Text version
CIVIL WORKS TEAM
26 FEDERAL PLAZA
NEW YORK NY 10278-0090
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
a.The Bid Opening date has been changed to 09 SEP 2009 at 3:30PM, EST;
b. Revise and reissue the Bid Schedule and sections of the Specifications and Plans;
c. Delete Section 31 11 00;
d. Inform prospective bidders about site visits;
e. Provide updated Wage Rate Decision NY08003; and
f. Provide questions to answ ers for INFORMATIONAL PURPOSES ONLY.
NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF 30, by separate letter, by telegram or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 79
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Aug-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-09-B-0015
X 9B. DATED (SEE ITEM 11)
07-Aug-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Aug-2009
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE E3H0610
FACILITY CODECODE
EMAIL:TEL:
W912DS-09-B-0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
Gerritson Creek Ecosystem Tidal Marsh & Coastal Upland Community Restoration
Brooklyn, NY
Amendment 0001
1) REVISED BID SCHEDULE:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Base Bid
FFP
The Base Bid shall focus on the restoration and construction of the low and high marsh areas along Gerritsen and Mill Creeks. The restored low marsh areas will be between 0 - 2' NAVD88, and slope on a 1% grade up to the restored high marsh areas. The high marsh areas will fall between 2 - 2.9' NAVD88, and will abut with the transition slope areas (3 - 8' NAVD88). Both the high and low marsh areas will be graded on 3:1 to curtail the potential for Pharmites reinvasion.
Prior to any construction acitivities, the existing Phragmites will be sprayed with herbicide (by others) and removed to an off-site disposal area.
FOB: Destination
NET AMT
0001AA 1 Lump Sum
MOBILIZATION AND DEMOBILIZATION
FFP
Furnishing and maintenance of services, equipment, and facilities & removal (as necessary), in accordance with the specifications.
0001AB 1 Lump Sum
MAINTENANCE/PROTECTION OF TRAFFIC
FFP
Maintenance and Protection of Traffic - Type "B" in accordance with the specifications.
0001AC 167 Square
Yard
ANTI-TRACKING PAD
FFP
Labor, materials, equipment, installation, maintenance, removal, and restoring vegetations (as necessary) in accorance with the specifications.
0001AD 1,107 Square
WORKSITE ACCESS ROAD
Labor, materials, equipment, installation, maintenance, removal, and restoring
0001AE 3,375 Square
STAGING AREA
Labor, materials, equipment, installation, maintenance, removal, and restoring
0001AF 333 Square
RESTORATION OF STREET PAVEMENT
Labor, materials, and equipment IAW specifications.
0001AG 1 Lump Sum
SITE CLEARING
FFP
0001AH 65 Linear
Foot
DEMOLITION: LUMBAR GUIDERAIL
Labor, materials, equipment, installation, maintenance, removal, & replacement of vegetation or pavement (as necessary) in accordance with the specifications.
0001AJ 2,494 Linear
DEMOLITION: NATURE TRAIL
Labor, equipment, & material removal and disposal in accordance with the speicifcations
0001AK 1 Each
13'-6" SINGLE LINK GATE (6' HIGH)
FFP
Labor, materials, equipment, installation, maintenance, removal, & replacement of
0001AL 1 Each
6'-6" CHAIN LINK GATE (6' HIGH)
FFP
Labor, materials, equipment, installation, maintenance, removal, & replacement of
0001AM 1 Each
12' CHAIN LINK GATE (6' HIGH)
FFP
Labor, materials, equipment, installation, maintenance, removal, & replacement of
0001AN 2,696 Linear
CHAIN LINK SECURITY FENCE (6' HIGH)
Labor, materials, equipment, installation, maintenance, removal, & replacement of
0001AP 4,043 Linear
CONSTRUCTION FENCE
CONSTRUCTION FENCE (GRASSLAND PERIMETER CONTROL) Labor, materials, equipment, installation, maintenance, removal, & replacement of
0001AQ 94 Linear
CORTEN BOX BEAM GUIDERAIL
Labor, materials, equipment, installation, maintenance, removal, & replacement of
0001AR 20 Each
TRANSPLANTING SHRUBS
FFP
Labor, materials, equipment, & installation in accordance with the specifications
0001AS 20 Each
TRANSPLANTING TREES (MINOR)
FFP
0001AT 20 Each
TRANSPLANTING TREES (MAJOR)
FFP
0001AU 170,320 Each
LOW MARSH
FFP
LOW MARSH: SPARTINA ALTERNIFLORA: Labor, materials, equipment, & installation in accordance with the specifications
0001AV 3,630 Each
HIGH MARSH
FFP
HIGH MARSH: DISTICHLIS SPICATA: Labor, materials, equipment, &
0001AW 3,630 Each
HIGH MARSH
FFP
HIGH MARSH: JUNCUS GERARDI: Labor, materials, equipment, & installation in accordance with the specifications
0001AX 3,630 Each
HIGH MARSH
FFP
HIGH MARSH: SPARTINA PATENS: Labor, materials, equipment, &
0001AY 5,500 Linear
SILT FENCE
Labor, materials, equipment, installation, maintenance, removal & restoring vegetation (as necessary) in accordance with the specifications.
0001AZ 167 Square
FILTER FABRIC - STABILIZATION
Labor, materials, and equipment IAW specifications
0001BA 4,482 Square
FILTER FABRIC - SEPARATION
0001BB 85,579 Cubic
UNCLASSIFIED EXCAVATION
Labor, equipment, hauling & any necessary pumping or diversions IAW specifications
0001BC 1,808 Linear
CONCRETE SIDEWALK, CURB, AND GUTTER
OPTION OPTION Item No. 1
FFP
Option #1 incorporates the restoration of the upland coastal grassland community, implementation of a stormwater management system, and .
installation of recreational features.
The grassland areas will be overlain with the clean excavated sand material sourced from the low and high marsh areas in the Basic Contract to create a 30" sand layer. The 30" layer will be capped with 6 inches of clean imported sand fill, and graded prior to planting and seeding.
The herbivory fence shall remain in place for two full growing seasons to allow for establishment of the coastal grassland community.
The upland stormwater management system will consist of a network of swales, trench drains, lawn inlets, and culverts.
Recreational features shall include the realignment of the existing nature trail, reinstallation of park signs and benches, resetting of the rock boulders, and new photo point bollards and osprey nest platforms.
0002AA 1,247 Linear
OPTION DEMOLITION: NATURE TRAIL
Labor, equipment, & material removal and disposal IAW specifications
0002AB 8 Each
OPTION REINSTALLATION OF PARK SIGNS
FFP
Labor, materials, equipment, installation & maintenance IAW specifications.
0002AC 6 Each
OPTION REINSTALLATION OF PARK BENCHES
FFP
0002AD 29 Linear
OPTION REMOVAL AND RESETTING
REMOVAL AND RESETTING OF EXISTING GUIDERAIL: Labor, materials, equipment, installation & maintenance IAW specifications.
0002AE 63 Each
OPTION RESETTING OF EXISTING BOULDERS
FFP
0002AF 16.30 Acre
OPTION HERBIVORY FENCE
FFP
Labor, equipment, materials, installation, maintenance and removal IAW
0002AG 7 Each
OPTION PHOTO POINT MONUMENTS
FFP
Labor, materials, equipment, installation IAW specifications
0002AH 2 Each
OPTION OSPREY NEST PLATFORMS
FFP
Labor, materials, equipment, installation, maintenace IAW specifications
0002AJ 3,520 Cubic
OPTION CONCRETE
Labor, materials, equipment IAW specifications
0002AK 10,952 Linear
OPTION NATURE TRAIL TIMBER CURBING
0002AL 676 Cubic
OPTION AGGREGATE BASE COURSE (NATURE TRAIL)
Labor, materials, & equipment IAW specifications
0002AM 507 Cubic
OPTION AGGREGATE SURFACE COURSE (NATURE TRAIL)
Labor, matierials, & equipment IAW specifications
0002AN 227 Cubic
OPTION AGGREGATE SURFACE COURSE (TRENCH DRAIN)
0002AP 70,937 Each
OPTION TRANSITION/GRASSLAND PLANTING
FFP
ANDROPOGON GERARDI: Labor, materials, and equipment IAW specifications
0002AQ 31,905 Each
OPTION TRANSITION/ GRASSLAND PLANTING
FFP
CAREX PENSYLVANICA: Labor, materials, and equipment IAW specifications
0002AR 31,905 Each
OPTION TRANSITION/GRASSLAND PLANTING
FFP
ASCLEPIUS SYRIACA: Labor, materials, and equipment IAW specifications
0002AS 31,905 Each
OPTION TRANSITION/GRASSLAND PLANTING
FFP
ASCLEPIAS TUBEROSA: Labor, materials, and equipment IAW specifications
0002AT 31,905 Each
OPTION TRANSITION/GRASSLAND PLANTING
FFP
MONARDA FISTULOSA: Labor, materials, and equipment IAW specifications
0002AU 31,905 Each
OPTION TRANSITION/GRASSLAND PLANTING
FFP
SOLIDAGO SEMPERVIRENS: Labor, materials, and equipment IAW
0002AV 31,905 Each
OPTION TRANSITION/GRASSLAND PLANTING
FFP
EUPATORIUM FIStULOSUM: Labor, materials, and equipment IAW
0002AX 31,905 Each
OPTION TRANSITION/GRASSLAND PLANTING
FFP
EUPATORIUM MACULATUM: Labor, materials, and equipment IAW
0002AY 31,905 Each
OPTION TRANSITION/GRASSLAND PLANTING
FFP
ASTER LAEVIS: Labor, materials, and equipment IAW specifications.
0002BA 31,905 Each
OPTION TRANSITION/GRASSLAND PLANTING
FFP
PANICUM VIRGATUM: Labor, materials, and equipment IAW specifications.
0002BB 31,905 Each
OPTION TRANSPLANTING/GRASSLAND PLANTING
FFP
RUDBECKIA HIRTA: Labor, materials, and equipment IAW specifications.
0002BC 31,905 Each
OPTION TRANSITION/GRASSLAND PLANTING
FFP
APOCYNUM CANNIBINUM: Labor, materials, and equipment IAW
0002BD 131 Pound
OPTION GRASSLAND A SEED MIX
FFP
GRASSLAND SEED MIX (VARIOUS): Labor, materials, and equipment IAW
0002BE 93 Pound
OPTION GRASSLAND B SEED MIX
FFP
GRASSLAND B SEED MIX (VARIOUS): Labor, materials, and equipment IAW
0002BF 12 Pound
OPTION TRANSITION SLOPE SEED MIX (VARIOUS)
FFP
0002BG 68 Pound
OPTION MOW STRIP SEED MIX (VARIOUS)
FFP
0002BH 7,000 Linear
OPTION SILT FENCE
Labor, materials, equipment, installation, & maintenance IAW specifications.
0002BJ 10 Each
OPTION INLETS, NJDOT TYPE A
FFP
0002BK 3,064 Linear
OPTION 8" PERFORATED PVC PIPE
8" PERFORATED PVC PIPE, TYPE PS46 (TRENCH DRAIN)
0002BL 125 Linear
OPTION 12" RCP (CROSS-DRAIN)
0002BM 252 Linear
OPTION 18" RCP (CROSS-DRAIN)
0002BN 2 Each
OPTION 12" CONCRETE FLARED END
FFP
0002BP 3 Each
OPTION 18" CONCRETE FLARED END
FFP
0002BQ 16 Cubic
OPTION RIPRAP
0002BR 1,728 Square
OPTION FILTER FABRIC - DRAINAGE
0002BS 9,241 Square
OPTION FILTER FABRIC - SEPERATION
0002BT 27,290 Cubic
OPTION CLEAN SAND, IMPORTED
0002BU 81,790 Cubic
OPTION SAND FILL, EXCAVATED
OPTION OPTION Item No. 2
FFP
Option Item No. 2
0003AA 5,000 Cubic
OPTION OPTION Item No. 3
FFP
Option Item No. 3
0004AA 10,000 Cubic
TOTAL
TOTAL OF BASE CLINS (0001): $___________________
TOTAL OF OPTIONS (CLIN 0002 - 0004): $___________________
TOTAL OF BASE PLUS OPTIONS (0001-0004): $___________________
NOTES FOR PRICE SCHEDULE:
CLIN (Contract Line Item Number) is the same as “Item No”
1 Bidders are required to bid on both the Base Bid Items and the Optional Items on the Price Schedule or their bid will be rejected.
2 The low bidder for the purpose of award will be the conforming responsible bidder offering the lowest amount for the Total Base Bid & Optional Items. The Government is under no obligation to award any Optional Item.
3 Any bid which is materially unbalanced as to the price for the Base Bid Item and Optional Item may be rejected. An unbalanced bid is one, which is based on price significantly less than the cost for some work and prices are significantly overstated for other work.
4 The government may award all the optional bid Items at the time of award of the basic contract.
Exercise of options is at the discretion of the government and not guaranteed. The Government is under no obligation to award any Option
5 Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidders thereto may render the bid non-responsive and be cause for its rejection.
6 Option 1 may be awarded within 100 calendar days from issuance of the Notice to Proceed date and no additional time will be added to the contract duration.
7 Option 2 an 3 may be awarded within 200 calendar days from issuance of the Notice to Proceed date and no additional time will be added to the contract duration.
2) SPECIFICATIONS: REVISE AS BELOW
- Section 00010: Price Schedule is revised and reissued in this amendment.
-Section 00 80 00.00 18, page 112 of 117, Revise Paragraph 32 c 1st paragraph. As below:
“- Base Contract: Before any clearing and grubbing operations begin, an aquatic herbicide spray will be applied by others/USACE to all areas of Phragmites Australis. Forty-five days after the herbicide has been applied, the Contractor shall clear and grub as described in the plans and specifications. All phragmites wrack and undesirable debris will be disposed of off-site.”
-Section 12 93 00 is revised and reissued in its entirety as attached -Section 31 10 00 is revised and reissued in its entirety as attached -Section 31 11 00 is deleted and not replaced -Section 32 16 13 is revised and reissued in its entirety as attached -Section 32 16 14.00 18 is revised and reissued in its entirety as attached -Section 32 16 15.00 18 is revised and reissued in its entirety as attached -Section 32 31 13 is revised and reissued in its entirety as attached -Section 32 92 19 is revised and reissued in its entirety as attached -Section 32 93 00 is revised and reissued in its entirety as attached -Section 32 96 00 is revised and reissued in its entirety as attached
3) DRAWINGS:
The following drawing, which accompanies, has been revised:
(1) Sheet GI002: Index
(2) Sheet C-001: Swale Alignment Tables (Option #1)
(3) Sheet C-101: Civil Site Plan 1
4) There is no formal site visit scheduled; Gerritsen Creek is open to the public and can be accessed during daylight hours.
5) SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE RATES
General Decision Number: NY080003 08/21/2009 NY3
Superseded General Decision Number: NY20070003
State: New York JR 28 August 2009
Construction Types: Building, Heavy, Highway and Residential
Counties: Bronx, Kings, New York, Queens and Richmond
Counties in New York.
BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS (includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 02/08/2008
1 02/15/2008
2 02/22/2008
3 02/29/2008
4 03/14/2008
5 03/21/2008
6 07/04/2008
7 07/18/2008
8 07/25/2008
9 08/08/2008
10 08/22/2008
11 08/29/2008
12 09/19/2008
13 10/03/2008
14 10/24/2008
15 11/28/2008
16 01/02/2009
17 02/06/2009
18 03/06/2009
19 04/24/2009
20 06/05/2009
21 06/19/2009
22 06/26/2009
23 07/03/2009
24 07/10/2009
25 07/17/2009
26 08/07/2009
27 08/21/2009
ASBE0012-001 06/29/2009
Rates Fringes
Asbestos Workers/Insulator includes application of all insulating materials, protective coverings,coatings and finishing to all types of mechanical systems..........$ 50.04 28.22
HAZARDOUS MATERIAL HANDLER.......$ 24.45 8.50
BOIL0005-001 01/01/2007
Rates Fringes
BOILERMAKER......................$ 44.98 28.95+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial
Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve
BRNY0001-001 07/01/2009
Rates Fringes
BRICKLAYER.......................$ 48.50 20.94
MASON - STONE....................$ 55.34 22.13
BRNY0001-002 07/01/2008
Rates Fringes
Pointer, cleaner and caulker.....$ 39.34 19.79
BRNY0003-001 07/01/2006
Rates Fringes
TERRAZZO FINISHER................$ 38.75 21.75
TERRAZZO WORKER/SETTER...........$ 40.09 21.75
BRNY0004-001 07/01/2007
Rates Fringes
MARBLE SETTER....................$ 47.83 22.20
BRNY0020-001 07/01/2007
Rates Fringes
MARBLE FINISHER..................$ 39.65 22.03
BRNY0024-001 01/01/2007
Rates Fringes
BRICKLAYER
MARBLE POLISHERS............$ 35.66 17.40
BRNY0052-001 12/01/2008
Rates Fringes
Tile Layer.......................$ 46.83 24.15
BRNY0088-001 12/01/2008
Rates Fringes
TILE FINISHER....................$ 37.68 20.90
CARP0001-009 07/01/2008
Rates Fringes
Carpenters:
Carpenters & Soft floor layers......................$ 43.02 35.96
CARP0740-001 07/01/2005
Rates Fringes
MILLWRIGHT.......................$ 38.13 35.40
CARP1456-004 07/01/2008
Rates Fringes
Dock Builder & Piledrivermen
DOCKBUILDERS................$ 43.61 38.06
CARP1456-005 07/01/2008
Rates Fringes
Diver Tender.....................$ 39.18 38.06
Diver............................$ 54.63 38.06
CARP1536-001 07/01/2003
Carpenters:
TIMBERMEN...................$ 34.47 26.05
ELEC0003-001 05/14/2009
Rates Fringes
ELECTRICIAN
Electricians................$ 49.00 34.81
Jobbing, and maintenance and repair work.............$ 25.30 15.13+a
PAID HOLIDAYS:
a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day
ELEC1049-001 04/06/2008
QUEENS COUNTY
Rates Fringes
Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;
Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment)
Groundman...................$ 24.83 17.91
Heavy Equipment Operator....$ 33.10 17.91
Lineman and Cable Splicer...$ 41.38 17.91
Tree Trimmer................$ 23.06 9.84
ELEV0001-002 03/17/2008
Rates Fringes
ELEVATOR MECHANIC
Elevator Constructor........$ 48.19 21.085+a+b
Modernization and Repair....$ 38.46 20.935+a+b
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Good Friday, President's
Day, Memorial Day, Independence Day, Labor Day, Columbus
Day, Veteran's Day, Thanksgiving Day, Friday after
Thanksgiving, and Christmas Day.
b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;
an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.
ENGI0014-001 07/01/2009
Rates Fringes
Pavement equipment operator
Asphalt Plants..............$ 44.04 27.35+a
Asphalt roller..............$ 52.55 27.35
Asphalt spreader............$ 54.03 27.35+a
Power Equipment Operator
(HEAVY & HIGHWAY)
GROUP 1....................$ 70.63 27.35+a
GROUP 2....................$ 57.77 27.35+a
GROUP 3....................$ 59.69 27.35+a
GROUP 4....................$ 58.22 27.35+a
GROUP 5....................$ 57.02 27.35+a
GROUP 6....................$ 54.64 27.35+a
GROUP 7....................$ 55.69 27.35+a
GROUP 8....................$ 54.03 27.35+a
GROUP 9....................$ 52.81 27.35+a
GROUP10....................$ 50.40 27.35+a
GROUP11....................$ 46.89 27.35+a
GROUP12....................$ 47.97 27.35+a
GROUP13....................$ 48.40 27.35+a
GROUP14....................$ 35.82 27.35+a
GROUP15....................$ 33.07 27.35+a
Steel erector
Compressors, Welding
Machines....................$ 35.03 27.35+a
Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 60.37 27.35+a
Three drum derricks.........$ 62.92 27.35+a
Utility Laborer
Horizontal boring rig.......$ 51.24 27.35+a
Off shift compressors.......$ 42.12 27.35+a
Utility Compressors.........$ 32.85 27.35
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Tower crane
GROUP 2: Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type
GROUP 3: Mine hoists and crane, etc. used as mine hoists
GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature
GROUP 5: Piledrivers, derrick boats, tunnel shovels
GROUP 6: All drills, and machines of a similar nature
GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers
GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps
GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)
GROUP 10: Concrete mixers
GROUP 11: Elevators
GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons
GROUP 13: Vibratory console
GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill
GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.
PREMIUMS ON CRANES (Crawler or Truck):
100' to 149' boom - add .50
150' to 249' boom - add .75
250' to 349' boom - add 1.00
350' to 450' boom - add 1.50
Premiums for Cranes on Steel Erection:
100' to 149' boom - add 1.75
150' to 249' boom - add 2.00
250' to 349' boom - add 2.25
350' to 450' boom - add 2.75
Tower crane - add 2.00
FOOTNOTE:
a. Paid Holidays: New Year's Day; Lincoln's Birthday;
Washington's Birthday; Memorial Day; Independence Day;
Labor Day; Veterans Day; Columbus Day; Election Day;
Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.
ENGI0014-002 07/01/2009
Rates Fringes
Power Equipment Operator
BUILDING & RESIDENTIAL
GROUP 1....................$ 56.58 27.35+a
GROUP 2....................$ 60.04 27.35+a
GROUP 3....................$ 54.58 27.35+a
GROUP 4....................$ 49.47 27.35+a
GROUP 5....................$ 36.56 27.35+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Double drum
GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks
GROUP 3: 4 pole Hoist, Single Drum Hoists
GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material
GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers
Premiums for Cranes:
100'-149' boom - add 1.75
150'-249' boom - add 2.00
250'-349' boom - add 2.25
350'-450' boom - add 2.75
Tower cranes add 2.00
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas
Day, provided the employee works one day in the payroll week in which the holiday occurs
IRON0040-002 07/01/2009
BRONX, NEW YORK, RICHMOND
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 41.05 43.91
IRON0046-003 07/01/2009
Rates Fringes
IRONWORKER
METALLIC LATHERS............$ 39.00 41.37
IRON0197-001 07/01/2009
Rates Fringes
IRONWORKER
STONE DERRICKMAN............$ 40.50 38.32
IRON0361-002 07/01/2009
KINGS, QUEENS
Rates Fringes
Ironworkers:
(STRUCTURAL)................$ 41.05 43.91
IRON0580-001 01/01/2009
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 39.85 39.67
LABO0006-001 07/01/2003
Rates Fringes
Laborers:
BUILDING CONSTRUCTION
CEMENT AND CONCRETE
WORKERS....................$ 31.50 15.27
LABO0029-001 07/01/2001
Rates Fringes
Laborers:
Heavy
Blasters (hydraulic trac drill).....................$ 32.08 16.70
Blasters...................$ 31.53 16.70
Hydraulic Trac Drill.......$ 28.38 16.70
Jackhammers, Chippers, Spaders, Concrete
Breakers, All Other
Pneumatic Tools, Walk
Behind Self-Propelled
Hydraulic Asphalt and
Concrete Breaker...........$ 27.14 16.70
Powder Carriers............$ 24.50 16.70
Wagon; Airtrac; Quarry
Bar Drill Runners..........$ 27.83 16.70
LABO0078-001 12/01/2008
Rates Fringes
LABORERS
BUILDING CONSTRUCTION
ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &
HAZARDOUS WASTE LABORERS
(Hazardous Waste, Hazardous Materials, Biochemical and Mold
Remediation, HVAC, Duct
Cleaning, Re-spray
Fireproofing, etc).........$ 31.50 11.31
LABO0079-001 07/01/2009
Laborers Building Construction
Demolition Laborers
Tier A.....................$ 30.38 18.91
Tier B.....................$ 20.74 12.41
Mason Tenders...............$ 32.99 20.56
CLASSIFICATIONS
TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.
TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.
LABO0147-001 07/01/2003
Rates Fringes
Laborers:
LABORERS....................$ 28.86 30.51
FREE AIR TUNNEL WORKERS Tunnel Workers (including
Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men
Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout
Men, Gravel Men, Form Workers, Concrete Workers, Tunnel
Laborers, Mole Nipper (one (1) Mole Sipper per Working
Shaft per Shift for up to and including Two (2) Moles)
* LABO0731-001 07/01/2009
Laborers:
Building, Heavy and
Residential Construction
UNSKILLED..................$ 36.64 26.21
UTILITY LABORER............$ 36.49 26.21
Heavy & Highway
Construction
LABORER/EXCAVATION
{Asbestos, Lead, Hazardous Waste Removal
(including soil)..........$ 36.64 26.21
Paid Holidays: Labor Day and Thanksgiving Day
LABO1010-001 07/01/2001
Rates Fringes
Laborers:
HIGHWAY CONSTRUCTION
Fence Installer & Repairer.$ 28.84 15.55+a
FORMSETTERS................$ 32.04 15.55+a
LABORERS...................$ 28.94 15.55+a
Landscape Planting &
Maintenance................$ 28.84 15.55+a
Maintenance Safety Surface.$ 28.44 15.55+a
Slurry/Sealcoater/Play
Equipment Installer........$ 28.69 15.55+a
Small Equipment Operator
(Not Operating
Engineer)..................$ 28.94 15.55+a
Small Power Tools Operator.$ 28.44 15.55+a
FOOTNOTES:
a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.
LABO1018-001 07/01/2001
Rates Fringes
Laborers:
Asphalt Rakers.............$ 32.36 15.55+a
Asphalt Tampers............$ 29.92 15.55+a
Landscape Planting &
Maintenance Fence
Installer/Maintenance......$ 29.81 15.55+a
Line Striping Installers...$ 29.56 15.55+a
Play Equipment/Safety
Surface Installer......$ 29.31 15.55+a
Screedman/Micropaver.......$ 32.73 15.55+a
Shoveler, General
Laborers/ All other incidental work............$ 29.81 15.55+a
Slurry/Sealcoater..........$ 29.31 15.55+a
Small Equipment Operator...$ 29.56 15.55+a
FOOTNOTE:
a. Paid Holidays: Memorial Day, Independence Day, Labor
Day, Columbus Day, Election Day, Veterans Day, and
Thanksgiving Day
PAIN0009-001 05/01/2008
GLAZIER..........................$ 38.00 29.59
Painters:
Painters, Drywall
Finishers, Lead Abatement
Worker......................$ 34.50 19.84
Spray, Scaffold and
Sandblasting................$ 37.50 19.84
PAIN0806-001 10/01/2008
Rates Fringes
Painters:
Structural Steel and Bridge.$ 45.25 27.58
PAIN1974-001 07/02/2008
Rates Fringes
Painters:
Drywall Tapers/Pointers.....$ 39.82 20.19
PLAS0260-001 07/01/1999
BRONX, NEW YORK AND RICHMOND COUNTIES:
Rates Fringes
PLASTERER........................$ 27.91 15.55
PLAS0260-002 07/01/1999
KINGS AND QUEENS COUNTIES
Rates Fringes
PLASTERER........................$ 27.91 15.16
PLAS0530-001 08/03/2005
PLASTERER
DRYWALL PLASTERERS..........$ 37.03 18.30
PLAS0780-001 07/01/2007
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 44.40 26.10
PLUM0001-001 01/01/2009
Rates Fringes
PLUMBER
MECHANICAL EQUIPMENT AND
SERVICE
Any repair and/or replacement of the present plumbing system that does not change the existing roughing..........$ 31.01 13.77
PLUMBERS:...................$ 51.36 30.74
PLUM0638-001 07/05/2006
Rates Fringes
PLUMBER
SERVICE FITTERS.............$ 26.30 2.55
SPRINKLER FITTERS,
STEAMFITTERS................$ 43.82 32.72
Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.
ROOF0008-003 07/01/2008
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply
Roofs............................$ 36.25 26.34
SHEE0028-002 01/29/2009
Rates Fringes
Sheet metal worker...............$ 45.40 36.51
TEAM0282-001 07/01/2008
Rates Fringes
Truck drivers:
TRUCK DRIVERS:
Asphalt....................$ 35.40 29.2025+a+b
Euclids & Turnapulls.......$ 35.50 29.2025+a+b
High Rise..................$ 41.81 27.1025+a+b
FOOTNOTES:
PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day and
Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.
b. VACATION: For each 15 days worked within the contract year an employee will receive one day's vacation with pay with a maximum vacation of 3 weeks per year.
TEAM0813-001 12/01/1998
Rates Fringes
Truck drivers:
GROUP 1....................$ 19.49 3.61+a
GROUP 2....................$ 19.76 3.61+a
GROUP 3....................$ 19.90 3.61+a
GROUP 4....................$ 20.23 3.61+a
GROUP 5....................$ 20.40 3.61+a
GROUP 6....................$ 21.29 3.61+a
GROUP 7....................$ 22.40 3.61+a
GROUP 8....................$ 19.90 3.61+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s
Birthday, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Thanksgiving Day, Christmas Day, Employee's Birthday, Two (2) Personal Days, and any holiday or day of mourning proclaimed as such by the State or
Federal Government.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Closed body trucks with self contained loading unit up to and including 22 yard capacity
GROUP 2: Open trucks, rack body or trucks with no self contained mechanical loading device, up to 22 yard capacity. One-container tractor hoist
GROUP 3: 10 wheel, open trucks, container loaders, dino-master, over-cab loaders, rack body trucks, or any trucks 22 yards to and including 25 yards capacity
GROUP 4: Rubbish and garbage trucks, 26 yards to and including 31 yards
GROUP 5: Single axle working non-compactor containers up to
15 yards capacity on rubbish and garbage removal
GROUP 6: Roll-off trucks up to and including 42 yard capacity
GROUP 7: Roll-off truck with more than 42 yard capacity or any tractor trailer trucks
GROUP 8: One-container tractor hoist on construction and alteration debris removal
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
6) QUESTIONS AND ANSWERS
The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation
1) Section 31 11 00 indicates that there are several allowances for hazardous material disposal, trash disposal and tire disposal under Payment Item Site Clearing. Please provide the amounts for these allowances.
Answer: Revised in this amendment, Section 31 10 00 is revised Section 31 11 00 is deleted.
2) If there is no prebid meeting at the site, please confirm whether the site is accessible for inspection prior to the bid date.
Answer: Park is open to the public and it can be accessed on a daily basis during daylight hours.
3) Please confirm the anticipated start date for the work. The specifications indicate that herbicides must be applied between 8-15 and 10-15. If this project is bid on 9-9-09, it is unlikely that the contractor will be approved to proceed with herbicide application in 2009.
Therefore, the herbicides would be applied in 2010 and the planting would take place in April May 2011 per Section 32 93 00.
Answer: Herbicide application was deleted as per this Amendment above, Herbicide is done by others.
4) On the reinstallation Benches, do we own cleaning & painting the existing benches? Or we just reinstall the benches whatever the condition of the benches?
Answer: Cleaning and any maintenance.
5) Drawing CR501 – What is the size of the Osprey Platform concrete footing?
Answer: No concrete, just driven pile.
6) Continuous from item 2 – What is the material of 30’ high utility pole (wood or steel)? And what is the length of the pole?
Answer: Wood telephone pole, needs to be 30' above ground.
7) Do we need to bring the disposal material off site the area? How far is the area from job site?
Answer: All debris and trash shall be taken off site at a licensed offsite facility.
8) There is 3520 CY concrete on the proposal. What is the concrete for?
Answer: Concrete for bench and sign posts. See section 03 31 01.00 10 paragraph 1.3.1
9) Specification 32.16.13 calls for Curb and Gutter payment. There is no line for Curb & Gutter on the proposal. Please advice.
Answer: Revised in this amendment.
10) Specification 32.16.14.0018 calls for Restoration of Street Pavement, but there is no line for this item in the proposal. Please advice.
Answer: Revised in this amendment.
11) Natural trail payment item in specification 32.16.15.18 is per SY, but the proposal is in LF.
Please advice.
Answer: Revised in this amendment
12) Specification 02.33.00.18 call for Silt Fence Installation. Do we own furnishing the Silt Fence?
Answer: See section 32 31 13. Silt fence is needed and shall be maintained during active construction and removed once guarantee period starts (unless otherwise directed by the COR). Fencing is property of contractor and shall be disposed of properly at a licensed facility.
13) Drawings show Rock Bump out, but I do not see it in proposal & specification. Please advice.
Answer: See Bid items and revised specs 12 93 00
14) Is Item No. 0001 for base bid the sum for item no. 0001AA to 0001BB?
Answer: Yes.
15) Bid item 0002AF 16 Herbivory Fence acres is based in acres. However, Specification 1.3.2 Herbivory fence states payment will be by l.f.. Which is correct?
Answer: This bid item has been revised via this amendment.
16) Please define tri-plug. There is no specification to explain this term. Also, there is no unit on the plant list in the plans for this item.
Answer: This item has been revised via this amendment.
17) Is it the intent of Army Corps to have the contractor guarantee plant material transplanted at the site? Standard industry practice normally does not have this requirement since the material is not nursery grown and transplant success is not predictable.
Answer: Revised in this amendment, no guarantee placed on it.
18) Are Options 1 bid items a stand-alone section or is this to be added to the base bid quantities?
Answer: Option 1 is stand alone and it’s the construction of the grass land Area.
19) Bid item 0002AJ 3,520 Concrete c.y. Please indicate where this much concrete is to be used on the site.
Answer: Concrete for bench and sign posts. Assumption made that ten existing benches to be replaced, and that two existing signs to be replaced will need new concrete posts.
20) Is Bid item 0002AK 5,476 Nature trail l.f. the sum of the quantities in Bid item 0002AL 10,952 Timber Curb l.f.; Bid item 0002AM 676 Aggregate Base Course c.y.; & Bid item 0002AN 734 Aggregate Surface Course c.y.?
Answer: Revised vis this amendment, The Nature Trail products are listed in Spec section 32 16 15.00 18 Nature Trail.
21) Is Bid item 0002BU 81,790 Sand Fill Excavated c.y. in Option 1 in addition to the quantity of excavation in the Base Bid Item 0001BB 85, 579 Excavation c.y. ?
Answer: No. The entire purpose of project is to utilize excavated fill in base contract in the grassland area in Option #1.
22) Bid Item 0002AV 31,905 Eupatorium fisulosum pound. Should pound be ea? I can not find a Eupatorium species fisulosum. I assume this should this be fistulosum?
Answer: This bid item has been revised via this amendment.
23) Are we to use a standard AIA Bond form?
Answer: AIA bond forms are not applicable to this action. This action requires the use the Stand Form 25 and Standard Form 25a1.
24) What is the Bid Bond Percentage? We understand the Performance and Payment bond to be 100%
Answer: The bid bond percentage is 20 percent of the bid price, not to exceed $3 million, IAW FAR clause 52.228-1. IAW FAR clause 52.228-15, the payment bond and performance bond need to be provided after contract award and before the notice to proceed letter. Each bond is required to be 100 percent of the awarded contract amount.
25) Is there a retainage?
Answer: Yes, retainage is included in the specs in many items, see specs and the revised specs in this amendment.
26) Is there to be a warranty?
Answer: yes, warranty (plant guarantee), see Section 32 92 19 Paragraph 1.5 PLANT GUARANTEE - GRASSLAND SEEDING, and Section 32 93 00 Paragraph 1.5 PLANT
GUARANTEE.
27) Can you direct me to the Certification of non-segregated facilities that accompanies the solicitation? It is listed at #5 of the invitation (page 3 of 117), but I can't find it within the downloaded documents.
Answer: The certification is the FAR clause 52.222-21, which is contained within the solicitation on page 43 (Section 0700).
28) The checklist asks us to list our DUNS # with Standard Form 1442, but I don't see a box designated for this. Shall we list this in box 14, with the Offeror's name and address?
Answer: Yes, you can list the DUNS # with the Offeror's name and address in box 14 of the
SF 1442.
29) Where can I find SF 24 for bid bond language?
Answer: SF 24's are provided by USACE after contract award and before the Notice to Proceed letter.
30) With each item description is the acronym FOB: Destination; what does FOB stand for?
Answer: FOB stands for Freight on Board.
(End of Summary of Changes)