This solicitation is for a full and open competition unrestricted design-bid-build construction contract to build a two-story 32,000 square foot Instructional Design Center/Distance Learning Center for Customs and Border Protection in Harpers Ferry, West Virginia. The project scope includes offices, collaboration spaces, audio/visual facilities, an elevator, HVAC system, electrical, life safety, finishes, stormwater management, and associated site work. The construction cost is estimated between $10-25 million with a 550 calendar day performance period. Proposals are due on October 3, 2022 and award will be made using lowest-price technically acceptable procedures. Offerors must be registered in the System for Award Management database.

View the file

Other files

File Type Posted
B.08.03 W912DR22R0049 Amendment 0005 - Cancelling Solicitation.pdf PDF
23 64 10_refrig leak detector removed.pdf PDF
23 52 13_Rev1.pdf PDF
Harpers Ferry Combined Set - FP and LS.pdf PDF
28 31 76.pdf PDF
ProjNet Inquiries_Responses - AM0004.pdf PDF
PN488559_HF IDC DLC_MECH Amendment 0004.pdf PDF
AM0004 W912DR22R0049 - IDC for CBP.pdf PDF
Project Description IDC DLC Harpers Ferry WV Solicitation W912DR22R0049.pdf PDF
W912DR22R0049-Amendment 0004 notes and clarifications-FA Life Safety and MECH Changes 9-28-2022 (004) (002).docx DOCX document
PN488559_HF IDC DLC_RTA ITR_Landscape_2022-09-15.pdf PDF
01 91 00.15 10.pdf PDF
12 93 00_2022-09-15.pdf PDF
AM0003 W912DR22R0049 - IDC for CBP.pdf PDF
08 81 00.pdf PDF
31 63 33_2022-09-13.pdf PDF
PN488559_HF IDC DLC_2019_BID REV1.pdf PDF
07 42 13.pdf PDF
Geotechnical Report 04-20-0534-IDC DLC Facility-Final 9-14-22.pdf PDF
W912DR22R0049 AM0002 - IDC for CBP.pdf PDF
CBP_IDC-DLC Specifications_RTA_2022-08-24.pdf PDF
AM0001 - W912DR22R0049_IDC at CBP.pdf PDF
IDC DLC HF IDC DLC 22R0049 Structural Architectural and Interiors Part 2 of 3 _2022 08 24.pdf PDF
Use Me IDC DLC HF IDC DLC 22R0049 Fire Protection Plumbing Mechanical Electrical Drawings Part 3 of 3.pdf PDF
Use me IDC DLC HF IDC DLC 22R0049 Cover Life Safety HAZ MAT CIVIL LANDSCAPING Part 1 of 3.pdf PDF
W912DR22R0049_Instructional Design Center Harpers Ferry WV_02SEP2022.pdf PDF
ATC Campus Access Notification Form (Updated).pdf PDF
CBP IDC-DLC Specifications_RTA_2022-08-24.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 107 PAGES

CBP IDC-DLC HARPERS FERRY, WV

01 14 00 SD-01 Preconstruction Submittals 1.3.1.1List of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals 1.3View Location Map 1.4Progress and Completion

Pictures 01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 16.00 10 SD-01 Preconstruction Submittals 1.7.2Advanced Modeling Project

Execution Plan (PxP)

1.5.1 G RODesign Quality Control Plan

1.5.2.2Initial Design Conference 1.5.2.5Preconstruction Conference

SD-05 Design Data

1.7.1 CDesign and Code Checklists

01 33 29 SD-01 Preconstruction Submittals

1.5.3.2 G ROPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G ROSustainability Action Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 107 PAGES

01 33 29 1.5.3.2 G ROPreliminary Sustainability eNotebook

SD-11 Closeout Submittals

1.5.3.2 G ROFinal High Performance and

Sustainable Building Checklist

1.5.3.2 G ROFinal Sustainability eNotebook

1.5.3.2 G ROAmended Final Sustainability

eNotebook

1.5.3.2 G ROAmended Final High

Performance and Sustainable Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.7.1 G ROAPP - Construction

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.4Crane Operators/Riggers

1.7.3.2 G ROStandard Lift Plan

1.7.3.3 G ROCritical Lift Plan

1.7.3.4 G RONaval Architecture Analysis

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 107 PAGES

01 35 26 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates

1.14.1 G RORadiography Operation Planning

Work Sheet

1.14.1 G ROPortable Gauge Operations

Planning Worksheet 01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

SD-06 Test Reports 3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals 3.1.3Written NDT Practices

SD-06 Test Reports 3.1.3Daily Reports 3.1.2Biweekly Reports

SD-07 Certificates 2.1AISC Certified Steel Fabricator 2.1Steel Truss Plant Quality

Assurance Program 2.1Wood Truss Plant Quality

Assurance Program 2.1AC472 Accreditation 2.1Steel Joist Institute Membership 2.1Certified Plant

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 107 PAGES

01 45 35 2.1Certificate of Compliance

1.5 G ROSpecial Inspector

3.1.3Qualification Records

SD-11 Closeout Submittals

3.1.3 G ROInterim Report

3.1.3 G ROComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

3.4.1 G ROTraffic Control Plan

2.2.1 G ROHaul Road Plan

1.6.1.4 G ROContractor Computer

Cybersecurity Compliance Statements

1.6.6 G ROContractor Temporary Network

Cybersecurity Compliance Statements

SD-06 Test Reports 3.5Backflow Preventer Tests

SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey

1.11 G ROSolid Waste Management Permit

1.6.2 G RORegulatory Notifications

1.7 G ROEnvironmental Protection Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 107 PAGES

01 57 19 3.2.1.1 G ROStormwater Pollution Prevention Plan

1.7.9.1 G RODirt and Dust Control Plan

1.6.5 G ROEmployee Training Records

1.6.4 G ROEnvironmental Manager

Qualifications SD-06 Test Reports

3.2.1.2Inspection Reports

1.11.1 G ROMonthly Solid Waste Disposal

Report SD-07 Certificates

1.6.5 G ROEmployee Training Records

1.6.5Erosion and Sediment Control

Inspector SD-11 Closeout Submittals

3.2.1.3 G ROStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.4 G ROStormwater Notice of Termination

3.7.1 G ROWaste Determination

Documentation

3.7.3.6 G RODisposal Documentation for

Hazardous and Regulated Waste

1.6.5 G ROAssembled Employee Training

Records

1.11 G ROSolid Waste Management Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 107 PAGES

01 57 19 3.7.2.1 G ROProject Solid Waste Disposal Documentation Report

3.7.3.1 G ROHazardous Waste/Debris

Management

1.6.2 G RORegulatory Notifications

3.7.2.1 G ROSales Documentation

01 58 00 SD-02 Shop Drawings

1.3.1.1 G ROPreliminary One Line

1.4.1 G ROSign Legend Orders

SD-04 Samples

1.3.1.2 G ROFinal Rendering

1.3.1.3 G ROFinal Framed Rendering

01 74 19 SD-01 Preconstruction Submittals

1.7 G ROConstruction Waste Management

Plan SD-06 Test Reports

1.9.2Quarterly Reports 1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report 01 78 00 SD-03 Product Data

1.8.1Warranty Management Plan 1.8.5Warranty Tags 1.6Spare Parts Data

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 107 PAGES

01 78 00 1.8.1Instructions SD-10 Operation and Maintenance Data

3.7 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

1.8.1As-Built Record of Equipment and Materials 3.6As-Built Record of Equipment and Materials

3.4 G ROFinal Approved Shop Drawings

3.5 G ROConstruction Contract

Specifications

2.3 G ROCertification of EPA Designated

Items

2.4 G ROCertification Of USDA

Designated Items

3.9.1 G ROInterim DD FORM 1354

3.9.2 G ROChecklist for DD FORM 1354

3.9.2 G ROHigh Performance and

Sustainable Building (HPSB) Checklist

01 78 23 SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 107 PAGES

01 78 23 1.3 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 78 24.00 10 SD-01 Preconstruction Submittals 1.5.1Facility Data Project Execution

Plan SD-05 Design Data

3.1 G ROFacility Data Workbook, Design

3.1 G ROFacility Document Set, Design

SD-10 Operation and Maintenance Data

3.2 G ROFacility Data Workbook, Construction Progress

3.2 G ROFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.3 G ROFacility Data Workbook, Construction Final

1.5.3 G ROFacility Document Set, Construction Final

3.3 G ROFacility Document Set, Construction Final

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 107 PAGES

01 91 00.15 10 SD-01 Preconstruction Submittals

1.7 G ROCommissioning Firm

1.7.1 G ROLead Commissioning Specialist

1.7.2 G ROTechnical Commissioning

Specialists

1.7 G ROCommissioning Firm's Contract

SD-06 Test Reports

3.1.4 G RODesign Review Report

3.1.3.1 G ROInterim Construction Phase

Commissioning Plan

3.1.3.2 G ROFinal Construction Phase

Commissioning Plan

3.1.3.1.2 G ROTemplate Building Envelope

Inspection Checklists

3.1.6.2 G ROBuilding Envelope Inspection

Checklists

3.1.6.3 G ROPre-Functional Checklists

1.9Issues Log

3.2 G ROCommissioning Report

3.3.1 G ROPost-Construction Trend Log

Report SD-07 Certificates

1.10 G ROCertificate of Readiness

SD-10 Operation and Maintenance Data

3.1.7 G ROTraining Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 107 PAGES

01 91 00.15 10 3.1.7 G ROTraining Attendance Rosters

3.1.8 G ROSystems Manual

3.1.8 G ROSystems Manual

SD-11 Closeout Submittals

3.2 SFinal Commissioning Report

3.1.3.2 SFinal Construction Phase

Commissioning Plan 02 41 00 SD-01 Preconstruction Submittals

1.2.2 G RODemolition Plan

1.11Existing Conditions

SD-07 Certificates

1.7 G RONotification

03 30 00 SD-01 Preconstruction Submittals 1.6.6Quality Control Plan 1.6.7Quality Control Personnel

Certifications 1.6.7Quality Control Organizational

Chart 1.6.9Laboratory Accreditation 3.3.10Maturity Method Data

SD-02 Shop Drawings 1.6.2.1Reinforcing Steel

SD-03 Product Data 2.4.5Joint Sealants 2.4.4Joint Filler 2.1Formwork Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 107 PAGES

03 30 00 2.3.1Cementitious Materials 2.4.6Vapor Retarder and Vapor

Barrier 2.4.1Concrete Curing Materials 2.6Reinforcement 2.4.3.1Liquid Chemical Floor Hardeners and Sealers 2.3.4Admixtures 2.6.2Mechanical Reinforcing Bar

Connectors 2.2.2Waterstops 2.4.2Nonshrink Grout

SD-05 Design Data 1.6.1.1Concrete Mix Design

SD-06 Test Reports 1.6.1.1Concrete Mix Design 1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Slag Cement 1.6.4.3Aggregates 3.10.2.1Tolerance Report 3.14.3.3Compressive Strength Tests 3.14.3.5Unit Weight of Structural

Concrete 3.14.3.6Chloride Ion Concentration 3.14.3.4Air Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 107 PAGES

03 30 00 3.14.3.1Slump Tests 2.3.2Water

SD-07 Certificates 2.6.1Reinforcing Bars 1.9Welder Qualifications 1.8.2Forest Stewardship Council

(FSC) Certification 1.6.7.2Field Testing Technician and

Testing Agency SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants 2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings 3.4.1.1Detail Drawings

SD-03 Product Data 1.5.1Hot Weather Procedures 1.5.2Cold Weather Procedures 2.2.3.2.1Cement 2.4.1.1Cementitious Materials

SD-04 Samples 1.3.1.1Mock-Up Panel 2.2.3.2Concrete Masonry Units (CMU) 2.2.5Dimension Stone Units 2.4.1.3Admixtures for Masonry Mortar

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 107 PAGES

04 20 00 2.6.2Anchors, Ties, and Bar Positioners

2.6.3Joint Reinforcement SD-05 Design Data

2.1.2Masonry Compressive Strength 2.2.3.3Fire-Rated Concrete Masonry

Units 3.2.5Bracing Calculations

SD-06 Test Reports 2.2.3.3Fire-Rated Concrete Masonry

Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.3Prism Tests 3.6.1.4Single-Wythe Masonry Wall

Water Penetration Test SD-07 Certificates

2.2.3.2Concrete Masonry Units (CMU) 2.4.1.1Cementitious Materials 2.4.1.3Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar

Positioners 2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions 2.4.1.3Admixtures for Masonry Mortar

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 107 PAGES

04 20 00 2.4.2.2Admixtures for Grout SD-10 Operation and Maintenance Data

3.8Take-Back Program SD-11 Closeout Submittals

2.2.3.2.2 SRecycled Content

05 05 20.00 SD-01 Preconstruction Submittals

1.5.1.1Installer Qualifications 1.5.1.2Post-Installed Anchor Special

Inspector Qualifications SD-03 Product Data

2.1.1.3Mechanical Anchors in Concrete 2.1.1.4Adhesive Anchor System in

Concrete 2.1.1.5Mechanical and Adhesive

Anchors in Masonry 3.1.3Non-Shrink, Non-Metallic Grout

SD-06 Test Reports 3.3.4Post-Installed Anchor Special

Inspections Report SD-07 Certificates

2.1.1.1Post-Installed Anchor Certification

SD-08 Manufacturer’s Instructions 2.1.1.2Manufacturer's Printed

Installation Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 107 PAGES

05 05 20.00 3.1.3Non-Shrink, Non-Metallic Grout 1.5Manufacturer's Material Safety

Data Sheets 05 05 23.13 10 SD-01 Preconstruction Submittals

1.4.1 G ROPersonnel Qualification

2.1.1 G ROProcedure description

SD-03 Product Data 2.1.1Equipment and accessories

SD-06 Test Reports 1.4.5Equipment Qualifications 3.4.1Inspection Test Reports

05 05 23.16 SD-01 Preconstruction Submittals

3.2 G ROWelding Quality Assurance Plan

SD-03 Product Data

1.3 G ROWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification 1.3.2Previous Qualifications

1.3.3 G ROPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports 3.3Nondestructive Testing 3.2Weld Inspection Log

SD-07 Certificates 1.3.1Certified Welding Procedure

Specifications (WPS)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 107 PAGES

05 05 23.16 1.3.1Certified Brazing Procedure Specifications (BPS)

1.3.1Certified Procedure Qualification Records (PQR)

1.3.1Certified Welder Performance Qualifications (WPQ)

1.3.1Certified Brazer Performance Qualifications (BPQ)

1.3.5Certified Welding Inspector 1.3.5Nondestructive Testing

Personnel 05 12 00 SD-01 Preconstruction Submittals

1.5.1.1Erection and Erection Bracing Drawings

SD-02 Shop Drawings 1.5.2Fabrication Drawings

SD-03 Product Data 2.6.2Shop Primer 2.4.1Welding Electrodes and Rods 2.4.2Non-Shrink Grout

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing SD-05 Design Data

1.5.2 G ROShoring and Temporary Bracing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 107 PAGES

05 12 00 SD-06 Test Reports 2.6.2Class B Coating 2.3Bolts, Nuts, and Washers 3.7.1.2Weld Inspection Reports 3.7.3.1Bolt Testing Reports 3.7.4Embrittlement Test Reports

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3AISC Structural Steel Fabricator

Quality Certification 1.3AISC Structural Steel Erector

Quality Certification 1.5.4.1Welding Procedures and

Qualifications 2.4.1Welding Electrodes and Rods 3.7.1.1Certified Welding Inspector 3.7.1.2NDT Technician 3.4Welding Procedure Specifications

(WPS)

05 21 00 SD-01 Preconstruction Submittals

1.3.2Welder Qualification SD-02 Shop Drawings

1.3.1Steel Joist Framing SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 107 PAGES

05 21 00 2.3 SRecycled Content Of Steel Products

SD-05 Design Data 2.2Design Calculations

SD-06 Test Reports 3.4Erection Inspection 3.4Welding Inspections

SD-07 Certificates 1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings 1.3.5Fabrication Drawings

SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.9Galvanizing Repair Paint 2.2.18Mechanical Fasteners 2.1.9Touch-Up Paint 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

2.1 SRecycled Content of Steel

Products SD-04 Samples

2.1.1Metal Roof Deck Units 2.2.4Flexible Closure Strips

SD-05 Design Data 2.1Deck Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 107 PAGES

05 30 00 SD-07 Certificates 1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance 1.3.1Manufacturer's Certificate 2.2.12Stud Manufacture's Certification 2.2.12Stud Manufacture's Test Reports

05 40 00 SD-02 Shop Drawings 1.6.1Framing Components

SD-03 Product Data 2.1Studs, Joists

2.1 SRecycled Content of Steel

Products SD-05 Design Data

1.6.2Metal Framing Calculations SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal Framing

3.2.1Welds 05 51 00 SD-02 Shop Drawings

2.1Iron and Steel Hardware 2.1Steel Shapes, Plates, Bars, and

Strips 2.2.1Metal Stair System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 107 PAGES

05 51 00 SD-03 Product Data 2.4.1Structural Steel Plates, Shapes, and Bars 2.4.2Structural Steel Tubing 2.4.5Hot-Rolled Carbon Steel Sheets and Strips 2.4.4Cold-Finished Steel Bars 2.4.3Hot-Rolled Carbon Steel Bars 2.4.6Cold-Rolled Carbon Steel Sheets 2.4.7Galvanized Carbon Steel Sheets 2.4.8Cold-Drawn Steel Tubing 2.3.4Concrete Inserts 2.3.5Masonry Anchorage Devices 2.2.4Protective Coating 2.2.2Steel Pan Stairs 2.3.1Steel Stairs 2.3.2Steel Stairs, Circular

SD-07 Certificates 1.3.1Welding Procedures 1.3.1Welder Qualification

SD-08 Manufacturer’s Instructions 2.4.1Structural Steel Plates, Shapes, and Bars 2.4.2Structural Steel Tubing 2.4.5Hot-Rolled Carbon Steel Sheets and Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 107 PAGES

05 51 00 2.4.4Cold-Finished Steel Bars 2.4.3Hot-Rolled Carbon Steel Bars 2.4.6Cold-Rolled Carbon Steel Sheets 2.4.7Galvanized Carbon Steel Sheets 2.4.8Cold-Drawn Steel Tubing 2.2.4Protective Coating 2.3.5Masonry Anchorage Devices

05 52 00 SD-02 Shop Drawings 1.2.1Fabrication Drawings 3.2Iron and Steel Hardware 3.2Steel Shapes, Plates, Bars and

Strips SD-03 Product Data

2.2.1Structural-Steel Plates, Shapes, and Bars

2.2.2Structural-Steel Tubing 2.2.4Cold-Finished Steel Bars 2.2.3Hot-Rolled Carbon Steel Bars 2.2.5Cold-Drawn Steel Tubing 2.2.7Concrete Inserts 2.2.8Masonry Anchorage Devices 2.1.3Protective Coating 2.2.10Steel Railings and Handrails 1.2.1Anchorage and Fastening

Systems SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 107 PAGES

05 52 00 1.4.1Welding Procedures 1.4.2Welder Qualification

SD-08 Manufacturer’s Instructions 3.2Installation Instructions

06 10 00 SD-02 Shop Drawings 1.9.2Modifications of Structural

Members 2.2.2Nailing Strips

SD-03 Product Data 1.8Fire-retardant Treatment

SD-05 Design Data 1.9.2Modifications of Structural

Members SD-06 Test Reports

1.4.5Preservative-treated 1.7Preservative Treatment

SD-07 Certificates 1.10.1Certificates of Grade

2.1.1 SCertified Sustainably Harvested

Virgin Lumber

2.2.2 SCertified Sustainably Harvested

Framing Lumber

2.3.7.1 SCertified Sustainably Harvested

Plywood for Other Uses 06 41 16.00 10 SD-02 Shop Drawings

1.5.2Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 107 PAGES

06 41 16.00 10 2.12Shop Drawings 3.1Installation

SD-03 Product Data 2.1Wood Materials 2.12.8.3Finish Schedule

SD-04 Samples 2.3Plastic Laminates 2.7Cabinet Hardware

SD-07 Certificates 1.5Quality Assurance 3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.4.2 G RODetail Fabrication Drawings

3.1 G ROInstallation

SD-03 Product Data

2.1.1 G ROSolid Polymer

2.2.2 SIndoor air quality for solid surface

seam and sealant products SD-04 Samples

2.1 G ROMaterial

2.3.6 G ROCounter Tops

SD-06 Test Reports 2.1.1Test Report Results

SD-07 Certificates 1.4.1Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 107 PAGES

06 61 16 2.1.1 SIndoor Air Quality for solid surface fabrication products

SD-10 Operation and Maintenance Data

2.1.1 G ROSolid Polymer

07 05 23 SD-01 Preconstruction Submittals

1.4Work Plan SD-03 Product Data

2.2Thermal Imaging Camera SD-05 Design Data

3.2Envelope Surface Area Calculations

SD-07 Certificates 1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports 3.5Pressure Test Procedures 1.6.4Air Leakage Test Report 3.5.8Air Leakage Test Report 1.6.4Diagnostic Test Report 3.6.5Diagnostic Test Report

07 11 13 SD-07 Certificates 1.3Materials

07 13 53 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 107 PAGES

07 13 53 1.3Manufacturer's Standard Details 2.2Elastomeric Waterproofing Sheet

Material 1.4Primers, Adhesives, and Mastics 2.2Primers, Adhesives, and Mastics

SD-06 Test Reports 2.2Elastomeric Waterproofing Sheet

Material 3.6Field Quality Control 3.7Protective Covering

SD-07 Certificates 2.2Elastomeric Waterproofing Sheet

Material 1.4Primers, Adhesives, and Mastics 2.2Primers, Adhesives, and Mastics 1.4Protective Coverings 1.8Special Warranties 2.1.1Certificates Of Compliance 2.1.2Certificates Of Compliance

SD-08 Manufacturer’s Instructions 1.4Primers, Adhesives, and Mastics 2.2Primers, Adhesives, and Mastics

SD-11 Closeout Submittals 2.1.1Certificates Of Compliance 2.1.2Certificates Of Compliance

07 14 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 107 PAGES

07 14 00 2.1Fluid-Applied Membrane 2.2Membrane Primer 3.3Solvent 3.4.1Moisture Meter 2.7Bond Breaker

SD-11 Closeout Submittals 1.6Warranty 3.6Information Card 3.5Instructions To Government

Personnel 07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.1.2 SRecycled Content for Insulation

Materials 2.4Vapor Retarder 2.5Pressure Sensitive Tape 2.6Accessories

SD-07 Certificates

2.1.4 SIndoor Air Quality for Insulation

Materials SD-08 Manufacturer’s Instructions

3.3.1Insulation 07 22 00 SD-02 Shop Drawings

1.3Insulation Board Layout SD-03 Product Data

2.1Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 107 PAGES

07 22 00 1.4Cover Board 2.6Fasteners 2.5Moisture Control

2.1.3 SRecycled Content For Insulation

SD-06 Test Reports 1.8.1Flame Spread Rating

SD-07 Certificates 1.6Installer Qualifications

2.1.4 SIndoor Air Quality For Insulation

SD-08 Manufacturer’s Instructions 2.6Fasteners 2.1Insulation

07 27 10.00 10 SD-02 Shop Drawings 2.1Air Barrier System Shop

Drawings SD-03 Product Data

2.1Air Barrier System Product Data SD-04 Samples

3.1.2Mock-Up 2.1Material Samples For Air Barrier

System SD-05 Design Data

1.8Design Data And Calculations For The Air Barrier System

SD-06 Test Reports 1.8Design Review Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 107 PAGES

07 27 10.00 10 3.1.3Testing and Inspection SD-07 Certificates

1.7Air Barrier Inspector 07 27 26 SD-01 Preconstruction Submittals

1.9.1Qualifications of Manufacturer 1.9.2Qualifications of Installer

SD-02 Shop Drawings 1.4Fluid-Applied Membrane Air

Barrier SD-03 Product Data

1.4Fluid-Applied Membrane Air Barrier

2.2Primers, Adhesives, and Mastics 2.6Reinforcement 1.4.2Safety Data Sheets

SD-04 Samples 1.4.3Mockup

SD-06 Test Reports 1.6Capillary Moisture Test 1.4.4Field Peel Adhesion Test 1.4.4Flame Propagation of Wall

Assemblies 1.4.4Flame Spread and Smoke

Developed Index Ratings 3.4.1Site Inspections

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 107 PAGES

07 27 26 1.4Fluid-Applied Membrane Air Barrier

SD-08 Manufacturer’s Instructions 1.4Fluid-Applied Membrane Air

Barrier 2.2Primers, Adhesives, and Mastics

07 27 36 SD-01 Preconstruction Submittals 1.10.1Qualification of Manufacturer 1.10.2Qualification of Installer 1.11Quality Control Plan 1.11Safety Plan 1.9.1Fire Prevention Plan 1.9.2Respirator Plan

SD-02 Shop Drawings 1.5Spray Foam Air Barrier 1.11Foam Air Barrier System 1.5.1Fire-Rated Assemblies

SD-03 Product Data 2.1.2Closed Cell 2.3Primers, Adhesives, and Mastics 2.5Sealants 1.5.2Safety Data Sheets 2.1.1Thermal Barrier Materials 2.1.6Accessories

2.1.2 SRecycled Content for Closed Cell

Spray Foam Air Barrier

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 107 PAGES

07 27 36 SD-04 Samples 1.5Spray Foam Air Barrier

SD-06 Test Reports 1.5.4Field Peel Adhesion Test 3.4.5.1Thermographic Test 1.8Air Barrier Test 1.5.3Primers 1.5.4Fire-Ratings Of Thermal Barrier

Materials 1.5.4Flame Spread And Smoke

Developed Index Ratings Of SPF Products

1.5.4Flame Propagation Of Wall Assemblies

3.4.1Site Inspections SD-07 Certificates

2.1.2Closed cell

2.1.5 SIndoor Air Quality for Spray Foam

Air Barrier SD-08 Manufacturer’s Instructions

1.6.1SPF Handling, Storage, and Spray Procedures

3.2.1Substrate Preparation 1.5.1Thermal Barrier 2.3Primers, Adhesives, and Mastics

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 107 PAGES

07 27 36 SD-09 Manufacturer’s Field Reports

1.11Core Samples 3.3.3Daily Work Record 3.4.5Visual Inspection and Thermal

Scanning 07 41 13 SD-02 Shop Drawings

1.4.5Roofing Panels 1.4.5Flashing and Accessories

SD-03 Product Data 2.1Roof Panels

2.1.2 SRecycled Content for Steel Roof

Panels

2.2.2 SEnergy Star Label for Metal

Roofing Product

2.2.2 SHeat Island Reduction

1.4.5Factory-Applied Color Finish 2.4Accessories 1.4.5Fasteners 1.4.5Pressure Sensitive Tape 2.8Underlayments 2.9Gaskets and Sealing/Insulating

Compounds 1.4.5Coil Stock 1.4.5Aluminized Steel Repair Paint 1.4.5Enamel Repair Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 107 PAGES

07 41 13 SD-04 Samples 2.1Roof Panels 1.4.5Factory-applied Color Finish 2.4Accessories 1.4.5Fasteners 1.4.5Gaskets and Sealant/Insulating

Compounds SD-05 Design Data

1.4.6Engineering Calculations 1.2.1.2Wind Uplift Resistance

SD-06 Test Reports 1.2.1.1Leakage Test Report 1.2.1.2Wind Uplift Test Report 2.2Factory Finish and Color

Performance Requirements SD-07 Certificates

2.1Roof Panels 1.4.5Coil Stock Compatibility 2.8.2Self-Adhering Modified Bitumen

Underlayment 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator

SD-08 Manufacturer’s Instructions 2.7Insulation 1.4.5Installation Manual

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 107 PAGES

07 41 13 SD-09 Manufacturer’s Field Reports

3.10.1Manufacturer's Field Inspection Reports

SD-11 Closeout Submittals 1.8Warranties

07 42 13 SD-01 Preconstruction Submittals 1.6.3Qualification of Manufacturer 1.6.4Qualification of Installation

Contractor 1.6.4.1Qualification of Welders 1.9Warranty

SD-02 Shop Drawings 1.6.1.1Installation Drawings

SD-03 Product Data 1.6.5Closure Materials 1.6.5Accessories 2.5Accessories

SD-04 Samples 1.6.3.1Fasteners

SD-05 Design Data 1.6.1.2Wind load design analysis

SD-07 Certificates 1.6.3.1Coil Stock 1.6.3.1Fasteners

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 107 PAGES

07 42 13 3.3Installation SD-09 Manufacturer’s Field Reports

3.9.1Manufacturer's Field Reports SD-11 Closeout Submittals

1.9Warranty 1.6.6Maintenance Instructions

07 54 23 SD-02 Shop Drawings 1.3.2Roofing System

SD-03 Product Data 2.1Thermoplastic Polyolefin (Tpo)

Sheet Roofing 3.2Installation 3.3Protection of Finished Roofing 3.4Inspection

SD-07 Certificates 1.3.1Materials 1.3.5Qualifications

07 60 00 SD-02 Shop Drawings 2.2.1Exposed Sheet Metal 3.1.17Gutters 3.1.18Downspouts 3.1.26Expansion Joints 2.2.1Gravel Stops and fascia 3.1.19Flashing for Roof Drains 3.1.11Base Flashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 107 PAGES

07 60 00 3.1.12Counterflashing 3.1.27Flashing at Roof Penetrations and Equipment Supports 2.2.15Reglets 3.1.30Copings 3.1.16Drip Edges 3.1.24Eave Flashing

2.1 SRecycled Content

SD-03 Product Data 2.2.12Cool Roof

SD-04 Samples 1.4.2Finish Samples

SD-08 Manufacturer’s Instructions 1.4.3Instructions for Installation 3.5Quality Control Plan

SD-10 Operation and Maintenance Data

1.4.3Cleaning and Maintenance 07 84 00 SD-02 Shop Drawings

2.1Firestopping System SD-03 Product Data

2.2Firestopping Materials SD-06 Test Reports

3.3Inspection SD-07 Certificates

1.5.2Inspector Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 107 PAGES

07 84 00 2.2Firestopping Materials 1.5.1Installer Qualifications

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond Breakers 2.4Backstops 3.1Field Adhesion

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

2.5 SIndoor Air Quality For Interior

Caulking 08 11 13 SD-02 Shop Drawings

2.1 G RODoors

2.1 G RODoors

2.1 SRecycled Content for Steel Door

Product

2.7 G ROFrames

2.7 G ROFrames

2.7 SRecycled Content for Steel

Frame Product

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 107 PAGES

08 11 13 2.5Accessories 2.9Weatherstripping

SD-03 Product Data

2.1 G RODoors

2.7 G ROFrames

2.5Accessories

08 11 16 SD-02 Shop Drawings 1.5.1Door and Frame Assembly

SD-03 Product Data 1.5.1Door and Frame Assembly 2.2.3Recycled Content of Aluminum

Material SD-04 Samples

1.5.2Finish Samples SD-05 Design Data

1.5.3Design Analysis 1.2.3Air Infiltration 1.2.4Water Penetration 1.2.5NFRC Project Label Certificates for Fenestration SD-08 Manufacturer’s Instructions

1.5.1Door and Frame Assembly 1.5.5Adjustments, Cleaning, and

Maintenance 1.2.5NFRC Project Label Certificates for Fenestration

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 107 PAGES

08 14 00 SD-02 Shop Drawings 2.1Doors

SD-03 Product Data 2.1Doors

2.1.2.1 SRecycled Content for Door Cores

2.2Accessories 2.3.7Water-resistant Sealer 1.5Warranty 2.1.6Sound Transmission Class

Rating 2.1.7Fire Resistance Rating

SD-04 Samples 2.1Doors

SD-06 Test Reports 2.4Cycle-Slam 2.4Hinge Loading Resistance

SD-07 Certificates 1.3.1Certificates of Grade

2.1.2 SCertified Sustainably Harvested

Flush Wood Doors

2.1.2.1 SIndoor Air Quality for

Particleboard and Agrifiber Door Cores

SD-11 Closeout Submittals 1.5Warranty

08 31 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 107 PAGES

08 31 00 1.3Access Doors And Panels SD-03 Product Data

1.3Access Doors And Panels 1.3.2Hardware 2.2.8Accessories

2.1 SRecycled Content

SD-04 Samples 2.5Finishes

SD-06 Test Reports 1.3.1Fire-rating(s) of Assemblies 1.3.1Acoustical Ratings of Assemblies

08 34 73 SD-02 Shop Drawings 2.1Fabrication Drawings

SD-03 Product Data 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.3.2Door Frame Sound Infill

SD-06 Test Reports 2.4.4Wind Loading Tests 2.4.4Water Leakage Tests 2.4.4Acoustical Tests 2.4.4Air Infiltration Tests

SD-07 Certificates 2.1Wood Sound Retardant Doors 2.1Door Frames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 107 PAGES

08 34 73 3.3.1Assembly Test Reports 08 41 13 SD-01 Preconstruction Submittals

1.2.1Sample Warranty 1.2.1List of Product Installations

SD-02 Shop Drawings 3.3Installation Drawings 2.2Fabrication Drawings

SD-03 Product Data 1.2.1Manufacturer's Catalog Data 2.2.3Finish

2.1.1.2 SRecycled Content of Aluminum

Material SD-04 Samples

1.2.1Finish and Color Samples SD-06 Test Reports

1.2.1Certified Test Reports 3.4.3Deflection 3.4.1Air Infiltration 3.4.4Condensation Resistance and

Thermal Transmittance 3.4.5Water Infiltration

SD-08 Manufacturer’s Instructions 3.3Manufacturer's Instructions

SD-11 Closeout Submittals 3.6Manufacturer's Product Warranty

08 44 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 107 PAGES

08 44 00 1.5Glazed Curtain Wall System 1.5Installation Drawings 2.4.2Shop-Painting Aluminum 2.4.3Shop-Painting Steel

SD-03 Product Data 1.5Glazed Curtain Wall System 2.2Metals For Fabrication 2.3Nonskinning Sealing Compound 2.4.1Metal Accessories 2.5Curtain-Wall Framing Members 2.6Aluminum Doors and Frames 2.9Thermal Insulation Materials 2.11.4Masonry Anchorage Devices

2.1.1 SRecycled Content of Aluminum

Curtain-Wall Framing Members 1.7.1Warranties

SD-05 Design Data 2.4.5Anodic Finish 2.4.5Exposed-to-View Aluminum

Finish 1.3.6.1Structural Calculations for

Deflection SD-06 Test Reports

1.3.6Factory Test Results 1.4.1Field Water Spray Test Results 1.4.2Air Infiltration Test Results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 107 PAGES

08 44 00 1.4.2.1Water Penetration Test Results SD-07 Certificates

1.3.6.6Energy Performance Certificates 1.3.3Qualifications for the Curtain-Wall

Installer SD-08 Manufacturer’s Instructions

1.5Glazed Curtain Wall System 3.3.13Insulating Glass 3.6.2Preventive Maintenance and

Inspection SD-11 Closeout Submittals

1.7Warranty 08 71 00 SD-02 Shop Drawings

1.3 G ROManufacturer's Detail Drawings

1.3 G ROVerification of Existing Conditions

1.5 G ROHardware Schedule

2.3.7 G ROKeying System

SD-03 Product Data

2.3 G ROHardware Items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.5 G ROHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .