CIVIL WORKS TEAM
26 FEDERAL PLAZA
NEW YORK NY 10278-0090
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Extend the Bid Due Date to 22 SEP 2009 at 2PM EST;
2. To revise Sections of the Specifications; and
3. Answ er contractor questions for INFORMATIONAL PURPOSESES ONLY.
NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF 30, by separate letter, by telegram or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Sep-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-09-B-0015
X 9B. DATED (SEE ITEM 11)
07-Aug-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Sep-2009
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE E3H0610
FACILITY CODECODE
EMAIL:TEL:
W912DS-09-B-0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0006
Gerritsen Creek Solicitation
AMENDMENT 0006
The Bid Due Date has been changed from 18 SEP 2009 at 3:30PM EST to 22 SEP 2009 at 2:00PM EST.
1) SPECIFICATIONS: REVISE AS BELOW:
a) Added these paragraphs in each section
1-Section 01 57 30.00 18
1.2.3 Payment Item – Filter Fabric – Separation
This item shall be measured by the square yard of filter fabric for the work site access road and staging area installed in accordance with the plans and specifications, and as directed by the Contracting Officer.
The price bid shall be a unit price per square yard of filter fabric installed, including all labor, materials, equipment, and incidentals necessary to complete the work in accordance with the plans, and to the satisfaction of the Contracting Officer. Any damages to filter fabric shall be replaced or restored to the satisfaction of the Contracting Officer.
2-Section 02 38 10.00 18
1.2.2 Payment Item – Filter Fabric – Stabilization
This item shall be measured by the square yard of filter fabric installed in accordance with the plans and specifications, and as directed by the Contracting Officer.
The price bid shall be a unit price per square yard of filter fabric installed, including all labor, materials, equipment, and incidentals necessary to complete the work in accordance with the plans, and to the satisfaction of the Contracting Officer. Any damages to filter fabric shall be replaced or restored to the satisfaction of the Contracting Officer.
3-Section 32 15 00
1.3 MEASUREMENT AND PAYMENT
Payment for Aggregate for the Trench Drain shall made under Payment Item – Aggregate Surface Course (Trench Drain), which is described in Section 33 46 16 SUBDRAINAGE
SYSTEM.
Section 32 16 15.00 18
1.2.2 Payment Item – Filter Fabric – Separation
This item shall be measured by the square yard of filter fabric for the nature trail installed in accordance with the plans and specifications, and as directed by the Contracting Officer.
The price bid shall be a unit price per square yard of filter fabric installed, including all labor, materials, equipment, and incidentals necessary to complete the work in accordance with the plans, and to the satisfaction of the Contracting Officer. Any damages to filter fabric shall be replaced or restored to the satisfaction of the Contracting Officer.
4-Section 33 40 00
1.2.2 Payment Item – Filter Fabric – Separation
This item shall be measured by the square yard of filter fabric for the lawn inlets (type A) and scour pads installed in accordance with the plans and specifications, and as directed by the Contracting Officer.
The price bid shall be a unit price per square yard of filter fabric installed, including all labor, materials, equipment, and incidentals necessary to complete the work in accordance with the plans, and to the satisfaction of the Contracting Officer. Any damages to filter fabric shall be replaced or restored to the satisfaction of the Contracting Officer.
5-Section 33 46 16
1.3.2 Payment Item – Aggregate Surface Course (Trench Drain)
This item shall be measured by the cubic foot of aggregate surface course installed in accordance with the plans and specifications, and as directed by the Contracting Officer.
The price bid shall be a unit price per cubic foot of surface course installed, including all labor, materials, equipment, and incidentals necessary to complete the work in accordance with the plans, and to the satisfaction of the Contracting Officer.
6-Section 33 46 16
1.3.3 Payment Item – Filter Fabric – Drainage
This item shall be measured by the square yard of filter fabric for the trench drain installed in accordance with the plans and specifications, and as directed by the Contracting Officer.
The price bid shall be a unit price per square yard of filter fabric installed, including all labor, materials, equipment, and incidentals necessary to complete the work in accordance with the plans, and to the satisfaction of the Contracting Officer. Any damages to filter fabric shall be replaced or restored to the satisfaction of the Contracting Officer.
b) Revised following paragraphs in each section 1- Section 01 57 30.00 18 paragraph 1.2.2 Payment
Delete “filter fabric (including repairs if necessary)” 3rd sentence.
2-Section 02 38 10.00 18 paragraph 1.2.1 Payment Item - Anti-Tracking Pad Delete “filter fabric (including repairs if necessary)” 3rd sentence.
3-Section 32 16 15.00 18 paragraph 1.2.1 Payment Item - Nature Trail Delete “filter fabric, filter fabric repairs (if necessary)” 3rd sentence.
4-Section 33 40 00 paragraph 1.3.1 Payment Item - Reinforced Concrete Culvert Pipe Delete “and filter and bedding materials.” 4th sentence.
And paragraph 1.3.6 Payment Item - Erosion Control Riprap Delete “including filter fabric (including repairs if necessary).” last sentence.
5-Section 33 46 16 paragraph 1.3.1 Payment Item - Trench Drain Delete “filter fabric (including repairs if necessary)” 4th sentence
2) QUESTIONS AND ANSWERS FOR INFORMATION ONLY:
The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation
1-Regarding item ‘0002AN Aggregate Surface Course (trench Drain)’ Is this for the Aggregate Surface Course indicated on CU502 in the detail on the right?
This is to be part of the ‘Nature Trail’ as it is labeled as such. Please Clarify.
Answer: Specs revised in this amendment
2-Regarding bid item ‘0001AF ‘Restoration of Street Pavement’, no detail indicating thickness’ of pavement layers is provided, nor is any location indicated on plan, please clarify.
Answer. Contractor should review to SECTION 32 16 14.00 18 “RESTORATION OF STREET PAVEMENT” paragraph 2.1 and the New York State Department of Transportation (NYSDOT) Standard.
1.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .