Project Description IDC DLC Harpers Ferry WV Solicitation W912DR22R0049.pdf

PDF 2 MB Posted

Attached to
Solicitation : W912DR22R0049 - Instructional Design Center (IDC)/Distance Learning Center (DLC) Design-Bid-Build Construction for CBP Harpers Ferry, WV
Solicitation number
W912DR22R0049
Issued by

About this file

This solicitation is for the design and construction of an Instructional Design Center and Distance Learning Center facility for the United States Customs and Border Protection Advanced Training Center in Harpers Ferry, West Virginia. The project involves construction of a two-story, 32,000 square foot steel, concrete and masonry building to house production areas, classrooms, open office spaces, a green screen room, sound editing booth, collaboration rooms, conference rooms and 158 parking spaces. Key requirements include installation of an elevator, HVAC system, electrical system, fire suppression system and coordination with local authorities on life safety elements. The project budget is between $10-25 million and construction duration is approximately 550 calendar days from notice to proceed. The procurement will use a firm-fixed price, design-bid-build contract with a low price technically acceptable evaluation. Proposals are due on October 3, 2022.

View the file

Other files

File Type Posted
B.08.03 W912DR22R0049 Amendment 0005 - Cancelling Solicitation.pdf PDF
23 64 10_refrig leak detector removed.pdf PDF
23 52 13_Rev1.pdf PDF
Harpers Ferry Combined Set - FP and LS.pdf PDF
28 31 76.pdf PDF
ProjNet Inquiries_Responses - AM0004.pdf PDF
PN488559_HF IDC DLC_MECH Amendment 0004.pdf PDF
AM0004 W912DR22R0049 - IDC for CBP.pdf PDF
W912DR22R0049-Amendment 0004 notes and clarifications-FA Life Safety and MECH Changes 9-28-2022 (004) (002).docx DOCX document
PN488559_HF IDC DLC_RTA ITR_Landscape_2022-09-15.pdf PDF
01 91 00.15 10.pdf PDF
12 93 00_2022-09-15.pdf PDF
AM0003 W912DR22R0049 - IDC for CBP.pdf PDF
08 81 00.pdf PDF
31 63 33_2022-09-13.pdf PDF
PN488559_HF IDC DLC_2019_BID REV1.pdf PDF
07 42 13.pdf PDF
Geotechnical Report 04-20-0534-IDC DLC Facility-Final 9-14-22.pdf PDF
W912DR22R0049 AM0002 - IDC for CBP.pdf PDF
CBP_IDC-DLC Specifications_RTA_2022-08-24.pdf PDF
AM0001 - W912DR22R0049_IDC at CBP.pdf PDF
IDC DLC HF IDC DLC 22R0049 Structural Architectural and Interiors Part 2 of 3 _2022 08 24.pdf PDF
Use Me IDC DLC HF IDC DLC 22R0049 Fire Protection Plumbing Mechanical Electrical Drawings Part 3 of 3.pdf PDF
Use me IDC DLC HF IDC DLC 22R0049 Cover Life Safety HAZ MAT CIVIL LANDSCAPING Part 1 of 3.pdf PDF
W912DR22R0049_Instructional Design Center Harpers Ferry WV_02SEP2022.pdf PDF
ATC Campus Access Notification Form (Updated).pdf PDF
CBP IDC-DLC Submittal Register_RTA_2022-08-24.pdf PDF
CBP IDC-DLC Specifications_RTA_2022-08-24.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYNOPSIS FOR IDC / DLC US CUSTOMS AND BORDER PATROL,

ADVANCED TRAINING CENTER, HARPERS FERRY, WV

W912DR22R0049

July 13, 2022

Project Title: Instructional Design Center (IDC)/Distance Learning Center (DLC) Facility

1. BACKGROUND:

This project is located at the Customs and Border Patrol’s Advanced Training Center (ATC) part of a noncontiguous 225-acre campus sited along US-340 which runs eastward towards the heart of Harpers Ferry and westward towards WV-9. The development area is split into two separate parcels of approximately 150 and 75 acres respectively. The Harpers Ferry Civil War Battlefield is located due east of the ATC and is separated from the site by a natural buffer area. The project site is located on the 150-acre parcel which has a number of existing facilities spread throughout a rolling terrain that generally slopes downward towards a creek along the western boundary.

2. LOCATION:

The Advanced Training Center is located at 4400 Koonce Road, Harpers Ferry, West Virginia

3. PROJECT DESCRIPTION:

This will be a Design Bid Build project to construct a two story 32,000 SF building. The building construction will be a steel, concrete, masonry, and framed glass enclosure to provide for the production of audio-visual training presentations and manuals for the United States Customs and Border Protection. This building will house production areas, classrooms, open office or “bull pens”, a green screen room, sound editing booth, collaboration rooms, conference rooms, and 158 parking spaces. Requirements will include utilities and storm water management.

• The installation of an elevator, a heating, ventilation, and air conditioning (HVAC) system and controls to meet current energy criteria

• Electrical system, LED lighting

• Piston elevator

• Life safety, fire alarm annunciator panels and a fire suppression system

All life safety work will need to be coordinated with the local authorities.

• Class A finishes

• Storm water management

Environmental permitting will be obtained prior to contract award, the contractor shall be required to coordinate all environmental work such as erosion, sediment control and storm water management with the local authorities.

• Paving and landscaping

Salient construction requirements:

Civil:

• Stormwater and Erosion Control permits have been applied for however the contractor shall be required to register with the permitting agencies and follow their guidance.

Structural:

• Micro pile foundation system (in lieu of shallow foundation) and thicker than usual reinforced floor slab.

Mechanical:

• Split System refrigerant pipe routing to avoid potential issues with compressor oil return.

For illustration purposes a rendering of the building, the parking lot layout and floor plans are shown below:

Main entrance and south elevation

July 13, 2022
Project Title: Instructional Design Center (IDC)/Distance Learning Center (DLC) Facility
1. BACKGROUND:
2. LOCATION:
3. PROJECT DESCRIPTION:
This will be a Design Bid Build project to construct a two story 32,000 SF building. The building construction will be a steel, concrete, masonry, and framed glass enclosure to provide for the production of audio-visual training presentations and manu...