ASTM A 588/A 588M. The guide rails shall consist of the following:
a. Rails: Box beam rails shall be Cor-Ten steel tubing, with post bolt slots of the sizes and locations shown on the plans drilled prior
SECTION 12 93 00 Page 9 to delivery.
b. Posts: Standard weight, with bolt slots of the sizes and locations shown on the plans drilled prior to delivery.
c. Bolts, nuts, and washers: Bolts and nuts shall be galvanized steel. All bolts and nuts shall be designed to develop the required joint strength. The heads of splice bolts shall be shallow, button-type, neatly rounded to provide the minimum obstruction.
d. Splice plates: Splice plates shall have bolt slots drilled prior to delivery.
2.1.3 Granite Bollards and Monuments
Each bollard or monument shall be constructed of a single piece of granite.
The bollards and monuments shall be a split face finish. Granite bollards and monuments shall consist of the following:
-Granite: Granite shall be monument grade, dense, free from cracks, seams or starts which may impair the structural integrity or function, conforming to ASTM C 615. Granite shall be pre-drilled to accept the stainless steel pins. For the bollards, the color shall be green, matching existing bollards on the Project Site. For the monuments, the color shall be black. Granite colors shall match the approved sample and acceptable by the Contracting Officer prior to installation.
- Concrete Footing: Concrete materials and products used for bollard footings shall meet requirements of and conform to Section 03 31 01.00 10
CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS.
- Grout: Epoxy grout.
- Pins: Stainless steel conforming to ASTM A 304.
- Rebar: Steel bar reinforcements conforming to the requirements of ASTM A 615/A 615M.
- Mortar: Laticrete modified Type M mortar. Admixture shall be Laticrete 8510, or approved equal. Mortar shall be pigmented to match the granite.
2.1.4 Benches
Benches shall be furnished with no sharp edges or protruding hardware.
Seats shall support a minimum 300 pounds for each person they are designed to accommodate. Benches shall consist of the following:
2.1.4.1 Steel Standards
Steel standards for Benches shall consist of tubular steel supports and a steel channel frame as shown on the plans. The frame shall be furnished with factory drilled holes. Components shall be free of excess weld and spatter. Metal components with holes that will not be filled by hardware or hidden by other components will be rejected. Structural steel products shall conform to ASTM A 36/A 36M, ASTM A 500, and ASTM A 501.
SECTION 12 93 00 Page 10
2.1.4.2 Plastics
Recycled HDPE Lumber shall contain 100 percent recycled post-consumer product and shall conform to U.S. Environmental Protection Agency requirements in accordance with Section 01 67 00.00 18 RECYCLED/RECOVERED
MATERIALS.
Recycled lumber shall be constructed or manufactured with a maximum 1/4 inch deflection or creep in any member in conformance with ASTM D 648 and ASTM D 2990. The HDPE material shall be: ultraviolet and color stabilized;
resistant to deformation from solar radiation heat gain; fading, cracking, fogging, and shattering; contain no more than 3 percent air voids; non-toxic; free from strong odors, marks, blemishes, discolorations, checks, warp, twist, quirk, or other imperfections; and have no discernible contaminates such as paper, foil or wood. All lumber slats shall be of one piece construction; no spliced slats will be allowed. Slats shall be smooth on all sides and ends. All surfaces shall be sanded after being worked to the required dimension, and shall be free of all grading marks and colors.
Recycled lumber edges shall be smoothed, rounded, and free of burrs and points. Recycled HDPE lumber will not be used as structural components of site furnishings.
2.1.4.3 Hardware
Hardware shall be galvanized steel in accordance with ASTM A 153/A 153M and compatible with the material to which applied. All exposed hardware shall match in color and finish. Mounting hardware shall be concealed, recessed, and plugged.
Bolts and nuts shall conform to the requirements of ASME B18.2.2 or ASTM A 307.
Washers shall conform to ASME B18.22.1 or ASME B18.21.1.
2.1.4.4 Accessories
The Contractor shall provide manufacturer's standard materials and accessories as required for assembly of units and as indicated on the shop drawings for the site furnishings. The Contractor shall separate dissimilar materials to prevent electrolytic action.
2.1.4.5 Concrete
Cast-in-place concrete materials and products used for bench piers shall conform to Section 03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR
CIVIL WORKS.
2.1.4.6 Galvanizing
Tubular Steel Supports shall be hot-dipped galvanized after fabrication.
Galvanizing shall conform to ASTM A 123/A 123M or ASTM A 153/A 153M, as applicable. Tailings and sharp protrusions formed as a result of the hot-dip process shall be removed and exposed edges burnished. Hardware and other parts or devices shall be galvanized as necessary for proper installation, unless otherwise indicated.
2.1.4.7 Extra Materials
The Contractor shall furnish (supply and deliver only, not install) extra
SECTION 12 93 00 Page 11 materials as follows:
a. 8 recycled HDPE lumber slats, 3 inch x 8 inch (nominal size), 8 feet in length, conforming to the requirements of the subparagraph Plastics above.
b. 16 sets of hardware, including a 18-8 stainless steel carriage bolt 3/8 inch diameter x 3 1/2 inch long, a 3/8 inch lock washer, and a stainless steel nut, conforming to the requirements of thesubparagraph Hardware above.
c. 4 slotted head, 18-8 stainless steel, vandal-resistant carriage bolts, 3/8 inch diameter x 3 1/2 inch long, conforming to the requirements of the subparagraph Hardware above.
2.1.5 Osprey Nest Platform
Lumber for Osprey Nest Platforms shall conform to the materials requirements described in Section 06 10 00 ROUGH CARPENTRY.
PART 3 EXECUTION
3.1 GENERAL INSTALLATION
The Contractor shall verify that finished grades and other operations affecting mounting surfaces have been completed prior to the reinstallation and installation of site furnishings. Site furnishings shall be installed plumb and true, at locations indicated, and in accordance with the approved manufacturer's instructions and shop drawings.
Items shall be shipped knocked-down ready for site assembly. Packaged components shall be complete, including all accessories and hardware. New parts shall be acquired from the manufacturer; substitute parts will not be accepted unless approved by the manufacturer. When the inspection of parts has been completed by the Contracting Officer, the Contractor shall assemble the site furnishings according to the manufacturer's instructions or as indicated on the plans. When site furnishings are assembled at the site, assembly shall not interfere with other operations or pedestrian and vehicular circulation.
Any vegetation within preserved areas damaged by the work under this section, as determined by the Contracting Officer, shall be replaced immediately after the completion of the work at no additional cost to the Government.
3.2 WELDING
Welders shall be qualified in accordance with AWS D1.1/D1.1M and use procedures, materials, and equipment of the type required for work under this Contract. All welding, welding inspection, and corrective welding shall be performed in accordance with AWS D1.1/D1.1M. Continuous welds shall be used on all exposed connections. Visible welds shall be ground smooth.
3.3 EXCAVATION, COMPACTION, AND BACKFILLING
Excavation, compaction, and backfilling shall be in accordance with the applicable requirements of Section 31 00 00 EARTHWORK.
SECTION 12 93 00 Page 12
3.4 REINSTALLATION OF PARK AMENITIES
Existing park amenities that are removed under Section 31 11 00 CLEARING EXISTING VEGETATION AND DEBRIS FROM THE RESTORATION AREA shall be reinstalled at the locations shown on the plans. The Contracting Officer shall inspect and approve all existing park amenities prior to reinstallation, including the pouring of concrete. The Contractor shall repair or replace any amenities that are disturbed during removal.
3.5 COR-TEN STEEL BEAM GUIDE RAILS
The Contractor shall excavate and compact for each post as shown on the plans. Excavation and compaction shall be approved by the Contracting Officer prior to pouring concrete. Posts shall be set in the concrete as shown on the plans, true to line and grade. Rails shall be set along the posts as shown on the plans and fillet welded as shown on the plans. Rails shall be spliced at or near each post by lapping or by butt joints with suitable splice plates allowing for 1/8 inch change in temperature. The splice plates shall make contact with the beams throughout the spliced area. Bolt holes in the beam at the post bolt and elsewhere shall be enlarged or slotted as necessary to permit expansion and contraction and to facilitate installation. Bolts shall be drawn tight and shall extend 1/4 inch to 1/2 inch beyond the nuts, unless otherwise directed by the Contracting Officer. The rail sections shall be installed in such a manner as to produce a smooth, continuous rail.
Posts shall be driven vertically plumb to the required depth in such manner and by such means as to insure no damage to the galvanized coating material. Water jetting in driving posts will not be permitted. The driving shall be accomplished with approved equipment and methods that will leave the posts in their final position, free of any distortion, burring or other damage. Where the proposed location of the post is not accessible by a driver, the hole shall be hand augered, the post set, then the earth compacted back against the post.
Each open end of every beam rail installation, including sections of interrupted rail, shall be capped with a terminal section as indicated on the plans. Each terminal section shall be made of the same material as that used in the construction of the beam rail.
The guide rail shall be interrupted for all vertical obstructions, including trees, clumps of trees, utility poles, fire hydrants, and any others elements as determined by the Contracting Officer. The Contractor shall allow a 1-foot space on either side of the vertical element from the end of the appropriate terminal section.
3.6 not used
3.7 BENCHES
The Contractor shall excavate and compact for each bench as shown on the plans. The Contracting Officer shall approve excavation and compaction for each bench prior to pouring concrete. Tubular steel supports shall be set in the concrete with supports vertical and true to line and position, as shown on the plans. The steel channel frames shall be fillet welded to the supports. The lumber slats shall be secured to the channel frames with bolts, as indicated on the plans. Bolt ends shall be peened.
SECTION 12 93 00 Page 13
3.8 OSPREY NEST PLATFORMS
The Contractor shall excavate and compact for each platform as shown on the plans. Platforms shall be constructed as shown on the plans and in accordance with the installation requirements of Section 06 10 00 ROUGH
CARPENTRY.
3.9 FINISHES
3.9.1 Field Finishes
Where dissimilar metals are in contact, the Contractor shall protect surfaces with a coat conforming to FS TT-P-664 to prevent galvanic or corrosive action.
3.9.2 Repair of Zinc-Coated Surfaces
The Contractor shall repair damaged surfaces with galvanizing repair method and paint conforming to ASTM A 780 or by the application of stick or thick paste material specifically designed for repair of galvanizing, as approved by the Contracting Officer. Areas to be repaired shall be cleaned and slag removed from the welds. Surfaces to which stick or paste material is applied shall be heated with a torch to a temperature sufficient to melt the metallics in stick or paste. The molten material shall then be spread uniformly over surfaces to be coated and excess material wiped off.
3.10 TESTING
Each site furnishing shall be tested to determine a secure and correct installation. The Contractor shall determine that the installation is correct by measuring the physical dimensions and clearance of each installed site furnishing for compliance with manufacturer's recommendations and/or as shown on the plans. Site furnishings which do not comply shall be reinstalled. Fasteners determined to be non-compliant shall be replaced. Written reports describing the results of the testing for each type of site furnishing shall be submitted.
Where re-installation is required, the following shall be accomplished:
a. Re-install the product as specified. Material acquisition of replacement parts is the responsibility of the Contractor.
Provide replacement materials that are new and supplied by the original manufacturer to match.
b. Damage caused by the failed installation shall be repaired.
3.11 RESTORATION AND CLEAN UP
When reinstallation of park amenities and installation of site furnishings have been completed, the Contractor shall restore any areas damaged during reinstallation and/or installation operations to their original conditions.
Reinstallation and installation work areas shall also be cleaned up, including the removal of any excess materials. The Contractor shall remove damaged, excess, and waste materials from the Project Site and dispose of the materials off Government property.
Reinstalled and newly installed site furnishing surfaces shall be cleaned of dirt, stains, filings, excess materials, and other blemishes occurring
SECTION 12 93 00 Page 14 from shipment and reinstallation or installation to the satisfaction of the Contracting Officer. Cleaning methods and agents shall be according to manufacturer's instructions or as indicated.
-- End of Section --
SECTION 12 93 00 Page 15
SECTION 31 10 00
SITE CLEARING
PART 1 GENERAL
1.1 SCOPE OF WORK
At least 45 days after the herbicide application (applied by Others), Work under this section includes the removal of all floatable debris that makes its way within the project limits during the construction period and maintenance period. Such debris includes, but is not limited to, general trash, wood, tires, and any other undesirable materials that could interfere with the successful establishment of the newly-planted vegetation. Also included in the section is the removal of undesirable vegetation such as invasive species plants that might establish among the new plantings and also wrack (rafts of dead vegetation) that might potentially float ashore.
The Contractor must containerize the collected debris rather than merely stockpile it within the project area. The container must be of a known volume and must be emptied upon reaching capacity. At a minimum, on a weekly basis and after a significant storm or tidal event, or at the request of the Contracting Officer, the Contractor shall inspect the project site for floatable debris and undesirable vegetation, and shall immediately collect and containerize any such material.
Within 15 days of the Notice to Proceed, the Contractor must provide a Debris Removal Plan that describes how he intends to containerize and dispose of the debris, including submitting a notice of intent from a licensed upland disposal facility, which confirms that the facility will accept the material.
Under this section, the Contractor shall clear and remove all objectionable material including trees, shrubs, brush, vines, standing common reed (Phragmites australis) and wrack, stumps of all sizes, weeds, stones, wood, tires, and trash. This material shall be removed from within the limits of the Work Site Access Road, Staging Area and Restoration Area, the top 6 inches of loose surface litter, organic litter, Phragmites sp. rhizomes, consolidated material, leaf litter, and other organic debris. This material shall be removed from within the limits of the Clearing Area, in accordance with the plans and specifications, and the direction of the Contracting Officer.
The Contractor shall carefully protect all preserved areas as shown on the plans, and shall also be liable for any and all damages to property caused by the work under this section. Any damages to property or to vegetation within preserved areas shall be restored to the original conditions to the satisfaction of the Contracting Officer.
All organic material and Phragmites Austrailis wrack cleared under this section shall be disposed of first, prior to any excavation activities, at an off-site disposal facility approval by the Contracting Officer. All
SECTION 31 10 00 Page 1 tires and trash that are cleared under this section shall be disposed of at the appropriate off-site facilities to be approved by the Contracting Officer.
1.2 MEASUREMENT AND PAYMENT
1.2.1 Payment Item - Site Clearing
For performing the work under this item, in accordance with the plans, specifications and directions of the Contracting Officer, the Contractor shall receive a lump sum. The lump sum price bid shall include the cost of all labor, materials, and equipment necessary for clearing all objectionable material within the limits of the Project Work Area and Work Site Access Road and Staging Area, and all work incidental thereto, in accordance with the plans and specifications and to the satisfaction of the Contracting Officer.
The lump sum price shall also include the disposal of organic materials and Phragmites Australis wrack at an off-site disposal facility approved by the Contracting Officer.
The lump sum price bid for this item shall include the removal and hauling of tires
The lump sum price bid for this item shall include the removal and hauling of trash
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00.00 18 SUBMITTAL PROCEDURES:
SD-03 Product Data
Invoices For Tire Disposal; G, RO.
For USACE-NYD reimbursement, submit copies of load tickets and paid invoices for tire disposal within 30 days of completion of all clearing activities.
Invoices For Trash Disposal; G, RO.
For USACE-NYD reimbursement, submit copies of load tickets and paid invoices for trash disposal within 30 days of completion of all clearing activities.
Invoices For Organic Disposal; G, RO.
For USACE-NYD reimbursement, submit copies of load tickets and paid invoices for organic disposal within 30 days of completion of all clearing activities.
SECTION 31 10 00 Page 2
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 METHOD
The Contractor shall perform work as indicated under this section prior to beginning work on excavation covered under other sections as directed by the Contracting Officer.
Unless otherwise directed, the Contractor shall thoroughly clear and remove all objectionable surface debris, including vegetation, tires, and trash.
Whenever possible, the Contractor shall separate debris from soil material.
When directed by the Contracting Officer, objectionable embedded subsurface material, as heretofore described, shall be removed and disposed of off-site.
All tires and trash that are cleared under this section shall be disposed of at the appropriate off-site facilities to be approved by the Contracting Officer. For USACE-NYD reimbursement, the Contractor shall submit Invoices for Tire Disposal, for Trash Disposal separately.
All organic material and Phragmites Australis wrack cleared under this section shall be disposed of first, prior to any excavation activities, at an off-site disposal facility approved by the Contracting Officer. Prior to disposal, all woody material, including Phragmites, shall be shredded or chipped.
Any vegetation within preserved areas damaged by the work under this section, as determined by the Contracting Officer, shall be replaced immediately after the completion of the work at no additional cost to the Government.
SECTION 31 10 00 Page 3
SECTION 31 11 00
CLEARING EXISTING VEGETATION AND DEBRIS FROM THE RESTORATION AREA
DELETED
1.1
SECTION 31 11 00 Page 1
SECTION 32 16 13
CONCRETE SIDEWALKS, CURBS AND GUTTERS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 182 (2005) Standard Specification for Burlap Cloth Made from Jute or Kenaf and Cotton Mats
ASTM INTERNATIONAL (ASTM)
ASTM A 185/A 185M (2007) Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete
ASTM A 615/A 615M (2008a) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM C 143/C 143M (2008) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C 171 (2007) Standard Specification for Sheet Materials for Curing Concrete
ASTM C 172 (2008) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C 173/C 173M (2008) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method
ASTM C 231 (2008b) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C 309 (2007) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C 31/C 31M (2008a) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C 920 (2008) Standard Specification for Elastomeric Joint Sealants
SECTION 32 16 13 Page 1
ASTM D 1751 (2004) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)
ASTM D 1752 (2004a) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion
1.2 SCOPE OF WORK
Under this section, the Contractor shall remove and restore all sidewalks, curbs, and gutters disturbed during construction, in accordance with the plans and specifications, and at the direction of the Contracting Officer.
The Contractor shall carefully protect all preserved areas as shown on the plans, and shall also be liable for any and all damages to property caused by clearing operations. Any damages to vegetation with preserved areas or property shall be replaced or restored to the original conditions to the satisfaction of the Contracting Officer.
1.3 MEASUREMENT FOR PAYMENT
1.3.1 Sidewalks
Payment for Restoration of Sidewalks shall made under Payment Item -
CONCRETE SIDEWALKS, CURBS AND GUTTERS.
1.3.2 Payment Item - CONCRETE SIDEWALKS, CURBS AND GUTTERS
Work under this item shall be measured by the linear feet of Sidewalk scurbs and gutters restored in accordance with the plans and specifications, and at the direction of the Contracting Officer. The measurement shall be taken along the face of the curb at the gutter line.
The price bid for this item shall be a unit price per linear feet of all Sidewalks, curbs and gutters restored, including all labor, materials, equipment, and other incidentals required to match the original existing conditions to the satisfaction of the Contracting Officer.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00.00 18 SUBMITTAL PROCEDURES:
SD-03 Product Data
Concrete Mix; G, RO.
Submit 30 days prior to starting work.
SD-06 Test Reports
Field Quality Control; G, RO.
Submit copies of all test reports within 24 hours of completion
SECTION 32 16 13 Page 2 of the test.
1.5 WEATHER LIMITATIONS
1.5.1 Placing During Cold Weather
Concrete placement shall not take place when the air temperature reaches 40 degrees Fahrenheit and is falling, or is already below that point.
Placement may begin when the air temperature reaches 35 degrees Fahrenheit and is rising, or is already above 40 degrees Fahrenheit. Provisions shall be made to protect the concrete from freezing during the specified curing period. If necessary to place concrete when the temperature of the air, aggregates, or water is below 35 degrees Fahrenheit, placement and protection shall be approved in writing by the Contracting Officer.
Approval will be contingent upon full conformance with the following provisions.
a. The underlying material shall be prepared and protected so that it is entirely free of frost when the concrete is deposited.
b. Mixing water shall be heated as necessary to result in the temperature of the in-place concrete being between 50 degrees Fahrenheit and 85 degrees Fahrenheit. Methods and equipment for heating shall be approved by the Contracting Officer.
c. Aggregates shall be free of ice, snow, and frozen lumps before entering the mixer.
d. Covering and other means shall be provided for maintaining the concrete at a temperature of at least 50 degrees Fahrenheit for not less than 72 hours after placing, and at a temperature above freezing for the remainder of the curing period.
1.5.2 Placing During Warm Weather
The temperature of the concrete as placed shall not exceed 85 degrees F ahrenheit except where an approved retarder is used. The mixing water and/or aggregates shall be cooled, if necessary, to maintain a satisfactory placing temperature. The placing temperature shall not exceed 95 degrees F ahrenheit at any time.
1.6 PLANT, EQUIPMENT, MACHINES, AND TOOLS
Plant, equipment, machines, and tools used in the work shall be subject to approval by the Contracting Officer and shall be maintained in a satisfactory working condition at all times. The equipment shall have the capability of producing the required product, meeting grade controls, thickness controls, and smoothness requirements as specified herein. Use of the equipment shall be discontinued if it produces unsatisfactory results.
The Contracting Officer shall have access at all times to the plant and equipment to ensure proper operation and compliance with these specifications.
PART 2 PRODUCTS
2.1 CONCRETE MIX
Concrete shall conform to the applicable requirements of Section
SECTION 32 16 13 Page 3
03 31 01.00 10 CAST-IN- PLACE STRUCTURAL CONCRETE except as otherwise specified. Concrete shall have a minimum compressive strength of 3000 pounds per square inch at 28 days. Maximum size of aggregate shall be 1 inch.
2.1.1 Air Content
Mixtures shall have air content by volume of concrete of 5 to 7 percent, based on measurements made immediately after discharge from the mixer.
2.1.2 Slump
The concrete slump shall be 2 inches plus or minus 1 inch where determined in accordance with ASTM C 143.
2.1.3 Reinforcement Steel
Reinforcement bars shall conform to ASTM A 615/A 615M. Wire mesh reinforcement shall conform to ASTM A 185/A 185M.
2.2 CONCRETE CURING MATERIALS
2.2.1 Impervious Sheet Materials
Impervious sheet materials shall conform to ASTM C 171, type optional, except that polyethylene film, if used, shall be white opaque.
2.2.2 Burlap
Burlap shall conform to AASHTO M 182.
2.2.3 White Pigmented Membrane-Forming Curing Compound
White pigmented membrane-forming curing compound shall conform to ASTM C 309, Type 2.
2.3 CONCRETE PROTECTION MATERIALS
Concrete protection materials shall be a linseed oil mixture of equal parts, by volume, of linseed oil and either mineral spirits, naphtha, or turpentine. At the option of the Contractor, commercially prepared linseed oil mixtures, formulated specifically for application to concrete to provide protection against the action of deicing chemicals may be used, except that emulsified mixtures are not acceptable.
2.4 JOINT FILLER STRIPS
2.4.1 Contraction Joint Filler for Curb and Gutter
Contraction joint filler for curb and gutter shall consist of hard-pressed fiberboard.
2.4.2 Expansion Joint Filler, Premolded
Expansion joint filler, premolded, shall conform to ASTM D 1751 or ASTM D 1752, 3/8 inch thick, unless otherwise indicated.
SECTION 32 16 13 Page 4
2.5 JOINT SEALANTS
Joint sealant, cold-applied shall conform to ASTM C 920 or ASTM D 5893.
2.5.1 Joint Sealant, Cold-Applied Sub Title
Joint sealant, cold-applied shall conform to ASTM C 920.
2.5.2 Joint Sealant, Hot-Poured
Joint sealant, hot-poured shall conform to ASTM D 3405.
2.6 FORM WORK
Form work shall be designed and constructed to ensure that the finished concrete will match existing , and within the tolerances specified herein.
Forms shall be of wood or steel, straight, and of sufficient strength to resist springing during depositing and consolidating concrete. Wood forms shall be surfaced plank, 2 inches nominal thickness, straight and free from warp, twist, loose knots, splits or other defects. Wood forms shall have a nominal length of 10 feet. Radius bends may be formed with 3/4 inch boards, laminated to the required thickness. Steel forms shall be channel-formed sections with a flat top surface and with welded braces at each end and at not less than two intermediate points. Ends of steel forms shall be interlocking and self-aligning. Steel forms shall include flexible forms for radius forming, corner forms, form spreaders, and fillers. Steel forms shall have a nominal length of 10 feet with a minimum of 3 welded stake pockets per form. Stake pins shall be solid steel rods with chamfered heads and pointed tips designed for use with steel forms.
2.6.1 Sidewalk Forms
Sidewalk forms shall be of a height equal to the full depth of the finished sidewalk.
2.6.2 Curb and Gutter Forms
Curb and gutter outside forms shall have a height equal to the full depth of the curb or gutter. The inside form of curb shall have batter to match existing and shall be securely fastened to and supported by the outside form. Rigid forms shall be provided for curb returns, except that benders or thin plank forms may be used for curb or curb returns with a radius of 10 feet or more, where grade changes occur in the return, or where the central angle is such that a rigid form with a central angle of 90 degrees cannot be used. Back forms for curb returns may be made of 1 1/2 inch benders, for the full height of the curb, cleated together. In lieu of inside forms for curbs, a curb "mule" may be used for forming and finishing this surface, provided the results are approved.
PART 3 EXECUTION
3.1 SUBGRADE PREPARATION
The subgrade shall be constructed to the match existing grades and cross sections prior to concrete placement. Subgrade shall be placed and compacted as directed by the Contracting Officer. Subgrade removed during sidewalk and/or curb and gutter removal shall be reused during restoration.
SECTION 32 16 13 Page 5
3.1.1 Sidewalk Subgrade
The subgrade shall be tested for grade and cross section with a template extending the full width of the sidewalk and supported between side forms.
3.1.2 Curb and Gutter Subgrade
The subgrade shall be tested for grade and cross section by means of a template extending the full width of the curb and gutter.
3.1.3 Maintenance of Subgrade
The subgrade shall be maintained in a smooth, compacted condition in conformity with the required section and established grade until the concrete is placed. The subgrade shall be in a moist condition when concrete is placed.