This document provides details for a federal construction solicitation. The U.S. Army Corps of Engineers, Baltimore District has issued solicitation number W912DR22R0030 to solicit for and award a firm-fixed-price construction contract using a best value tradeoff source selection process. The proposed construction project is for a Special Operations Forces Battalion Operations Facility located at the Hugh E. Casey Building in Alexandria, Virginia. Interested offerors are to provide construction services to build out the SOF BOF1 in accordance with the solicitation and attached documents, which include the full requirements for the project. The award is to be a competitive design-bid-build contract.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANTEC PROJECT NUMBER: 178451908
CONSTRUCTION CONTRACT NO.: W912HN19D2000/ DO W912DR20F0205
Date: 29 October 2021
US Army Corps of Engineers
Baltimore District
ARCHITECT/DESIGN:
Stantec Architecture Inc.
4798 New Broad Street Suite 100
Orlando, Florida 32814
FINAL SUBMITTAL
STRUCTURAL INTERIOR DESIGN BROCHURE
BATTALION OPERATIONS FACILITY PN91018 / P2 477925
Humphries Engineering Center Alexandria, VA
BINDER PREPARED BY:
Lori Carson, NCIDQ
Stantec Architecture, Inc.
4798 New Broad Street, Suite 100
Orlando, Florida 32814
P: 407.425.2500
STANTEC PROJECT NUMBER: 178451908
CONSTRUCTION CONTRACT NO.: W912HN19D2000/ DO W912DR20F0205
Date: 29 October 2021
US Army Corps of Engineers
Baltimore District
ARCHITECT/DESIGN:
Stantec Architecture Inc.
4798 New Broad Street, Suite 100
Orlando, Florida 32814
FINAL SUBMITTAL
STRUCTURAL INTERIOR DESIGN BROCHURE
BATTALION OPERATIONS FACILITY PN91018 / P2 477925
Humphries Engineering Center Alexandria, VA
Index
1. Design Analysis
2. Floor Plans AE101; AE102; AE103
3. Demountable Walls Plans IF201; IF202; IF203
4. Demountable Walls Elevations IF400
5. Finish Schedule & Finish Key I601; I602
6. Finish Floor Plans I101; I102; I103
7. Restroom Elevations AE407; AE408
Wellness, GSB & Loadout Elevations AE409
FCC Lab & Break Area Elevations AE410
8. Reflected Ceiling Plans AE111; AE112; AE113
9. Enlarged Plans and Casework Section AE411; AE412
10. Interior Finish Boards
BINDER PREPARED BY:
Lori Carson, NCIDQ
Stantec Architecture, Inc.
4798 New Broad Street Suite 100
Orlando, Florida 32814
P: 407.425.2500
DIVIDER 1
BATTALION OPERTATIONS FACILITY
ALEXANDRIA, VA
3.9
3.2 ARCHITECTURAL
3.2.1 General Parameters
UFC 1-200-01-DOD Building Code (2019)
UFC 1-200-02-High Performance and Sustainable Building Requirements, with Change 4 (2019)
UFC 1-300-09N-Design Procedures (2005)
UFC 3-101-01-Architecture with Change 5 (2019)
UFC 1-300-02, Unified Facilities Guide Specifications with Change 2 (UFGS) Format Standard (2019)
UFC 3-110-03-Roofing with Change 4 (2019)
UFC 3-120-10-Interior Design (2018)
UFC 3-190-06-Protective Coatings and Paints (2004)
UFC 3-600-01-Fire Protection Engineering for Facilities with Change 4 (2020)
UFC 4-010-01 - DoD Minimum Antiterrorism Standards for Buildings (2018)
UFC 4-010-05 Sensitive Compartmented Information Facilities Planning, Design, And Construction, with Change 1
(2013)
AR 405-70- Utilization of Real Property (2006)
Intelligence Community Directive (ICD/ICS) 705
International Building Code (IBC) (2018)
Virginia Statewide Building Code (2018)
National Fire Protection Association (NFPA) 101, Life Safety Code (2018)
Architectural Barriers Act (ABA) Standards (2015)
ASHRAE Guidelines 0 (2013)
ASHRAE Guidelines 1.1 (2007)
ASHRAE 90.1-2016, Energy Standard for Buildings Except Low-Rise Residential Buildings (2016)
ASHRAE 189.1-2014, Standard for the Design of High-Performance Green Buildings, Except Low-Rise Residential
Buildings (2014)
3.10
3.2.2 Functional and Technical Requirements
The facilities on HEC traditionally are purpose built, secure, and technology driven in service of the soldiers and civilians they serve. More recently the United States Special Operations Command (USSOCOM) has initiated design and construction of facilities to support the Special Operations Forces (SOF) that will operate on HEC. Recently, the development of a Humphreys Engineer Center masterplan was commissioned by the Baltimore District, which will bring context to future facilities and infrastructure on the installation. The pre-final document titled “Real Property
Master Plan” was completed and dated July 10, 2020. The typical exterior materials that sheathe the existing HEC structures are precast concrete and tinted glazing.
The new BOF is intended to work alongside the developing master plan and provide an architectural context that will work harmoniously with the development of guidelines being established by the master plan. Care is taken to design the new BOF to feel a part of the current structures as well as the planned structures of the growing HEC installation.
The exterior finishes for the facility are planned to correspond with the context of the exteriors of the surrounding buildings and start to give a new precedent for future buildings as well. The new BOF will be constructed of modular precast concrete sandwich panels, metal panels and glazing systems to add texture and scale to the building.
The building has both secure and non-secure spaces. In accordance with UFC 4-010-05 and ICD/ICS 705 a design is presented that allows personnel to enter the BOF thru an access controlled entry point into a non-secure entrance vestibule and associated unclassified areas that include restrooms, wellness room, personnel cages and conferencing spaces. From the non-secure space visitors will enter a secure sally port from which they may enter through access control doors either the secure/classified areas of the building or into a collocation office space where temporary personnel with temporary clearance work, until full security clearance is given.
Building Code Summary: The BOF is classified as mixed occupancy without separation, consisting of Storage and
Business occupancies. Construction type is designated as Type IIB.
3.2.3 Design Objectives and Provisions
Exterior Construction and Features
The new BOF is designed as a three-story structure, consisting of 43,100 gross square feet, with all three levels above grade. The building structure consists of slab on grade concrete floor, spread footing foundations with aggregate piers, structural steel skeleton with concrete floors on metal deck. Roof structure is steel joists supporting metal roof deck.
The exterior walls consist of 11-inch thick architectural precast concrete sandwich panels on Level 1. The upper levels (Levels 2 and 3) consist of metal panel rainscreen system over 2-inch continuous rigid insulation, air barrier, 5/8-inch exterior sheathing, 6-inch metal stud infilled with batt insulation and 2 layers of 5/8-inch gypsum wall board.
Continuous sealant is applied at the top and bottom of all metal stud tracks. This exterior wall design provides a minimum combination R value of 20 for the precast sandwich panel, and a minimum R value of 20.5 for the metal panel rain screen system on the second and third levels.
Exterior doors and frames are insulated galvanized hollow metal. Key card access is required at all exterior doors.
Doors at the entry to the main building is a storefront system with key card access. Doors have continuous hinges, 3.11 closers, panic devices or locksets as appropriate and weather stripping. The facility includes insulated overhead sectional doors, 10-feet x 12-feet, with high-lift track and power operators at the garage bay, and 10-feet x 10-feet, with high-lift track and power operator at the load out space.
All exterior windows meet the criteria of UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, for this facility.
The roofing system is an Ethylene Propylene Diene Monomer (EPDM) membrane system, 1 layer, ½-inch glass-mat faced gypsum decking sloped polyisocyanurate rigid insulation (4-inches minimum insulation), vapor barrier, 5/8 exterior roof sheathing, and metal decking. The roof is sloped a minimum 1/2-inch per foot towards interior roof drains
(upper roof) and toward overflow drains/scuppers with downspouts (lower roof).
The surrounding parapet is comprised of a galvanized sheet metal parapet cap and continuous cleat with a full-strength fluoropolymer 3 coat finish, 6-inch light gage metal framing, ½-inch gypsum sheathing with glass mat facing
(both sides), and waterproofing membrane (both sides).
All roofs have a minimum R-value of 30.
The primary exterior materials of the building are precast concrete sandwich panels, a metal panel rain screen system and glazing systems. Color and texture match nearby recently constructed buildings and maintain conformance with the evolving Installation Master Plan. The cavity wall has exterior sheathing, waterproof membrane and flashing to maintain the integrity of the wall and provides control of moisture within the wall cavity. Continuous 2-inch rigid insulation (minimum R-7.5 ci.) insulation around the entire exterior enclosure of the building and 6-inch batt insulation (minimum R-19) within the stud cavity meet the required energy budgets and requirements for thermal resistance of R-20 insulation at walls and R-30 batt insulation at the roof. The overall design detailing provides a continuity of wall and roof insulation and air barriers included as required to prevent the transmission of air and moisture through the walls and roof. The exterior skin of the building will be tight to minimize infiltration and drafts along the perimeter walls. The interior face of exterior cold formed stud wall is enclosed with 2 layers of 5/8-inch gypsum wall board and painted as required.
Exterior windows are provided as shown on the exterior elevations of the building. Exterior windows are clear low-e insulated laminated glazing meeting the requirements of the UFC 4-010-01 - DoD Minimum Antiterrorism Standards for Buildings. All windows are fixed and designed for a sustained wind speed of 115 mph. Aluminum framing is pre-finished, color to be clear anodized. Aluminum storefronts are pre-finished and glazed with double-pane, insulated, clear, low-e, laminated glass. Exterior doors and frames are either insulated metal doors set in hollow metal frames or aluminum storefront doors including either wide or medium stile glazing and are pre-finished. Insulated hollow metal doors and frames are field painted. Glazing is clear and insulated low-e glass. Door hardware is stainless steel and mortised with all locks having a removable core with seven pin tumblers. Hinges have non-removable pins and antifriction bearing hinges. Exit devices are touch bars in lieu of conventional crossbars and arms. Aluminum storefront doors have the touch bar installed in the factory. Keying of all doors is in accordance with the installation standards. Lever handles are used throughout the facility. All exterior doors have a sign located per installations standards, indicating the name of the room to which it enters. The signage has raised braille lettering beneath the room name.
3.12
A new exterior accessible route connects with the new sidewalk along the south building façade and provides access to the public way. New exterior plazas and sidewalks meet ABA and Uniform Federal Accessibility Standards (UFAS) standards. See Section 3.1 CIVIL for areas of the existing parking area to be restriped and laid out to reconfigure the location of accessible parking spaces.
Building Envelope Air Tightness Design and Testing
To ensure the building design and the air barrier materials meet the needs of the project and requirements set forth in the UFC standards, the design team has incorporated in the project specifications laboratory testing standards of
ASTM E-2357 which tests air barrier materials for air leakage and ASTM E-799 which tests the completed building. In accordance with the requirements of the UFC standards, if the building fails the air barrier testing described, a
Thermographic Inspection will be performed in accordance with ASTM C1060-90 on the entire building envelope while the building is pressurized to determine the corrective action required.
Roof
The building roof is a combination of low slope roofs. The low (1/2 inch per foot slope) roof is 0.090 inch fully adhered EPDM membrane roofing with a solar reflective index (SRI) rating of 78 min and a 20-year warranty. The roof membrane is placed over rigid roof insulation (R-30 minimum) on metal decking supported by open web steel joists. The roof assembly provides a total R-Value of R-30. The EPDM roofing membrane has a white coating that achieves an SRI rating of 78 minimum, which allows sustainable credit Heat Island Reduction to be achieved. Access to the upper roof is by a roof hatch accessed from a small room on Level 3 adjacent to Stair Number 1.
A roof drainage system with both internal drains with overflow drains is provided for the high roof in the building design, while the low roof area will consist of thru wall scuppers to conductor heads to external downspouts. The drainage is designed to carry the water to the underground storm water collection system. The roofing design complies with UFC 3-110-03-Roofing” and UFC 3-101-01-Architecturel and Interior Design Requirements” for additional roofing requirements.
On the lower roof, south building corner, the user requested the incorporation of an exterior satellite pad for testing of equipment. Access to this pad is from the second level through secure space. The design uses continuous galvanized steel channels that are mounted to a raised concrete pad. These channels provide a mounting support system for secure tie downs for satellite transmitter antennas during testing. This perimeter of the satellite pad is protected with guardrails for fall protection
Signage, Area and Fixture Calculations, and Accessibility
All exterior and interior signage will meet installation requirements and standards, as well as Architectural Barriers Act
(ABA) requirements. Individual rooms, workstations and suites will be identified with permanent or interchangeable signage at each location.
Area calculations are based on a combination of factors. Where rooms are typical business use the occupancy is based on the measured area and calculated at 150 square feet per person. When density exceeds one person per
100 square feet the actual predicted occupancy for that area has been used. Classrooms are calculated at 20 square feet per person and Break Areas and Conference Rooms are calculated at 15 square feet per person. Storage
3.13 rooms, service rooms, mechanical and electrical rooms and primary server rooms are calculated with a 500 gross occupant load factor.
Fixture quantities are based on occupancy calculations as stated in Appendix F. Showers are provided for both men and women restrooms on Level 2 and Level 3. A Wellness Room is provided on Level 1 in the non-secure area located next to the restrooms.
The public areas of the BOF comply with the ABA Accessibility Standard for Department of Defense Facilities dated
2015. The facility will be designed for able-bodied military personnel and will meet the ABA standards. A new exterior accessible route connects with the new sidewalk along the south building façade and provides access to the public way. New exterior plazas and sidewalks meet ABA and UFAS standards. Existing parking areas will be restriped and laid out to reconfigure the location of accessible parking spaces.
Interior Construction and Features
Interior construction includes interior partitions, interior doors and fittings, floor and ceiling finishes, and fixed cabinetry and equipment. Construction is durable as appropriate to the building’s use, and as required by the government. For general use, all interior and corridor partitions are constructed of cold-formed non-load bearing studs as agreed with the users during programming. These walls are covered with impact resistant drywall depending on space requirements. Interior partitions meet specified Sound Transmission Class (STC) ratings as discussed with the user during programming exercises. All partitions are supported from the floor and braced to the structure above if they do not extend to the deck above. The interior doors in the office areas are stain-grade, extra heavy duty, solid core wood set in hollow metal frame, doors in back of house areas on the first floor and accessing utility rooms are heavy duty hollow metal doors set in hollow metal frames. STC, fire, and smoke rated doors are provided where required. Interior glazing for door lites, vision panels, and interior view windows are 1/4-inch tempered clear glass, fire glass or laminated glass depending on the application. Door hardware is high quality mortised with satin stainless-steel finish. Toilet accessories and partitions are provided in each restroom as required. All accessories are stainless steel. An interior signage system is provided throughout the interior of the facility meeting installation requirements and standards. The signs are 1/8-inch thick engraved acrylic, meeting all the requirements of the ABA for tactile letters in braille and symbols where applicable. Full height corner guards are heavy duty, premium grade stainless steel and are provided at all outside corners susceptible to damage. All cabinets are plastic laminate and constructed to meet “Custom” quality grade as defined in Architectural Woodwork Institute (AWI) Quality Standards. A recessed removable floor mat is provided at the primary building entrance.
Structural Interior Design
The building has been designed to have an inviting office feel with porcelain tile floors installed over sound absorbing acoustical impact sheet membrane in service areas, restrooms areas and corridors with painted abuse resistant gypsum board walls. The built-in millwork features laminate clad millwork with solid surface countertops in service areas. Warm rich colors and finishes are used throughout the facility. Restroom walls feature floor-to-ceiling porcelain wall tile. The working bay areas on the first floor are sealed concrete for durability.
General building finishes are as follows: main corridors and lobby features porcelain tile flooring with cove base, office areas have carpet, restrooms have porcelain tile floors and utility areas have sealed concrete. Open office spaces have carpet floor surfaces with a modern inviting pattern. On the second and third levels carpet is placed
3.14 over raised access flooring. Ceilings are acoustical ceiling tile in the office and work areas. The storage and support spaces are exposed ceilings with painted structure above. Moisture resistant gypsum board ceiling is used in wet areas. All mechanical, electrical, communication and elevator machine rooms are exposed painted structure.
The interior finishes selected are warm and inviting patterns chosen to be long lasting. Finishes are durable, aesthetically pleasing, functional, and low maintenance. They are chosen to accompany the flexibility of the space and coordinated with the demountable walls and raised access floors.
Construction of interior partition systems generally adheres to the following detailed description:
Where walls extend to underside of deck (i.e. spaces dividing user groups, corridors, secure rooms, storage areas above 100 square feet needing a smoke barrier, and where spaces contain toilets or showers), 3 5/8-inch metal stud walls are used with gypsum board on both sides to the underside of deck.
Within areas where walls do not need to extend to the underside of deck, walls are 3 5/8-inch metal stud with gypsum wall board on both sides extending from on top of the floor to 6-inches above finished ceiling.
Where vertical shafts are located, a 6-inch metal stud (C-H type) are used with two layers of 5/8-inch fire resistant gypsum wall board on one side and 1-inch shaft liner on other side.
Drywall Modifications are as follows:
5/8-inch water resistant drywall is used in restrooms.
5/8-inch cement board is used in parts of rooms with showers and under ceramic tile.
5/8-inch impact resistant drywall is used in all corridors.
Walls surrounding conference rooms and classrooms is comprised of 3 5/8-inch metal studs, with 1 layer of gypsum wall board on one side and 2 layers of gypsum wall board on the other side, extending from slab to slab. Walls contain 4-inch sound attenuation batts, and continuous acoustical sealant is used. A minimum STC of 45 is provided for office suites; A minimum STC of 50 is provided for rooms with amplified sound. ie. with Video Teleconferencing equipment (VTC).
One-hour fire-rated construction walls are used around vertical circulation elements (i.e. stairs, and elevator shafts) on all levels in the building. The wall design is based on the UL U415 test number, consisting of two layers of 5/8-inch type X gypsum wall board, a 4-inch C-H stud (25 gauge 24-inches on center) and 1-inch shaft liner on the shaft side.
All shaft walls are designed and coordinated with structural framing to meet progressive collapse requirements as stated in the structural requirements.
Doors are solid core flush wood doors in hollow metal frames. Fire rated doors and frames are used where required by code. Hardware typically consists of butt hinges, lockset, wall stop, closers at suite entrance doors and fire doors.
Key card access is required into all suites and doors leading from stairwells into the floors they serve (including roof).
Interiors doors and their frames maintain the STC rating of the walls in which they are placed. Ratings for acoustic doors will be based on manufacturer field tested values.
3.15
Stair construction is concrete filled metal pan on steel channel stringers.
Interior Finishes and Furnishings
Carpet tile is used throughout the office area with one-to-one positioning tabs to maintain alignment with the raised floor panels. Accent tiles are used for visual interest and to help locate electrical and data hubs under the access floor. Corridors on first floor have porcelain tile and Break Area and have resilient vinyl tile. All walls are painted except as noted. Conference rooms have carpet flooring and painted walls. Whisper zones have a separate carpet pattern to identify the spaces as needed throughout the building.
Raised access flooring will be 24-inch x 24-inch, 18-inches tall and will be provided throughout most of Level 2 and
Level 3 along with demountable partition walls for flexibility to reconfigure the space in the future. The demountable partitions are in a variety of finishes from laminate panels and wall coverings as needed for each space function. The walls have glass panel inserts to allow natural light into the interior of the space.
One 4000-pound machine room less hydraulic passenger elevator with 8-foot tall doors will be provided. The elevator has removable wall pads and stainless-steel doors, frames, hall call and monitor stations, elevator car front and code required safety features. Interior elevator finishes are stainless steel, flooring with luxury vinyl tile as specified.
Finish carpentry in the Break Areas and Wellness Room will be plastic laminate and countertops will be solid surface.
Each Conference Room and Classroom has multiple marker board track system with tack board to cover classified information. The boards will be in lengths to fit the spaces. All markerboards in the facility are this track system for security of classified information.
Storage shelving located in the personnel and team cages is pre-manufactured metal shelving units and provided as part of the Furniture, Fixtures and Equipment (FF&E) package.
Signage, as stated earlier, will be durable and interchangeable and is provided throughout the interior of the building.
Break Area and Wellness Room appliances are provided and specified in Specification section 11 31 13.
3.3 STRUCTURAL
The BOF is a rectangular shaped three-story building. The exterior walls consist of non-load bearing precast architectural panels at the Level 1 and metal panel at each level above.
3.3.1 General Parameters
The BOF structural framing system is composed of conventional steel framing with in-fill non-load bearing metal stud framing. The floor construction type is steel frame with elevated reinforced concrete floors supported by composite beams. The roof consists of metal deck roofing system supported by steel bar joists and supplementary beams at cantilever conditions. Level 1 will be reinforced concrete slab-on-grade, vapor barrier, and granular base. The foundation level consists of column supporting spread footings bearing on aggregate piers as recommended by the geotechnical report.
STRUCTURAL INTERIOR FINISH BOARDS
Battalion Operations Facility PN 91018 / P2 477925
Humphrey’s Engineer Center, Alexandria, Virginia
SDT-01 Static Control Tile
Roppe
ESD Vinyl Static Control Tile –
Cumulus White
LVT-01 Luxury Vinyl Tile
Shaw Contract
Tire Swing #93520
CPT-01 Carpet Tile
J&J Flooring
Revue II – Atticus 2252
CPT-02 Carpet Tile
J&J Flooring
One Good Turn – Turn the Tables 2463
T-01 Porcelain Floor Tile /
TB-01 Base Tile
Daltile
Dignitary - Superior Taupe
DR08
T-02 Porcelain Floor Tile /
TB-02 Base Tile
Caesar Ceramics USA
Origin – Artic
T-03 Porcelain Tile
Daltile
Fabric Art – Modrn Linr Taupe ML62
LVT-02 Luxury Vinyl TIle
Shaw Contract
Joy Squared – Carousel
CPT-03 Carpet Tile
J&J Flooring
Revue - Scarlet
STRUCTURAL INTERIOR FINISH BOARDS
Battalion Operations Facility PN 91018 / P2 477925
Humphrey’s Engineer Center, Alexandria, Virginia
PL-02 Plastic Laminate
Wilsonart
Silver Oak Ply 8203K-28
PL-01 Plastic Laminate
Formica
Citadel Wrap 5882-58
SS-01 Quartz Stone
Cambria
Dunmore
PL-03 Plastic Laminate
Formica
Folkstone 927-58
GT-01 Grout
Custom Building Products
Graystone 542
SS-02 Quartz Stone
Cambria
Newport Matte
GT-02 Grout
Custom Building Products
Oyster Gray 386
PT-01 Wall Paint – Eggshell
PT-02 Ceiling Paint - Flat
Sherwin Williams
Snowbound SW7004
RB-01 Floor Base /
ST-01 Stair Tread
Roppe
Creekbed, 640
ST-02 Stair Tread – Rubber Insert
Roppe
TT-Brown
DIVIDER 2
T
UP
UP
ALIGN
ALIGN
ALIGN
A L
IG
N
ALIGN
ALIGN
ALIGN
ALIGN
ALIGN
ALIGN
ALIGN ALIGN
ALIGN
A L
IG
N
A
A E
GCBA
GSB (STE) 3 BAY
GARAGE
GSB FCC
LOGISTICS AREA
& SECURE
LOADOUT
LOADOUT
GSB FCC
MISSION
SUPPORT
DMARC125
FCO TEAM CAGE
GSB MISSION
TEAM CAGE
FCO TEAM CAGE
FCO TEAM CAGE
EL-1
ELEVATOR
ENTRY
VESTIBULE
COLLATERAL
FIRE
ELECTRICAL
CONFERENCE
MEETING AREA
A
A E
G1
AE201
PERSONAL
CAGES
S-1
STAIR 1
C O
R R
ID
O
R
WELLNESS
JC133
CORRIDOR
S4 STORAGE
STORAGE
E
ELEVATOR
LOBBY
S-2
STAIR 2
A1
AE301
A1
AE301
A1
AE302
A1
AE302
A1
AE303
A1
AE303
H1
AE301
H1
AE301
G1
AE302
G1
AE302
H1
AE303
H1
AE303
H1
AE304
H1
AE304
A1
AE304
A1
AE304
WOMEN
MEN
RECEPTION
AREA110
SALLY PORT
S-2A
A
C
B
A
110B
110A
109A
110D
110C
126B
C
S -1
A
B
133A
128A
B
S -1
B
B
A
B
A
127B
C
129A
B.5 F
3.5
2.3
CORRIDOR
D
2.5
2.6
FCO TEAM CAGE
CORRIDOR
CORRIDOR
C O
R R
ID
O
R
1'-8" 21'-8" 42'-6" 16'-7" 19'-4" 7'-5" 13'-1" 11'-8" 5'-4" 10'-1" 2'-4" 2'-4" 19'-4" 1'-8"
AE403
A2
AE401
A2
AE407
H2
AE406
A8
MECHANICAL
TR
B.6
3.6
C.8 E.5D.8B3
E Q
E Q
20'-4" 11'-1" 7'-2" 1'-9"
13'-8" 21'-7" 9'-3" 16'-9" 9'-5" 12'-3" 18'-4" 7'-8" 22'-5" 1'-8"
175'-0"
13'-2"
1'-8"
MECHANICAL
YARD
COOLING TOWER
CONDENSING
UNITS
GENERATOR
175'-0"
LINE OF OVERHANG ABOVE
9'-4"
METAL STORAGE CAGE PER MIL-M-17194,
TYP AT FCO TEAM CAGES, STORAGE 134,
AND GSB MISSION TEAM CAGE 120
59 PERSONAL CAGES
107A
SF4
A
B
100D
100C
SF1
S F
6-TIER LOCKERS,
TYP OF 7
AE409
A1
AE409
J7
AE409
A7
F.3
2.8
11A
11A
11A
11A
11A 11A 11A
11A
11A
11A
11A
11A
11A 11A
11A
12A
12A
12A
12A
13A
12A
1A
13A
11A
11A
13B
1A
1A
1A
1A
1A
1A
12A 12A
1A
1A
1A
1A
1A
1A
1C
1A
1A
1A
6A
6A
6A
6A
6B
1A
10'-0" WIDE ORNAMENTAL FENCE GATE
7'-0" TALL ORNAMENTAL FENCE
DOWNSPOUT AND BOOT,
TYP OF 4 ON THIS FACADE
DOWNSPOUT AND
BOOT , TYP 3 ON
THIS FACADE
AE603
A14
AE603
A14
AE501
K2 TYP
10'-0" WIDE
ORNAMENTAL
FENCE GATE
AE501
F14
AE501
F8
AE501
A8
AE501
F2
AE510
H14
AE510
H8
AE510
A1
ELECTRICAL
2'-4"
AE510
A14
AE511
F7
AE510
A8
11A
11A
1'-0"
MIN
1'-0"
AE502
H1
AE511
A7
AE502
H7
5 PERSONAL CAGES
7'-5" 13'-3"
8'-9" 4'-6"
1'-9" 1'-3"
5'-0" 2'-11" 12'-7"
5'-8" 5'-8"
8"
11'-0"
2'-8"
10'-7"
5'-7"
15'-8"
13A
10'-4"
13'-5" 15'-9" 9'-7" 2'-0"
13A
AE511
F13
AE511
A13
1A
AE510
H8
AE510
H8
1A
1A
1A
" 1'-6"
9'
0" T
Y P
21'-7"
3'-4"
9" 10'-5"
1A1A
4'-1"
9"
EQ EQ
" 8
E Q
E Q
1'-9"
23'-5"
3'-0" WIDE ORNAMENTAL
FENCE GATE W/ PANIC
HARDWARE
FOR FENCE/GATE DETAILS
AE501
K14
SIM
NO R-FOIL
REFER TO SHEET AE413
AE501
A14
SIM
MAINTENANCE ACCESS ROAD
LINE OF CONCRETE
PAVEMENT, SEE CIVIL
C O
N C
R E
T E
P A
V E
M E
N T
S
E E
C
IV
IL
FLOOR DRAIN,
SEE PLUMB
BOLLARDS,
TYP OF 4
BOLLARDS,
TYP OF 2
1'-0"
5'-2"
G1
AE202
/8
" 1
"1
SIM
COORDINATE OVERHEAD
UTILITIES WITH CAR LIFT.
UTILITIES TO AVOID CAR
LIFT AREA
AE603
A6
AE603
A6
1. UNLESS NOTED OTHERWISE, ALL
DIMENSIONS ARE TO:
- FACE OF GWB
- FACE OF CONCRETE
- CENTERLINE OF DEMOUNTABLE
PARTITIONS
2. SEE MECHANICAL, ELECTRICAL,
PLUMBING, AND FIRE PROTECTION
(M.E.P.) DRAWINGS AND ENLARGED
ARCHITECTURAL PLANS FOR
INFORMATION NOT SHOWN ON THIS
SHEET.
3. COORDINATE AND PROVIDE
BLOCKING IN PARTITIONS FOR THE
INSTALLATION AND ATTACHMENT
OF ALL WALL MOUNTED EQUIPMENT
AND PRODUCTS. ALL CONCEALED
BLOCKING SHALL BE FIRE
RETARDENT TREATED. SEE
ARCHITECTURAL PLANS, AND MEP
AND AV DRAWINGS FOR THE
LOCATIONS OF WALL MOUNTED
EQUIPMENT AND PRODUCTS.
4. WHISPER ZONES AS SHOWN ON
PLAN SHALL BE DESIGNATED WITH
WALL SIGNAGE OR FLOOR
MARKINGS. THESE ZONES WILL BE
NO DISCUSSION ZONES WHERE NO
CONVERSATIONS DEALING WITH
CLASSIFIED INFORMATION WILL BE
ALLOWED.
5. SEE SHEETS AE701-AE703 FOR
INTERIOR PARTITION TYPES
6. SECURE BORDER WALLS TO BE
ICD/ICS-705 AND UFC 4-010-05
COMPLIANT. CONTRACTOR TO
MEET ALL RELEVANT
REQUIREMENTS FOR
ACCREDITATION.
GENERAL NOTES
RAISED ACCESS FLOOR
WALK OFF MAT
(FLOOR GRILLE)
WHISPER ZONE
SECURE BOUNDARY
FLOOR PLAN LEGEND
XX#
WINDOW, CURTAINWALL,
STOREFRONT TAG. SEE
AE602
12 WALL TYPE TAG
FLOOR DRAIN, SEE
PLUMB DRAWINGS
TAPERED INSULATION,
SEE ROOF PLAN
J
O N
E S
F R
A N
K L
IN
R
D
S U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
4' 8' 16'
PROJECT
NORTH
TRUE
NORTH
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M A
R Y
L A
N D
F
IL
E N
A M
E
CONTROLLED UNCLASSIFIED INFORMATION
X X
X -X
X X
-X X
X
X X
X -X
X X
-X X
X
B
C
D
E
F
G
H
J
K
L
M
N
P
11 12 13 14 15 16 17 18 19 20
D R
A W
IN
G
N O
F
-2
-1
PROPERTY OF UNITED STATES GOVERNMENT, CONTROLLED UNCLASSIFIED INFORMATION (CUI), DISSEMINATION, AND DISTIBUTION TO AUTHORIZED INDIVIDUALS PROHIBITED
AE101
F L O
O R
P L A
N
L E
V E
L
H U
M P
H R
E Y
S E
N G
IN
E
E R
C E
N T
E R
A
L E
X A
N D
R
IA
V
IR
G
IN
IA
P Z
O O
K
IB
U
S T
A M
A N
T E
W B
Y N
U M
M B
O W
L E
S
O
C T
O B
E R
A E
.D
W G
B A
T T
A L
IO
N O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
P N
P
1/8" = 1'-0" A1
FLOOR PLAN - LEVEL 1
GROSS BUILDING SF
LEVEL AREA
LEVEL 1 17500.00 SF
LEVEL 2 12800.00 SF
LEVEL 3 12800.00 SF
TOTAL 43100.00 SF
DN
UP
DN
UP
A L
IG
N
A L
IG
N
ALIGN
GCBA
FCC LAB
EL-1
ELEVATOR
G1
AE202
A
A E
G1
AE201
WOMEN 205
TR
MECHANICAL
S-1
STAIR 1
FARADAY CAGE
IT/COMMS
STORAGE
OPEN OFFICE
FCC TEAM 2
FCC TEAM 1
FCC TEAM 3
FCC TEAM 4
BREAK AREA
CORRIDOR
MEN
CONFERENCE
ROOM
O4 PRIVATE
OFFICE
E
O4 PRIVATE
OFFICE
UPS
FCC CUBES
O4 PRIVATE
OFFICE
S-2
STAIR 2
A1
AE301
A1
AE301
A1
AE302
A1
AE302
A1
AE303
A1
AE303
H1
AE301
H1
AE301
G1
AE302
G1
AE302
H1
AE303
H1
AE303
H1
AE304
H1
AE304
A1
AE304
A1
AE304
SATELLITE PAD
B.5 F
3.5
2.3
S -2
B
203202
LOWER
ROOF
D
2.5
S -1
C
2.6
AE403
A8
AE401
A8
AE408
A1
AE406
G8
LOWER
ROOF
B.6
3.6
C.8 E.5D.8B3
20'-4" 11'-1" 7'-2" 1'-9" 13'-8" 21'-7" 9'-3" 16'-9" 9'-5" 12'-3" 18'-4" 7'-8" 22'-5" 6'-11"
160'-0"
4'-0" 4'-0" 16'-0" 4'-0" 8'-0" 4'-0" 8'-0" 4'-0" 8'-0" 4'-0" 8'-0" 4'-0" 8'-0" 4'-0" 8'-0" 4'-0" 8'-0" 4'-0" 16'-0" 4'-0" 8'-0" 20'-0"
124'-0" 36'-0"
A
A E
1'-9"
1'-9"
6'-11"
SF3
SF3
SF3 SF3 SF3 SF3
SF3 SF3 SF3 SF3
CW3
C W
S
F
S F
S
F
AE410
A4
AE410
K4
AE503
A5
AE604
F8
AE502
A7
AE604
F14
F.3
10'-4"19'-8"14'-4"8'-8"5'-0"5'-0"11'-0"
2.8
FLOOR
DRAIN
1B
1B 1B
1B
1B 1B
1B
1A
1A
10 10
12A 1A
1A
4B
1A
1A
4B
4B
12A
12A
12A
12A
DOWNSPOUT BELOW, TYP
GALV STL GUARDRAIL
A10
AE508
AE502
H14
AE502
A1
AE512
A8
AE413
F8
AE502
A14 SIM
COMSEC
AE512
A2
AE503
H12
AE512
A2
AE512
A2 AE512
A2
AE512
A2
AE512
A2
AE512
A2
AE512
A2
AE512
A8
AE512
A8
AE512
A8
AE512
A8
X-8
X-7
X-9
X-7
X-8
X-8
X-7
X-10
X-5
X-8
X-7
X-9
X-7
X-8
AE503
H5 10'-5" 2
3'-0"
11'-7"
4'-9" 18'-0" 3'-5"
8'-8"
1A
1A
9'-8" 2'-4"
8'-1"
AE512
A2
AE502
A1
8'-9"
5'-7"
EQ EQ
1'-3"
F
A E
AE413
F14_______
A10
AE508
BOUNDARY OF
FCC CUBES, FOR
REFERENCE ONLY
BOUNDARY OF
FARADAY CAGE,
FOR REFERENCE
ONLY
TYP
O4 PRIVATE
OFFICE
X-5
X-8
H10
AE508
TYP
H10
AE508
ELEVATED FLOOR AT TOILETS,
SEE STRUCTURAL
ELEVATED FLOOR AT
MECHANICAL, SEE STRUCTURAL 4
TYP
4'-0"
C-CHANNELS MOUNTED
TO PAD FOR SECURING
SATELLITES TO ROOF
TOP PAD
RAISED ACCESS FLOOR
WALK OFF MAT
(FLOOR GRILLE)
WHISPER ZONE
SECURE BOUNDARY
FLOOR PLAN LEGEND
XX#
WINDOW, CURTAINWALL,
STOREFRONT TAG. SEE
AE602
12 WALL TYPE TAG
FLOOR DRAIN, SEE
PLUMB DRAWINGS
TAPERED INSULATION,
SEE ROOF PLAN
J
O N
E S
F R
A N
K L
IN
R
D
S U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
4' 8' 16'
PROJECT
NORTH
TRUE
NORTH
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M A
R Y
L A
N D
F
IL
E N
A M
E
CONTROLLED UNCLASSIFIED INFORMATION
X X
X -X
X X
-X X
X
X X
X -X
X X
-X X
X
B
C
D
E
F
G
H
J
K
L
M
N
P
11 12 13 14 15 16 17 18 19 20
D R
A W
IN
G
N O
F
-2
-1
PROPERTY OF UNITED STATES GOVERNMENT, CONTROLLED UNCLASSIFIED INFORMATION (CUI), DISSEMINATION, AND DISTIBUTION TO AUTHORIZED INDIVIDUALS PROHIBITED
AE102
F L O
O R
P L A
N
L E
V E
L
H U
M P
H R
E Y
S E
N G
IN
E
E R
C E
N T
E R
A
L E
X A
N D
R
IA
V
IR
G
IN
IA
P Z
O O
K
IB
U
S T
A M
A N
T E
W B
Y N
U M
M B
O W
L E
S
O
C T
O B
E R
A E
.D
W G
B A
T T
A L
IO
N O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
P N
P
1/8" = 1'-0" A1
FLOOR PLAN - LEVEL 2
GROSS BUILDING SF
LEVEL AREA
LEVEL 1 17500.00 SF
LEVEL 2 12800.00 SF
LEVEL 3 12800.00 SF
TOTAL 43100.00 SF
REFER TO SHEET AE101
FOR GENERAL NOTES
NOTE: SEE IF201 - IF203 SHEETS FOR "X" WALL TYPES
A L
IG
N
GCBA
HHT PRIVATE
OFFICE
CG
CONFERENCE
ROOM
CONFERENCE
ROOM
CG PRIVATE
OFFICE
TOILET
CG PRIVATE
OFFICE
CG PRIVATE
OFFICE
G1
AE202
A
A E
G1
AE201
EL-1
ELEVATOR
MEN
WOMEN
MECHANICAL
TR
G4 PRIVATE
OFFICE 324
G4 PRIVATE
OFFICE
SPO PRIVATE
OFFICE
SPO PRIVATE
OFFICE
S3 PRIVATE
OFFICE 320
S3 PRIVATE
OFFICE
BREAK AREA
PSYCH OFFICE
SCT SERVICE
AREA
CLASSROOM
CHAPLAIN
OFFICE
CG PRIVATE
OFFICE
E
WAITING AREA
S4 CUBES
OPEN OFFICE
AREA
S-2
STAIR 2
S-1
STAIR 1
A1
AE301
A1
AE301
A1
AE303
A1
AE303
H1
AE301
H1
AE301
G1
AE302
G1
AE302
H1
AE303
H1
AE303
H1
AE304
H1
AE304
A1
AE304
A1
AE304
B.5 F
3.5
2.3
A
313318
S-2C
312B
A
B
D
2.5
2.6
CORRIDOR
AE403
A15
AE401
A13AE406
G8 SIM
AE408
A1 SIM
AE407
A2
EXTERIOR PATIO
B.6
3.6
C.8 E.5D.8B3
A
A E
20'-4" 11'-1" 7'-2" 1'-9" 13'-8" 21'-7" 9'-3" 16'-9" 9'-5" 12'-3" 18'-4" 7'-8" 22'-5"
160'-0"
20'-0"8'-0"4'-0"16'-0"4'-0"8'-0"4'-0"8'-0"4'-0"8'-0"4'-0"8'-0"4'-0"8'-0"4'-0"8'-0"4'-0"8'-0"4'-0"16'-0"4'-0"4'-0"
1'-9"
6'-11" 16'-0"4'-0"
1'-9"
11"
S -1
D
317 314
SF3 SF3 SF3 SF3 SF3 SF3 SF3 SF3 SF3 SF3
C W
S
F
S F
S
F
CW3
AE411
A12
AE411
H12
AE504
G3
AE504
G13
AE504
A3
F.3
2.8
FLOOR
DRAIN
1D
12A
12A
1B 1B 1B
1B
1B 1B
1B
1A
1A
12A
12A 1A
1A
1B
1B 1B
1A
1A
1A
1A
1A
1A
160'-0"
AE512
F14
AE512
F8
AE504
A13
AE502
A1
AE503
A12
2'-4"
307A
ELECTRICAL
307A
ROOF ACCESS
16'-1"
6'-0" 8'-1"
11" 11"
17'-0" 17'-0"
11"
4A4A4A
AE512
A2
4A
4A
14'-0" 9'-8" 4'-4"
X-5
X-5 X-8
X-10
X-5 X-7
X-5
X-10
X-5
AE512
A8
AE512
A8
AE512
A8
AE512
A8
1'-7"
4A4A
4A
AE512
A2
11" 11"
4A
4A
4A
AE512
A2
12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 11'-5" 7"
X-5
X-7
X-7
X-7
X-7
X-7X-7
X-7
2'-6" 11'-0" 5'-0" 5'-0" 8'-8" 14'-4" 19'-8" 10'-4"
10'-5"
EQEQ
1A1A
AE503
A5 SIM
AE503
H5 SIM
2" CONCRETE PAVERS ON
LEVELING PEDESTALS,
ALIGN WITH METAL PANEL
REVEALS.
A10
AE508
A4
AE508
AE103
L13
ELEVATED FLOOR AT
TOILETS, SEE STRUCTURAL
ELEVATED FLOOR AT
MECHANICAL, SEE STRUCTURAL
ELEVATED
FLOOR AT
TOILET, SEE
STRUCTURAL
3/4"
3/4"
F A
C E
O F
S T
U D
/4
FACE OF STUD
1'-3 1/2"
A
A E
AE506
A3
G11
AE506
AE506
A11
LOW
HIGH
INTERNAL ROOF DRAIN &
OVERFLOW ROOF DRAIN
UNDERNEATH PAVERS
F1
AE203
RAISED ACCESS FLOOR
WALK OFF MAT
(FLOOR GRILLE)
WHISPER ZONE
SECURE BOUNDARY
FLOOR PLAN LEGEND
XX#
WINDOW, CURTAINWALL,
STOREFRONT TAG. SEE
AE602
12 WALL TYPE TAG
FLOOR DRAIN, SEE
PLUMB DRAWINGS
TAPERED INSULATION,
SEE ROOF PLAN
3.5
A4
AE508
CHAPLAIN
OFFICE
PSYCH OFFICE
CENTERLINE OF
DEMOUNTABLE PARTION, TYP
5/8" GYPSUM WALL BOARD,
2 1/2" CFMF, SOUND
ATTENUATION INSULATION
BELOW RAISED ACCESS,
TYP
6" TYP 6" TYP
1A
TYP
J
O N
E S
F R
A N
K L
IN
R
D
S U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
4' 8' 16'
PROJECT
NORTH
TRUE
NORTH
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M A
R Y
L A
N D
F
IL
E N
A M
E
CONTROLLED UNCLASSIFIED INFORMATION
X X
X -X
X X
-X X
X
X X
X -X
X X
-X X
X
B
C
D
E
F
G
H
J
K
L
M
N
P
11 12 13 14 15 16 17 18 19 20
D R
A W
IN
G
N O
F
-2
-1
PROPERTY OF UNITED STATES GOVERNMENT, CONTROLLED UNCLASSIFIED INFORMATION (CUI), DISSEMINATION, AND DISTIBUTION TO AUTHORIZED INDIVIDUALS PROHIBITED
AE103
F L O
O R
P L A
N
L E
V E
L
H U
M P
H R
E Y
S E
N G
IN
E
E R
C E
N T
E R
A
L E
X A
N D
R
IA
V
IR
G
IN
IA
P Z
O O
K
IB
U
S T
A M
A N
T E
W B
Y N
U M
M B
O W
L E
S
O
C T
O B
E R
A E
.D
W G
B A
T T
A L
IO
N O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
P N
P
1/8" = 1'-0" A1
FLOOR PLAN - LEVEL 3
GROSS BUILDING SF
LEVEL AREA
LEVEL 1 17500.00 SF
LEVEL 2 12800.00 SF
LEVEL 3 12800.00 SF
TOTAL 43100.00 SF
REFER TO SHEET AE101
FOR GENERAL NOTES
NOTE: SEE IF201 - IF203 SHEETS FOR "X" WALL TYPES
1/8" = 1'-0" L13
FLOOR PLAN - CHAPLAIN & PSYCH OFFICE -
BELOW ACCESS FLOOR
DIVIDER 3
GSB (STE) 3 BAY
GARAGE
GSB FCC
LOGISTICS AREA
& SECURE
LOADOUT
LOADOUT
GSB FCC
MISSION
SUPPORT
DMARC
FCO TEAM CAGE
GSB MISSION
TEAM CAGE
FCO TEAM CAGE
FCO TEAM CAGE
EL-1
ELEVATOR
ENTRY
VESTIBULE
CORRIDOR
COLLATERAL
FIRE
ELECTRICAL
CONFERENCE
MEETING AREA
PERSONAL
CAGES
S-1
STAIR 1
CORRIDOR
WELLNESS
JC
CORRIDOR
S4 STORAGE
STORAGE
BBF
FF 2DR
MEN
WOMEN
CORRIDOR
S-2
STAIR 2
SALLY PORT
CORRIDOR
RECEPTION
AREA115
ELEVATOR
LOBBY
CORRIDOR
MECHANICAL
TR
FCO TEAM CAGE
J
O N
E S
F R
A N
K L
IN
R
D
S U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
4' 8' 16'
PROJECT
NORTH
TRUE
NORTH
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M A
R Y
L A
N D
F
IL
E N
A M
E
CONTROLLED UNCLASSIFIED INFORMATION
X X
X -X
X X
-X X
X
X X
X -X
X X
-X X
X
B
C
D
E
F
G
H
J
K
L
M
N
P
11 12 13 14 15 16 17 18 19 20
D R
A W
IN
G
N O
F
-2
-1
PROPERTY OF UNITED STATES GOVERNMENT, CONTROLLED UNCLASSIFIED INFORMATION (CUI), DISSEMINATION, AND DISTIBUTION TO AUTHORIZED INDIVIDUALS PROHIBITED
IF201
L E
V E
L
D E
M O
U N
T A
B L E
W A
L L S
P L A
N
H U
M P
H R
E Y
S E
N G
IN
E
E R
C E
N T
E R
A
L E
X A
N D
R
IA
V
IR
G
IN
IA
L B
A R
N A
R D
A V
E G
A
W B
Y N
U M
J C
A R
T E
R
O
C T
O B
E R
IF
.D
W G
B A
T T
A L
IO
N O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
P N
P
1/8" = 1'-0" C2
LEVEL 1 DEMOUNTABLE WALLS PLAN
10/22/21
T
T
T
T
T
T
T
T
T
T
C
TT
T
J
EQ T
T
VS
EQ
EQ
EQ
T
O S
ESS
D
DD
TV
D D
3D3
D D
D D
VS
TV
T V
VS VS
D
T
EQT
TV
FCC TEAM 2
FCC TEAM 1
BREAK AREA
FCC TEAM 3
FCC TEAM 4
WOMEN
MEN
MECHANICAL
EL-1
ELEVATOR
OPEN OFFICE
FCC LAB
STORAGE
IT/COMMS
FARADAY CAGE
O4 PRIVATE
OFFICE
CONFERENCE
ROOM
O4 PRIVATE
OFFICE
O4 PRIVATE
OFFICE
UPS
TR
FCC CUBES
CORRIDOR
S-1
STAIR 1
S-2
STAIR 2 X-8
X-9
X-8X-7
X-8
X-7
X-5
X-10
X-8
X-7
X-9
X-9 X-7
X-7
COMSEC
O4 PRIVATE
OFFICE
X-5
X-8
X-8
WALL TYPE LEGEND
• SEE SPECIFICATIONS FOR
DEMOUNTABLE WALLS IN FF&E
PACKAGE FOR FURTHER DETAILS
LAMINATE EXTERIOR AND
INTERIOR W/ GLASS
X-5
LAMINATE EXTERIOR W/
FABRIC INTERIOR
X-7
FABRIC EXTERIOR AND
INTERIOR
X-8
LAMINATE EXTERIOR,
FABRIC INTERIOR W/ GLASS
X-9
LAMINATE EXTERIOR AND
INTERIOR
X-10
1. SEE SHEETS E-001 - E-002 FOR
ELECTRICAL ABBRVIATIONS AND
SYMBOL LEGENDS.
2. REFER TO SHEET IF400 FOR
DEMOUNTABLE WALL TYPE
ELEVATIONS.
GENERAL NOTES
J
O N
E S
F R
A N
K L
IN
R
D
S U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
4' 8' 16'
PROJECT
NORTH
TRUE
NORTH
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M A
R Y
L A
N D
F
IL
E N
A M
E
CONTROLLED UNCLASSIFIED INFORMATION
X X
X -X
X X
-X X
X
X X
X -X
X X
-X X
X
B
C
D
E
F
G
H
J
K
L
M
N
P
11 12 13 14 15 16 17 18 19 20
D R
A W
IN
G
N O
F
-2
-1
PROPERTY OF UNITED STATES GOVERNMENT, CONTROLLED UNCLASSIFIED INFORMATION (CUI), DISSEMINATION, AND DISTIBUTION TO AUTHORIZED INDIVIDUALS PROHIBITED
IF202
L E
V E
L
D E
M O
U N
T A
B L E
W A
L L S
P L A
N
H U
M P
H R
E Y
S E
N G
IN
E
E R
C E
N T
E R
A
L E
X A
N D
R
IA
V
IR
G
IN
IA
L B
A R
N A
R D
A V
E G
A
W B
Y N
U M
J C
A R
T E
R
O
C T
O B
E R
IF
.D
W G
B A
T T
A L
IO
N O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
P N
P
1/8" = 1'-0" C2
LEVEL 2 DEMOUNTABLE WALLS PLAN
TTT
T
T
T
TTT
T T
T
C
CC
OS
D
D
D
EQ
VSVSVSVSVS
V S
EQ
EQ
EQ
EQ
V S
V S
T
TV
TV
T V
T V
TVTV
D
3D
D
D
D
ESS
T V
T V
T V
T V
VSVS
V S
V S
3D3D
J
D
EQ
T V
T V
BREAK AREA
MEN
WOMEN
TR
MECHANICAL
EL-1
ELEVATOR
S4 CUBES
CLASSROOM
CG PRIVATE
OFFICE
TOILET
CG PRIVATE
OFFICE
CG
CONFERENCE
ROOM
CONFERENCE
ROOM
HHT PRIVATE
OFFICE
S3 PRIVATE
OFFICE
S3 PRIVATE
OFFICE
SPO PRIVATE
OFFICE
SPO PRIVATE
OFFICE
G4 PRIVATE
OFFICE
G4 PRIVATE
OFFICE
SCT SERVICE
AREA
OPEN OFFICE
AREA
CHAPLAIN
OFFICE
WAITING AREA
CG PRIVATE
OFFICE317
PSYCH OFFICE
CG PRIVATE
OFFICE
BBF
FF
EXTERIOR PATIO
S-1
STAIR 1
S-2
STAIR 2
CORRIDOR
X-7
X-7
X-7
X-7 X-7
X-5
X-7 X-7
X-5
X-10
X-5
X-5
X-7
X-10 X-5
X-8
WALL TYPE LEGEND
• SEE SPECIFICATIONS FOR
DEMOUNTABLE WALLS IN FF&E
PACKAGE FOR FURTHER DETAILS
LAMINATE EXTERIOR AND
INTERIOR W/ GLASS
X-5
LAMINATE EXTERIOR W/
FABRIC INTERIOR
X-7
FABRIC EXTERIOR AND
INTERIOR
X-8
LAMINATE EXTERIOR,
FABRIC INTERIOR W/ GLASS
X-9
LAMINATE EXTERIOR AND
INTERIOR
X-10
1. SEE SHEETS E-001 - E-002 FOR
ELECTRICAL ABBRVIATIONS AND
SYMBOL LEGENDS.
2. REFER TO SHEET IF400 FOR
DEMOUNTABLE WALL TYPE
ELEVATIONS.
GENERAL NOTES
J
O N
E S
F R
A N
K L
IN
R
D
S U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
4' 8' 16'
PROJECT
NORTH
TRUE
NORTH
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M A
R Y
L A
N D
F
IL
E N
A M
E
CONTROLLED UNCLASSIFIED INFORMATION
X X
X -X
X X
-X X
X
X X
X -X
X X
-X X
X
B
C
D
E
F
G
H
J
K
L
M
N
P
11 12 13 14 15 16 17 18 19 20
D R
A W
IN
G
N O
F
-2
-1
PROPERTY OF UNITED STATES GOVERNMENT, CONTROLLED UNCLASSIFIED INFORMATION (CUI), DISSEMINATION, AND DISTIBUTION TO AUTHORIZED INDIVIDUALS PROHIBITED
IF203
L E
V E
L
D E
M O
U N
T A
B L E
W A
L L S
P L A
N
H U
M P
H R
E Y
S E
N G
IN
E
E R
C E
N T
E R
A
L E
X A
N D
R
IA
V
IR
G
IN
IA
L B
A R
N A
R D
A V
E G
A
W B
Y N
U M
J C
A R
T E
R
O
C T
O B
E R
IF
.D
W G
B A
T T
A L
IO
N O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
P N
P
1/8" = 1'-0" C2
LEVEL 3 DEMOUNTABLE WALLS PLAN
DIVIDER 4
SOLID FASCIA
BASE FASCIA
SINGLE GLASS
FASCIA
LAMINATE FASCIA
SOLID FASCIA
BASE FASCIA
SINGLE GLASS
FASCIA
LAMINATE FASCIA
INTERIOR EXTERIOR
SOLID FASCIA
BASE FASCIA
LAMINATE FASCIA
SOLID FASCIA
BASE FASCIA
FABRIC FASCIA
INTERIOR EXTERIOR
SOLID FASCIA
BASE FASCIA
FABRIC FASCIA
SOLID FASCIA
BASE FASCIA
FABRIC FASCIA
INTERIOR EXTERIOR
SOLID FASCIA
BASE FASCIA
SINGLE GLASS
FASCIA
LAMINATE FASCIA
SOLID FASCIA
BASE FASCIA
SINGLE GLASS
FASCIA
FABRIC FASCIA
INTERIOR EXTERIOR
SOLID FASCIA
BASE FASCIA
LAMINATE FASCIA
SOLID FASCIA
BASE FASCIA
LAMINATE FASCIA
INTERIOR EXTERIOR
1. SEE FURNITURE, FIXTURES, AND
EQUIPMENT PACKAGE FOR
SPECIFICATION DETAILS.
GENERAL NOTES
J
O N
E S
F R
A N
K L
IN
R
D
S U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M A
R Y
L A
N D
F
IL
E N
A M
E
CONTROLLED UNCLASSIFIED INFORMATION
X X
X -X
X X
-X X
X
X X
X -X
X X
-X X
X
B
C
D
E
F
G
H
J
K
L
M
N
P
11 12 13 14 15 16 17 18 19 20
D R
A W
IN
G
N O
F
-2
-1
PROPERTY OF UNITED STATES GOVERNMENT, CONTROLLED UNCLASSIFIED INFORMATION (CUI), DISSEMINATION, AND DISTIBUTION TO AUTHORIZED INDIVIDUALS PROHIBITED
IF400
D E
M O
U N
T A
B L E
W A
L L E
L E
V A
T
IO
N S
H U
M P
H R
E Y
S E
N G
IN
E
E R
C E
N T
E R
A
L E
X A
N D
R
IA
V
IR
G
IN
IA
L B
A R
N A
R D
A V
E G
A
W B
Y N
U M
J C
A R
T E
R
O
C T
O B
E R
IF
.D
W G
B A
T T
A L
IO
N O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
P N
P
3/8" = 1'-0" K2
X-5 TYPICAL DEMOUNTABLE WALL ELEVATION
3/8" = 1'-0"
K9
X-7 TYPICAL DEMOUNTABLE WALL ELEVATION
3/8" = 1'-0" K15
X-8 TYPICAL DEMOUNTABLE WALL ELEVATION
3/8" = 1'-0" E2
X-9 TYPICAL DEMOUNTABLE WALL ELEVATION
3/8" = 1'-0"
E9
X-10 TYPICAL DEMOUNTABLE WALL ELEVATION
DIVIDER 5
J
O N
E S
F R
A N
K L
IN
R
D
S U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M A
R Y
L A
N D
F
IL
E N
A M
E
CONTROLLED UNCLASSIFIED INFORMATION
X X
X -X
X X
-X X
X
X X
X -X
X X
-X X
X
B
C
D
E
F
G
H
J
K
L
M
N
P
11 12 13 14 15 16 17 18 19 20
D R
A W
IN
G
N O
F
-2
-1
PROPERTY OF UNITED STATES GOVERNMENT, CONTROLLED UNCLASSIFIED INFORMATION (CUI), DISSEMINATION, AND DISTIBUTION TO AUTHORIZED INDIVIDUALS PROHIBITED
I-601
IN
T
E R
IO
R
R O
O M
F
IN
IS
H
S C
H E
D U
L E
H U
M P
H R
E Y
S E
N G
IN
E
E R
C E
N T
E R
A
L E
X A
N D
R
IA
V
IR
G
IN
IA
L B
A R
N A
R D
A V
E G
A
W B
Y N
U M
J C
A R
T E
R
O
C T
O B
E R
I- .D
W G
B A
T T
A L
IO
N O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
P N
P
ROOM FINISH SCHEDULE
# NAME
FLOOR
FINISH
FLOOR
GROUT
WALL FINISHES WALL
GROUT
WALL
BASE CEILING
MILLWORK
MISCNORTH EAST SOUTH WEST COUNTER CABINETS
217 FCC CUBES CPT-01 - - - PT-01 - - - - - - PT-01 - - - RB-01 ACT-1 - - - - - - - - -
218 O4 PRIVATE OFFICE CPT-02 - - - PT-01 PT-01 - - - - - - - - - RB-01 ACT-1 - - - - - - - - -
219 CONFERENCE ROOM CPT-02 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 ACT-1 - - - - - - - - -
220 O4 PRIVATE OFFICE CPT-02 - - - - - - PT-01 - - - - - - - - - RB-01 ACT-1 - - - - - - - - -
221 O4 PRIVATE OFFICE CPT-02 - - - PT-01 - - - - - - - - - - - - RB-01 ACT-1 - - - - - - - - -
222 COMSEC CPT-02 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 ACT-1 - - - - - - - - -
223 O4 PRIVATE OFFICE CPT-02 - - - PT-01 PT-01 - - - - - - - - - RB-01 ACT-1 - - - - - - - - -
LEVEL 3
301 BREAK AREA LVT-01 - - - PT-01 PT-01 - - - PT-01 - - - RB-01 ACT-1 SS-01 PL-01 - - -
302 MEN T-02 GT-02 T-03 T-03 T-03 T-03 GT-02 TB-02 GWB-2/PT-02 SS-02 PL-03 - - -
303 WOMEN T-02 GT-02 T-03 T-03 T-03 T-03 GT-02 TB-02 GWB-2/PT-02 SS-02 PL-03 - - -
304 MECHANICAL SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
305 TR SDT-01 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
306 CORRIDOR CPT-01 - - - - - - PT-01 - - - - - - - - - RB-01 ACT-1 - - - - - - - - -
307 S4 CUBES CPT-01 /
CPT-03
PT-01 PT-01 - - -
PT-01 - - - RB-01
ACT-1 - - - - - - - - -
307A ELECTRICAL SDT-01 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
308 CLASSROOM CPT-02 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 ACT-1 - - - - - - - - -
309 CG PRIVATE OFFICE CPT-02 - - - PT-01 PT-01 - - - - - - - - - RB-01 ACT-1 - - - - - - - - -
310 CG PRIVATE OFFICE CPT-02 - - - - - - PT-01 PT-01 - - - - - - RB-01 ACT-1 - - - - - - - - -
311 TOILET T-02 GT-02 PT-01 PT-01 PT-01 T-03 GT-02 TB-02 GWB-2/PT-02 SS-02 PL-03 - - -
312 CG PRIVATE OFFICE CPT-02 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 ACT-1 - - - - - - - - -
313 CG CONFERENCE ROOM CPT-02 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 ACT-1 - - - - - - - - -
314 CG PRIVATE OFFICE CPT-02 - - - - - - - - - PT-01 - - - - - - RB-01 ACT-1 - - - - - - - - -
315 WAITING AREA CPT-01 - - - - - - - - - - - - - - - - - - RB-01 ACT-1 - - - - - - - - -
316 CHAPLAIN OFFICE CPT-02 - - - - - - - - - - - - - - - - - - RB-01 ACT-1 - - - - - - - - -
317 PSYCH OFFICE CPT-02 - - - - - - - - - PT-01 - - - - - - RB-01 ACT-1 - - - - - - - - -
318 CONFERENCE ROOM CPT-02 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 ACT-1 - - - - - - - - -
319 HHT PRIVATE OFFICE CPT-02 - - - - - - PT-01 PT-01 - - - - - - RB-01 ACT-1 - - - - - - - - -
320 S3 PRIVATE OFFICE CPT-02 - - - - - - - - - PT-01 - - - - - - RB-01 ACT-1 - - - - - - - - -
321 S3 PRIVATE OFFICE CPT-02 - - - - - - - - - PT-01 - - - - - - RB-01 ACT-1 - - - - - - - - -
322 SPO PRIVATE OFFICE CPT-02 - - - - - - - - - PT-01 - - - - - - RB-01 ACT-1 - - - - - - - - -
323 SPO PRIVATE OFFICE CPT-02 - - - - - - - - - PT-01 - - - - - - RB-01 ACT-1 - - - - - - - - -
324 G4 PRIVATE OFFICE CPT-02 - - - - - - - - - PT-01 - - - - - - RB-01 ACT-1 - - - - - - - - -
325 G4 PRIVATE OFFICE CPT-02 - - - - - - - - - PT-01 - - - - - - RB-01 ACT-1 - - - - - - - - -
326 SCT SERVICE AREA CPT-01 - - - PT-01 - - - PT-01 - - - - - - RB-01 ACT-1 - - - - - - - - -
327 OPEN OFFICE AREA CPT-01 /
CPT-03
PT-01 - - - - - -
PT-01 - - - RB-01
ACT-1 - - - - - - - - -
328 EXTERIOR PATIO SC - - - - - - - - - - - - - - - - - - - - - GWB-2/PT-02 - - -
329 ROOF ACCESS SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
ROOM FINISH SCHEDULE
# NAME
FLOOR
FINISH
FLOOR
GROUT
WALL FINISHES WALL
GROUT
WALL
BASE CEILING
MILLWORK
MISCNORTH EAST SOUTH WEST COUNTER CABINETS
LEVEL 1
100 ENTRY VESTIBULE WOM-1 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 GWB-1/PT-02 - - - - - - - - -
101 CONFERENCE CPT-02 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 ACT-1 - - - - - - - - -
102 MEETING AREA CPT-02 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 ACT-1 - - - - - - - - -
103 JC T-01 GT-01 PT-01 PT-01 PT-01 PT-01 - - - TB-01 GWB-1/PT-02 - - - - - - - - -
104 WELLNESS T-02 GT-02 PT-01 PT-01 PT-01 PT-01 - - - TB-02 GWB-1/PT-02 SS-02 PL-03 - - -
105 MEN T-02 GT-02 T-03 T-03 T-03 T-03 GT-02 TB-02 GWB-2/PT-02 SS-02 PL-03 - - -
106 WOMEN T-02 GT-02 T-03 T-03 T-03 T-03 GT-02 TB-02 GWB-2/PT-02 SS-02 PL-03 - - -
107 CORRIDOR T-01
GT-01
PT-01 PT-01 PT-01
PT-01 - - - TB-01
ACT-1/GWB-1/
PT-02
108 RECEPTION AREA T-01
GT-01
PT-01 PT-01 PT-01
- - - - - - RB-01
EXP/PT-02ACT-
1/GWB-1/PT-02
109 PERSONAL CAGES SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
110 SALLY PORT CPT-03 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 ACT-1 - - - - - - - - -
111 ELECTRICAL SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
112 FIRE SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
113 COLLATERAL CPT-02 /
CPT-03
PT-01 PT-01 PT-01
PT-01 - - - RB-01
ACT-1 - - - - - - - - -
114 CORRIDOR SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
115 ELEVATOR LOBBY T-01 GT-01 PT-01 PT-01 PT-01 PT-01 - - - TB-01 EXP/PT-02 - - - - - - - - -
116 TR SDT-01 - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
117 MECHANICAL SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
118 DMARC SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
119 CORRIDOR SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - CG-01
120 GSB MISSION TEAM CAGE SC - - - PT-01 PT-01 - - - PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
121 FCO TEAM CAGE SC - - - - - - PT-01 PT-01 - - - - - - RB-01 EXP/PT-02 - - - - - - - - -
122 FCO TEAM CAGE SC - - - - - - PT-01 - - - EXP/PT-02 - - -
123 FCO TEAM CAGE SC - - - PT-01 PT-01 - - - - - - - - - RB-01 EXP/PT-02 - - - - - - - - -
124 CORRIDOR SC
PT-01 PT-01 PT-01
PT-01 - - - RB-01
ACT-1/GWB-1/
PT-02
125 FCO TEAM CAGE SC - - - PT-01 - - - - - - PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
126 GSB FCC LOGISTICS AREA & SECURE
LOADOUT
SC
PT-01 PT-01 PT-01
PT-01 - - - RB-01
EXP/PT-02 - - - - - - - - -
127 GSB FCC MISSION SUPPORT SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
128 GSB (STE) 3 BAY GARAGE SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
129 S4 STORAGE SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
130 ELECTRICAL SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
131 LOADOUT SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
133 CORRIDOR SC
PT-01 PT-01 PT-01
PT-01 - - - RB-01
EXP/PT-02//GW
B-1/PT-02
134 STORAGE SC - - - PT-01 PT-01 - - - - - - - - - RB-01 EXP/PT-02 - - - - - - - - -
135 CORRIDOR SC - - - PT-01 PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - - - - -
EL-1 ELEVATOR T-01 GT-01 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
S-1 STAIR 1 ST-01 - - - - - - PT-01 PT-01 PT-01 - - - RB-01 EXP/PT-02 - - - - - -…
This is the start of the file's text. The full file is on GovTribe.