Attachment A - Experience in Relevant Projects.pdf

PDF 115 KB Posted

Attached to
SOF BATTALION OPERATIONS FACILITY, HEC, ALEXANDRIA, VIRGINIA Federal contract opportunity
Solicitation number
W912DR22R0030
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

About this file

This document contains an experience qualification form for federal construction contractors and information on a related federal contract opportunity. The experience qualification form requests details on relevant past projects, including location, scope, costs, schedule, and an explanation of relevancy to the skills required. The related federal contract opportunity is a solicitation from the U.S. Army Corps of Engineers, Baltimore District to provide construction services for a Special Operations Forces Battalion Operations Facility in Alexandria, Virginia. It will be a competitive, firm-fixed-price, design-bid-build contract utilizing a best value tradeoff process.

View the file

Other files for this federal contract opportunity

Other files attached to SOF BATTALION OPERATIONS FACILITY, HEC, ALEXANDRIA, VIRGINIA, newest first.
File Type Posted
B.08.03 RFI Responses.pdf PDF
Amendment 0002 Files.zip ZIP file
B.08.03 Amendment W912DR22R0030 0002.pdf PDF
I.01.11 BOF1 Site Visit Attendance Roster - 25MAY22.pdf PDF
B.08.03 Amendment W912DR22R0030 0001.pdf PDF
Attachment L - Site Visit Visitor Authorization Form for HECSA.xlsx XLSX spreadsheet
Attachment H.1 - BOF HEC Original Documents Drawings Vol 1 29 October 2021.pdf PDF
Attachment C - SBPP Proposal Format.pdf PDF
Attachment B - Past Performance Questionnaire.pdf PDF
Attachment J - BOF HEC Original Documents SID Binder 29 October 2021.pdf PDF
Attachment F - Vol_3_BOF HEC Original Documents Submittal Specifications 29 October 2021.pdf PDF
Attachment H.2 - BOF HEC Original Documents Drawings Vol 1 29 October 2021.pdf PDF
Attachment G - Vol_4_BOF HEC Original Documents Submittal Specifications 29 October 2021.pdf PDF
B.08.02 Solicitation_W912DR22R0030.pdf PDF
Attachment K - BOF HEC Original Douments FFE Binder 29 October 2021.pdf PDF
Attachment I - H.08.04_BOF HEC Original Documents Drawings Vol 2 29 October 2021.pdf PDF
Attachment E - Vol_2_BOF HEC Original Documents Submittal Specifications 29 October 2021.pdf PDF
Attachment D - Vol_1_BOF HEC Original Documents Submittal Specifications 29 October 2021.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI//SP-SSEL//FEDONLY

CUI//SP-SSEL//FEDONLY

APPENDIX C

ATTACHMENT A: EXPERIENCE IN RELEVANT PROJECTS

<<PICTURE>>

CONTRACTOR’S NAME (WHO PERFORMED THE WORK?):

Project Name: Project Location:

City, State

Design-Build or Design-Bid-Build:

New Construction or Renovation:

Agency/Government Contracting Activity: Point of contact information (address, PCO name, email address and phone number) if government contract, additionally provide the contract number and contracting office)

Agency/Government Technical Rep./COR (at least two (2)): Point of contact information (email address and phone number). If government contract, additionally provide the contract number)

Project Description: General scope. Provide a description of the project. Be sure to include features of this project that make it comparable in type or nature to the proposed project described in this request for proposal.

Description of the actual work performed by the contractor submitting this project: Provide specific tasks performed on this project by the firm submitting the project.

Explanation of relevancy (Must be in narrative format): All relevant projects must clearly identify at least two of the elements specified under section 2.2.1.

BGSF: XXX,XXX Lost Time Accidents:

Schedule:

Start Date:

MM-DD-YYYY

Original Completion:

MM-DD-YYYY

Final Contract Completion:

MM-DD-YYYY

Beneficial Occupancy Date:

MM-DD-YYYY

Design Percent Complete: Construction Percent Complete:

Cost:

Original Project Cost:

Final Project Cost:

Cost Difference

*Original Subcontractor Cost:

*Final Subcontractor Cost:

*Cost Difference

Cost and time growth discussion: Reason(s) for differences between original and final schedule or costs. This section can be excluded if not applicable to the project. Response should contain more detail than “owner requested/initiated changes”. Provide examples to support growth.

*Only to be completed if the experience was performed as a subcontractor on the submitted project.

OFFERORS MAY INCREASE SPACING IN FORM AS NECESSARY

File details come from the government source that posted it. Updated .