W912DS-09-B-0015 Amendment 0001.pdf

PDF 117 KB Posted

Attached to
Gerritsen Creek Ecosystem Tidal Marsh & Coastal Upland Community Restoration in Brooklyn, New York
Solicitation number
W912DS-09-B-0015
Issued by

About this file

Amendment 0001 to Solicitation W912DS-09-B-0015.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL WORKS TEAM

26 FEDERAL PLAZA

NEW YORK NY 10278-0090

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

a.The Bid Opening date has been changed to 09 SEP 2009 at 3:30PM, EST;

b. Revise and reissue the Bid Schedule and sections of the Specifications and Plans;

c. Delete Section 31 11 00;

d. Inform prospective bidders about site visits;

e. Provide updated Wage Rate Decision NY08003; and

f. Provide questions to answ ers for INFORMATIONAL PURPOSES ONLY.

NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF 30, by separate letter, by telegram or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 79

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Aug-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-09-B-0015

X 9B. DATED (SEE ITEM 11)

07-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Aug-2009

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE E3H0610

FACILITY CODECODE

EMAIL:TEL:

W912DS-09-B-0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

Gerritson Creek Ecosystem Tidal Marsh & Coastal Upland Community Restoration

Brooklyn, NY

Amendment 0001

1) REVISED BID SCHEDULE:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Base Bid

FFP

The Base Bid shall focus on the restoration and construction of the low and high marsh areas along Gerritsen and Mill Creeks. The restored low marsh areas will be between 0 - 2' NAVD88, and slope on a 1% grade up to the restored high marsh areas. The high marsh areas will fall between 2 - 2.9' NAVD88, and will abut with the transition slope areas (3 - 8' NAVD88). Both the high and low marsh areas will be graded on 3:1 to curtail the potential for Pharmites reinvasion.

Prior to any construction acitivities, the existing Phragmites will be sprayed with herbicide (by others) and removed to an off-site disposal area.

FOB: Destination

NET AMT

0001AA 1 Lump Sum

MOBILIZATION AND DEMOBILIZATION

FFP

Furnishing and maintenance of services, equipment, and facilities & removal (as necessary), in accordance with the specifications.

0001AB 1 Lump Sum

MAINTENANCE/PROTECTION OF TRAFFIC

FFP

Maintenance and Protection of Traffic - Type "B" in accordance with the specifications.

0001AC 167 Square

Yard

ANTI-TRACKING PAD

FFP

Labor, materials, equipment, installation, maintenance, removal, and restoring vegetations (as necessary) in accorance with the specifications.

0001AD 1,107 Square

WORKSITE ACCESS ROAD

Labor, materials, equipment, installation, maintenance, removal, and restoring

0001AE 3,375 Square

STAGING AREA

Labor, materials, equipment, installation, maintenance, removal, and restoring

0001AF 333 Square

RESTORATION OF STREET PAVEMENT

Labor, materials, and equipment IAW specifications.

0001AG 1 Lump Sum

SITE CLEARING

FFP

0001AH 65 Linear

Foot

DEMOLITION: LUMBAR GUIDERAIL

Labor, materials, equipment, installation, maintenance, removal, & replacement of vegetation or pavement (as necessary) in accordance with the specifications.

0001AJ 2,494 Linear

DEMOLITION: NATURE TRAIL

Labor, equipment, & material removal and disposal in accordance with the speicifcations

0001AK 1 Each

13'-6" SINGLE LINK GATE (6' HIGH)

FFP

Labor, materials, equipment, installation, maintenance, removal, & replacement of

0001AL 1 Each

6'-6" CHAIN LINK GATE (6' HIGH)

FFP

Labor, materials, equipment, installation, maintenance, removal, & replacement of

0001AM 1 Each

12' CHAIN LINK GATE (6' HIGH)

FFP

Labor, materials, equipment, installation, maintenance, removal, & replacement of

0001AN 2,696 Linear

CHAIN LINK SECURITY FENCE (6' HIGH)

Labor, materials, equipment, installation, maintenance, removal, & replacement of

0001AP 4,043 Linear

CONSTRUCTION FENCE

CONSTRUCTION FENCE (GRASSLAND PERIMETER CONTROL) Labor, materials, equipment, installation, maintenance, removal, & replacement of

0001AQ 94 Linear

CORTEN BOX BEAM GUIDERAIL

Labor, materials, equipment, installation, maintenance, removal, & replacement of

0001AR 20 Each

TRANSPLANTING SHRUBS

FFP

Labor, materials, equipment, & installation in accordance with the specifications

0001AS 20 Each

TRANSPLANTING TREES (MINOR)

FFP

0001AT 20 Each

TRANSPLANTING TREES (MAJOR)

FFP

0001AU 170,320 Each

LOW MARSH

FFP

LOW MARSH: SPARTINA ALTERNIFLORA: Labor, materials, equipment, & installation in accordance with the specifications

0001AV 3,630 Each

HIGH MARSH

FFP

HIGH MARSH: DISTICHLIS SPICATA: Labor, materials, equipment, &

0001AW 3,630 Each

HIGH MARSH

FFP

HIGH MARSH: JUNCUS GERARDI: Labor, materials, equipment, & installation in accordance with the specifications

0001AX 3,630 Each

HIGH MARSH

FFP

HIGH MARSH: SPARTINA PATENS: Labor, materials, equipment, &

0001AY 5,500 Linear

SILT FENCE

Labor, materials, equipment, installation, maintenance, removal & restoring vegetation (as necessary) in accordance with the specifications.

0001AZ 167 Square

FILTER FABRIC - STABILIZATION

Labor, materials, and equipment IAW specifications

0001BA 4,482 Square

FILTER FABRIC - SEPARATION

0001BB 85,579 Cubic

UNCLASSIFIED EXCAVATION

Labor, equipment, hauling & any necessary pumping or diversions IAW specifications

0001BC 1,808 Linear

CONCRETE SIDEWALK, CURB, AND GUTTER

OPTION OPTION Item No. 1

FFP

Option #1 incorporates the restoration of the upland coastal grassland community, implementation of a stormwater management system, and .

installation of recreational features.

The grassland areas will be overlain with the clean excavated sand material sourced from the low and high marsh areas in the Basic Contract to create a 30" sand layer. The 30" layer will be capped with 6 inches of clean imported sand fill, and graded prior to planting and seeding.

The herbivory fence shall remain in place for two full growing seasons to allow for establishment of the coastal grassland community.

The upland stormwater management system will consist of a network of swales, trench drains, lawn inlets, and culverts.

Recreational features shall include the realignment of the existing nature trail, reinstallation of park signs and benches, resetting of the rock boulders, and new photo point bollards and osprey nest platforms.

0002AA 1,247 Linear

OPTION DEMOLITION: NATURE TRAIL

Labor, equipment, & material removal and disposal IAW specifications

0002AB 8 Each

OPTION REINSTALLATION OF PARK SIGNS

FFP

Labor, materials, equipment, installation & maintenance IAW specifications.

0002AC 6 Each

OPTION REINSTALLATION OF PARK BENCHES

FFP

0002AD 29 Linear

OPTION REMOVAL AND RESETTING

REMOVAL AND RESETTING OF EXISTING GUIDERAIL: Labor, materials, equipment, installation & maintenance IAW specifications.

0002AE 63 Each

OPTION RESETTING OF EXISTING BOULDERS

FFP

0002AF 16.30 Acre

OPTION HERBIVORY FENCE

FFP

Labor, equipment, materials, installation, maintenance and removal IAW

0002AG 7 Each

OPTION PHOTO POINT MONUMENTS

FFP

Labor, materials, equipment, installation IAW specifications

0002AH 2 Each

OPTION OSPREY NEST PLATFORMS

FFP

Labor, materials, equipment, installation, maintenace IAW specifications

0002AJ 3,520 Cubic

OPTION CONCRETE

Labor, materials, equipment IAW specifications

0002AK 10,952 Linear

OPTION NATURE TRAIL TIMBER CURBING

0002AL 676 Cubic

OPTION AGGREGATE BASE COURSE (NATURE TRAIL)

Labor, materials, & equipment IAW specifications

0002AM 507 Cubic

OPTION AGGREGATE SURFACE COURSE (NATURE TRAIL)

Labor, matierials, & equipment IAW specifications

0002AN 227 Cubic

OPTION AGGREGATE SURFACE COURSE (TRENCH DRAIN)

0002AP 70,937 Each

OPTION TRANSITION/GRASSLAND PLANTING

FFP

ANDROPOGON GERARDI: Labor, materials, and equipment IAW specifications

0002AQ 31,905 Each

OPTION TRANSITION/ GRASSLAND PLANTING

FFP

CAREX PENSYLVANICA: Labor, materials, and equipment IAW specifications

0002AR 31,905 Each

OPTION TRANSITION/GRASSLAND PLANTING

FFP

ASCLEPIUS SYRIACA: Labor, materials, and equipment IAW specifications

0002AS 31,905 Each

OPTION TRANSITION/GRASSLAND PLANTING

FFP

ASCLEPIAS TUBEROSA: Labor, materials, and equipment IAW specifications

0002AT 31,905 Each

OPTION TRANSITION/GRASSLAND PLANTING

FFP

MONARDA FISTULOSA: Labor, materials, and equipment IAW specifications

0002AU 31,905 Each

OPTION TRANSITION/GRASSLAND PLANTING

FFP

SOLIDAGO SEMPERVIRENS: Labor, materials, and equipment IAW

0002AV 31,905 Each

OPTION TRANSITION/GRASSLAND PLANTING

FFP

EUPATORIUM FIStULOSUM: Labor, materials, and equipment IAW

0002AX 31,905 Each

OPTION TRANSITION/GRASSLAND PLANTING

FFP

EUPATORIUM MACULATUM: Labor, materials, and equipment IAW

0002AY 31,905 Each

OPTION TRANSITION/GRASSLAND PLANTING

FFP

ASTER LAEVIS: Labor, materials, and equipment IAW specifications.

0002BA 31,905 Each

OPTION TRANSITION/GRASSLAND PLANTING

FFP

PANICUM VIRGATUM: Labor, materials, and equipment IAW specifications.

0002BB 31,905 Each

OPTION TRANSPLANTING/GRASSLAND PLANTING

FFP

RUDBECKIA HIRTA: Labor, materials, and equipment IAW specifications.

0002BC 31,905 Each

OPTION TRANSITION/GRASSLAND PLANTING

FFP

APOCYNUM CANNIBINUM: Labor, materials, and equipment IAW

0002BD 131 Pound

OPTION GRASSLAND A SEED MIX

FFP

GRASSLAND SEED MIX (VARIOUS): Labor, materials, and equipment IAW

0002BE 93 Pound

OPTION GRASSLAND B SEED MIX

FFP

GRASSLAND B SEED MIX (VARIOUS): Labor, materials, and equipment IAW

0002BF 12 Pound

OPTION TRANSITION SLOPE SEED MIX (VARIOUS)

FFP

0002BG 68 Pound

OPTION MOW STRIP SEED MIX (VARIOUS)

FFP

0002BH 7,000 Linear

OPTION SILT FENCE

Labor, materials, equipment, installation, & maintenance IAW specifications.

0002BJ 10 Each

OPTION INLETS, NJDOT TYPE A

FFP

0002BK 3,064 Linear

OPTION 8" PERFORATED PVC PIPE

8" PERFORATED PVC PIPE, TYPE PS46 (TRENCH DRAIN)

0002BL 125 Linear

OPTION 12" RCP (CROSS-DRAIN)

0002BM 252 Linear

OPTION 18" RCP (CROSS-DRAIN)

0002BN 2 Each

OPTION 12" CONCRETE FLARED END

FFP

0002BP 3 Each

OPTION 18" CONCRETE FLARED END

FFP

0002BQ 16 Cubic

OPTION RIPRAP

0002BR 1,728 Square

OPTION FILTER FABRIC - DRAINAGE

0002BS 9,241 Square

OPTION FILTER FABRIC - SEPERATION

0002BT 27,290 Cubic

OPTION CLEAN SAND, IMPORTED

0002BU 81,790 Cubic

OPTION SAND FILL, EXCAVATED

OPTION OPTION Item No. 2

FFP

Option Item No. 2

0003AA 5,000 Cubic

OPTION OPTION Item No. 3

FFP

Option Item No. 3

0004AA 10,000 Cubic

TOTAL

TOTAL OF BASE CLINS (0001): $___________________

TOTAL OF OPTIONS (CLIN 0002 - 0004): $___________________

TOTAL OF BASE PLUS OPTIONS (0001-0004): $___________________

NOTES FOR PRICE SCHEDULE:

CLIN (Contract Line Item Number) is the same as “Item No”

1 Bidders are required to bid on both the Base Bid Items and the Optional Items on the Price Schedule or their bid will be rejected.

2 The low bidder for the purpose of award will be the conforming responsible bidder offering the lowest amount for the Total Base Bid & Optional Items. The Government is under no obligation to award any Optional Item.

3 Any bid which is materially unbalanced as to the price for the Base Bid Item and Optional Item may be rejected. An unbalanced bid is one, which is based on price significantly less than the cost for some work and prices are significantly overstated for other work.

4 The government may award all the optional bid Items at the time of award of the basic contract.

Exercise of options is at the discretion of the government and not guaranteed. The Government is under no obligation to award any Option

5 Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidders thereto may render the bid non-responsive and be cause for its rejection.

6 Option 1 may be awarded within 100 calendar days from issuance of the Notice to Proceed date and no additional time will be added to the contract duration.

7 Option 2 an 3 may be awarded within 200 calendar days from issuance of the Notice to Proceed date and no additional time will be added to the contract duration.

2) SPECIFICATIONS: REVISE AS BELOW

- Section 00010: Price Schedule is revised and reissued in this amendment.

-Section 00 80 00.00 18, page 112 of 117, Revise Paragraph 32 c 1st paragraph. As below:

“- Base Contract: Before any clearing and grubbing operations begin, an aquatic herbicide spray will be applied by others/USACE to all areas of Phragmites Australis. Forty-five days after the herbicide has been applied, the Contractor shall clear and grub as described in the plans and specifications. All phragmites wrack and undesirable debris will be disposed of off-site.”

-Section 12 93 00 is revised and reissued in its entirety as attached -Section 31 10 00 is revised and reissued in its entirety as attached -Section 31 11 00 is deleted and not replaced -Section 32 16 13 is revised and reissued in its entirety as attached -Section 32 16 14.00 18 is revised and reissued in its entirety as attached -Section 32 16 15.00 18 is revised and reissued in its entirety as attached -Section 32 31 13 is revised and reissued in its entirety as attached -Section 32 92 19 is revised and reissued in its entirety as attached -Section 32 93 00 is revised and reissued in its entirety as attached -Section 32 96 00 is revised and reissued in its entirety as attached

3) DRAWINGS:

The following drawing, which accompanies, has been revised:

(1) Sheet GI002: Index

(2) Sheet C-001: Swale Alignment Tables (Option #1)

(3) Sheet C-101: Civil Site Plan 1

4) There is no formal site visit scheduled; Gerritsen Creek is open to the public and can be accessed during daylight hours.

5) SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

WAGE RATES

General Decision Number: NY080003 08/21/2009 NY3

Superseded General Decision Number: NY20070003

State: New York JR 28 August 2009

Construction Types: Building, Heavy, Highway and Residential

Counties: Bronx, Kings, New York, Queens and Richmond

Counties in New York.

BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS (includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 02/08/2008

1 02/15/2008

2 02/22/2008

3 02/29/2008

4 03/14/2008

5 03/21/2008

6 07/04/2008

7 07/18/2008

8 07/25/2008

9 08/08/2008

10 08/22/2008

11 08/29/2008

12 09/19/2008

13 10/03/2008

14 10/24/2008

15 11/28/2008

16 01/02/2009

17 02/06/2009

18 03/06/2009

19 04/24/2009

20 06/05/2009

21 06/19/2009

22 06/26/2009

23 07/03/2009

24 07/10/2009

25 07/17/2009

26 08/07/2009

27 08/21/2009

ASBE0012-001 06/29/2009

Rates Fringes

Asbestos Workers/Insulator includes application of all insulating materials, protective coverings,coatings and finishing to all types of mechanical systems..........$ 50.04 28.22

HAZARDOUS MATERIAL HANDLER.......$ 24.45 8.50

BOIL0005-001 01/01/2007

Rates Fringes

BOILERMAKER......................$ 44.98 28.95+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial

Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0001-001 07/01/2009

Rates Fringes

BRICKLAYER.......................$ 48.50 20.94

MASON - STONE....................$ 55.34 22.13

BRNY0001-002 07/01/2008

Rates Fringes

Pointer, cleaner and caulker.....$ 39.34 19.79

BRNY0003-001 07/01/2006

Rates Fringes

TERRAZZO FINISHER................$ 38.75 21.75

TERRAZZO WORKER/SETTER...........$ 40.09 21.75

BRNY0004-001 07/01/2007

Rates Fringes

MARBLE SETTER....................$ 47.83 22.20

BRNY0020-001 07/01/2007

Rates Fringes

MARBLE FINISHER..................$ 39.65 22.03

BRNY0024-001 01/01/2007

Rates Fringes

BRICKLAYER

MARBLE POLISHERS............$ 35.66 17.40

BRNY0052-001 12/01/2008

Rates Fringes

Tile Layer.......................$ 46.83 24.15

BRNY0088-001 12/01/2008

Rates Fringes

TILE FINISHER....................$ 37.68 20.90

CARP0001-009 07/01/2008

Rates Fringes

Carpenters:

Carpenters & Soft floor layers......................$ 43.02 35.96

CARP0740-001 07/01/2005

Rates Fringes

MILLWRIGHT.......................$ 38.13 35.40

CARP1456-004 07/01/2008

Rates Fringes

Dock Builder & Piledrivermen

DOCKBUILDERS................$ 43.61 38.06

CARP1456-005 07/01/2008

Rates Fringes

Diver Tender.....................$ 39.18 38.06

Diver............................$ 54.63 38.06

CARP1536-001 07/01/2003

Carpenters:

TIMBERMEN...................$ 34.47 26.05

ELEC0003-001 05/14/2009

Rates Fringes

ELECTRICIAN

Electricians................$ 49.00 34.81

Jobbing, and maintenance and repair work.............$ 25.30 15.13+a

PAID HOLIDAYS:

a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day

ELEC1049-001 04/06/2008

QUEENS COUNTY

Rates Fringes

Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;

Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment)

Groundman...................$ 24.83 17.91

Heavy Equipment Operator....$ 33.10 17.91

Lineman and Cable Splicer...$ 41.38 17.91

Tree Trimmer................$ 23.06 9.84

ELEV0001-002 03/17/2008

Rates Fringes

ELEVATOR MECHANIC

Elevator Constructor........$ 48.19 21.085+a+b

Modernization and Repair....$ 38.46 20.935+a+b

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Good Friday, President's

Day, Memorial Day, Independence Day, Labor Day, Columbus

Day, Veteran's Day, Thanksgiving Day, Friday after

Thanksgiving, and Christmas Day.

b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;

an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.

ENGI0014-001 07/01/2009

Rates Fringes

Pavement equipment operator

Asphalt Plants..............$ 44.04 27.35+a

Asphalt roller..............$ 52.55 27.35

Asphalt spreader............$ 54.03 27.35+a

Power Equipment Operator

(HEAVY & HIGHWAY)

GROUP 1....................$ 70.63 27.35+a

GROUP 2....................$ 57.77 27.35+a

GROUP 3....................$ 59.69 27.35+a

GROUP 4....................$ 58.22 27.35+a

GROUP 5....................$ 57.02 27.35+a

GROUP 6....................$ 54.64 27.35+a

GROUP 7....................$ 55.69 27.35+a

GROUP 8....................$ 54.03 27.35+a

GROUP 9....................$ 52.81 27.35+a

GROUP10....................$ 50.40 27.35+a

GROUP11....................$ 46.89 27.35+a

GROUP12....................$ 47.97 27.35+a

GROUP13....................$ 48.40 27.35+a

GROUP14....................$ 35.82 27.35+a

GROUP15....................$ 33.07 27.35+a

Steel erector

Compressors, Welding

Machines....................$ 35.03 27.35+a

Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 60.37 27.35+a

Three drum derricks.........$ 62.92 27.35+a

Utility Laborer

Horizontal boring rig.......$ 51.24 27.35+a

Off shift compressors.......$ 42.12 27.35+a

Utility Compressors.........$ 32.85 27.35

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Tower crane

GROUP 2: Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type

GROUP 3: Mine hoists and crane, etc. used as mine hoists

GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature

GROUP 5: Piledrivers, derrick boats, tunnel shovels

GROUP 6: All drills, and machines of a similar nature

GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers

GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps

GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)

GROUP 10: Concrete mixers

GROUP 11: Elevators

GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons

GROUP 13: Vibratory console

GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill

GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.

PREMIUMS ON CRANES (Crawler or Truck):

100' to 149' boom - add .50

150' to 249' boom - add .75

250' to 349' boom - add 1.00

350' to 450' boom - add 1.50

Premiums for Cranes on Steel Erection:

100' to 149' boom - add 1.75

150' to 249' boom - add 2.00

250' to 349' boom - add 2.25

350' to 450' boom - add 2.75

Tower crane - add 2.00

FOOTNOTE:

a. Paid Holidays: New Year's Day; Lincoln's Birthday;

Washington's Birthday; Memorial Day; Independence Day;

Labor Day; Veterans Day; Columbus Day; Election Day;

Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.

ENGI0014-002 07/01/2009

Rates Fringes

Power Equipment Operator

BUILDING & RESIDENTIAL

GROUP 1....................$ 56.58 27.35+a

GROUP 2....................$ 60.04 27.35+a

GROUP 3....................$ 54.58 27.35+a

GROUP 4....................$ 49.47 27.35+a

GROUP 5....................$ 36.56 27.35+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Double drum

GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks

GROUP 3: 4 pole Hoist, Single Drum Hoists

GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material

GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers

Premiums for Cranes:

100'-149' boom - add 1.75

150'-249' boom - add 2.00

250'-349' boom - add 2.25

350'-450' boom - add 2.75

Tower cranes add 2.00

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas

Day, provided the employee works one day in the payroll week in which the holiday occurs

IRON0040-002 07/01/2009

BRONX, NEW YORK, RICHMOND

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 41.05 43.91

IRON0046-003 07/01/2009

Rates Fringes

IRONWORKER

METALLIC LATHERS............$ 39.00 41.37

IRON0197-001 07/01/2009

Rates Fringes

IRONWORKER

STONE DERRICKMAN............$ 40.50 38.32

IRON0361-002 07/01/2009

KINGS, QUEENS

Rates Fringes

Ironworkers:

(STRUCTURAL)................$ 41.05 43.91

IRON0580-001 01/01/2009

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 39.85 39.67

LABO0006-001 07/01/2003

Rates Fringes

Laborers:

BUILDING CONSTRUCTION

CEMENT AND CONCRETE

WORKERS....................$ 31.50 15.27

LABO0029-001 07/01/2001

Rates Fringes

Laborers:

Heavy

Blasters (hydraulic trac drill).....................$ 32.08 16.70

Blasters...................$ 31.53 16.70

Hydraulic Trac Drill.......$ 28.38 16.70

Jackhammers, Chippers, Spaders, Concrete

Breakers, All Other

Pneumatic Tools, Walk

Behind Self-Propelled

Hydraulic Asphalt and

Concrete Breaker...........$ 27.14 16.70

Powder Carriers............$ 24.50 16.70

Wagon; Airtrac; Quarry

Bar Drill Runners..........$ 27.83 16.70

LABO0078-001 12/01/2008

Rates Fringes

LABORERS

BUILDING CONSTRUCTION

ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &

HAZARDOUS WASTE LABORERS

(Hazardous Waste, Hazardous Materials, Biochemical and Mold

Remediation, HVAC, Duct

Cleaning, Re-spray

Fireproofing, etc).........$ 31.50 11.31

LABO0079-001 07/01/2009

Laborers Building Construction

Demolition Laborers

Tier A.....................$ 30.38 18.91

Tier B.....................$ 20.74 12.41

Mason Tenders...............$ 32.99 20.56

CLASSIFICATIONS

TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.

TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.

LABO0147-001 07/01/2003

Rates Fringes

Laborers:

LABORERS....................$ 28.86 30.51

FREE AIR TUNNEL WORKERS Tunnel Workers (including

Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men

Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout

Men, Gravel Men, Form Workers, Concrete Workers, Tunnel

Laborers, Mole Nipper (one (1) Mole Sipper per Working

Shaft per Shift for up to and including Two (2) Moles)

* LABO0731-001 07/01/2009

Laborers:

Building, Heavy and

Residential Construction

UNSKILLED..................$ 36.64 26.21

UTILITY LABORER............$ 36.49 26.21

Heavy & Highway

Construction

LABORER/EXCAVATION

{Asbestos, Lead, Hazardous Waste Removal

(including soil)..........$ 36.64 26.21

Paid Holidays: Labor Day and Thanksgiving Day

LABO1010-001 07/01/2001

Rates Fringes

Laborers:

HIGHWAY CONSTRUCTION

Fence Installer & Repairer.$ 28.84 15.55+a

FORMSETTERS................$ 32.04 15.55+a

LABORERS...................$ 28.94 15.55+a

Landscape Planting &

Maintenance................$ 28.84 15.55+a

Maintenance Safety Surface.$ 28.44 15.55+a

Slurry/Sealcoater/Play

Equipment Installer........$ 28.69 15.55+a

Small Equipment Operator

(Not Operating

Engineer)..................$ 28.94 15.55+a

Small Power Tools Operator.$ 28.44 15.55+a

FOOTNOTES:

a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.

LABO1018-001 07/01/2001

Rates Fringes

Laborers:

Asphalt Rakers.............$ 32.36 15.55+a

Asphalt Tampers............$ 29.92 15.55+a

Landscape Planting &

Maintenance Fence

Installer/Maintenance......$ 29.81 15.55+a

Line Striping Installers...$ 29.56 15.55+a

Play Equipment/Safety

Surface Installer......$ 29.31 15.55+a

Screedman/Micropaver.......$ 32.73 15.55+a

Shoveler, General

Laborers/ All other incidental work............$ 29.81 15.55+a

Slurry/Sealcoater..........$ 29.31 15.55+a

Small Equipment Operator...$ 29.56 15.55+a

FOOTNOTE:

a. Paid Holidays: Memorial Day, Independence Day, Labor

Day, Columbus Day, Election Day, Veterans Day, and

Thanksgiving Day

PAIN0009-001 05/01/2008

GLAZIER..........................$ 38.00 29.59

Painters:

Painters, Drywall

Finishers, Lead Abatement

Worker......................$ 34.50 19.84

Spray, Scaffold and

Sandblasting................$ 37.50 19.84

PAIN0806-001 10/01/2008

Rates Fringes

Painters:

Structural Steel and Bridge.$ 45.25 27.58

PAIN1974-001 07/02/2008

Rates Fringes

Painters:

Drywall Tapers/Pointers.....$ 39.82 20.19

PLAS0260-001 07/01/1999

BRONX, NEW YORK AND RICHMOND COUNTIES:

Rates Fringes

PLASTERER........................$ 27.91 15.55

PLAS0260-002 07/01/1999

KINGS AND QUEENS COUNTIES

Rates Fringes

PLASTERER........................$ 27.91 15.16

PLAS0530-001 08/03/2005

PLASTERER

DRYWALL PLASTERERS..........$ 37.03 18.30

PLAS0780-001 07/01/2007

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 44.40 26.10

PLUM0001-001 01/01/2009

Rates Fringes

PLUMBER

MECHANICAL EQUIPMENT AND

SERVICE

Any repair and/or replacement of the present plumbing system that does not change the existing roughing..........$ 31.01 13.77

PLUMBERS:...................$ 51.36 30.74

PLUM0638-001 07/05/2006

Rates Fringes

PLUMBER

SERVICE FITTERS.............$ 26.30 2.55

SPRINKLER FITTERS,

STEAMFITTERS................$ 43.82 32.72

Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.

ROOF0008-003 07/01/2008

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 36.25 26.34

SHEE0028-002 01/29/2009

Rates Fringes

Sheet metal worker...............$ 45.40 36.51

TEAM0282-001 07/01/2008

Rates Fringes

Truck drivers:

TRUCK DRIVERS:

Asphalt....................$ 35.40 29.2025+a+b

Euclids & Turnapulls.......$ 35.50 29.2025+a+b

High Rise..................$ 41.81 27.1025+a+b

FOOTNOTES:

PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day and

Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.

b. VACATION: For each 15 days worked within the contract year an employee will receive one day's vacation with pay with a maximum vacation of 3 weeks per year.

TEAM0813-001 12/01/1998

Rates Fringes

Truck drivers:

GROUP 1....................$ 19.49 3.61+a

GROUP 2....................$ 19.76 3.61+a

GROUP 3....................$ 19.90 3.61+a

GROUP 4....................$ 20.23 3.61+a

GROUP 5....................$ 20.40 3.61+a

GROUP 6....................$ 21.29 3.61+a

GROUP 7....................$ 22.40 3.61+a

GROUP 8....................$ 19.90 3.61+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s

Birthday, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Thanksgiving Day, Christmas Day, Employee's Birthday, Two (2) Personal Days, and any holiday or day of mourning proclaimed as such by the State or

Federal Government.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Closed body trucks with self contained loading unit up to and including 22 yard capacity

GROUP 2: Open trucks, rack body or trucks with no self contained mechanical loading device, up to 22 yard capacity. One-container tractor hoist

GROUP 3: 10 wheel, open trucks, container loaders, dino-master, over-cab loaders, rack body trucks, or any trucks 22 yards to and including 25 yards capacity

GROUP 4: Rubbish and garbage trucks, 26 yards to and including 31 yards

GROUP 5: Single axle working non-compactor containers up to

15 yards capacity on rubbish and garbage removal

GROUP 6: Roll-off trucks up to and including 42 yard capacity

GROUP 7: Roll-off truck with more than 42 yard capacity or any tractor trailer trucks

GROUP 8: One-container tractor hoist on construction and alteration debris removal

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

6) QUESTIONS AND ANSWERS

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation

1) Section 31 11 00 indicates that there are several allowances for hazardous material disposal, trash disposal and tire disposal under Payment Item Site Clearing. Please provide the amounts for these allowances.

Answer: Revised in this amendment, Section 31 10 00 is revised Section 31 11 00 is deleted.

2) If there is no prebid meeting at the site, please confirm whether the site is accessible for inspection prior to the bid date.

Answer: Park is open to the public and it can be accessed on a daily basis during daylight hours.

3) Please confirm the anticipated start date for the work. The specifications indicate that herbicides must be applied between 8-15 and 10-15. If this project is bid on 9-9-09, it is unlikely that the contractor will be approved to proceed with herbicide application in 2009.

Therefore, the herbicides would be applied in 2010 and the planting would take place in April May 2011 per Section 32 93 00.

Answer: Herbicide application was deleted as per this Amendment above, Herbicide is done by others.

4) On the reinstallation Benches, do we own cleaning & painting the existing benches? Or we just reinstall the benches whatever the condition of the benches?

Answer: Cleaning and any maintenance.

5) Drawing CR501 – What is the size of the Osprey Platform concrete footing?

Answer: No concrete, just driven pile.

6) Continuous from item 2 – What is the material of 30’ high utility pole (wood or steel)? And what is the length of the pole?

Answer: Wood telephone pole, needs to be 30' above ground.

7) Do we need to bring the disposal material off site the area? How far is the area from job site?

Answer: All debris and trash shall be taken off site at a licensed offsite facility.

8) There is 3520 CY concrete on the proposal. What is the concrete for?

Answer: Concrete for bench and sign posts. See section 03 31 01.00 10 paragraph 1.3.1

9) Specification 32.16.13 calls for Curb and Gutter payment. There is no line for Curb & Gutter on the proposal. Please advice.

Answer: Revised in this amendment.

10) Specification 32.16.14.0018 calls for Restoration of Street Pavement, but there is no line for this item in the proposal. Please advice.

Answer: Revised in this amendment.

11) Natural trail payment item in specification 32.16.15.18 is per SY, but the proposal is in LF.

Please advice.

Answer: Revised in this amendment

12) Specification 02.33.00.18 call for Silt Fence Installation. Do we own furnishing the Silt Fence?

Answer: See section 32 31 13. Silt fence is needed and shall be maintained during active construction and removed once guarantee period starts (unless otherwise directed by the COR). Fencing is property of contractor and shall be disposed of properly at a licensed facility.

13) Drawings show Rock Bump out, but I do not see it in proposal & specification. Please advice.

Answer: See Bid items and revised specs 12 93 00

14) Is Item No. 0001 for base bid the sum for item no. 0001AA to 0001BB?

Answer: Yes.

15) Bid item 0002AF 16 Herbivory Fence acres is based in acres. However, Specification 1.3.2 Herbivory fence states payment will be by l.f.. Which is correct?

Answer: This bid item has been revised via this amendment.

16) Please define tri-plug. There is no specification to explain this term. Also, there is no unit on the plant list in the plans for this item.

Answer: This item has been revised via this amendment.

17) Is it the intent of Army Corps to have the contractor guarantee plant material transplanted at the site? Standard industry practice normally does not have this requirement since the material is not nursery grown and transplant success is not predictable.

Answer: Revised in this amendment, no guarantee placed on it.

18) Are Options 1 bid items a stand-alone section or is this to be added to the base bid quantities?

Answer: Option 1 is stand alone and it’s the construction of the grass land Area.

19) Bid item 0002AJ 3,520 Concrete c.y. Please indicate where this much concrete is to be used on the site.

Answer: Concrete for bench and sign posts. Assumption made that ten existing benches to be replaced, and that two existing signs to be replaced will need new concrete posts.

20) Is Bid item 0002AK 5,476 Nature trail l.f. the sum of the quantities in Bid item 0002AL 10,952 Timber Curb l.f.; Bid item 0002AM 676 Aggregate Base Course c.y.; & Bid item 0002AN 734 Aggregate Surface Course c.y.?

Answer: Revised vis this amendment, The Nature Trail products are listed in Spec section 32 16 15.00 18 Nature Trail.

21) Is Bid item 0002BU 81,790 Sand Fill Excavated c.y. in Option 1 in addition to the quantity of excavation in the Base Bid Item 0001BB 85, 579 Excavation c.y. ?

Answer: No. The entire purpose of project is to utilize excavated fill in base contract in the grassland area in Option #1.

22) Bid Item 0002AV 31,905 Eupatorium fisulosum pound. Should pound be ea? I can not find a Eupatorium species fisulosum. I assume this should this be fistulosum?

Answer: This bid item has been revised via this amendment.

23) Are we to use a standard AIA Bond form?

Answer: AIA bond forms are not applicable to this action. This action requires the use the Stand Form 25 and Standard Form 25a1.

24) What is the Bid Bond Percentage? We understand the Performance and Payment bond to be 100%

Answer: The bid bond percentage is 20 percent of the bid price, not to exceed $3 million, IAW FAR clause 52.228-1. IAW FAR clause 52.228-15, the payment bond and performance bond need to be provided after contract award and before the notice to proceed letter. Each bond is required to be 100 percent of the awarded contract amount.

25) Is there a retainage?

Answer: Yes, retainage is included in the specs in many items, see specs and the revised specs in this amendment.

26) Is there to be a warranty?

Answer: yes, warranty (plant guarantee), see Section 32 92 19 Paragraph 1.5 PLANT GUARANTEE - GRASSLAND SEEDING, and Section 32 93 00 Paragraph 1.5 PLANT

GUARANTEE.

27) Can you direct me to the Certification of non-segregated facilities that accompanies the solicitation? It is listed at #5 of the invitation (page 3 of 117), but I can't find it within the downloaded documents.

Answer: The certification is the FAR clause 52.222-21, which is contained within the solicitation on page 43 (Section 0700).

28) The checklist asks us to list our DUNS # with Standard Form 1442, but I don't see a box designated for this. Shall we list this in box 14, with the Offeror's name and address?

Answer: Yes, you can list the DUNS # with the Offeror's name and address in box 14 of the

SF 1442.

29) Where can I find SF 24 for bid bond language?

Answer: SF 24's are provided by USACE after contract award and before the Notice to Proceed letter.

30) With each item description is the acronym FOB: Destination; what does FOB stand for?

Answer: FOB stands for Freight on Board.

(End of Summary of Changes)