CBP IDC-DLC Submittal Register_RTA_2022-08-24.pdf
PDF 551 KB Posted
- Solicitation number
- W912DR22R0049
About this file
This solicitation is for a full and open competition unrestricted design-bid-build construction contract to build a two-story 32,000 square foot Instructional Design Center/Distance Learning Center for Customs and Border Protection in Harpers Ferry, West Virginia. The project scope includes offices, collaboration spaces, audio/visual facilities, an elevator, HVAC system, electrical, life safety, finishes, stormwater management, and associated site work. The construction cost is estimated between $10-25 million with a 550 calendar day performance period. Proposals are due on October 3, 2022 and award will be made using lowest-price technically acceptable procedures. Offerors must be registered in the System for Award Management database.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 107 PAGES
CBP IDC-DLC HARPERS FERRY, WV
01 14 00 SD-01 Preconstruction Submittals 1.3.1.1List of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals 1.3View Location Map 1.4Progress and Completion
Pictures 01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 G ROSubmittal Register
01 33 16.00 10 SD-01 Preconstruction Submittals 1.7.2Advanced Modeling Project
Execution Plan (PxP)
1.5.1 G RODesign Quality Control Plan
1.5.2.2Initial Design Conference 1.5.2.5Preconstruction Conference
SD-05 Design Data
1.7.1 CDesign and Code Checklists
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 G ROPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G ROSustainability Action Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 107 PAGES
01 33 29 1.5.3.2 G ROPreliminary Sustainability eNotebook
SD-11 Closeout Submittals
1.5.3.2 G ROFinal High Performance and
Sustainable Building Checklist
1.5.3.2 G ROFinal Sustainability eNotebook
1.5.3.2 G ROAmended Final Sustainability
eNotebook
1.5.3.2 G ROAmended Final High
Performance and Sustainable Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.7.1 G ROAPP - Construction
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.4Crane Operators/Riggers
1.7.3.2 G ROStandard Lift Plan
1.7.3.3 G ROCritical Lift Plan
1.7.3.4 G RONaval Architecture Analysis
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 107 PAGES
01 35 26 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates
1.14.1 G RORadiography Operation Planning
Work Sheet
1.14.1 G ROPortable Gauge Operations
Planning Worksheet 01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
SD-06 Test Reports 3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals 3.1.3Written NDT Practices
SD-06 Test Reports 3.1.3Daily Reports 3.1.2Biweekly Reports
SD-07 Certificates 2.1AISC Certified Steel Fabricator 2.1Steel Truss Plant Quality
Assurance Program 2.1Wood Truss Plant Quality
Assurance Program 2.1AC472 Accreditation 2.1Steel Joist Institute Membership 2.1Certified Plant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 107 PAGES
01 45 35 2.1Certificate of Compliance
1.5 G ROSpecial Inspector
3.1.3Qualification Records
SD-11 Closeout Submittals
3.1.3 G ROInterim Report
3.1.3 G ROComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 G ROConstruction Site Plan
3.4.1 G ROTraffic Control Plan
2.2.1 G ROHaul Road Plan
1.6.1.4 G ROContractor Computer
Cybersecurity Compliance Statements
1.6.6 G ROContractor Temporary Network
Cybersecurity Compliance Statements
SD-06 Test Reports 3.5Backflow Preventer Tests
SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey
1.11 G ROSolid Waste Management Permit
1.6.2 G RORegulatory Notifications
1.7 G ROEnvironmental Protection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 107 PAGES
01 57 19 3.2.1.1 G ROStormwater Pollution Prevention Plan
1.7.9.1 G RODirt and Dust Control Plan
1.6.5 G ROEmployee Training Records
1.6.4 G ROEnvironmental Manager
Qualifications SD-06 Test Reports
3.2.1.2Inspection Reports
1.11.1 G ROMonthly Solid Waste Disposal
Report SD-07 Certificates
1.6.5 G ROEmployee Training Records
1.6.5Erosion and Sediment Control
Inspector SD-11 Closeout Submittals
3.2.1.3 G ROStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.4 G ROStormwater Notice of Termination
3.7.1 G ROWaste Determination
Documentation
3.7.3.6 G RODisposal Documentation for
Hazardous and Regulated Waste
1.6.5 G ROAssembled Employee Training
Records
1.11 G ROSolid Waste Management Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 107 PAGES
01 57 19 3.7.2.1 G ROProject Solid Waste Disposal Documentation Report
3.7.3.1 G ROHazardous Waste/Debris
Management
1.6.2 G RORegulatory Notifications
3.7.2.1 G ROSales Documentation
01 58 00 SD-02 Shop Drawings
1.3.1.1 G ROPreliminary One Line
1.4.1 G ROSign Legend Orders
SD-04 Samples
1.3.1.2 G ROFinal Rendering
1.3.1.3 G ROFinal Framed Rendering
01 74 19 SD-01 Preconstruction Submittals
1.7 G ROConstruction Waste Management
Plan SD-06 Test Reports
1.9.2Quarterly Reports 1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report 01 78 00 SD-03 Product Data
1.8.1Warranty Management Plan 1.8.5Warranty Tags 1.6Spare Parts Data
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 107 PAGES
01 78 00 1.8.1Instructions SD-10 Operation and Maintenance Data
3.7 G ROOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 G ROAs-Built Drawings
3.3 G RORecord Drawings
1.8.1As-Built Record of Equipment and Materials 3.6As-Built Record of Equipment and Materials
3.4 G ROFinal Approved Shop Drawings
3.5 G ROConstruction Contract
Specifications
2.3 G ROCertification of EPA Designated
Items
2.4 G ROCertification Of USDA
Designated Items
3.9.1 G ROInterim DD FORM 1354
3.9.2 G ROChecklist for DD FORM 1354
3.9.2 G ROHigh Performance and
Sustainable Building (HPSB) Checklist
01 78 23 SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 107 PAGES
01 78 23 1.3 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
01 78 24.00 10 SD-01 Preconstruction Submittals 1.5.1Facility Data Project Execution
Plan SD-05 Design Data
3.1 G ROFacility Data Workbook, Design
3.1 G ROFacility Document Set, Design
SD-10 Operation and Maintenance Data
3.2 G ROFacility Data Workbook, Construction Progress
3.2 G ROFacility Document Set, Construction Progress
SD-11 Closeout Submittals
3.3 G ROFacility Data Workbook, Construction Final
1.5.3 G ROFacility Document Set, Construction Final
3.3 G ROFacility Document Set, Construction Final
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 107 PAGES
01 91 00.15 10 SD-01 Preconstruction Submittals
1.7 G ROCommissioning Firm
1.7.1 G ROLead Commissioning Specialist
1.7.2 G ROTechnical Commissioning
Specialists
1.7 G ROCommissioning Firm's Contract
SD-06 Test Reports
3.1.4 G RODesign Review Report
3.1.3.1 G ROInterim Construction Phase
Commissioning Plan
3.1.3.2 G ROFinal Construction Phase
Commissioning Plan
3.1.3.1.2 G ROTemplate Building Envelope
Inspection Checklists
3.1.6.2 G ROBuilding Envelope Inspection
Checklists
3.1.6.3 G ROPre-Functional Checklists
1.9Issues Log
3.2 G ROCommissioning Report
3.3.1 G ROPost-Construction Trend Log
Report SD-07 Certificates
1.10 G ROCertificate of Readiness
SD-10 Operation and Maintenance Data
3.1.7 G ROTraining Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 107 PAGES
01 91 00.15 10 3.1.7 G ROTraining Attendance Rosters
3.1.8 G ROSystems Manual
3.1.8 G ROSystems Manual
SD-11 Closeout Submittals
3.2 SFinal Commissioning Report
3.1.3.2 SFinal Construction Phase
Commissioning Plan 02 41 00 SD-01 Preconstruction Submittals
1.2.2 G RODemolition Plan
1.11Existing Conditions
SD-07 Certificates
1.7 G RONotification
03 30 00 SD-01 Preconstruction Submittals 1.6.6Quality Control Plan 1.6.7Quality Control Personnel
Certifications 1.6.7Quality Control Organizational
Chart 1.6.9Laboratory Accreditation 3.3.10Maturity Method Data
SD-02 Shop Drawings 1.6.2.1Reinforcing Steel
SD-03 Product Data 2.4.5Joint Sealants 2.4.4Joint Filler 2.1Formwork Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 107 PAGES
03 30 00 2.3.1Cementitious Materials 2.4.6Vapor Retarder and Vapor
Barrier 2.4.1Concrete Curing Materials 2.6Reinforcement 2.4.3.1Liquid Chemical Floor Hardeners and Sealers 2.3.4Admixtures 2.6.2Mechanical Reinforcing Bar
Connectors 2.2.2Waterstops 2.4.2Nonshrink Grout
SD-05 Design Data 1.6.1.1Concrete Mix Design
SD-06 Test Reports 1.6.1.1Concrete Mix Design 1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Slag Cement 1.6.4.3Aggregates 3.10.2.1Tolerance Report 3.14.3.3Compressive Strength Tests 3.14.3.5Unit Weight of Structural
Concrete 3.14.3.6Chloride Ion Concentration 3.14.3.4Air Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 107 PAGES
03 30 00 3.14.3.1Slump Tests 2.3.2Water
SD-07 Certificates 2.6.1Reinforcing Bars 1.9Welder Qualifications 1.8.2Forest Stewardship Council
(FSC) Certification 1.6.7.2Field Testing Technician and
Testing Agency SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants 2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings 3.4.1.1Detail Drawings
SD-03 Product Data 1.5.1Hot Weather Procedures 1.5.2Cold Weather Procedures 2.2.3.2.1Cement 2.4.1.1Cementitious Materials
SD-04 Samples 1.3.1.1Mock-Up Panel 2.2.3.2Concrete Masonry Units (CMU) 2.2.5Dimension Stone Units 2.4.1.3Admixtures for Masonry Mortar
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 107 PAGES
04 20 00 2.6.2Anchors, Ties, and Bar Positioners
2.6.3Joint Reinforcement SD-05 Design Data
2.1.2Masonry Compressive Strength 2.2.3.3Fire-Rated Concrete Masonry
Units 3.2.5Bracing Calculations
SD-06 Test Reports 2.2.3.3Fire-Rated Concrete Masonry
Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.3Prism Tests 3.6.1.4Single-Wythe Masonry Wall
Water Penetration Test SD-07 Certificates
2.2.3.2Concrete Masonry Units (CMU) 2.4.1.1Cementitious Materials 2.4.1.3Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar
Positioners 2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions 2.4.1.3Admixtures for Masonry Mortar
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 107 PAGES
04 20 00 2.4.2.2Admixtures for Grout SD-10 Operation and Maintenance Data
3.8Take-Back Program SD-11 Closeout Submittals
2.2.3.2.2 SRecycled Content
05 05 20.00 SD-01 Preconstruction Submittals
1.5.1.1Installer Qualifications 1.5.1.2Post-Installed Anchor Special
Inspector Qualifications SD-03 Product Data
2.1.1.3Mechanical Anchors in Concrete 2.1.1.4Adhesive Anchor System in
Concrete 2.1.1.5Mechanical and Adhesive
Anchors in Masonry 3.1.3Non-Shrink, Non-Metallic Grout
SD-06 Test Reports 3.3.4Post-Installed Anchor Special
Inspections Report SD-07 Certificates
2.1.1.1Post-Installed Anchor Certification
SD-08 Manufacturer’s Instructions 2.1.1.2Manufacturer's Printed
Installation Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 107 PAGES
05 05 20.00 3.1.3Non-Shrink, Non-Metallic Grout 1.5Manufacturer's Material Safety
Data Sheets 05 05 23.13 10 SD-01 Preconstruction Submittals
1.4.1 G ROPersonnel Qualification
2.1.1 G ROProcedure description
SD-03 Product Data 2.1.1Equipment and accessories
SD-06 Test Reports 1.4.5Equipment Qualifications 3.4.1Inspection Test Reports
05 05 23.16 SD-01 Preconstruction Submittals
3.2 G ROWelding Quality Assurance Plan
SD-03 Product Data
1.3 G ROWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification 1.3.2Previous Qualifications
1.3.3 G ROPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports 3.3Nondestructive Testing 3.2Weld Inspection Log
SD-07 Certificates 1.3.1Certified Welding Procedure
Specifications (WPS)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 107 PAGES
05 05 23.16 1.3.1Certified Brazing Procedure Specifications (BPS)
1.3.1Certified Procedure Qualification Records (PQR)
1.3.1Certified Welder Performance Qualifications (WPQ)
1.3.1Certified Brazer Performance Qualifications (BPQ)
1.3.5Certified Welding Inspector 1.3.5Nondestructive Testing
Personnel 05 12 00 SD-01 Preconstruction Submittals
1.5.1.1Erection and Erection Bracing Drawings
SD-02 Shop Drawings 1.5.2Fabrication Drawings
SD-03 Product Data 2.6.2Shop Primer 2.4.1Welding Electrodes and Rods 2.4.2Non-Shrink Grout
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing SD-05 Design Data
1.5.2 G ROShoring and Temporary Bracing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 107 PAGES
05 12 00 SD-06 Test Reports 2.6.2Class B Coating 2.3Bolts, Nuts, and Washers 3.7.1.2Weld Inspection Reports 3.7.3.1Bolt Testing Reports 3.7.4Embrittlement Test Reports
SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3AISC Structural Steel Fabricator
Quality Certification 1.3AISC Structural Steel Erector
Quality Certification 1.5.4.1Welding Procedures and
Qualifications 2.4.1Welding Electrodes and Rods 3.7.1.1Certified Welding Inspector 3.7.1.2NDT Technician 3.4Welding Procedure Specifications
(WPS)
05 21 00 SD-01 Preconstruction Submittals
1.3.2Welder Qualification SD-02 Shop Drawings
1.3.1Steel Joist Framing SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 107 PAGES
05 21 00 2.3 SRecycled Content Of Steel Products
SD-05 Design Data 2.2Design Calculations
SD-06 Test Reports 3.4Erection Inspection 3.4Welding Inspections
SD-07 Certificates 1.3.2Certification of Compliance
05 30 00 SD-02 Shop Drawings 1.3.5Fabrication Drawings
SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.9Galvanizing Repair Paint 2.2.18Mechanical Fasteners 2.1.9Touch-Up Paint 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories
2.1 SRecycled Content of Steel
Products SD-04 Samples
2.1.1Metal Roof Deck Units 2.2.4Flexible Closure Strips
SD-05 Design Data 2.1Deck Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 107 PAGES
05 30 00 SD-07 Certificates 1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance 1.3.1Manufacturer's Certificate 2.2.12Stud Manufacture's Certification 2.2.12Stud Manufacture's Test Reports
05 40 00 SD-02 Shop Drawings 1.6.1Framing Components
SD-03 Product Data 2.1Studs, Joists
2.1 SRecycled Content of Steel
Products SD-05 Design Data
1.6.2Metal Framing Calculations SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal Framing
3.2.1Welds 05 51 00 SD-02 Shop Drawings
2.1Iron and Steel Hardware 2.1Steel Shapes, Plates, Bars, and
Strips 2.2.1Metal Stair System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 107 PAGES
05 51 00 SD-03 Product Data 2.4.1Structural Steel Plates, Shapes, and Bars 2.4.2Structural Steel Tubing 2.4.5Hot-Rolled Carbon Steel Sheets and Strips 2.4.4Cold-Finished Steel Bars 2.4.3Hot-Rolled Carbon Steel Bars 2.4.6Cold-Rolled Carbon Steel Sheets 2.4.7Galvanized Carbon Steel Sheets 2.4.8Cold-Drawn Steel Tubing 2.3.4Concrete Inserts 2.3.5Masonry Anchorage Devices 2.2.4Protective Coating 2.2.2Steel Pan Stairs 2.3.1Steel Stairs 2.3.2Steel Stairs, Circular
SD-07 Certificates 1.3.1Welding Procedures 1.3.1Welder Qualification
SD-08 Manufacturer’s Instructions 2.4.1Structural Steel Plates, Shapes, and Bars 2.4.2Structural Steel Tubing 2.4.5Hot-Rolled Carbon Steel Sheets and Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 107 PAGES
05 51 00 2.4.4Cold-Finished Steel Bars 2.4.3Hot-Rolled Carbon Steel Bars 2.4.6Cold-Rolled Carbon Steel Sheets 2.4.7Galvanized Carbon Steel Sheets 2.4.8Cold-Drawn Steel Tubing 2.2.4Protective Coating 2.3.5Masonry Anchorage Devices
05 52 00 SD-02 Shop Drawings 1.2.1Fabrication Drawings 3.2Iron and Steel Hardware 3.2Steel Shapes, Plates, Bars and
Strips SD-03 Product Data
2.2.1Structural-Steel Plates, Shapes, and Bars
2.2.2Structural-Steel Tubing 2.2.4Cold-Finished Steel Bars 2.2.3Hot-Rolled Carbon Steel Bars 2.2.5Cold-Drawn Steel Tubing 2.2.7Concrete Inserts 2.2.8Masonry Anchorage Devices 2.1.3Protective Coating 2.2.10Steel Railings and Handrails 1.2.1Anchorage and Fastening
Systems SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 107 PAGES
05 52 00 1.4.1Welding Procedures 1.4.2Welder Qualification
SD-08 Manufacturer’s Instructions 3.2Installation Instructions
06 10 00 SD-02 Shop Drawings 1.9.2Modifications of Structural
Members 2.2.2Nailing Strips
SD-03 Product Data 1.8Fire-retardant Treatment
SD-05 Design Data 1.9.2Modifications of Structural
Members SD-06 Test Reports
1.4.5Preservative-treated 1.7Preservative Treatment
SD-07 Certificates 1.10.1Certificates of Grade
2.1.1 SCertified Sustainably Harvested
Virgin Lumber
2.2.2 SCertified Sustainably Harvested
Framing Lumber
2.3.7.1 SCertified Sustainably Harvested
Plywood for Other Uses 06 41 16.00 10 SD-02 Shop Drawings
1.5.2Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 107 PAGES
06 41 16.00 10 2.12Shop Drawings 3.1Installation
SD-03 Product Data 2.1Wood Materials 2.12.8.3Finish Schedule
SD-04 Samples 2.3Plastic Laminates 2.7Cabinet Hardware
SD-07 Certificates 1.5Quality Assurance 3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
1.4.2 G RODetail Fabrication Drawings
3.1 G ROInstallation
SD-03 Product Data
2.1.1 G ROSolid Polymer
2.2.2 SIndoor air quality for solid surface
seam and sealant products SD-04 Samples
2.1 G ROMaterial
2.3.6 G ROCounter Tops
SD-06 Test Reports 2.1.1Test Report Results
SD-07 Certificates 1.4.1Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 107 PAGES
06 61 16 2.1.1 SIndoor Air Quality for solid surface fabrication products
SD-10 Operation and Maintenance Data
2.1.1 G ROSolid Polymer
07 05 23 SD-01 Preconstruction Submittals
1.4Work Plan SD-03 Product Data
2.2Thermal Imaging Camera SD-05 Design Data
3.2Envelope Surface Area Calculations
SD-07 Certificates 1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration
SD-06 Test Reports 3.5Pressure Test Procedures 1.6.4Air Leakage Test Report 3.5.8Air Leakage Test Report 1.6.4Diagnostic Test Report 3.6.5Diagnostic Test Report
07 11 13 SD-07 Certificates 1.3Materials
07 13 53 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 107 PAGES
07 13 53 1.3Manufacturer's Standard Details 2.2Elastomeric Waterproofing Sheet
Material 1.4Primers, Adhesives, and Mastics 2.2Primers, Adhesives, and Mastics
SD-06 Test Reports 2.2Elastomeric Waterproofing Sheet
Material 3.6Field Quality Control 3.7Protective Covering
SD-07 Certificates 2.2Elastomeric Waterproofing Sheet
Material 1.4Primers, Adhesives, and Mastics 2.2Primers, Adhesives, and Mastics 1.4Protective Coverings 1.8Special Warranties 2.1.1Certificates Of Compliance 2.1.2Certificates Of Compliance
SD-08 Manufacturer’s Instructions 1.4Primers, Adhesives, and Mastics 2.2Primers, Adhesives, and Mastics
SD-11 Closeout Submittals 2.1.1Certificates Of Compliance 2.1.2Certificates Of Compliance
07 14 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 107 PAGES
07 14 00 2.1Fluid-Applied Membrane 2.2Membrane Primer 3.3Solvent 3.4.1Moisture Meter 2.7Bond Breaker
SD-11 Closeout Submittals 1.6Warranty 3.6Information Card 3.5Instructions To Government
Personnel 07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2 SRecycled Content for Insulation
Materials 2.4Vapor Retarder 2.5Pressure Sensitive Tape 2.6Accessories
SD-07 Certificates
2.1.4 SIndoor Air Quality for Insulation
Materials SD-08 Manufacturer’s Instructions
3.3.1Insulation 07 22 00 SD-02 Shop Drawings
1.3Insulation Board Layout SD-03 Product Data
2.1Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 107 PAGES
07 22 00 1.4Cover Board 2.6Fasteners 2.5Moisture Control
2.1.3 SRecycled Content For Insulation
SD-06 Test Reports 1.8.1Flame Spread Rating
SD-07 Certificates 1.6Installer Qualifications
2.1.4 SIndoor Air Quality For Insulation
SD-08 Manufacturer’s Instructions 2.6Fasteners 2.1Insulation
07 27 10.00 10 SD-02 Shop Drawings 2.1Air Barrier System Shop
Drawings SD-03 Product Data
2.1Air Barrier System Product Data SD-04 Samples
3.1.2Mock-Up 2.1Material Samples For Air Barrier
System SD-05 Design Data
1.8Design Data And Calculations For The Air Barrier System
SD-06 Test Reports 1.8Design Review Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 107 PAGES
07 27 10.00 10 3.1.3Testing and Inspection SD-07 Certificates
1.7Air Barrier Inspector 07 27 26 SD-01 Preconstruction Submittals
1.9.1Qualifications of Manufacturer 1.9.2Qualifications of Installer
SD-02 Shop Drawings 1.4Fluid-Applied Membrane Air
Barrier SD-03 Product Data
1.4Fluid-Applied Membrane Air Barrier
2.2Primers, Adhesives, and Mastics 2.6Reinforcement 1.4.2Safety Data Sheets
SD-04 Samples 1.4.3Mockup
SD-06 Test Reports 1.6Capillary Moisture Test 1.4.4Field Peel Adhesion Test 1.4.4Flame Propagation of Wall
Assemblies 1.4.4Flame Spread and Smoke
Developed Index Ratings 3.4.1Site Inspections
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 107 PAGES
07 27 26 1.4Fluid-Applied Membrane Air Barrier
SD-08 Manufacturer’s Instructions 1.4Fluid-Applied Membrane Air
Barrier 2.2Primers, Adhesives, and Mastics
07 27 36 SD-01 Preconstruction Submittals 1.10.1Qualification of Manufacturer 1.10.2Qualification of Installer 1.11Quality Control Plan 1.11Safety Plan 1.9.1Fire Prevention Plan 1.9.2Respirator Plan
SD-02 Shop Drawings 1.5Spray Foam Air Barrier 1.11Foam Air Barrier System 1.5.1Fire-Rated Assemblies
SD-03 Product Data 2.1.2Closed Cell 2.3Primers, Adhesives, and Mastics 2.5Sealants 1.5.2Safety Data Sheets 2.1.1Thermal Barrier Materials 2.1.6Accessories
2.1.2 SRecycled Content for Closed Cell
Spray Foam Air Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 107 PAGES
07 27 36 SD-04 Samples 1.5Spray Foam Air Barrier
SD-06 Test Reports 1.5.4Field Peel Adhesion Test 3.4.5.1Thermographic Test 1.8Air Barrier Test 1.5.3Primers 1.5.4Fire-Ratings Of Thermal Barrier
Materials 1.5.4Flame Spread And Smoke
Developed Index Ratings Of SPF Products
1.5.4Flame Propagation Of Wall Assemblies
3.4.1Site Inspections SD-07 Certificates
2.1.2Closed cell
2.1.5 SIndoor Air Quality for Spray Foam
Air Barrier SD-08 Manufacturer’s Instructions
1.6.1SPF Handling, Storage, and Spray Procedures
3.2.1Substrate Preparation 1.5.1Thermal Barrier 2.3Primers, Adhesives, and Mastics
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 107 PAGES
07 27 36 SD-09 Manufacturer’s Field Reports
1.11Core Samples 3.3.3Daily Work Record 3.4.5Visual Inspection and Thermal
Scanning 07 41 13 SD-02 Shop Drawings
1.4.5Roofing Panels 1.4.5Flashing and Accessories
SD-03 Product Data 2.1Roof Panels
2.1.2 SRecycled Content for Steel Roof
Panels
2.2.2 SEnergy Star Label for Metal
Roofing Product
2.2.2 SHeat Island Reduction
1.4.5Factory-Applied Color Finish 2.4Accessories 1.4.5Fasteners 1.4.5Pressure Sensitive Tape 2.8Underlayments 2.9Gaskets and Sealing/Insulating
Compounds 1.4.5Coil Stock 1.4.5Aluminized Steel Repair Paint 1.4.5Enamel Repair Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 107 PAGES
07 41 13 SD-04 Samples 2.1Roof Panels 1.4.5Factory-applied Color Finish 2.4Accessories 1.4.5Fasteners 1.4.5Gaskets and Sealant/Insulating
Compounds SD-05 Design Data
1.4.6Engineering Calculations 1.2.1.2Wind Uplift Resistance
SD-06 Test Reports 1.2.1.1Leakage Test Report 1.2.1.2Wind Uplift Test Report 2.2Factory Finish and Color
Performance Requirements SD-07 Certificates
2.1Roof Panels 1.4.5Coil Stock Compatibility 2.8.2Self-Adhering Modified Bitumen
Underlayment 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator
SD-08 Manufacturer’s Instructions 2.7Insulation 1.4.5Installation Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 107 PAGES
07 41 13 SD-09 Manufacturer’s Field Reports
3.10.1Manufacturer's Field Inspection Reports
SD-11 Closeout Submittals 1.8Warranties
07 42 13 SD-01 Preconstruction Submittals 1.6.3Qualification of Manufacturer 1.6.4Qualification of Installation
Contractor 1.6.4.1Qualification of Welders 1.9Warranty
SD-02 Shop Drawings 1.6.1.1Installation Drawings
SD-03 Product Data 1.6.5Closure Materials 1.6.5Accessories 2.5Accessories
SD-04 Samples 1.6.3.1Fasteners
SD-05 Design Data 1.6.1.2Wind load design analysis
SD-07 Certificates 1.6.3.1Coil Stock 1.6.3.1Fasteners
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 107 PAGES
07 42 13 3.3Installation SD-09 Manufacturer’s Field Reports
3.9.1Manufacturer's Field Reports SD-11 Closeout Submittals
1.9Warranty 1.6.6Maintenance Instructions
07 54 23 SD-02 Shop Drawings 1.3.2Roofing System
SD-03 Product Data 2.1Thermoplastic Polyolefin (Tpo)
Sheet Roofing 3.2Installation 3.3Protection of Finished Roofing 3.4Inspection
SD-07 Certificates 1.3.1Materials 1.3.5Qualifications
07 60 00 SD-02 Shop Drawings 2.2.1Exposed Sheet Metal 3.1.17Gutters 3.1.18Downspouts 3.1.26Expansion Joints 2.2.1Gravel Stops and fascia 3.1.19Flashing for Roof Drains 3.1.11Base Flashing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 107 PAGES
07 60 00 3.1.12Counterflashing 3.1.27Flashing at Roof Penetrations and Equipment Supports 2.2.15Reglets 3.1.30Copings 3.1.16Drip Edges 3.1.24Eave Flashing
2.1 SRecycled Content
SD-03 Product Data 2.2.12Cool Roof
SD-04 Samples 1.4.2Finish Samples
SD-08 Manufacturer’s Instructions 1.4.3Instructions for Installation 3.5Quality Control Plan
SD-10 Operation and Maintenance Data
1.4.3Cleaning and Maintenance 07 84 00 SD-02 Shop Drawings
2.1Firestopping System SD-03 Product Data
2.2Firestopping Materials SD-06 Test Reports
3.3Inspection SD-07 Certificates
1.5.2Inspector Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 107 PAGES
07 84 00 2.2Firestopping Materials 1.5.1Installer Qualifications
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond Breakers 2.4Backstops 3.1Field Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
2.5 SIndoor Air Quality For Interior
Caulking 08 11 13 SD-02 Shop Drawings
2.1 G RODoors
2.1 G RODoors
2.1 SRecycled Content for Steel Door
Product
2.7 G ROFrames
2.7 G ROFrames
2.7 SRecycled Content for Steel
Frame Product
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 107 PAGES
08 11 13 2.5Accessories 2.9Weatherstripping
SD-03 Product Data
2.1 G RODoors
2.7 G ROFrames
2.5Accessories
08 11 16 SD-02 Shop Drawings 1.5.1Door and Frame Assembly
SD-03 Product Data 1.5.1Door and Frame Assembly 2.2.3Recycled Content of Aluminum
Material SD-04 Samples
1.5.2Finish Samples SD-05 Design Data
1.5.3Design Analysis 1.2.3Air Infiltration 1.2.4Water Penetration 1.2.5NFRC Project Label Certificates for Fenestration SD-08 Manufacturer’s Instructions
1.5.1Door and Frame Assembly 1.5.5Adjustments, Cleaning, and
Maintenance 1.2.5NFRC Project Label Certificates for Fenestration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 107 PAGES
08 14 00 SD-02 Shop Drawings 2.1Doors
SD-03 Product Data 2.1Doors
2.1.2.1 SRecycled Content for Door Cores
2.2Accessories 2.3.7Water-resistant Sealer 1.5Warranty 2.1.6Sound Transmission Class
Rating 2.1.7Fire Resistance Rating
SD-04 Samples 2.1Doors
SD-06 Test Reports 2.4Cycle-Slam 2.4Hinge Loading Resistance
SD-07 Certificates 1.3.1Certificates of Grade
2.1.2 SCertified Sustainably Harvested
Flush Wood Doors
2.1.2.1 SIndoor Air Quality for
Particleboard and Agrifiber Door Cores
SD-11 Closeout Submittals 1.5Warranty
08 31 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 107 PAGES
08 31 00 1.3Access Doors And Panels SD-03 Product Data
1.3Access Doors And Panels 1.3.2Hardware 2.2.8Accessories
2.1 SRecycled Content
SD-04 Samples 2.5Finishes
SD-06 Test Reports 1.3.1Fire-rating(s) of Assemblies 1.3.1Acoustical Ratings of Assemblies
08 34 73 SD-02 Shop Drawings 2.1Fabrication Drawings
SD-03 Product Data 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.3.2Door Frame Sound Infill
SD-06 Test Reports 2.4.4Wind Loading Tests 2.4.4Water Leakage Tests 2.4.4Acoustical Tests 2.4.4Air Infiltration Tests
SD-07 Certificates 2.1Wood Sound Retardant Doors 2.1Door Frames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 107 PAGES
08 34 73 3.3.1Assembly Test Reports 08 41 13 SD-01 Preconstruction Submittals
1.2.1Sample Warranty 1.2.1List of Product Installations
SD-02 Shop Drawings 3.3Installation Drawings 2.2Fabrication Drawings
SD-03 Product Data 1.2.1Manufacturer's Catalog Data 2.2.3Finish
2.1.1.2 SRecycled Content of Aluminum
Material SD-04 Samples
1.2.1Finish and Color Samples SD-06 Test Reports
1.2.1Certified Test Reports 3.4.3Deflection 3.4.1Air Infiltration 3.4.4Condensation Resistance and
Thermal Transmittance 3.4.5Water Infiltration
SD-08 Manufacturer’s Instructions 3.3Manufacturer's Instructions
SD-11 Closeout Submittals 3.6Manufacturer's Product Warranty
08 44 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 107 PAGES
08 44 00 1.5Glazed Curtain Wall System 1.5Installation Drawings 2.4.2Shop-Painting Aluminum 2.4.3Shop-Painting Steel
SD-03 Product Data 1.5Glazed Curtain Wall System 2.2Metals For Fabrication 2.3Nonskinning Sealing Compound 2.4.1Metal Accessories 2.5Curtain-Wall Framing Members 2.6Aluminum Doors and Frames 2.9Thermal Insulation Materials 2.11.4Masonry Anchorage Devices
2.1.1 SRecycled Content of Aluminum
Curtain-Wall Framing Members 1.7.1Warranties
SD-05 Design Data 2.4.5Anodic Finish 2.4.5Exposed-to-View Aluminum
Finish 1.3.6.1Structural Calculations for
Deflection SD-06 Test Reports
1.3.6Factory Test Results 1.4.1Field Water Spray Test Results 1.4.2Air Infiltration Test Results
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 107 PAGES
08 44 00 1.4.2.1Water Penetration Test Results SD-07 Certificates
1.3.6.6Energy Performance Certificates 1.3.3Qualifications for the Curtain-Wall
Installer SD-08 Manufacturer’s Instructions
1.5Glazed Curtain Wall System 3.3.13Insulating Glass 3.6.2Preventive Maintenance and
Inspection SD-11 Closeout Submittals
1.7Warranty 08 71 00 SD-02 Shop Drawings
1.3 G ROManufacturer's Detail Drawings
1.3 G ROVerification of Existing Conditions
1.5 G ROHardware Schedule
2.3.7 G ROKeying System
SD-03 Product Data
2.3 G ROHardware Items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.5 G ROHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .