This federal solicitation is seeking proposals for a design-bid-build construction project to build a two-story, 32,000 square foot instructional design center and distance learning center in Harpers Ferry, West Virginia. Work includes construction of offices, collaboration rooms, conference rooms, and associated facilities. Additional requirements include installation of utilities, an HVAC system, electrical system, elevator, fire suppression system, and stormwater management. Environmental permitting and coordination with local authorities is also required. The estimated construction cost is between $10-25 million and the project duration is approximately 550 calendar days. Proposals are due on October 3rd, 2022. This will be awarded as a firm-fixed price contract to the lowest price technically acceptable offeror. Vendors must be registered in SAM and have updated representations and certifications to receive an award. The soliciting agency is the Department of the Army Corps of Engineers Baltimore District.

View the file

Other files

File Type Posted
B.08.03 W912DR22R0049 Amendment 0005 - Cancelling Solicitation.pdf PDF
23 64 10_refrig leak detector removed.pdf PDF
23 52 13_Rev1.pdf PDF
Harpers Ferry Combined Set - FP and LS.pdf PDF
28 31 76.pdf PDF
ProjNet Inquiries_Responses - AM0004.pdf PDF
AM0004 W912DR22R0049 - IDC for CBP.pdf PDF
Project Description IDC DLC Harpers Ferry WV Solicitation W912DR22R0049.pdf PDF
W912DR22R0049-Amendment 0004 notes and clarifications-FA Life Safety and MECH Changes 9-28-2022 (004) (002).docx DOCX document
PN488559_HF IDC DLC_RTA ITR_Landscape_2022-09-15.pdf PDF
01 91 00.15 10.pdf PDF
12 93 00_2022-09-15.pdf PDF
AM0003 W912DR22R0049 - IDC for CBP.pdf PDF
08 81 00.pdf PDF
31 63 33_2022-09-13.pdf PDF
PN488559_HF IDC DLC_2019_BID REV1.pdf PDF
07 42 13.pdf PDF
Geotechnical Report 04-20-0534-IDC DLC Facility-Final 9-14-22.pdf PDF
W912DR22R0049 AM0002 - IDC for CBP.pdf PDF
CBP_IDC-DLC Specifications_RTA_2022-08-24.pdf PDF
AM0001 - W912DR22R0049_IDC at CBP.pdf PDF
IDC DLC HF IDC DLC 22R0049 Structural Architectural and Interiors Part 2 of 3 _2022 08 24.pdf PDF
Use Me IDC DLC HF IDC DLC 22R0049 Fire Protection Plumbing Mechanical Electrical Drawings Part 3 of 3.pdf PDF
Use me IDC DLC HF IDC DLC 22R0049 Cover Life Safety HAZ MAT CIVIL LANDSCAPING Part 1 of 3.pdf PDF
W912DR22R0049_Instructional Design Center Harpers Ferry WV_02SEP2022.pdf PDF
ATC Campus Access Notification Form (Updated).pdf PDF
CBP IDC-DLC Submittal Register_RTA_2022-08-24.pdf PDF
CBP IDC-DLC Specifications_RTA_2022-08-24.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD

HHP-1

CLASSROOM 3

CLOSET

106ALOBBY

L100

COLLABORATION

COLLABORATION

COLLABORATION

COLLABORATION/

CONF

VESTIBULE

V101

COLLABORATION/

CONF

COLLABORATION

COLLABORATION

COLLABORATION

STAIR C

STC1

E L

E V

L O

B B

Y

C

KITCHENETTE

MEN'S

G101

WOMEN'S

G100

VESTIBULE

V100

ELEC

C O

R R

ID

O

R

C

CORRIDOR

C103

COPY

V 1-

V1-14

V1-9

V1-10 V1-12V1-8

V1-7

14Ø SA

18Ø SA

ACCU-4

M A

T C

H L

IN

E

8Ø A230

12Ø A405

12ØA

12ØA 400

8Ø A

145 10ØA 320

10ØA 245

8Ø A

8ØA 130

12Ø A

12Ø A375

12Ø A

12Ø A375 12Ø A375

6Ø A

6x6 EG125 6x6 EG

6x6 EG

6x6 EG

6x6 EG130 x1

SA

FCU-2

16x16 SA

14x12 SA

V1-11

12x10 SA

V1-13

12ØRG 420 22x22RG

10Ø RG

12Ø RG405

12Ø RG405

15x15RG 800

8Ø RG145

6x6 EA 12x10 EA x1

EA

12x12 SA

V1-6

10Ø RG235

8Ø RG

T

T

T T T T T

TTT

TYP 3

T

12Ø RG

TYP 3

12x10 RA

TYP 2

12x12 RA

18x10 RA

16x14 RA

12x12 RA

10x12 SA 12x10 SA

TYP 2

10x10RG

TYP 2

8 9 10 11 12 12.9 13 14

M

L

K

J

H

G

C

D

E

V1-5

22x12 RA

Ø

S A

22Ø SA

12Ø RG325

12x10 SA

8x8 EA8x8 EA

14x14 RA

12x10 RA

8Ø A

8Ø A135

6x6EG

6x6 EA

20x16 RA

20x16 RA

T

6x10 EA

8Ø E

12' - 0"

6Ø SA

8ØA 205

8Ø A205

V1-16

6ØF 50

4' - 0"

6ØF

4' - 0"

A14 /M-501

TYP

T

10x10 RG

8Ø SA

26x14 RA

10Ø SA

8x10 SA

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

M B

I( A

E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

A B

KEY PLAN

324239

MH112

H V

A C

S

T F

L O

O R

A

R E

A B

H A

R P

E R

S F

E R

R Y

W

E S

T V

IG

IN

IA

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T C

T O

F C

R M

A

F O

R T

W O

R T

H T

X

-0

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

L

Y N

D O

N B

J O

H N

S O

N F

W Y

S

U

IT

E

D A

L L A

S T

X

A K

A L

IA

N D

A

T M

A R

C

IN

O W

S K

I

J A

S O

N T

A C

K E

T T

K B

L A

N C

H

S E

P T

E M

B E

R

W D

R -2

-R

-0

W G

-1 -D

-0

O P

T

IO

N T

IT

L E

O P

T

IO

N F

IE

L D

A M

E N

D M

E N

T

IN

S

T R

U C

T

IO

N A

L D

E S

IG

N

C E

N T

E R

D

IS

T

A N

C E

L E

A R

N

IN

G C

E N

T E

R

P N

SCALE: 1/8" = 1'-0"

HVAC - FIRST FLOOR - AREA B

B2

PLAN NORTH

GENERAL NOTES - HVAC

1 PROVIDE MANUAL VOLUME DAMPERS IN ALL

RUN-OUTS TO DIFFUSERS, AT ALL BRANCH

TAKE-OFFS FROM MAIN SUPPLY DUCT, AND IN ALL

OTHER AREAS AS REQUIRED TO PROVIDE PROPER

SYSTEM BALANCING.

2 ALL SUPPLY AIR DUCT RUN-OUTS TO DIFFUSERS

AND VAV BOXES SHALL BE SIZED TO MATCH

DIFFUSER NECK SIZE OR VAV BOX INLET SIZE

UNLESS OTHERWISE INDICATED.

3 SHEET METAL FABRICATOR MAY SUBSTITUTE

EQUIVALENT ROUND OR FLAT OVAL DUCTWORK

FOR RECTANGULAR SIZES INDICATED.

DUCTWORK BETWEEN AHU AND VAV BOXES SHALL

BE SIZED TO 0.2” STATIC PRESSURE LOSS PER 100'

OF DUCT RUN, DUCTWORK DOWNSTREAM OF VAV

BOXES, RETURN, EXHAUST AND TRANSFER AIR

DUCTS SHALL BE SIZED TO 0.08”/100' OF DUCT

RUN. ALL REVISIONS MUST BE COORDINATED

WITH ALL OTHER TRADES AND ILLUSTRATED IN

DUCTWORK SHOP DRAWINGS FOR APPROVAL.

4 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE

AND DO NOT ILLUSTRATE ALL SPECIFIC DUCT

TAKE-OFF CONFIGURATIONS, TAPS, ETC. REFER

TO PROJECT SPECIFICATIONS AND DUCTWORK

DETAILS FOR SPECIFIC REQUIREMENTS.

5 ALL EQUIPMENT SHALL BE INSTALLED WITH

MANUFACTURER'S REQUIRED ACCESS SPACE

BETWEEN UNIT AND FULL HEIGHT WALLS AND

OTHER OBSTRUCTIONS.

6 FLEX DUCT MAY BE USED TO AID WITH

GRILLE/DIFFUSER ALIGNMENT IN CEILING GRID.

MAXIMUM OF 2 FT IN TOTAL LENGTH FOR

RETURN/EXHAUST SYSTEMS, AND A MAXIMUM OF

5 FT TOTAL LENGTH FOR SUPPLY SYSTEMS.

7 OUTDOOR AIR INTAKE OPENINGS SHALL BE

SEPARATED FROM EXHAUST/VENT OUTLETS AND

OTHER CONTAMINANT SOURCES AT MINIMUM

DISTANCES SPECIFIED BY CODES.

SCALE: 1/8" = 1'-0"

0 4'-0" 8'-0" 16'-0"

KEYNOTES

1 EXHAUST DUCT UP TO SECOND FLOOR.

2 COORDINATE EXACT LOCATION WITH ARCHITECT.

TEMPERATURE SENSOR SHALL BE SET AT 85°F

COOLING AND 60°F HEATING.

3 CONTRACTOR TO SUBMIT THE PROPOSED

CHILLER LAYOUT, IF DIFFERENT FOOTPRINT THAN

SHOWN, FOR DOR APPROVAL AND COORDINATE

WITH OTHER AFFECTED DISCIPLINES, SUCH AS

ARCHITECTURAL, CIVIL, STRUCTURAL,

ELECTRICAL, ETC.

2 PERSON OFFICE

OFFICE

OFFICE

DESIGN ROOM 1

DESIGN ROOM 3

OPEN STAFF BAY

ELEV LOBBY

C200

TECH / COMMS

C O

R R

ID

O

R

C

LAN/SWITCH

DESIGN ROOM 2

C O

N F

E R

E N

C E

R O

O M

STAIR B

STB1

TELE / COMM

OFFICE

COLLABORATION

AREA

CORRIDOR

C202

STAIR A

STA1

18Ø SA

V2-10

V2-11

V2-7

V2-4

V2-9

V2-1

V2-2

V2-5

V2-6

V2-3

ACU-2

ACU-3

12Ø A365

12Ø A365

10ØA 385

10Ø A

8ØA

10Ø A

8ØA

8ØA 210

12ØRG

8ØA

8Ø A150

8Ø A

8Ø A

10Ø A

10ØA 315

V2-12

V2-8

6ØA

30x4D 525

36x4 D650

30x4D

30x4D 420

30x4D 440

12ØA 400

FCU-5

16Ø RG815

8ØRG

8Ø RG

8ØRG

8ØRG 150

20Ø SA

16Ø SA

16Ø SA

16Ø SA

24Ø SA

M-401 C11

14x12 SA

14x14 SA

M A

T C

H L

IN

E

T T

T T

T

T

T

T

T

T T

T

T

T

16x16 WR

16x16 WR945

12Ø RG325

26Ø SA

12Ø SA

12x12 SA

18x18 RG

18x16WR

8ØRG

32x20 RA22x20 RA x3

R

A

20x24 RA

Ø

S A

16x14 RA

Ø

S A

14Ø RG

14Ø RG

T

18x12 RA T x3

R

A

10Ø SA

10x10 SA

10x10 SA

10x10 SA

12x12 SA

30x4 D

1 2 2.1 2.5 3 4 4.3 3.3 5 6 7

M

L

K

J

H

G

F

C

D

E

14Ø SA

10x10 C

10x10C 400

10x12 SA

L-4

48x26 OA

48x26 EA

12Ø SA

10x14 RA

16x16 RA

16x16 RA

L-3

34x26 RA

6x6 EA

T

E15 /M-504

TYP

A13 /M-504

A13 /M-504

8Ø RA

14Ø SA

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

M B

I( A

E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

A B

KEY PLAN

324241

MH121

H V

A C

N

D F

L O

O R

A

R E

A A

H A

R P

E R

S F

E R

R Y

W

E S

T V

IG

IN

IA

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T C

T O

F C

R M

A

F O

R T

W O

R T

H T

X

-0

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

L

Y N

D O

N B

J O

H N

S O

N F

W Y

S

U

IT

E

D A

L L A

S T

X

A K

A L

IA

N D

A

T M

A R

C

IN

O W

S K

I

J A

S O

N T

A C

K E

T T

K B

L A

N C

H

S E

P T

E M

B E

R

W D

R -2

-R

-0

W G

-1 -D

-0

O P

T

IO

N T

IT

L E

O P

T

IO

N F

IE

L D

A M

E N

D M

E N

T

IN

S

T R

U C

T

IO

N A

L D

E S

IG

N

C E

N T

E R

D

IS

T

A N

C E

L E

A R

N

IN

G C

E N

T E

R

P N

GENERAL NOTES - HVAC

1 PROVIDE MANUAL VOLUME DAMPERS IN ALL

RUN-OUTS TO DIFFUSERS, AT ALL BRANCH

TAKE-OFFS FROM MAIN SUPPLY DUCT, AND IN ALL

OTHER AREAS AS REQUIRED TO PROVIDE PROPER

SYSTEM BALANCING.

2 ALL SUPPLY AIR DUCT RUN-OUTS TO DIFFUSERS

AND VAV BOXES SHALL BE SIZED TO MATCH

DIFFUSER NECK SIZE OR VAV BOX INLET SIZE

UNLESS OTHERWISE INDICATED.

3 SHEET METAL FABRICATOR MAY SUBSTITUTE

EQUIVALENT ROUND OR FLAT OVAL DUCTWORK

FOR RECTANGULAR SIZES INDICATED.

DUCTWORK BETWEEN AHU AND VAV BOXES SHALL

BE SIZED TO 0.2” STATIC PRESSURE LOSS PER 100'

OF DUCT RUN, DUCTWORK DOWNSTREAM OF VAV

BOXES, RETURN, EXHAUST AND TRANSFER AIR

DUCTS SHALL BE SIZED TO 0.08”/100' OF DUCT

RUN. ALL REVISIONS MUST BE COORDINATED

WITH ALL OTHER TRADES AND ILLUSTRATED IN

DUCTWORK SHOP DRAWINGS FOR APPROVAL.

4 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE

AND DO NOT ILLUSTRATE ALL SPECIFIC DUCT

TAKE-OFF CONFIGURATIONS, TAPS, ETC. REFER

TO PROJECT SPECIFICATIONS AND DUCTWORK

DETAILS FOR SPECIFIC REQUIREMENTS.

5 ALL EQUIPMENT SHALL BE INSTALLED WITH

MANUFACTURER'S REQUIRED ACCESS SPACE

BETWEEN UNIT AND FULL HEIGHT WALLS AND

OTHER OBSTRUCTIONS.

6 FLEX DUCT MAY BE USED TO AID WITH

GRILLE/DIFFUSER ALIGNMENT IN CEILING GRID.

MAXIMUM OF 2 FT IN TOTAL LENGTH FOR

RETURN/EXHAUST SYSTEMS, AND A MAXIMUM OF

5 FT TOTAL LENGTH FOR SUPPLY SYSTEMS.

7 OUTDOOR AIR INTAKE OPENINGS SHALL BE

SEPARATED FROM EXHAUST/VENT OUTLETS AND

OTHER CONTAMINANT SOURCES AT MINIMUM

DISTANCES SPECIFIED BY CODES.

SCALE: 1/8" = 1'-0"

HVAC - SECOND FLOOR - AREA A

C2

PLAN NORTH

SCALE: 1/8" = 1'-0"

0 4'-0" 8'-0" 16'-0"

KEYNOTES

1 TOTAL DISTANCE COMBINED SHALL BE A MINIMUM

OF 10'-0". SEE A-202 AND A-203 FOR EXACT

DIMENSIONS.

2 INTAKE AIR OPENINGS SHALL BE SEPARATED

FROM EXHAUST OPENINGS, VENT TERMINATIONS,

AND OTHER SOURCES OF CONTAMINATION AT

MINIMUM DISTANCES SPECIFIED BY CODE.

3 PROVIDE MIN. 3/8" UNDERCUT.

2ND FLOOR PLAN

15' - 0"

3" GCWS

3" GCWR

2 1/2" GHWS

2 1/2" GHWR

A H

U -2

3" GCWS

3" GCWR

1 1/2" GHWS

1 1/2" GHWR

3" GCW

BYPASS

2" GHW

BYPASS

2" GHWR

1" GCWR

1" GCWS

2" GHWS 3" GCWS

3" GCWR

2 1/2" GHWR

2 1/2" GHWS1 1/2" GCWR

1 1/2" GCWS

2" GHWR

2" GHWS

2" GHWR

2" GHWS

1ST FLOOR PLAN

0' - 0"

5 6 7

2 1/2" GHWS

2 1/2" GHWR

3" GCWR

3" GCWS

2 1/2" GHWS

2 1/2" GHWR

2 1/2" GCWR

4" GCWR

3" GCWR

3" GCWS

1 1/2" GHWS

1 1/2" GHWR

1 1/2" GHWR

1 1/2" GHWS

AS-2

ET-2

CHWP-1

CHWP-2

4" GCWR

3" GCWR

2 1/2" GCWR

3/4" GCWR

2 1/2" GCWR

3" GCWR

4" GCWR

4" GCWR

1ST FLOOR PLAN

0' - 0"

C D E

AHU-1

1 1/2" GHWR

1 1/2" GHWS

ET-1

HWP-2

FCU-1

3" GHWS

4" GCWS

3" GHWR

4" GCWR

2 1/2" GCWS

2 1/2" GCWR

1 1/4" GHWR

4" GCWR

2 1/2" GCWR

AS-1

3" GHWR

3" GHWR

1" GHWR

1" GHWS

1" GCWR

1" GCWS

1" GCWS

1" GCWR

2 1/2" GHWS

3" GCWS

2 1/2" GHWS

3" GHWR

3" GHWS

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

M B

I( A

E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

324250

M-302

M E

C H

A N

IC

A

L S

E C

T

IO

N S

P

IP

IN

G

H A

R P

E R

S F

E R

R Y

W

E S

T V

IG

IN

IA

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T C

T O

F C

R M

A

F O

R T

W O

R T

H T

X

-0

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

L

Y N

D O

N B

J O

H N

S O

N F

W Y

S

U

IT

E

D A

L L A

S T

X

D e s ig n e r

A u th o r

J A

S O

N T

A C

K E

T T

C h e c k e r

S E

P T

E M

B E

R

W D

R -2

-R

-0

W G

-1 -D

-0

O P

T

IO

N T

IT

L E

O P

T

IO

N F

IE

L D

A M

E N

D M

E N

T

IN

S

T R

U C

T

IO

N A

L D

E S

IG

N

C E

N T

E R

D

IS

T

A N

C E

L E

A R

N

IN

G C

E N

T E

R

P N

SCALE: 1/4" = 1'-0"

LEVEL 2 - PIPING - MECHANICAL ROOM SECTION WEST

G12

SCALE: 1/4" = 1'-0"

LEVEL 1 - PIPING - MECHANICAL ROOM SECTION NORTH

A12SCALE: 1/4" = 1'-0"

LEVEL 1 - PIPING - MECHANICAL ROOM SECTION WEST

A3

SCALE: 1/4" = 1'-0"

0 2'-0" 4'-0" 8'-0"

GENERAL NOTES - PIPING

1 ALL GHWS & GHWR BRANCHES ARE 3/4" UNLESS

NOTED OTHERWISE.

2 PROVIDE AN AIR VENT AT THE HIGH POINT OF

EACH DROP IN THE HEATING AND CHILLED WATER

PIPING SYSTEMS. ALL PIPING SHALL GRADE TO

THE LOW POINTS. PROVIDE HOSE END DRAIN

VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

3 INSTALL PIPING SO THAT ALL VALVES, STRAINERS,

UNIONS, TRAPS, FLANGES AND OTHER

APPURTENANCES REQUIRING ACCESS ARE EASILY

ACCESSIBLE. ALL VALVES SHALL BE INSTALLED

SO THAT THE REMAINS IN SERVICE WHEN

EQUIPMENT OR PIPING ON EQUIPMENT SIDE OF

VALVE IS REMOVED. ALL BALANCING VALVES AND

BUTTERFLY VALVES SHALL BE PROVIDED WITH

POSITION INDICATORS AND MAXIMUM

ADJUSTABLE STOPS (AKA “MEMORY STOPS”). ALL

VALVES (EXCEPT CONTROL VALVES) AND

STRAINERS SHALL BE FULL SIZE OF PIPE BEFORE

REDUCING SIZE TO MAKE CONNECTIONS TO

EQUIPMENT AND CONTROLS.

4 INSTALL PIPING WITHOUT FORCING OR

SPRINGING.

KEYNOTES

1 CAP FOR FUTURE BOILER CONNECTIONS, IF

SUPPLEMENTAL BOILER IS NOT REQUIRED (SEE

NOTE 2 ON CHILLER SCHEDULE).

x3

R

A

22Ø SA

16x20 RA

FCU-1

AHU-1

T

6x6 EA

5 6 7

C

D

E

20x16 RA

30x32 OA

48x30 EA

L-1

L-2

A11

M-301

F11

M-301

20Ø SA

22x12 RA

14Ø SA

A13 /M-504

A13 /M-504

JAN

MECH

6Ø SA

6x6 EG

26x14 RA

12x12 RA

22Ø SA

26Ø SA

x3

R

A

AHU-2

FCU-3

26Ø SA

T

5 6 7

16Ø RA 48x26 OA

26x48 OA

34x26 RA

50x30 SA

52x18 RA

50x30 EA

40x30 EA

48x26 EA

F3

M-301

48x26 EAA3

M-301

6x6EG

JAN

EF-2 8" EA UTR

8x8 EA200

A4 /M-503

M E

C H

A N

IC

A

L

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

M B

I( A

E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

324251

M-401

M E

C H

A N

IC

A

L E

N L A

R G

E D

P L A

N S

H

V A

C

H A

R P

E R

S F

E R

R Y

W

E S

T V

IG

IN

IA

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T C

T O

F C

R M

A

F O

R T

W O

R T

H T

X

-0

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

L

Y N

D O

N B

J O

H N

S O

N F

W Y

S

U

IT

E

D A

L L A

S T

X

A K

A L

IA

N D

A

T M

A R

C

IN

O W

S K

I

J A

S O

N T

A C

K E

T T

K B

L A

N C

H

S E

P T

E M

B E

R

W D

R -2

-R

-0

W G

-1 -D

-0

O P

T

IO

N T

IT

L E

O P

T

IO

N F

IE

L D

A M

E N

D M

E N

T

IN

S

T R

U C

T

IO

N A

L D

E S

IG

N

C E

N T

E R

D

IS

T

A N

C E

L E

A R

N

IN

G C

E N

T E

R

P N

PLAN NORTH

SCALE: 1/4" = 1'-0"

0 2'-0" 4'-0" 8'-0"

SCALE: 1/4" = 1'-0"

HVAC - 1ST FLOOR PLAN - ENLARGED MECHANICAL ROOM

C2 SCALE: 1/4" = 1'-0"

HVAC - SECOND FLOOR - ENLARGED MECHANICAL ROOM

C11

GENERAL NOTES - HVAC

1 PROVIDE MANUAL VOLUME DAMPERS IN ALL

RUN-OUTS TO DIFFUSERS, AT ALL BRANCH

TAKE-OFFS FROM MAIN SUPPLY DUCT, AND IN ALL

OTHER AREAS AS REQUIRED TO PROVIDE PROPER

SYSTEM BALANCING.

2 ALL SUPPLY AIR DUCT RUN-OUTS TO DIFFUSERS

AND VAV BOXES SHALL BE SIZED TO MATCH

DIFFUSER NECK SIZE OR VAV BOX INLET SIZE

UNLESS OTHERWISE INDICATED.

3 SHEET METAL FABRICATOR MAY SUBSTITUTE

EQUIVALENT ROUND OR FLAT OVAL DUCTWORK

FOR RECTANGULAR SIZES INDICATED.

DUCTWORK BETWEEN AHU AND VAV BOXES SHALL

BE SIZED TO 0.2” STATIC PRESSURE LOSS PER 100'

OF DUCT RUN, DUCTWORK DOWNSTREAM OF VAV

BOXES, RETURN, EXHAUST AND TRANSFER AIR

DUCTS SHALL BE SIZED TO 0.08”/100' OF DUCT

RUN. ALL REVISIONS MUST BE COORDINATED

WITH ALL OTHER TRADES AND ILLUSTRATED IN

DUCTWORK SHOP DRAWINGS FOR APPROVAL.

4 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE

AND DO NOT ILLUSTRATE ALL SPECIFIC DUCT

TAKE-OFF CONFIGURATIONS, TAPS, ETC. REFER

TO PROJECT SPECIFICATIONS AND DUCTWORK

DETAILS FOR SPECIFIC REQUIREMENTS.

5 ALL EQUIPMENT SHALL BE INSTALLED WITH

MANUFACTURER'S REQUIRED ACCESS SPACE

BETWEEN UNIT AND FULL HEIGHT WALLS AND

OTHER OBSTRUCTIONS.

6 FLEX DUCT MAY BE USED TO AID WITH

GRILLE/DIFFUSER ALIGNMENT IN CEILING GRID.

MAXIMUM OF 2 FT IN TOTAL LENGTH FOR

RETURN/EXHAUST SYSTEMS, AND A MAXIMUM OF

5 FT TOTAL LENGTH FOR SUPPLY SYSTEMS.

7 OUTDOOR AIR INTAKE OPENINGS SHALL BE

SEPARATED FROM EXHAUST/VENT OUTLETS AND

OTHER CONTAMINANT SOURCES AT MINIMUM

DISTANCES SPECIFIED BY CODES.

KEYNOTES

1 TOTAL DISTANCE COMBINED SHALL BE A MINIMUM

OF 10'-0". SEE A-202 AND A-203 FOR EXACT

DIMENSIONS.

2 INTAKE AIR OPENINGS SHALL BE SEPARATED

FROM EXHAUST OPENINGS, VENT TERMINATIONS,

AND OTHER SOURCES OF CONTAMINATION AT

MINIMUM DISTANCES SPECIFIED BY CODE.

3 PROVIDE MIN. 3/8" UNDERCUT.

FE

FE

CHWP-1

CHWP-2

FCU-1

AHU-1

3" G

C W

S

1/

2" G

H W

R

1 1/2" GHWS

1 1/2" GHWR

ET-2

1 1/2" GHWS

1 1/2" GHWR

MECH

ET-1

AS-2

AS-1

HWP-1

HWP-2

5 6 7

C

D

E

2 1/2" GHWS

2 1/2" GHWR

3" GCWR

3" GCWS

1" GCWS

1" GCWR

1" GHWS

1" GHWR

4" GCWR

4" GCWR

3" GHWR

3" GHWR

1 1/2" GHWR

1" GCWR

1" GCWS

2 1/2" GHWS

4" GCWS

2 1/2" GCWR

2 1/2" GHWS

JAN

A12

M-302

A3

M-302

1 1/2" GHWS

2 1/2" GCWR

2 1/2" GCWS

4" GCWR

4" GCWS 3" GHWR

3" GHWS

3" GHWS

3" GHWR

A6 /M-502

E15 /M-503

F8 /M-503

L8 /M-503

L1 /M-503

3" GHWS

DECOUPLER

FCU-3

AHU-2

3" GCWR

3" GCWS

2 1/2" GHWR

2 1/2" GHWS

2" GHWS

2" GHWR

1 1/2" GCWS

1 1/2" GCWR

1 1/2" GHWS

1 1/2" GHWR

5 6 7

3" GCWS

3" GCWR

2" GHWR

2" GHWS

1" GCWR

1" GCWS

2" GHWR

2" GHWS

3/4" GCWS

3/4" GCWR 3/4" GHWS

3/4" GHWR

2" GHW

BYPASS

3" GCW

BYPASS

G12

M-302 A6 /M-502

JAN

216F8 /M-503

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

M B

I( A

E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

324252

M-402

M E

C H

A N

IC

A

L E

N L A

R G

E D

P L A

N S

P

IP

IN

G

H A

R P

E R

S F

E R

R Y

W

E S

T V

IG

IN

IA

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T C

T O

F C

R M

A

F O

R T

W O

R T

H T

X

-0

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

L

Y N

D O

N B

J O

H N

S O

N F

W Y

S

U

IT

E

D A

L L A

S T

X

A K

A L

IA

N D

A

T M

A R

C

IN

O W

S K

I

J A

S O

N T

A C

K E

T T

K B

L A

N C

H

S E

P T

E M

B E

R

W D

R -2

-R

-0

W G

-1 -D

-0

O P

T

IO

N T

IT

L E

O P

T

IO

N F

IE

L D

A M

E N

D M

E N

T

IN

S

T R

U C

T

IO

N A

L D

E S

IG

N

C E

N T

E R

D

IS

T

A N

C E

L E

A R

N

IN

G C

E N

T E

R

P N

SCALE: 1/4" = 1'-0"

PIPING - 1ST FLOOR PLAN - ENLARGED MECHANICAL ROOM

B2 SCALE: 1/4" = 1'-0"

PIPING - 2ND FLOOR PLAN - ENLARGED MECHANICAL ROOM

B11

PLAN NORTH

SCALE: 1/4" = 1'-0"

0 2'-0" 4'-0" 8'-0"

KEYNOTES

1 PIPING UP TO SECOND FLOOR.

2 PROVIDE 3-WAY VALVES PER SCHEDULE. SEE

DETAIL F1/M-503.

3 SYSTEM BYPASS, SEE M-803 & M-804 FOR

SCHEMATIC AND CONTROLLABILITY.

4 CAP FOR FUTURE BOILER CONNECTIONS, IF

SUPPLEMENTAL BOILER IS NOT REQUIRED (SEE

NOTE 2 ON CHILLER SCHEDULE).

5 CONDENSATE DRAIN ROUTING TO BE

COORDINATED AND SHOWN ON PLUMBING

DRAWINGS. SEE DETAIL A10/M-503.

6 SUPPLEMENTAL/FUTURE BOILER (SEE NOTE 2 ON

CHILLER SCHEDULE). CONCRETE PAD TO BE

PROVIDED.

7 PROVIDE PIPE GUIDES AND ANCHORS WHERE

SHOWN.

GENERAL NOTES - PIPING

1 ALL GHWS & GHWR BRANCHES ARE 3/4" UNLESS

NOTED OTHERWISE.

2 PROVIDE AN AIR VENT AT THE HIGH POINT OF

EACH DROP IN THE HEATING AND CHILLED WATER

PIPING SYSTEMS. ALL PIPING SHALL GRADE TO

THE LOW POINTS. PROVIDE HOSE END DRAIN

VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

3 INSTALL PIPING SO THAT ALL VALVES, STRAINERS,

UNIONS, TRAPS, FLANGES AND OTHER

APPURTENANCES REQUIRING ACCESS ARE EASILY

ACCESSIBLE. ALL VALVES SHALL BE INSTALLED

SO THAT THE REMAINS IN SERVICE WHEN

EQUIPMENT OR PIPING ON EQUIPMENT SIDE OF

VALVE IS REMOVED. ALL BALANCING VALVES AND

BUTTERFLY VALVES SHALL BE PROVIDED WITH

POSITION INDICATORS AND MAXIMUM

ADJUSTABLE STOPS (AKA “MEMORY STOPS”). ALL

VALVES (EXCEPT CONTROL VALVES) AND

STRAINERS SHALL BE FULL SIZE OF PIPE BEFORE

REDUCING SIZE TO MAKE CONNECTIONS TO

EQUIPMENT AND CONTROLS.

4 INSTALL PIPING WITHOUT FORCING OR

SPRINGING.

POTABLE WATER

BY-PASS SHUT-OFF VALVE

SHUT-OFF VALVE

DUPLEX WATER SOFTENER,

TANK #1

DRAIN LINE, EXTEND TO FLOOR DRAIN

HOUSEKEEPING PAD

DUPLEX WATER SOFTENER,

TANK #2

WATER METER, SUPPLIED

WITH WATER SOFTENER

SOFT WATER

BRINE TANK

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

M B

I( A

E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

324258

M-601

M E

C H

A N

IC

A

L S

C H

E D

U L E

S

H A

R P

E R

S F

E R

R Y

W

E S

T V

IG

IN

IA

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T C

T O

F C

R M

A

F O

R T

W O

R T

H T

X

-0

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

L

Y N

D O

N B

J O

H N

S O

N F

W Y

S

U

IT

E

D A

L L A

S T

X

A K

A L

IA

N D

A

T M

A R

C

IN

O W

S K

I

J A

S O

N T

A C

K E

T T

K B

L A

N C

H

S E

P T

E M

B E

R

W D

R -2

-R

-0

W G

-1 -D

-0

O P

T

IO

N T

IT

L E

O P

T

IO

N F

IE

L D

A M

E N

D M

E N

T

IN

S

T R

U C

T

IO

N A

L D

E S

IG

N

C E

N T

E R

D

IS

T

A N

C E

L E

A R

N

IN

G C

E N

T E

R

P N

14. PROVIDE BACNET INTERFACE CARD.

13. PROVIDE PRE-FILTER/FINAL FILTER MERV-8/MERV-13; PROVIDE FILTER RACKS.

12. RADIATED CASING SOUND POWER LEVELS IN THE INDUSTRY STANDARD (8) OCTAVE BANDS STARTING AT THE 62.5 HZ BAND ARE 84, 85, 93, 89, 92, 71, 66, 62.

11. SA FAN DISCHARGE SOUND POWER LEVELS IN THE INDUSTRY STANDARD (8) OCTAVE BANDS STARTING AT THE 62.5 HZ BAND ARE 81, 85, 98, 92, 93, 90, 87, 81.

10. RA FAN DUCTED INLET SOUND POWER LEVELS IN THE INDUSTRY STANDARD (8) OCTAVE BANDS STARTING AT THE 62.5 HZ BAND ARE 79, 81, 88, 85, 82, 80, 79, 70.

9. UNIT TO HAVE DIFFERENTIAL ENTHALPY CONTROLLED ECONOMIZER, 100% AIRFLOW.

8. LATENT COOLING CAPACITIES (TOTAL MINUS SENSIBLE MBH"S) MUST BE PROVIDED.

7. UNIT SA FAN AND RA FAN MUST BE COMPATIBLE WITH EACH OTHER FOR MATCHED VAV DUTY.

6. INSTALL UNIT FOR PROPER CONDENSATE DRAINAGE.

5. SMOKE DETECTORS IN RA DUCT AT UNIT PROVIDED AND INSTALLED BY F.A.C., WIRED TO SHUT DOWN UNIT BY M.C. COORDINATE BETWEEN TRADES AND G.C.

4. FIELD PROVIDED UNIT DISCONNECT AND VFD DRIVES; AHU 2 SUPPLY AND RETURN FAN VFD'S MAY HAVE TO BE REMOTE FIELD MOUNTED. COORDINATE WIRING.

3. COOLING AND HEATING COIL FLUIDS ARE 30% PROPYLENE GLYCOL. SIZE TUBE AND SELECT COIL CIRCUITING TO MAINTAIN 2-6 FPS VELOCITY.

2. TOTAL STATIC PRESSURES INDICATED INCLUDE FULLY LOADED (DIRTY) FILTER ALLOWANCE.

NOTES : 1. PROVIDE 115V FOR AHU-1: ONE CIRCUIT SERVING RECEPTACLE, AHU-2: TWO CIRCUITS SERVING CONTROLS, LIGHTS, SWITCH, AND RECEPTACLE. MAX FUSE SIZE 15A EACH.

AHU-2 SECOND FLOOR 12700 3000 PLENUM 12700 2336 5.1 / 2.15 2 (10) 460/3/60 2 (15.63) 2 (25) PLENUM 12700 1911 2.1 / 1.5 (2) 5 460/3/60 2 (8.4) 2 (15) 504 / 375 80 / 66 52.9 / 52.8 0.8 44 / 54 109 19 5000 208 37 / 75 0.02 140 / 132 55 9 1-15

AHU-1 FIRST FLOOR 9000 3250 PLENUM 9000 2156 5.4 / 2 15 PLENUM 9000 1785 2.3 / 1.5 7.5 397 / 325 84 / 66 51 / 50.9 1.12 44 / 54 86 8 4300 173 23 / 60 0.03 140 / 132 49 10 460/3/60 38.6 50 1-15

FAN

TYPE

MAX

AIRFLOW

(CFM)

MAX FAN

SPEED

(RPM)

TOT/ EXT

SP (IN

WG)

MTR

HP

VOLTS/

PHASE/

HERTZ

MCA

(A)

MOCP

(A)

FAN

TYPE

MAX

AIRFLOW

(CFM)

MAX FAN

SPEED

(RPM)

TOT/ EXT

SP (IN

WG)

MTR

HP

VOLTS/

PHASE/

HERTZ

MCA

(A)

MOCP

(A)

CAP

TOT/

SENS

(MBH)

EAT

DB /

WB

(ºF)

LAT

DB /

WB

(ºF)

APD

(IN

WG)

FLUID

TEMP

ENT / LVG

(ºF)

FLOW

(GPM)

WPD

(FT

H20)

CFM

CAP

(MBH)

EAT/

LAT

(ºF DB)

APD

(IN WG)

FLUID

TEMP

ENT/LVG

(ºF)

FLOW

(GPM)

WPD

(FT

H20)

VOLTS/

PHASE/

HERTZ

MCA

(A)

MOCP

(A)

TAG AREA SERVED

MAX

SUPPLY

AIR

(CFM)

MIN

OA

(CFM)

SUPPLY FAN RETURN FAN COOLING COIL SECTION HEATING COIL SECTION

SINGLE POINT

CONNECTION

NOTES

AIR HANDLING UNIT SCHEDULE

09/28/2022 16:19

5. PROVIDE A COMPLETE WATER SOFTENER SYSTEM IF REQUIRED TO MEET BOILER WATER QUALITY REQUIREMENTS.

4. SEE NOTE 2 ON CHILLER SCHEDULE.

3. PROVIDE CONSTANT FLOW RECIRCULATION PUMP, SIZED ONLY FOR THE BOILER LOOP.

2. 30% PROPYLENE GLYCOL.

1. PROVIDE WITH BOILER CONTROLLER WITH CAPABILITY TO INTERFACE TO BUILDING DDC SYSTEM (BACNET).

NOTES:

B-1 ELECTRIC RESISTANCE 139 475 120 140 2 1/4 115/1/60 460/3/60 1000 1-5

EWT

(°F)

LWT

(°F)

MAX. WPD

(FT H2O)

MOTOR

(HP)

VOLT /

PHASE /

HERTZ

VOLT /

PHASE /

HERTZ

TAG TYPE MIN. KW

MIN.

CAPACITY

(MBH)

WATER DATA INTEGRAL PUMP ELECTRICAL

MAX.

OPERATING

WEIGHT

(LBS)

NOTES

SUPPLEMENTAL HOT WATER BOILER SCHEDULE

11. VERIFY MINIMUM SYSTEM VOLUME REQUIREMENT. PROVIDE BUFFER TANKS IF REQUIRED TO MEET THE MINIMUM. 09/28/2022 16:19

10. RATED IN ACCORDANCE WITH AHRI 550/590

9. MAXIMUM EVAPORATOR PRESSURE DROP < 15 FT AND CONDENSER PRESSURE DROP < 8 FT.

8. PROVIDE NO LOSS OF HEATING CAPACITY WHEN IN DEFROST MODE REGARDLESS IF UNIT IS IN SIMULTANEOUS HEATING AND COOLING, HEAT RECOVERY, OR HEATING-ONLY MODE.

7. PROVIDE FILTER DRYER KIT, FACTORY INSTALLED.

6. PROVIDE BACNET INTERFACE CARD.

5. 30% PROPYLENE GLYCOL FOR HEATING AND COOLING.

4. A MASTER CONTROLLER SHALL CONTROL COOLING MODE, HEATING MODE, AND SIMULTANEOUS HEATING-COOLING.

3. FACTORY INSTALLED COMMON PIPING HEADERS, INTEGRATED CONTROLS, AND SINGLE POINT ELECTRICAL CONNECTION. EACH MODULE SHALL HAVE A UNIT DISCONNECT FOR SERVICE WHILE ALLOWING OTHER MODULES TO RUN. ANY ADDITIONAL COSTS ASSOCIATED WITH FIELD POWER WIRING AND THE ELECTRICAL INFRASTRUCTURE TO SUPPORT ARE RESPONSIBILITY OF THE INSTALLING CONTRACTOR IF THEY CANNOT USE SINGLE POINT POWER.

2. AMBIENT HEATING DESIGN CONDITION: 14.5 °F DB. IF CHILLER IS CAPABLE OF MEETING THE REQUIRED BUILDING HEATING LOAD AT DESIGN CONDITION, CONTRACTOR MAY OMIT THE SUPPLEMENTAL BOILER.

NOTES: 1. CONSIST OF FOUR (4) 30-TON MODULE: 3 OPERATING MODULES TO HANDLE BUILDING PEAK COOLING LOAD + 1 MODULE FOR REDUNDANCY. AMBIENT COOLING DESIGN CONDITION OF 95/76 °F DB/WB.

HHP-1 MECHANICAL YARD 80 54 44 475 120 140 890 9.6 2 SCROLL R-410A 290 350 460/3/60 15,000 1-11

COOLING

(TON)

EWT

(°F)

(NOTE 1)

LWT

(°F)

(NOTE 1)

HEATING

(MBH)

EWT

(⁰F)

(NOTE 2)

LWT

(⁰F)

(NOTE 2)

NO OF

COMP.

PER

MODULE

TYPE OF

COMPRESSOR

TYPE OF

REFRIGERANT

MAX

MCA

MAX

MOCP

VOLTS/

PHASE/

HERTZ

TAG LOCATION

BUILDING PEAK COOLING LOAD BUILDING PEAK HEATING LOAD MINIMUM

BANK

HEATING

(MBH)

(NOTE 2)

MIN EER

(NOTE 10)

COMPRESSOR ELECTRICAL

MAX

OPERATING

WEIGHT

LBS

NOTES

MODULAR AIR-TO-WATER HEAT PUMP CHILLER SCHEDULE

SCALE:NTS

COIL PIPING W/ 2-WAY VALVES DETAIL

B8

CONTRACTOR SHALL PROVIDE AIR-TO-WATER HEAT PUMP CHILLER THAT PRODUCE

HEATING HOT WATER AND CHILLED WATER TO MEET THE BUILDING HEATING AND COOLING

REQUIREMENTS AND PROVIDE SPARE CAPACITIES AS NOTED IN THE SCHEDULE.

SUPPLEMENTAL BOILER MAY BE USED TO MEET THE REQUIRED SUPPLY HEATING WATER

TEMPERATURE AT DESIGN OUTDOOR CONDITION IF THE HEAT PUMP CHILLER ALONE IS NOT

CAPABLE TO PROVIDE. OTHERWISE, BOILER MAY BE OMITED. REFER TO CONTROL

DRAWINGS SERIES M-800 FOR CONTROL SEQUENCES.

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

M B

I( A

E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

324260

M-603

M E

C H

A N

IC

A

L S

C H

E D

U L E

S

H A

R P

E R

S F

E R

R Y

W

E S

T V

IG

IN

IA

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T C

T O

F C

R M

A

F O

R T

W O

R T

H T

X

-0

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

L

Y N

D O

N B

J O

H N

S O

N F

W Y

S

U

IT

E

D A

L L A

S T

X

A K

A L

IA

N D

A

T M

A R

C

IN

O W

S K

I

J A

S O

N T

A C

K E

T T

K B

L A

N C

H

S E

P T

E M

B E

R

W D

R -2

-R

-0

W G

-1 -D

-0

O P

T

IO

N T

IT

L E

O P

T

IO

N F

IE

L D

A M

E N

D M

E N

T

IN

S

T R

U C

T

IO

N A

L D

E S

IG

N

C E

N T

E R

D

IS

T

A N

C E

L E

A R

N

IN

G C

E N

T E

R

P N

SMACNA HVAC Air Duct Leakage Test Manual

Notes: 1. Test in accordance with UFGS 23 05 93, Testing, Adjusting, and Balancing for HVAC and the procedures in

Exhaust Duct - -1 - - - A 24 - - 1.0 1

VAV Terminal

Boxes 2 - - - A 6 A 12 - - 2.0 1

- - -1 - - - - A 24 1.0 -

- - -1 - - A 24 - - 1.0 -

- -2 - - - - - - A 24 2.0 1

Air Handling

Unit with

Economizer -

VAV

4 - - - A 3 A 6 - - 4.0 1

Supply

Duct

Return

Duct

Exhaust

Duct

Outside

Air Duct

Duct Seal

Class

Duct Leak

Class

Duct Seal

Class

Duct Leak

Class

Duct Seal

Class

Duct Leak

Class

Inches of Water Column Round/Oval Rectangular

System

Duct Pressure Class Supply Return/

Outside Air Duct Test

Pressure:

Inches of

Water

Column

Notes

Ductwork Construction

8. CONTROLS SHALL BE CONFIGURED TO CLOSE DAMPER WHEN OUTDOOR AMBIENT TEMPERATURE IS GREATER THAN 45°F.

7. PROVIDE BACNET INTERFACE CARD. ELECTRICAL TO PROVIDE ONE 120V JUNCTION BOX FOR UP TO 5 VAV BOXES. PROVIDE STEPDOWN TRANSFORMER AND 24V TO BOXES.

6. PRESSURE INDEPENDENT TYPE BOX.

5. BOX COOLING MAXIMUM IS THE SUM OF DIFFUSERS CFM VALUES AS SHOWN IN THE DRAWINGS.

4. MAXIMUM STATIC PRSSURE DROP PERMISSABLE ACROSS BOX AND COIL AT MAXIMUM COOLING CFM.

3. MINIMUM CFM IS 30% OF MAXIMUM COOLING CFM UNLESS OTHERWISE NOTED.

2. COIL HEATING CAPACITY BASED ON HEATING MAXIMUM AIR FLOW (60% OF MAXIMUM COOLING CFM), UNLESS NOTED OTHERWISE.

NOTES: 1. MAXIMUM DISCHARGE NC AT BOX DIFFERENTIAL PRESSURE BASED ON ARI STANDARD 880-89

V2-24 2 PERSON OFFICE 204 8 590 355 175 55 95 0.65 28 15.3 1.5 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-23 OFFICE 203 6 320 190 95 55 95 0.5 28 8.2 0.8 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-22

GREEN SCREEN /

SOUND STUDIO 205

12 1200 720 360 55 95 0.65 26 31.1 3.1 140 P.GLYCOL 1 2 3/4 3/4 1-7

V2-21

COLLABORATION AREA

10 830 500 250 55 95 0.65 26 21.6 2.2 140 P.GLYCOL 1 2 3/4 3/4 1-7

V2-20

MOTHER'S NURSING

215, ELEV LOBBY C200

8 480 290 145 55 95 0.65 28 12.5 1.3 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-19 KITCHENETTE 200 8 460 - 160 55 - 0.65 28 1, 3-7

V2-18 OPEN STAFF BAY 201 12 1050 630 315 55 95 0.65 26 27.2 2.7 140 P.GLYCOL 1 2 3/4 3/4 1-7

V2-17 DESIGN ROOM 6 206 8 350 210 105 55 95 0.65 28 9.1 0.9 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-16 DESIGN ROOM 5 207 6 150 90 45 55 95 0.5 28 3.9 0.5 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-15 OPEN STAFF BAY 201 12 945 565 285 55 95 0.65 26 24.4 2.4 140 P.GLYCOL 1 2 3/4 3/4 1-7

V2-14 DESIGN ROOM 4 208 6 150 90 45 55 95 0.5 28 3.9 0.5 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-13

OPEN STAFF BAY 201,

COPY AREA 201.1

12 1170 700 350 55 95 0.65 26 30.2 3.0 140 P.GLYCOL 1 2 3/4 3/4 1-7

V2-12 CORRIDOR C202 10 730 440 220 55 95 0.65 26 19.0 1.9 140 P.GLYCOL 1 2 3/4 3/4 1-7

V2-11

OFFICE 221, CORRIDOR

C203

6 275 165 85 55 95 0.5 28 7.1 0.7 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-10 2 PERSON OFFICE 222 10 685 410 205 55 95 0.65 26 17.7 1.8 140 P.GLYCOL 1 2 3/4 3/4 1-7

V2-9 TECH / COMMS 219 8 630 380 190 55 95 0.65 28 16.4 1.6 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-8

CONFERENCE ROOM

8 420 250 125 55 95 0.65 28 10.8 1.1 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-7 OFFICE 223, OFFICE 225 8 430 260 130 55 95 0.65 28 11.2 1.1 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-6 DESIGN ROOM 3 210 6 145 85 45 55 95 0.5 28 3.7 0.5 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-5 DESIGN ROOM 2 211 6 150 90 45 55 95 0.5 28 3.9 0.5 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-4 DESIGN ROOM 1 212 6 150 90 45 55 95 0.5 28 3.9 0.5 140 P.GLYCOL 1 2 3/4 1/2 1-7

V2-3 OPEN STAFF BAY 201 12 1320 790 395 55 95 0.65 26 34.1 3.4 140 P.GLYCOL 1 2 3/4 3/4 1-7

V2-2 OPEN STAFF BAY 201 12 945 565 285 55 95 0.65 26 24.4 2.4 140 P.GLYCOL 1 2 3/4 3/4 1-7

V2-1 OPEN STAFF BAY 201 12 1175 705 355 55 95 0.65 26 30.5 3.0 140 P.GLYCOL 1 2 3/4 3/4 1-7

V1-17 VESTIBULE V100 4 70 70 20 55 90 0.1 25 2.6 0.5 140 P.GLYCOL 1 1 3/8 3/8 1-8

V1-16 VESTIBULE V101 4 70 70 20 55 90 0.1 25 2.6 0.5 140 P.GLYCOL 1 1 3/8 3/8 1-8

V1-15

COLLABORATION /

CONF 110

10 565 340 170 55 95 0.65 26 14.7 1.5 140 P.GLYCOL 1 2 3/4 3/4 1-7

V1-14

COLLABORATION /

CONF 112

10 800 480 240 55 95 0.65 26 20.7 2.1 140 P.GLYCOL 1 2 3/4 3/4 1-7

V1-13 COLLABORATION 109 6 145 85 45 55 95 0.5 28 3.7 0.5 140 P.GLYCOL 1 2 3/4 1/2 1-7

V1-12 COLLABORATION 113 8 415 250 125 55 95 0.65 28 10.8 1.1 140 P.GLYCOL 1 2 3/4 1/2 1-7

V1-11 COLLABORATION 108 6 270 160 80 55 95 0.5 28 6.9 0.7 140 P.GLYCOL 1 2 3/4 1/2 1-7

V1-10 COLLABORATION 114 8 395 235 120 55 95 0.65 28 10.2 1.0 140 P.GLYCOL 1 2 3/4 1/2 1-7

V1-9 COLLABORATION 107 6 275 165 85 55 95 0.5 28 7.1 0.7 140 P.GLYCOL 1 2 3/4 1/2 1-7

V1-8 COLLABORATION 115 6 230 140 70 55 95 0.5 28 6.0 0.6 140 P.GLYCOL 1 2 3/4 1/2 1-7

V1-7

CLASSROOM 3 / (OPT)

WORKSPACE 23

14 1540 925 460 55 95 0.65 26 40.0 4.0 140 P.GLYCOL 1 2 3/4 3/4 1-7

V1-6 ELEV LOBBY C100 6 270 160 80 55 95 0.5 28 6.9 0.7 140 P.GLYCOL 1 2 3/4 1/2 1-7

V1-5 KITCHENETTE 103 8 410 - 125 55 - 0.65 28 1, 3-7

V1-4 LOBBY L100 10 820 490 245 55 95 0.65 26 21.2 2.1 140 P.GLYCOL 1 2 3/4 3/4 1-7

V1-3 LOBBY L100 8 460 390 140 55 95 0.65 28 16.8 1.7 140 P.GLYCOL 1 2 3/4 1/2 1-7

V1-2 CLASSROOM 2 104.1 14 1850 1110 555 55 95 0.65 26 48.0 4.8 140 P.GLYCOL 1 2 3/4 3/4 1-7

V1-1 CLASSROOM 1 104.2 14 1570 940 470 55 95 0.65 26 40.6 4.1 140 P.GLYCOL 1 2 3/4 3/4 1-7

ID (IN) (CFM) (CFM) (CFM) (DEG. F) (DEG. F) (IN H20) S.P. (MB) (GPM) (DEG. F) FLUID (FT) ROWS (IN) (IN) NOTES

SIZE AIR (5) AIR (2) AIR (3) DB DB CFM (4) (1) LOAD FLOW TEMP WORKING DROP COIL SIZE SIZE

INLET MAXIMUM MAXIMUM MINIMUM AIR TEMP. AIR TEMP. AT MAX 1" H2O HEAT FLUID FLUID PRESSURE MIN. PIPE VALVE

COOLING HEATING ENTERING MAXIMUM S.P. LOSS NC AT TOTAL ENT. MAX. FLUID BALANCING

AREA SERVED

AIR FLUID (2) COIL

VAV BOX SCHEDULE

2. 125 PSI RATED DESIGN PRESSURE.

NOTES: 1. HEAVY DUTY BUTYL REPLACEABLE BUTYL BLADDER TYPE.

ET-2 VERTICAL FLOOR MOUNTED CHW MECH RM - 100 10" DIA x 37 5/16" H 3/4" NPTM 10 10 20 PSI 1, 2

ET-1 VERTICAL FLOOR MOUNTED HW MECH RM - 100 24" DIA x 36 7/8" H 1 " NPTF 53 53 20 PSI 1, 2

TANK ACCEPTANCE

TAG TYPE SERVICE LOCATION SIZE

CONNECTION

SIZE

VOLUME (GALLON)

CHARGING

PRESSURE

(PSI)

NOTES

EXPANSION TANK SCHEDULE

5/26/2022 11:51

3. PROVIDE BACNET INTERFACE CARD.

2. COLD AND HOT FLUIDS ARE 30% PROPYLENE GLYCOL.

NOTES : 1. INSTALL WITH AUXILIARY DRAIN PAN; EXTEND DRAIN LINE TO LOCATION AS INDICATED ON PLUMBING PLANS.

FCU-6 STAIR C STC1 HOR.RECESSED 0.5 600 0.86 19.8 22.5 44 54 85 / 67 55 / 55 5.9 7.5 28.1 140 120 55 / 98 3 2.3 5.33 15 208/1/60 1-3

FCU-5 STAIR B STB1 HOR.RECESSED 0.5 600 0.86 19.8 22.5 44 54 85 / 67 55 / 55 5.9 7.5 28.1 140 120 55 / 98 3 2.3 5.33 15 208/1/60 1-3

FCU-4 ELECTRICAL 217 HORIZ.CABINET 0.22 400 0.43 10.9 15 44 54 85 / 67 54 / 52 2.9 8 12.3 140 120 55 / 90 1.3 6.7 2.25 15 208/1/60 1-3

FCU-3 MECHANICAL 214 HORIZ.CABINET 0.22 270 0.35 7.5 11 44 54 85 / 67 54 / 52 2.4 5.7 9.8 140 120 55 / 96 1 4.5 2.25 15 208/1/60 1-3

FCU-2 ELECTRICAL 101 HORIZ.CABINET 0.5 600 0.86 19.8 22.5 44 54 85 / 67 55 / 55 5.9 7.5 28.1 140 120 55 / 98 3 2.3 5.33 15 208/1/60 1-3

FCU-1 MECHANICAL 100 HORIZ.CABINET 0.22 400 0.43 10.9 15 44 54 85 / 67 55 / 54 2.9 8 12.3 140 120 55 / 90 1.3 6.7 2.25 15 208/1/60 1-3

MINIMUM

SENSIBLE

(MBH)

MINIMUM

TOTAL

(MBH)

EWT

(°F)

LWT

(°F)

EAT

DB /

WB

(°F)

LAT

DB /

WB

(°F)

GPM

WPD

(FT)

MBH

EWT

(°F)

LWT

(°F)

EAT /

LAT

DB

(°F)

GPM

WPD

(FT)

MCA

(A)

MFS (A) V/PH/HZ

TAG AREA SERVED

CABINET

STYLE

MOTOR

HP

NOMINAL

CFM

MAX

TSP

(IN.WG)

COOLING COIL HEATING COIL ELECTRICAL DATA

NOTES

FAN COIL SCHEDULE

2. CONTRACTOR TO PROVIDE VALIDATION CALCULATION OF CV AND SIZE OF THE PROPOSED VALVES DURING SHOP...

NOTES: 1. SEE SCHEMATICS ON M-800 SERIES DRAWINGS FOR LOCATIONS OF VALVES

CV-RHC-2-24 VAV-2-24 REHEAT COIL MODULATING THREE-WAY 1/2 1.5 5 0.7 1-2

CV-RHC-2-23 VAV-2-23 REHEAT COIL MODULATING THREE-WAY 1/2 0.8 5 0.4 1-2

CV-RHC-2-22 VAV-2-22 REHEAT COIL MODULATING TWO-WAY 1/2 3.1 5 1.4 1-2

CV-RHC-2-21 VAV-2-21 REHEAT COIL MODULATING TWO-WAY 1/2 2.2 5 1.0 1-2

CV-RHC-2-20 VAV-2-20 REHEAT COIL MODULATING TWO-WAY 1/2 1.3 5 0.6 1-2

CV-RHC-2-18 VAV-2-18 REHEAT COIL MODULATING TWO-WAY 1/2 2.7 5 1.2 1-2

CV-RHC-2-17 VAV-2-17 REHEAT COIL MODULATING TWO-WAY 1/2 0.9 5 0.4 1-2

CV-RHC-2-16 VAV-2-16 REHEAT COIL MODULATING TWO-WAY 1/2 0.5 5 0.2 1-2

CV-RHC-2-15 VAV-2-15 REHEAT COIL MODULATING TWO-WAY 1/2 2.4 5 1.1 1-2

CV-RHC-2-14 VAV-2-14 REHEAT COIL MODULATING TWO-WAY 1/2 0.5 5 0.2 1-2

CV-RHC-2-13 VAV-2-13 REHEAT COIL MODULATING TWO-WAY 1/2 3.0 5 1.4 1-2

CV-RHC-2-12 VAV-2-12 REHEAT COIL MODULATING TWO-WAY 1/2 1.9 5 0.9 1-2

CV-RHC-2-11 VAV-2-11 REHEAT COIL MODULATING TWO-WAY 1/2 0.7 5 0.3 1-2

CV-RHC-2-10 VAV-2-10 REHEAT COIL MODULATING TWO-WAY 1/2 1.8 5 0.8 1-2

CV-RHC-2-9 VAV-2-9 REHEAT COIL MODULATING TWO-WAY 1/2 1.6 5 0.7 1-2

CV-RHC-2-8 VAV-2-8 REHEAT COIL MODULATING TWO-WAY 1/2 1.1 5 0.5 1-2

CV-RHC-2-7 VAV-2-7 REHEAT COIL MODULATING TWO-WAY 1/2 1.1 5 0.5 1-2

CV-RHC-2-6 VAV-2-6 REHEAT COIL MODULATING TWO-WAY 1/2 0.5 5 0.2 1-2

CV-RHC-2-5 VAV-2-5 REHEAT COIL MODULATING TWO-WAY 1/2 0.5 5 0.2 1-2

CV-RHC-2-4 VAV-2-4 REHEAT COIL MODULATING TWO-WAY 1/2 0.5 5 0.2 1-2

CV-RHC-2-3 VAV-2-3 REHEAT COIL MODULATING THREE-WAY 1/2 3.4 5 1.5 1-2

CV-RHC-2-2 VAV-2-2 REHEAT COIL MODULATING TWO-WAY 1/2 2.4 5 1.1 1-2

CV-RHC-2-1 VAV-2-1 REHEAT COIL MODULATING TWO-WAY 1/2 3.0 5 1.4 1-2

CV-RHC-1-17 VAV-1-17 REHEAT COIL MODULATING TWO-WAY 1/2 0.5 5 0.2 1-2

CV-RHC-1-16 VAV-1-16 REHEAT COIL MODULATING TWO-WAY 1/2 0.5 5 0.2 1-2

CV-RHC-1-15 VAV-1-15 REHEAT COIL MODULATING THREE-WAY 1/2 1.5 5 0.7 1-2

CV-RHC-1-14 VAV-1-14 REHEAT COIL MODULATING TWO-WAY 1/2 2.1 5 0.9 1-2

CV-RHC-1-13 VAV-1-13 REHEAT COIL MODULATING TWO-WAY 1/2 0.5 5 0.2 1-2

CV-RHC-1-12 VAV-1-12 REHEAT COIL MODULATING TWO-WAY 1/2 1.1 5 0.5 1-2

CV-RHC-1-11 VAV-1-11 REHEAT COIL MODULATING TWO-WAY 1/2 0.7 5 0.3 1-2

CV-RHC-1-10 VAV-1-10 REHEAT COIL MODULATING TWO-WAY 1/2 1.0 5 0.5 1-2

CV-RHC-1-9 VAV-1-9 REHEAT COIL MODULATING TWO-WAY 1/2 0.7 5 0.3 1-2

CV-RHC-1-8 VAV-1-8 REHEAT COIL MODULATING TWO-WAY 1/2 0.6 5 0.3 1-2

CV-RHC-1-7 VAV-1-7 REHEAT COIL MODULATING TWO-WAY 1/2 4.0 5 1.8 1-2

CV-RHC-1-6 VAV-1-6 REHEAT COIL MODULATING TWO-WAY 1/2 0.7 5 0.3 1-2

CV-RHC-1-4 VAV-1-4 REHEAT COIL MODULATING TWO-WAY 1/2 2.1 5 1.0 1-2

CV-RHC-1-3 VAV-1-3 REHEAT COIL MODULATING TWO-WAY 1/2 1.2 5 0.5 1-2

CV-RHC-1-2 VAV-1-2 REHEAT COIL MODULATING TWO-WAY 1/2 4.8 5 2.2 1-2

CV-RHC-1-1 VAV-1-1 REHEAT COIL MODULATING TWO-WAY 1/2 4.1 5 1.8 1-2

CV-HC-F6 FCU-6 HEATING COIL MODULATING TWO-WAY 1/2 3 5 1.4 1-2

CV-HC-F5 FCU-5 HEATING COIL MODULATING TWO-WAY 1/2 3 5 1.4 1-2

CV-HC-F4 FCU-4 HEATING COIL MODULATING TWO-WAY 1/2 1.3 5 0.6 1-2

CV-HC-F3 FCU-3 HEATING COIL MODULATING TWO-WAY 1/2 1 5 0.5 1-2

CV-HC-F2 FCU-2 HEATING COIL MODULATING TWO-WAY 1/2 3 5 1.4 1-2

CV-HC-F1 FCU-1 HEATING COIL MODULATING TWO-WAY 1/2 1.3 5 0.6 1-2

CV-HC-A2 AHU-2 HEATING COIL MODULATING TWO-WAY 1 1/4 55 5 25 1-2

CV-HC-A1 AHU-1 HEATING COIL MODULATING TWO-WAY 1 1/4 49 5 22 1-2

CV-B-HHW SYSTEM BYPASS HEATING HOT WATER MODULATING TWO-WAY 1 1/2 35 5 16 1-2

CV-CC-F6 FCU-2 COOLING COIL MODULATING THREE-WAY 1/2 5.9 5 2.7 1-2

CV-CC-F5 FCU-2 COOLING COIL MODULATING THREE-WAY 1/2 5.9 5 2.7 1-2

CV-CC-F4 FCU-4 COOLING COIL MODULATING THREE-WAY 1/2 2.9 5 1.3 1-2

CV-CC-F3 FCU-3 COOLING COIL MODULATING THREE-WAY 1/2 2.4 5 1.1 1-2

CV-CC-F2 FCU-2 COOLING COIL MODULATING THREE-WAY 1/2 5.9 5 2.7 1-2

CV-CC-F1 FCU-1 COOLING COIL MODULATING THREE-WAY 1/2 2.9 5 1.3 1-2

CV-CC-A2 AHU-2 COOLING COIL MODULATING TWO-WAY 2 109 5 49 1-2

CV-CC-A1 AHU-1 COOLING COIL MODULATING TWO-WAY 2 86 5 39 1-2

CV-B-CHW SYSTEM BYPASS CHILLED WATER MODULATING TWO-WAY 2 76 5 34 1-2

VALVE TAG SERVICE TYPE

NOMINAL

VALVE SIZE

(INCH)

FLOW

(GPM)

PRESSURE

DROP

(PSI)

Cv

VALUE

NOTES

CONTROL VALVE SCHEDULE

Zone title turns purple italic for critical zone(s)

System Ventilation Efficiency (Table 6.3 Method)

100% 100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

12,378

10,015

0.06

5.0

0%

67%

90%

2,054

1,570

2,413

1,850

2,030

2,077

1,540

Ev

Outdoor Air Intake Flow required to System (Table 6.3 Method)Vot

OA intake req'd as a fraction of primary SA (Table 6.3 Method) Y

= Value from Table 6.3 cfm = Vou / Ev

= Vot / Vps n/a n/a n/a

Frac. of local recirc. air that is representative of system RA Er

Primary air fraction of supply air at conditioned analyzed Ep

CBP IDC/DLC Harpers Ferry, WV

AHU-1

Design Cooling

IP

Building:

System Tag/Name:

Operating Condition Description:

Units (select from pull-down list)

Inputs for System

Floor area served by system

Population of area served by system

Design primary supply fan airflow rate

OA req'd per unit area for system (Weighted average)

OA req'd per person for system area (Weighted average)

Percent increase in Vbz over minimum required

Inputs for Potentially Critical zones

Zone Name

Zone Tag

Occupancy Category

Floor Area of zone

Design population of zone

Az

Pz

Inputs for Operating Condition Analyzed

Percent of total design airflow rate at conditioned analyzed Ds %

Air distribution type at conditioned analyzed

Zone air distribution effectiveness at conditioned analyzed

Results

System Ventilation Efficiency

Outdoor air intake required for system

Outdoor air per unit floor area

Ev

Vot cfm

Vot /As cfm/sf

Outdoor air per person served by system (including diversity) Vot /Ps cfm/p

Outdoor air as a % of design primary supply air Ypd %

Detailed Calculations

Initial Calculations for the System as a whole

System primary supply air flow at conditioned analyzed

Uncorrected OA intake flow req'd for system

Uncorrected OA req'd as a fraction of primary SA

Initial Calculations for individual zones

Area outdoor air rate

People outdoor air rate

Total supply air to zone (at condition being analyzed)

Primary airflow to zone (at condition being analyzed)

Breathing zone outdoor airflow

Zone outdoor airflow

Fraction of zone supply not directly recirc. from zone

Fraction of zone supply from fully mixed primary air

Fraction of zone OA not directly recirc. from zone

OA fraction required in the supply air to the zone

OA fraction required in the primary air to the zone

System Ventilation Efficiency

Zone Ventilation Efficiency (App A Method)

System Ventilation Efficiency (App A Method)

Minimum outdoor air intake airflow

Outdoor Air Intake Flow required to System

OA intake req'd as a fraction of primary SA

OA Temp at which Min OA provides all cooling

OAT below which OA Intake flow is @ minimum

0.58

0.25

15.2

30%

Ez

May need to manually edit Ds:

Select from pull-down list:

Select from pull-down list:

sf

P (default value listed; may be overridden)

Design total supply to zone (primary plus local recirculated) Vdzd cfm

Induction Terminal Unit, Dual Fan Dual Duct or Transfer Fan? Select from pull-down list or leave blank if N/A:

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

As

Ps

Name Units sf

P

Vpsd cfm

Ras cfm/sf

Rps cfm/p w/o diversity

System

298 D

Diversity w/ diversity

System

Potentially Critical Zones

Classroom 1 Classroom 2 Lobby L100 Lobby L100 Kitchenette

V1-1

Conference/ meeting

V1-2

Conference/ meeting

V1-3

Lobbies

V1-4 V1-5

Lobbies Break rooms

(Office)

Elev. Lobby

C100 V1-6

Classroom 3 Collaboration

V1-7

Corridors Conference/ meeting

V1-8

Conference/ meeting

Collaboration

V1-9

Conference/ meeting

Collaboration

V1-10

Conference/ meeting

Collaboration

V1-11

Conference/ meeting

Collaboration

V1-12

Conference/ meeting

Collaboration

V1-13

Conference/ meeting

Collaboration

/Conf. 112 V1-14

Conference/ meeting

Collaboration

/Conf. 110 V1-15

Conference/ meeting

Vps

Vou

Xs cfm = Vpsd Ds cfm = Rps Ps + Ras As

= Vou / Vps

Ra cfm/sf

Rp cfm/p

Vdz

Vpz

Vbz

Voz

Fa

Fb

Fc

Zd

Zpz

Evz

Ev

Vot

Y cfm Vdzd Ds cfm = Vdz Ep cfm = Rp Pz + Ra Az cfm = Vbz / Ez

= Ep + (1-Ep) Er

= Ep

= 1-(1-Ez)(1-Ep)(1-Er)

= Voz / Vdz

= Voz / Vpz

= (Fa+FbXs-FcZpzEp)/Fa

= min (Evz) cfm = Vou / Ev

= Vot / Vps

Deg F = (Tp-dTsf)-(1-Y)*(Tr+dTrf)/Y =

0.58

0.34

= 9000

= 1756

= 0.20

0.06

5.00

1.00

1.00

1.00

0.24

0.24

0.96

0.06

5.00

1.00

1.00

1.00

0.21

0.21

0.98

0.06

5.00

1.00

1.00

1.00

0.22

0.22

0.98

0.06

5.00

1.00

1.00

1.00

0.62

0.62

0.58

0.12

5.00

1.00

1.00

1.00

0.17

0.17

1.03

0.06

0.00

1.00

1.00

1.00

0.16

0.16

1.04

0.06

5.00

1.00

1.00

1.00

0.24

0.24

0.95

0.06

5.00

1.00

1.00

1.00

0.13

0.13

1.06

0.06

5.00

1.00

1.00

1.00

0.17

0.17

1.02

0.06

5.00

1.00

1.00

1.00

0.08

0.08

1.12

0.06

5.00

1.00

1.00

1.00

0.17

0.17

1.03

0.06

5.00

1.00

1.00

1.00

0.07

0.07

1.12

0.06

5.00

1.00

1.00

1.00

0.21

0.21

0.99

0.06

5.00

1.00

1.00

1.00

0.10

0.10

1.10

0.06

5.00

1.00

1.00

1.00

0.15

0.15

1.05

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

M B

I( A

E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

M-604

M E

C H

A N

IC

A

L S

C H

E D

U L E

S

H A

R P

E R

S F

E R

R Y

W

E S

T V

IG

IN

IA

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T C

T O

F C

R M

A

F O

R T

W O

R T

H T

X

-0

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

L

Y N

D O

N B

J O

H N

S O

N F

W Y

S

U

IT

E

D A

L L A

S T

X

A K

A L

IA

N D

A

A u th o r

J A

S O

N T

A C

K E

T T

K B

L A

N C

H

S E

P T

E M

B E

R

W D

R -2

-R

-0

W G

-1 -D

-0

O P

T

IO

N T

IT

L E

O P

T

IO

N F

IE

L D

A M

E N

D M

E N

T

IN

S

T R

U C

T

IO

N A

L D

E S

IG

N

C E

N T

E R

D

IS

T

A N

C E

L E

A R

N

IN

G C

E N

T E

R

P N

AHU-1 - ASHRAE 62.1 VENTILATION CALCULATION AT DESIGN COOLING OPERATING CONDITION F1

Zone title turns purple italic for critical zone(s)

67% 60% 60%

0.80

85%

0.80

60%

CSCRH CSCRH CSCRH CSCRH

0.80 0.80

30%

1.00

60% 60%

0.80

60%

0.80

60%

0.80

60%

0.80

60%

0.80

60%

0.80

60%

0.80

60%

0.80

60%

CS CSCRH CSCRH CSCRH CSCRH CSCRH CSCRH CSCRH CSCRH CSCRH CSCRH

0.80 0.80

12,378

10,015

0.06

5.0

0%

58%

90%

2,054

1,570

2,413

1,850

2,030

2,077

1,540

Ev

Outdoor Air Intake Flow required to System (Table 6.3 Method)Vot

OA intake req'd as a fraction of primary SA (Table 6.3 Method) Y

= Value from Table 6.3 cfm = Vou / Ev

= Vot / Vps n/a n/a n/a

Frac. of local recirc. air that is representative of system RA Er

Primary air fraction of supply air at conditioned analyzed Ep

CBP IDC/DLC, Hapers Ferry, WV

AHU-1

Design Heating

IP

Building:

System Tag/Name:

Operating Condition Description:

Units (select from pull-down list)

Inputs for System

Floor area served by system

Population of area served by system

Design primary supply fan airflow rate

OA req'd per unit area for system (Weighted average)

OA req'd per person for system area (Weighted average)

Percent increase in Vbz over minimum required

Inputs for Potentially Critical zones

Zone Name

Zone Tag

Occupancy Category

Floor Area of zone

Design population of zone

Az

Pz

Inputs for Operating Condition Analyzed

Percent of total design airflow rate at conditioned analyzed Ds %

Air distribution type at conditioned analyzed

Zone air distribution effectiveness at conditioned analyzed

Results

System Ventilation Efficiency

Outdoor air intake required for system

Outdoor air per unit floor area

Ev

Vot cfm

Vot /As cfm/sf

Outdoor air per person served by system (including diversity) Vot /Ps cfm/p

Outdoor air as a % of design primary supply air Ypd %

Detailed Calculations

Initial Calculations for the System as a whole

System primary supply air flow at conditioned analyzed

Uncorrected OA intake flow req'd for system

Uncorrected OA req'd as a fraction of primary SA

Initial Calculations for individual zones

Area outdoor air rate

People outdoor air rate

Total supply air to zone (at condition being analyzed)

Primary airflow to zone (at condition being analyzed)

Breathing zone outdoor airflow

Zone outdoor airflow

Fraction of zone supply not directly recirc. from zone

Fraction of zone supply from fully mixed primary air

Fraction of zone OA not directly recirc. from zone

OA fraction required in the supply air to the zone

OA fraction required in the primary air to the zone

System Ventilation Efficiency

Zone Ventilation Efficiency (App A Method)

System Ventilation Efficiency (App A Method)

Minimum outdoor air intake airflow

Outdoor Air Intake Flow required to System

OA intake req'd as a fraction of primary SA

OA Temp at which Min OA provides all cooling

OAT below which OA Intake flow is @ minimum

0.48

0.26

20.3

32%

Ez

May need to manually edit Ds:

Select from pull-down list:

Select from pull-down list:

sf

P (default value listed; may be overridden)

Design total supply to zone (primary plus local recirculated) Vdzd cfm

Induction Terminal Unit, Dual Fan Dual Duct or Transfer Fan? Select from pull-down list or leave blank if N/A:

0.50 0.50

1.00

0.50

1.00

0.50

1.00 1.00

0.50

1.00

0.50 0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00 1.00

As

Ps

Name Units sf

P

Vpsd cfm

Ras cfm/sf

Rps cfm/p w/o diversity

System

275 D

Diversity w/ diversity

System

Potentially Critical Zones

Classroom 1 Classroom 2 Lobby L100 Lobby L100 Kitchenette

V1-1

Conference/ meeting

V1-2

Conference/ meeting

V1-3

Lobbies

V1-4 V1-5

Lobbies Break rooms

(Office)

Elev. Lobby

C100 V1-6

Classroom 3 Collaboration

V1-7

Corridors Conference/ meeting

V1-8

Conference/ meeting

Collaboration

V1-9

Conference/ meeting

Collaboration

V1-10

Conference/ meeting

Collaboration

V1-11

Conference/ meeting

Collaboration

V1-12

Conference/ meeting

Collaboration

V1-13

Conference/ meeting

Collaboration

/Conf. 112 V1-14

Conference/ meeting

Collaboration

/Conf. 110 V1-15

Conference/ meeting

Vps

Vou

Xs cfm = Vpsd Ds cfm = Rps Ps + Ras As

= Vou / Vps

Ra cfm/sf

Rp cfm/p

Vdz

Vpz

Vbz

Voz

Fa

Fb

Fc

Zd

Zpz

Evz

Ev

Vot

Y cfm Vdzd Ds cfm = Vdz Ep cfm = Rp Pz + Ra Az cfm = Vbz / Ez

= Ep + (1-Ep) Er

= Ep

= 1-(1-Ez)(1-Ep)(1-Er)

= Voz / Vdz

= Voz / Vpz

= (Fa+FbXs-FcZpzEp)/Fa

= min (Evz) cfm = Vou / Ev

= Vot / Vps

Deg F = (Tp-dTsf)-(1-Y)*(Tr+dTrf)/Y =

0.48

0.54

= 6001

= 1555

= 0.26

0.06

5.00

1.00

1.00

1.00

0.50

0.50

0.76

0.06

5.00

1.00

1.00

1.00

0.44

0.44

0.81

0.06

5.00

1.00

1.00

1.00

0.59

0.59

0.67

0.06

5.00

1.00

1.00

1.00

0.78

0.78

0.48

0.12

5.00

1.00

1.00

1.00

0.57

0.57

0.69

0.06

0.00

1.00

1.00

1.00

0.33

0.33

0.93

0.06

5.00

1.00

1.00

1.00

0.51

0.51

0.75

0.06

5.00

1.00

1.00

1.00

0.27

0.27

0.99

0.06

5.00

1.00

1.00

1.00

0.36

0.36

0.90

0.06

5.00

1.00

1.00

1.00

0.16

0.16

1.10

0.06

5.00

1.00

1.00

1.00

0.35

0.35

0.91

0.06

5.00

1.00

1.00

1.00

0.15

0.15

1.11

0.06

5.00

1.00

1.00

1.00

0.43

0.43

0.83

0.06

5.00

1.00

1.00

1.00

0.20

0.20

1.06

0.06

5.00

1.00

1.00

1.00

0.31

0.31

0.95

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

M B

I( A

E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

M-605

M E

C H

A N

IC

A

L S

C H

E D

U L E

S

H A

R P

E R

S F

E R

R Y

W

E S

T V

IG

IN

IA

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T C

T O

F C

R M

A

F O

R T

W O

R T

H T

X

-0

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

L

Y N

D O

N B

J O

H N

S O

N F

W Y

S

U

IT

E

D A

L L A

S T

X

A K

A L

IA

N D

A

A u th o r

J A

S O

N T

A C

K E

T T

K B

L A

N C

H

S E

P T

E M

B E

R

W D

R -2

-R

-0

W G

-1 -D

-0

O P

T

IO

N T

IT

L E

O P

T

IO

N F

IE

L D

A M

E N

D M

E N

T

IN

S

T R

U C

T

IO

N A

L D

E S

IG

N

C E

N T

E R

D

IS

T

A N

C E

L E

A R

N

IN

G C

E N

T E

R

P N

AHU-1 - ASHRAE 62.1 VENTILATION CALCULATION AT DESIGN HEATING OPERATING CONDITION F1

100% 100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

100%

CS

1.00

1,175

1,036

1,320

11,852

14,970

0.07

5.5

0%

71%

85%

1,037

1,170

1,050

1,050

1,500

1,200

Ev

Outdoor Air Intake Flow required to System (Table 6.3 Method) Vot

OA intake req'd as a fraction of primary SA (Table 6.3 Method) Y

= Value from Table 6.3 cfm = Vou / Ev

= Vot / Vps =

= 0.88

= 1509

0.12

82.76

0.05

Frac. of local recirc. air that is representative of system RA Er

Primary air fraction of supply air at conditioned analyzed Ep

Zone title turns purple italic for critical zone(s)

Conference

Room 224

CBP IDC/DLC, Harpers Ferry, WV

AHU-2

Design Cooling

IP

Building:

System Tag/Name:

Operating Condition Description:

Units (select from pull-down list) w/o diversity

Inputs for System

Floor area served by system

Population of area served by system

Design primary supply fan airflow rate

OA req'd per unit area for system (Weighted average)

Inputs for Potentially Critical zones

Zone Name

Zone Tag

Occupancy Category

Floor Area of zone

Design population of zone

Az

Pz

Inputs for Operating Condition Analyzed

Percent of total design airflow rate at conditioned analyzed Ds %

Air distribution type at conditioned analyzed

Zone air distribution effectiveness at conditioned analyzed

Results

System Ventilation Efficiency

Outdoor air intake required for system

Outdoor air per unit floor area

Outdoor air per person served by system (including diversity)

Outdoor air as a % of design primary supply air

Detailed Calculations

Initial Calculations for the System as a whole

System primary supply air flow at conditioned analyzed

Uncorrected OA intake flow req'd for system

Uncorrected OA req'd as a fraction of primary SA

Initial Calculations for individual zones

Area outdoor air rate

People outdoor air rate

Total supply air to zone (at condition being analyzed)

Primary airflow to zone (at condition being analyzed)

Breathing zone outdoor airflow

Zone outdoor airflow

Fraction of zone supply not directly recirc. from zone

Fraction of zone supply from fully mixed primary air

Fraction of zone OA not directly recirc. from zone

OA fraction required in the supply air to the zone

OA fraction required in the primary air to the zone

System Ventilation Efficiency

Zone Ventilation Efficiency (App A Method)

System Ventilation Efficiency (App A Method)

Minimum outdoor air intake airflow

Outdoor Air Intake Flow required to System

OA intake req'd as a fraction of primary SA

OA Temp at which Min OA provides all cooling

OAT below which OA Intake flow is @ minimum

Ev

Vot cfm

Vot /As cfm/sf

Vot/Ps cfm/p

Ypd %

0.83

0.13

15.9

11%

Ez

May need to manually edit Ds:

Select from pull-down list:

Select from pull-down list:

sf

P (default value listed; may be overridden)

Design total supply to zone (primary plus local recirculated) Vdzd cfm

Induction Terminal Unit, Dual Fan Dual Duct or Transfer Fan? Select from pull-down list or leave blank if N/A:

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

0.50

1.00

V2-1 V2-2 V2-3 V2-4

Office space Office space Office space Conference/ meeting

V2-5

Conference/ meeting

V2-6

Conference/ meeting

V2-7 V2-8

Office space Conference/ meeting

V2-9 V2-10 V2-11 V2-12

As

Ps

Name Units sf

P

Vpsd cfm

Ras cfm/sf

OA req'd per person for system area (Weighted average) Rps cfm/p

Percent increase in Vbz over minimum required

System Diversity

140 D w/ diversity

System

Potentially Critical Zones

Open Staff

Bay 201

Open Staff

Bay 201

Open Staff

Bay 201

Design Room

1 212

Design Room

2 211

Design

Room 3 210

Office 223, Tech /

Comms 219

2 Person

Office 222

Office 221, Corridor

Corridor C202 Open Staff

Bay 201, Copy 201.1

V2-13

Design Room

4 208

V2-14

Office space Office space Office space Corridors Office space Conference/ meeting

Open Staff

Bay 201

V2-15

Design Room

5 207

V2-16

Office space Conference/ meeting

Design Room

6 206

V2-17

Conference/ meeting

Open Staff

Bay 201

V2-18

Kitchennete

V2-19

Office space Break rooms

(Office)

Mother's

Nursing 215, Elev Lobby

V2-20

Break rooms

(Office)

Collaboration

Area 218

V2-21

Conference/ meeting

Green Screen

V2-22

Stages, studios

Office 203 2 Person

Office 204

V2-23 V2-24

Office space Office space

Vps

Vou

Xs cfm = Vpsd Ds cfm = Rps Ps + Ras As

= Vou / Vps

Ra cfm/sf

Rp cfm/p

Vdz

Vpz

Vbz

Voz

Fa

Fb

Fc

Zd

Zpz

Evz

Ev

Vot

Y cfm Vdzd Ds cfm = Vdz Ep cfm = Rp Pz + Ra Az cfm = Vbz / Ez

= Ep + (1-Ep) Er

= Ep

= 1-(1-Ez)(1-Ep)(1-Er)

= Voz / Vdz

= Voz / Vpz

= (Fa+FbXs-FcZpzEp)/Fa

= min (Evz) cfm = Vou / Ev

= Vot / Vps

0.83

0.13

Deg F = (Tp-dTsf)-(1-Y)*(Tr+dTrf)/Y = -64

= 12700

= 1325

0.10

0.06

5.00

1.00

1.00

1.00

0.07

0.07

1.04

0.06

5.00

1.00

1.00

1.00

0.09

0.09

1.02

0.06

5.00

1.00

1.00

1.00

0.08

0.08

1.02

0.06

5.00

1.00

1.00

1.00

0.20

0.20

0.90

0.06

5.00

1.00

1.00

1.00

0.20

0.20

0.90

0.06

5.00

1.00

1.00

1.00

0.21

0.21

0.90

0.06

5.00

1.00

1.00

1.00

0.06

0.06

1.04

0.06

5.00

1.00

1.00

1.00

0.27

0.27

0.83

0.06

5.00

1.00

1.00

1.00

0.13

0.13

0.97

0.06

5.00

1.00

1.00

1.00

0.04

0.04

1.07

0.06

5.00

1.00

1.00

1.00

0.11

0.11

1.00

0.06

0.00

1.00

1.00

1.00

0.03

0.03

1.07

0.06

5.00

1.00

1.00

1.00

0.09

0.09

1.01

0.06

5.00

1.00

1.00

1.00

0.20

0.20

0.90

0.06

5.00

1.00

1.00

1.00

0.09

0.09

1.02

0.06

5.00

1.00

1.00

1.00

0.20

0.20

0.90

0.06

5.00

1.00

1.00

1.00

0.09

0.09

1.02

0.06

5.00

1.00

1.00

1.00

0.08

0.08

1.03

0.12

5.00

1.00

1.00

1.00

0.17

0.17

0.94

0.12

5.00

1.00

1.00

1.00

0.19

0.19

0.92

0.06

5.00

1.00

1.00

1.00

0.08

0.08

1.03

0.06

10.00

1.00

1.00

1.00

0.20

0.20

0.90

0.06

5.00

1.00

1.00

1.00

0.04

0.04

1.06

0.06

5.00

1.00

1.00

1.00

0.04

0.04

1.06

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

M B

I( A

E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

M-606

M E

C H

A N

IC

A

L S

C H

E D

U…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .