B.08.03 Amendment W912DR22R0030 0002.pdf
PDF 411 KB Posted
- Attached to
- SOF BATTALION OPERATIONS FACILITY, HEC, ALEXANDRIA, VIRGINIA Federal contract opportunity
- Solicitation number
- W912DR22R0030
About this file
This document is an amendment to a solicitation for construction services for a SOF Battalion Operations Facility in Alexandria, Virginia. The U.S. Army Corps of Engineers, Baltimore District is seeking a firm-fixed-price construction contract using a best value tradeoff source selection process. The amendment extends the response deadline to June 29, 2022 at 2:00 PM EDT and provides responses to inquiries, updated specifications and drawings, and a revised price schedule. Modifications include changes to specifications, drawings, general provisions, and replacement pages for the furniture, fixtures and equipment binder. Bidders must bid on all base items and optional items related to utilities, site work, generators, furniture, audiovisual equipment, electronic surveillance systems, IT systems, and a protected distribution system.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DR22R0030
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project Title: SOF Battalion Operations Facility (BOF1), Humphreys Engineer Center (HEC), Alexandria, Virginia
The purpose of this amendment is to:
1. Extend proposal due date. Due date extended from 24 June 2022 to 29 June 2022 at 2:00 PM EDT.
2. Provide responses to inquiries received during the Request for Information (RFI) period.
3. Provide updated specifications/draw ings based on RFI responses.
4. Provide updated price schedule.
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DR22R0030
X 9B. DATED (SEE ITEM 11)
13-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jun-2022
CODE
USACE, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
SPECIFICATIONS:
1) Project Table of Contents: Delete this section entirely and replace with attached like-named revised section dated, dated June 3, 2022.
2) Specification 01 33 00 - Submittal Register: Insert the attached submittal register for new Sections 07 17 00 and 10 14 00.20 to the end of specification section.
3) Specification 01 33 29, Paragraph 1.5.4: Revise the first sentence to read as follows:
“This project has been designed for and must be constructed to attain a sustainability rating of LEED Silver per the LEED BDC Ref Guide v4.”
4) Specification 01 33 29, Paragraph 1.5.5.1: Revise the first paragraph to read as follows:
“Pay all fees associated with achievement of Third-Party Certification (TPC), by meeting all TPC and project requirements for a level of LEEDv4 Silver rating for New Construction and Major Renovations, or Government-approved equivalent TPC sustainability certification, assessment, or validation. Register project with TPC organization using the following format and content:”
5) Specification 07 17 00: Insert specification section after section 07 05 23.
6) Specification 08 44 00: Delete Paragraphs 1.9.1, 1.9.1.1, 1.9.1.2, and 1.9.1.3 from this specification.
7) Specification 09 65 00, Paragraph 1.8: Replace first sentence with “Provide extra flooring material of each color and pattern at the rate of 10 square feet of sheet flooring installed.”
8) Specification 10 14 00.20: Insert specification section after section 10 14 00.10.
9) Specification 10 26 00, Paragraph 2.2.1: Replace last two sentences with “Corner guards must extend from floor to ceiling. Corner guard must be formed to dimensions.”
10) Specification 10 44 16: Delete Paragraph 2.1.1 from this specification.
11) Specification 12 24 13: Delete Paragraphs 1.5.1.1 and 2.1.1.d from this specification.
12) Specification 27 41 16, Paragraph 1.2.d.1: Revise this paragraph to read as follows:
“Lighting Control System: Reference Specification Section 26 51 00 INTERIOR LIGHTING for lighting control panel information and reference Electrical EL series drawings for lighting location information. The Contractor is responsible for required low voltage interfaces, cabling, and connectivity.”
13) Specification 27 41 16, Paragraph 1.2.d.2: Delete this paragraph from the specification.
14) Specification 27 41 16, Paragraph 2.1.h.1: Revise this paragraph to read as follows:
“The Contractor, as needed, shall be responsible for coordinating delivery and obtaining GFE equipment from the Government. The Government will deliver GFE equipment to the jobsite.
All equipment shall be tested as per manufacturer's requirements and verified that said equipment is performing at or above manufacturer's factory specifications.”
15) Specification 27 41 16.20, Paragraph 1.3.c: Revise this paragraph to read as follows:
“The Digital Media Routing system will be a NAIP EAL4+ Certified digital media switcher which utilizes all fiber optic connections. The Contractor shall supply media converters to convert fiber optic signals back to the appropriate signal type for the displays. The switcher will allow for segmented “red/black” style switching, completely disconnecting the source devices from the system depending on the security classification setting. The switcher centralizes all secure switching including video, audio and KVM functions”
16) Specification 27 41 16.20, Paragraph 1.3.d: Revise this paragraph to read as follows:
“The audio system will be managed by an expandable digital signal processor (DSP) that includes acoustic echo cancellation and a telephone hybrid. Ceiling microphones will be provided for video and teleconferencing, with system Mute capabilities to be programmed into the control system touch panel. The Mute feature will completely mute room microphones to allow for secure discussions within the room without being heard by others on the call. Sound reinforcement will be routed to the ceiling speaker system only. An infrared assisted listening system (ALS) will be provided with two emitters to meet the current federal ADA ALS requirements. ALS receivers will be provided with both headphone and neck-loop style listening devices. The ALS system will be disabled in the control system by default and will have to be enabled manually with a button press when its use is required.”
17) Specification 27 41 16.20, Paragraph 1.3.e: Revise this paragraph to read as follows:
“Video Teleconferencing System (VTC) capable of communicating on all three security classification levels will be provided by the government. Two high-definition pan-tilt-zoom cameras will be wall mounted in the SAR or use by the VTC system by routing through the secure switcher. One camera will be located at the front of the room (VIP, table view) and one will be located at the rear of the room (VIP, Battle Captain’s view). The VTC system will utilize the in-room ceiling microphones and audio DSP, with network connections routed through the secure switcher. When not in use, especially during classified meetings, all cameras shall go dark and point down.”
18) Specification 27 41 16.20, Paragraph 1.3.f: Revise this paragraph to read as follows:
“Room computers will be available capable of all three security classification levels. The government will provide, and deliver to the jobsite, all computers, keyboard, mice, and high-definition computer monitors. The secure KVM switcher with card access readers (CAC), shall be provided by the Contractor. The computer systems, including the KVM functions, will be connected through the secure switcher to allow for secure, automated switching between presentation/control positions in the room and the computers”.
19) Specification 27 41 16.20, Paragraph 1.3.g: Revise this paragraph to read as follows:
“The control system will consist of a central control processor, connection expanders (as required), network connectivity and a control touch panel. The control system processor will be the central hub to translate touch panel commands to the different serial and TCP/IP communication protocols required by the connected controlled equipment. The touch panels shall be programmed with different levels of security and password protection. When authenticated, the control system shall adjust systems and control features based on requirements for each classification level. Each level shall control source/destination routing and presentation/control positions as well as advanced technical functions such as microphone volume and mute control. The control system will be connected to room’s lighting system to allow for an ”AV” lighting preset to be recalled when the AV system is activated, and a ”VTC” lighting preset to be recalled when the VTC system is activated. A link from the existing building fire alarm systems will be connected to the control system. When this connection is active it will override the audio in the room. LED message boards will be provided in both the front and back of the room and programmed to show the security state of the AV system between SIC, Secret and Unclassified. Due to classification and network requirements, the control system shall be on a separate AV network and isolated from other networks.”
20) Specification 31 61 00: Delete Paragraphs 1.4, 1.4.1. 1.4.2, and 1.4.3 from this specification.
DRAWINGS:
21) Sheet G-003: Delete this sheet and replace with the attached like-named sheet dated 3
June 2022.
22) Sheet L-501: Delete this sheet and replace with the attached like-named sheet dated 3
23) Sheet S-302: Delete this sheet and replace with the attached like-named sheet dated 3
24) Sheet AE102: Delete this sheet and replace with the attached like-named sheet dated 3
25) Sheet AE310: Delete this sheet and replace with the attached like-named sheet dated 3
26) Sheet AE312: Delete this sheet and replace with the attached like-named sheet dated 3
27) Sheet AE411: Delete this sheet and replace with the attached like-named sheet dated 3
28) Sheet AE413: Delete this sheet and replace with the attached like-named sheet dated 3
29) Sheet AE601: Delete this sheet and replace with the attached like-named sheet dated 3
30) Sheet AE610: Delete this sheet and replace with the attached like-named sheet dated 3
31) Sheet P-001: Delete this sheet and replace with the attached like-named sheet dated 3
32) Sheet PL121: Delete this sheet and replace with the attached like-named sheet dated 3
33) Sheet PL123: Delete this sheet and replace with the attached like-named sheet dated 3
34) Sheet PL133: Delete this sheet and replace with the attached like-named sheet dated 3
35) Sheet P-402: Delete this sheet and replace with the attached like-named sheet dated 3
36) Sheet P-403: Delete this sheet and replace with the attached like-named sheet dated 3
37) Sheet P-601: Delete this sheet and replace with the attached like-named sheet dated 3
38) Sheet P-701: Delete this sheet and replace with the attached like-named sheet dated 3
39) Sheet P-901: Delete this sheet and replace with the attached like-named sheet dated 3
40) Sheet M-002: Delete this sheet and replace with the attached like-named sheet dated 3
41) Sheet E-001: Delete this sheet and replace with the attached like-named sheet dated 3
42) Sheet TS101: Delete this sheet and replace with the attached like-named sheet dated 3
43) Sheet TN508: Insert this sheet dated 3 June 2022 after sheet TN507.
44) Sheet TN509: Insert this sheet dated 3 June 2022 after sheet TN508.
45) Sheet TY501: Delete this sheet and replace with the attached like-named sheet dated 3
46) Sheet TA501: Delete this sheet and replace with the attached like-named sheet dated 3
47) Sheet TA502: Delete this sheet and replace with the attached like-named sheet dated 3
GENERAL:
48) Price Schedule: Delete this document and replace with the attached revised price schedule, dated 16 June 2022.
49) Geotechnical Report: Geotechnical Report dated June 2020 is included as a reference for information only.
50) Topographic Survey: Post Construction Conditions provided by Doyon Technical Services dated 6 July 2021 is included as a reference for information only.
51) Attachment K – FFE Binder, Page 107-110 of 118: Procurement Data, Plan Code X-7, X- 8, X-9 and X-10 Item Demountable Walls. Delete these pages in their entirety and replace with the attached revised like-named pages dated June 3, 2022.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 24-Jun-2022 11:00 AM to 29-Jun-2022 02:00 PM.
The following have been modified:
PRICE SCHEDULE
PRICE SCHEDULE
Revised 16 June 2022
Item No.
Description Amount
BASE BID ITEMS
0001 All costs in connection with the construction of the Battalion Operations Facility including utilities to points 5 feet outside the building lines, complete as shown on drawings and specified, but exclusive of Stand-by Generator and Uninterruptible Power Supply (UPS) System, and Optional Bid Items below
0002AA
0002BB
0002CC
All costs in connection with construction of all outside utilities and all site work beyond points 5 feet outside the building lines, complete as shown on drawings and specified, but exclusive of Optional Bid Items below and 0002BB and 0002CC
All costs in connection with the installation of the gas utility by the utility company
All costs in connection with the installation of the electric utility by the utility company
All costs in connection with the purchase and installation of the Stand-by Generator, complete as shown on drawings and specified, but exclusive of Optional Bid Items below
All costs in connection with the purchase and installation of the Uninterruptible Power Supply (UPS) System, complete as shown on drawings and specified, but exclusive of Optional Bid Items below
$ ___110,000.00______
$ ___125,000.00______
TOTAL BASE BID AMOUNT $ __________________
OPTIONAL BID ITEMS
Optional Bid Item 001 – Protected Distribution System (PDS)- All costs in connection with construction of telecommunications infrastructure from existing handhole HX3 to the building
DEMARC Room as shown on the civil and telecommunications drawings CU101, TS101 and TN403 and per the specifications.
0006 Optional Bid Item 002 – Furniture, Fixtures & Equipment-
Purchase and Delivery: All costs in connection with the purchase and delivery of furniture, fixtures & equipment complete, as shown on drawings and specified.
0007 Optional Bid Item 003 - Furniture, Fixtures & Equipment- Installation: All costs in connection with the installation of furniture, fixtures & equipment complete, as shown on drawings and specified
00011
Optional Bid Item 004 – Audio-Visual Equipment-Purchase and Delivery: All costs in connection with the purchase and delivery of audio-visual equipment complete, as shown on drawings and specified.
Optional Bid Item 005 – Audio-Visual Equipment-Installation:
All costs in connection with the installation of audio-visual equipment complete, as shown on drawings and specified
Optional Bid Item 006 – Electronic Surveillance System (ESS)- Purchase and Delivery: All costs in connection with the purchase and delivery of electronic surveillance system complete, as shown on the drawings and specified.
Optional Bid Item 007 – Electronic Surveillance System- Installation: All costs in connection with the installation of electronic surveillance system complete, as shown on drawings and specified
Optional Bid Item 008 – IT System-Purchase and Delivery: All costs in connection with the purchase and delivery of IT system complete, as shown on the drawings and specified.
Optional Bid Item 009 – IT System-Installation: All costs in connection with the installation of IT system complete, as shown on drawings and specified
TOTAL OPTIONAL BID ITEMS
TOTAL BASE AND OPTION BID AMOUNT
NOTES TO OFFERORS
Offerors must bid on all items including Optional Items. Failure to bid on all items may be cause for rejection of the proposal.
Optional Items may be exercised at any time within 180 calendar days after Notice to Proceed (NTP). The Contracting Officer may exercise the Optional Items by written notice to the Contractor, postmarked within the period specified above.
The Government may exercise any, all or none of the listed Optional Items in any order.
No additional time for contract completion will be allowed when an Optional Item is exercised.
Evaluation of Options:
Except when it is determined not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of Summary of Changes)
File details come from the government source that posted it. Updated .