Copy of C.04.01 Abstract of Bids - W912DR20B0020 Page 1.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
W912DR20B0020 Dalecarlia Clearwells Maintenance
Solicitation number
W912DR20B0020
Issued by

About this file

This bid abstract summarizes offers received in response to Solicitation Number W912DR20B0020 from the U.S. Army Corps of Engineers Baltimore District. The solicitation seeks bids for maintenance and improvement projects at the Dalecarlia Clearwells, which are critical water storage and treatment facilities for the Washington Aqueduct. Work includes installing new flow meters and mixers, rehabilitating sluice gates, improving drainage, and conducting mold remediation. Two offers were received by the October 2020 due date. ACE Service Inc. bid $3,560,974 and CPP Construction bid $4,236,347.37. Both offers were above the independent government estimate of $4,684,000. Scope of work includes upgrades to drain lines, gate rehabilitation, installation of new equipment, and improvements to overflow structures and soil drainage at the 15MG and 30MG Clearwells. Outages must be coordinated with seasonal water demands and sequenced so only one Clearwell is out of service at a time.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Abstract - W912DR20B0001

ABSTRACT OF OFFERS - CONSTRUCTION1. SOLICITATION NUMBER2. DATE ISSUED3. DATE OPENEDPAGE
W912DR20B002044158.044158.01 of 2
4. ISSUING OFFICEName and title of Certifying Official (Type)
I CERTIFY that I have opened, read, and
USACE, BALTIMORE DISTRICTrecorded on this abstract all offersSignatureDate Signed OCT 2020
2 HOPKINS PLAZA, 03-G-04received in response to this solicitation.
BALTIMORE, MD 21201Contracting Officer: Mark Ryan Andrews
5. PROJECT TITLE9. OFFERS
8. GOVERNMENT ESTIMATENo. 1No. 2
Dalecarlia Clearwells Maintenance & Improvements(Check A, B or C and complete D, E, and F.)ACE Service Inc.CPP Construction

A. HIRED LABOR

B. REASONABLE CONTRACTB. Bid Security (Type and Amount)B. Bid Security (Type and Amount)
(Without Profit)Bid Bond 20%Bid Bond 20%
6. NUMBER OF AMENDMENTS ISSUED: 4 (four)XC. REASONABLE CONTRACTC. Amendment AcknowledgedC. Amendment Acknowledged
(Including Profit)YesYes
7A.7B.7C.D.E.F.E.F.E.F.
ITEMDESCRIPTION OF OFFERED ITEMEST.UNITUNITESTIMATEDUNITESTIMATEDUNITESTIMATED
No.QUANTITYPRICEAMOUNT IGEPRICEAMOUNTPRICEAMOUNT
0001All costs in connection with the new multi-path acoustic flow meter in the venturi of the conduit between the two Clearwells, the new sample drain system and the rehabilitation of Sluice Gates 13 - 19, complete as shown on the drawings and as specified.1JB$637,526.94$ 637,526.94$ 534,146.00$ 534,146.00$ 1,800,000.00$ 1,800,000.00
0002All costs in connection with the 15 MG Clearwell including selective demolition, re-grading, storm water pipe assessment and cleaning, new sluice gate, waterproof membrane installation, drainage chamber and valves, and structural modifications complete as shown on the drawings and as specified.1JB$958,647.85$ 958,647.85$ 1,780,487.00$ 1,780,487.00$ 1,800,000.00$ 1,800,000.00
0003All costs in connection with the 30 MG Clearwell including the selective demolition, re-grading, storm water pipe assessment

and cleaning, sluice gate rehabilitation of gates 1-12 per Sheet M-105, drainage chamber, baffle wall and outfall modifications, crack repair, and mixing chamber equipment installation

complete as shown on the drawings and as specified.1JB$ 2,361,894.62$ 2,361,894.62$ 1,068,293.00$ 1,068,293.00$ 600,000.00$ 600,000.00
0004All costs in connection with the Visitor Center Basement and Theater repair and modifications, including installation of various Environmental control equipment, waterproofing, and mold remediation, structural and finishing repairs, complete as shown on the drawings and as specified.1JB$278,277.96$ 278,277.96$ 178,048.00$ 178,048.00$ 484,000.00$ 484,000.00
TOTAL ESTIMATED AMOUNT$ 4,236,347.37$ 3,560,974.00$ 4,684,000.00
NSN 7540-01-150-0981 501419-101NOTE: If more than two offers are received, continue on OF 1419A.All costs in connection with the 15 MG Clearwell including selective demolition, re-grading, storm water pipe assessment and cleaning, new sluice gate, waterproof membrane installation, drainage chamber and valves, and structural modifications complete as shown on the drawings and as specified.Prescribed by GSA-FAR(48 CER)53.236-1OPTIONAL FORM 1419 (11-88)