This solicitation is for a firm-fixed price Design-Bid-Build construction contract to construct a two story 32,000 square foot Instructional Design Center/Distance Learning Center at Customs and Border Protection in Harpers Ferry, West Virginia. The project includes offices, open work areas, a green screen room, sound editing booth, collaboration rooms, conference rooms, and parking area. Requirements include utilities, storm water management, an elevator, HVAC system, electrical system, LED lighting, fire alarm and suppression systems. Finishes will be Class A. The construction magnitude is between $10-25 million and duration is approximately 550 calendar days from notice to proceed. Proposals are due on October 3, 2022 and will be evaluated using Lowest Price Technically Acceptable criteria. Vendors must be registered in the System for Award Management to receive an award. The soliciting agency is the Department of the Army Corps of Engineers Baltimore District.

View the file

Other files

File Type Posted
B.08.03 W912DR22R0049 Amendment 0005 - Cancelling Solicitation.pdf PDF
23 64 10_refrig leak detector removed.pdf PDF
23 52 13_Rev1.pdf PDF
Harpers Ferry Combined Set - FP and LS.pdf PDF
28 31 76.pdf PDF
ProjNet Inquiries_Responses - AM0004.pdf PDF
PN488559_HF IDC DLC_MECH Amendment 0004.pdf PDF
AM0004 W912DR22R0049 - IDC for CBP.pdf PDF
Project Description IDC DLC Harpers Ferry WV Solicitation W912DR22R0049.pdf PDF
PN488559_HF IDC DLC_RTA ITR_Landscape_2022-09-15.pdf PDF
01 91 00.15 10.pdf PDF
12 93 00_2022-09-15.pdf PDF
AM0003 W912DR22R0049 - IDC for CBP.pdf PDF
08 81 00.pdf PDF
31 63 33_2022-09-13.pdf PDF
PN488559_HF IDC DLC_2019_BID REV1.pdf PDF
07 42 13.pdf PDF
Geotechnical Report 04-20-0534-IDC DLC Facility-Final 9-14-22.pdf PDF
W912DR22R0049 AM0002 - IDC for CBP.pdf PDF
CBP_IDC-DLC Specifications_RTA_2022-08-24.pdf PDF
AM0001 - W912DR22R0049_IDC at CBP.pdf PDF
IDC DLC HF IDC DLC 22R0049 Structural Architectural and Interiors Part 2 of 3 _2022 08 24.pdf PDF
Use Me IDC DLC HF IDC DLC 22R0049 Fire Protection Plumbing Mechanical Electrical Drawings Part 3 of 3.pdf PDF
Use me IDC DLC HF IDC DLC 22R0049 Cover Life Safety HAZ MAT CIVIL LANDSCAPING Part 1 of 3.pdf PDF
W912DR22R0049_Instructional Design Center Harpers Ferry WV_02SEP2022.pdf PDF
ATC Campus Access Notification Form (Updated).pdf PDF
CBP IDC-DLC Submittal Register_RTA_2022-08-24.pdf PDF
CBP IDC-DLC Specifications_RTA_2022-08-24.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DR22R0049

Amendment 0004 September 28, 2022 Instructional Design Center / Distance Learning Center

DRAWINGS:

1. Fire Alarm (FA) and Life Safety Sheets (G) – FA001, FA002, FA111, FA112, FA121, FA122, FA501, FA701, FX001, FX111, FX112, FX121, FX122, FX501, FX502, G-004, G-110, G-111, G112, G-120, G-121, and G-122,

2. Sheet MH112: Added a keynote to address different chiller footprint that BOD.

3. Sheet MH121 & M-401/C11: Corrected the location of EF-2 exhaust grille to the elevator hoist way wall to match architectural updated wall location.

4. Sheet M-302/A3: Corrected the location of the boiler piping connection and showed piping continuation to boiler. Updated Keynote 1. See revised M-402 below (note 3).

5. Sheet M-402/B2: Corrected the boiler GHWR connection to the system heating supply line to act as an injection loop instead of parallel to the chiller. Added piping to boiler. Updated Keynotes 4 and 6.

6. Sheet M-601: Replaced Heat Pump Chiller Schedules to one non-manufacturer specific schedule. Updated Boiler Schedule with additional notes.

7. Sheet M-603: Updated Control Valve Schedule (moved from M-604) to add valve size to address a review comment. Revised a couple zones in VAV Box Schedule to match ventilation calculations.

8. Sheet M-604-607: Replaced previous ASHRAE 62.1 table to use a spreadsheet provided by ASHRAE/USGBC to calculate minimum ventilation requirement, per review comment.

9. Sheet M-805: Revised Sequence of Operation for Hydronic Heat Pump System, Added Supplemental Heating Boiler Sequence of Operation and Points Schedule.

10. Sheet M-806: Added Boiler to Hydronic Heat Pump System Schematic.

11. Sheet M-807: Added “UNOCCUPIED” to GHWS TEMPERATURE SETPOINT.

SPECIFICATIONS:

12. Section 23 64 10, paragraph 2.7.1: Delete the entire paragraph since there is no Refrigerant Leak Detector required.

13. Section 23 52 13: New added “Electric Boiler” section.

14. Section 28 32 76: Interior Fire Alarm and Mass Notification System, Addressable