Attachment C - SBPP Proposal Format.pdf

PDF 246 KB Posted

Attached to
SOF BATTALION OPERATIONS FACILITY, HEC, ALEXANDRIA, VIRGINIA Federal contract opportunity
Solicitation number
W912DR22R0030
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

About this file

This document provides a proposal format for a Small Business Participation Plan (SBPP) related to a construction services solicitation. The U.S. Army Corps of Engineers, Baltimore District seeks to award a firm-fixed-price design-bid-build construction contract for a Special Operations Forces Battalion Operations Facility in Alexandria, Virginia. Offerors must complete an SBPP utilizing the specified six-part format to demonstrate their extent of commitments to small businesses as prime contractors, joint ventures, teaming partners, or subcontractors. The SBPP requires information including the prime offeror's business size and socioeconomic categories, total contract values and percentages for large and small businesses, participation percentages and dollar values for each small business category, identification of and supply/service descriptions for the prime and each intended subcontractor including CAGE codes and NAICS codes.

View the file

Other files for this federal contract opportunity

Other files attached to SOF BATTALION OPERATIONS FACILITY, HEC, ALEXANDRIA, VIRGINIA, newest first.
File Type Posted
Amendment 0002 Files.zip ZIP file
B.08.03 Amendment W912DR22R0030 0002.pdf PDF
B.08.03 RFI Responses.pdf PDF
I.01.11 BOF1 Site Visit Attendance Roster - 25MAY22.pdf PDF
B.08.03 Amendment W912DR22R0030 0001.pdf PDF
Attachment H.2 - BOF HEC Original Documents Drawings Vol 1 29 October 2021.pdf PDF
Attachment G - Vol_4_BOF HEC Original Documents Submittal Specifications 29 October 2021.pdf PDF
B.08.02 Solicitation_W912DR22R0030.pdf PDF
Attachment A - Experience in Relevant Projects.pdf PDF
Attachment K - BOF HEC Original Douments FFE Binder 29 October 2021.pdf PDF
Attachment I - H.08.04_BOF HEC Original Documents Drawings Vol 2 29 October 2021.pdf PDF
Attachment E - Vol_2_BOF HEC Original Documents Submittal Specifications 29 October 2021.pdf PDF
Attachment D - Vol_1_BOF HEC Original Documents Submittal Specifications 29 October 2021.pdf PDF
Attachment L - Site Visit Visitor Authorization Form for HECSA.xlsx XLSX spreadsheet
Attachment H.1 - BOF HEC Original Documents Drawings Vol 1 29 October 2021.pdf PDF
Attachment B - Past Performance Questionnaire.pdf PDF
Attachment J - BOF HEC Original Documents SID Binder 29 October 2021.pdf PDF
Attachment F - Vol_3_BOF HEC Original Documents Submittal Specifications 29 October 2021.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI//SP-SSEL//FEDONLY

APPENDIX C

PHASE II - ATTACHMENT C: SMALL BUSINESS PARTICIAPTION PLAN PROPOSAL FORMAT:

The Small Business Participation Plan (SBPP) proposal format is designed to streamline and bring uniformity to responses and evaluations for Small Business Participation (FAR 15.304 and DFARS PGI 215.304). The format provides clarity in that it is distinctly different than the Small Business Subcontracting Plan required for large businesses only (IAW DFARS PGI 219.704-5). Do not submit a hybrid plan that includes a combination of elements from both.

All Offerors (both large and small businesses) are required to complete a Small Business Participation Plan proposal. Offerors should propose the level of participation of small businesses (as a small business prime, joint venture, teaming arrangement, and/or small business subcontractors) in the performance of the acquisition relative to the objectives/goals set forth in the evaluation of this area.

The format below is to be utilized for the SBPP Proposal, but does not preclude Offerors from providing additional information that further demonstrates their extent of commitments to small businesses presently and in the past. Offerors must comply with all elements spelled out within How the Government will evaluate listed above and information requested within the SBPP Proposal Format.

(a) Check the applicable size and categories for the PRIME Offeror only -- Check all applicable boxes:

{ } Large Prime { } Historically Black Colleges or Universities and Minority Institutions (HBCU/MI) or { } Small Business Prime; also categorized as a { } Small Disadvantaged Business (SDB) { } Woman-Owned Small Business (WOSB) { } Historically Underutilized Business Zone (HUBZone) { } Veteran-Owned Small Business (VOSB) { } Service-Disabled Veteran-Owned Small Business (SDVOSB)

(b) Submit the total combined dollar value and percentage of work to be performed by both large and small businesses (include the percentage of work to be performed both by Prime, joint venture, teaming arrangement, and subcontractors):

Example: If Prime proposes a price of $1,000,000 (including all options), and small business(es) will provide $250,000 in services/supplies as a prime or subcontractor, the % planned for small businesses is 25%; and 75% for large business equaling 100%.

The SBTEB will use the information provided within this section to assess an Offerors compliance of item (d) as described under how the government will evaluate, SBPP Submission Requirements and respond accordingly.

Total Percentage Planned for Large Business(es) _______% = $ ____________________

Total Percentage Planned for Small Business(es) _______ % = $ ____________________

When combined, Large and Small Business totals must 100% = $____________________ equal 100% and represents the value of the total acquisition

(c) Please indicate the total percentage (%) and dollar value of participation to be performed by each type of subcategory small business. Not doing so will result in a weakness. The percentage of work performed by small businesses that qualify in multiple small business categories may be counted in each category:

Example: Victory Prop Mgt (WOSB and SDVOSB) performing 2%; and Williams Group (SDB, HUBZone and WOSB) performing 3%. Results equate to: SDB 3%; HUBZone 3%; WOSB 5%; SDVOSB 2%; VOSB 2%;).

SDVOSBs are also VOSBs automatically; however VOSBs are not automatically SDVOSBs.

Provide both the percentage and total dollars to be performed by small businesses to ensure consistency for evaluation purposes. Not doing so may result in a weakness.

Small Businesses

% of Total Acquisition Value

(TAV)

Corresponding Dollars

Small Disadvantaged Business % $

Woman-Owned Small Business % $

HUBZone Small Business % $

Veteran-Owned Small Business % $

Service-Disabled Veteran-Owned Small Business % $

HBCU/Minority Institutions* (Aspirational goal) % $

If an Offeror is unable to meet the participation goals or proposes a zero percent goal for ANY of the socioeconomic categories (SDB, HUBZone, WOSB, VOSB and/or SDVOSB) within the solicitation, the Offeror must provide a detailed explanation as to why the participation goal(s) cannot be met, and the actions that were taken prior to the submission of proposals to increase the participation goals for any of the socioeconomic categories the Offeror is unable to meet.

(d) Identify the Prime Offeror and type of service/supply that the Prime Offeror will provide. Then list each of the intended subcontractors and principal supplies/services to be provided by that subcontractor. Provide the Commercial and Government Entity (CAGE) code for the Prime and each intended subcontractor. Also, provide the anticipated NAICS codes(s) that the Prime Offeror believes best describes the product or services being acquired by its subcontracts with each intended subcontractor.

Note: Offerors must provide all of the requested information identified within the chart below. Small business Primes and small business subcontractors that qualify as small businesses in multiple small business categories should be listed in each applicable small business category.

The SBTEB will use the information provided under this section to assess both the extent to which such firms are specifically identified in proposals as referenced within item (a) and also the complexity and variety of the work small firms are to perform as described within item (c) under how the government will evaluate. .

Example: If a Small Business qualifies also as a WOSB and a SDVOSB, and you can add them to each category below in which they qualify.

Offerors are not limited to the space provided below.

Note: (1) Pursuant to Sections 8(d) of the Small Business Act, a business is considered small for Government procurements if it does not exceed the size standard for the NAICS code that the prime contractor believes best describes the product or services being acquired. In other words, the size of the prime’s suppliers is determined by the applicable NAICS code of their joint venture, teaming partner, or subcontract, which may or may not be the same NAICS code as the one for your prime contract with the Government.

(e) Describe the extent of commitment to use small businesses (for example, what types of commitments if any are in place for this specific acquisition either – small business prime, written contract, verbal, enforceable, non-enforceable, joint venture, mentor-protégé, etc.) Provide documentation regarding commitments to small business for this effort. Copies of such agreements should be provided as part of your small business participation plan and will not count against the page limitation for this binder.

See item (b) under how the government will evaluate SBPP for specifics and respond accordingly.

(f) Utilization of Small Business: Extent of small business subcontracting compliance/business relations –e.g. record of complying with requirements of FAR Clauses 52.219-8 and 52.219-9.

See item (e) under how the government will evaluate SBPP and respond accordingly.

Additional Important Note for Other than U.S. Small Businesses (Large Businesses) ONLY

Name of Company (Include CAGE Code)

Anticipated NAICS Code for Each Subcontractor (1)

Type of Service/Service

Prime Offeror:

Large Business:

Small Business:

SDB:

WOSB:

HUBZone Small:

VOSB:

SDVOSB:

HBCU/MI:

See specifics for the submission of Small Business Subcontracting Plan under how the government will evaluate the SBPP to ensure that all required elements have been addressed. Failure to submit a subcontracting plan will result in a deficiency.