Attachment A- Drawings.pdf
PDF 26 MB Posted
- Attached to
- W912DR20B0020 Dalecarlia Clearwells Maintenance
- Solicitation number
- W912DR20B0020
About this file
This solicitation is for the rehabilitation and maintenance of two clearwells and associated infrastructure at the Dalecarlia Water Treatment Plant. The Washington Aqueduct seeks upgrades to drain lines, replacement of large sluice gates, installation of new flow meters and induction mixers, improvements to the clearwell overflow structure, re-routing of chemical analyzer drain pipes, and soil drainage improvements. Mold remediation and HVAC upgrades are also required in a building near the 15 million gallon clearwell. Both clearwells are critical assets for water supply and outages must be coordinated with lower seasonal demand, sequencing work so only one clearwell is out of service at a time. The Department of the Army Corps of Engineers Engineering District Baltimore is the contracting agency.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
CONDITION IS SHOWN
SHEET ON WHICH THE
CONDITION IS DRAWN
OR SECTION OF THE
SHEET ON WHICH DETAIL
IDENTIFICATION NUMBER
DETAIL OR SECTION
DETAIL SYMBOLS
WASHINGTON AQUEDUCT
DALECARLIA WATER
TREATMENT PLANT
N
McMILLAN WATER
TREATMENT PLANT
LOCATION MAP
DALECARLIA WATER TREATMENT PLANT
WASHINGTON AQUEDUCT DIVISION NAME:
WASHINGTON AQUEDUCT
DALECARLIA WATER TREATMENT PLANT, WASHINGTON, DC
CLEARWELLS MAINTENANCE & IMPROVEMENTS
A B B R E V I A T I O N S
AB
AC
ACB
ACST
AD
ADJ
AL
ALTN
AP
APPROX
ARCH
ARR
ASPH
AWG
ASBESTOS CEMENT, ALTERNATING CURRENT
AIR CIRCUIT BREAKER
ACOUSTIC
AREA DRAIN
ADJUSTABLE, ADJACENT
ALUMINUM
ALTERNATE
ACCESS PANEL
APPROXIMATE
ARCHITECTURAL
ARRESTER
ASPHALT
AMERICAN WIRE GAGE
ANCHOR BOLT
A, AMP
B
BARR
BD
BITUM
BL
BLDG
BLK
BM
BSMT
BTU
BASE
BARRIER
BOARD
BITUMINOUS
BASELINE
BUILDING
BLOCK
BEAM, BENCH MARK
BASEMENT
BRITISH THERMAL UNIT
C
CAP
C TO C
CEM
CFM
CI
CIP
CIR
CJ
CKT
CELSIUS
CAPACITY
CENTER TO CENTER
CEMENT
CUBIC FEET PER MINUTE
CAST IRON
CAST IRON PIPE
CIRCULATING
CONTROL JOINT
CIRCUIT
CL
CLG
CMP
CND
CO
CLEAR, CLEARANCE, CENTERLINE
CEILING
CORRUGATED METAL PIPE
CONDUIT
CLEANOUT
CU
CS
CRS
CSK
CT
CTR
CW
CWB
CAST STEEL, CAST STONE, CARBON STEEL
COLD-ROLLED STEEL
COUNTERSINK
CERAMIC TILE, CURRENT TRANSFORMER
CENTER
COLD WATER
CAPILLARY WATER BARRIER
D
DB
DBL
DET
DIA
DIM
DL
DN
DO
DPNL
DS
DWG
DEEP, DEGREE
DRY BULB, DECIBEL, DIRECT BURIAL
DOUBLE
DETAIL
DIAMETER
DIMENSION
DEAD LOAD
DOWN
DITTO
DISTRIBUTION PANEL
DOWNSPOUT
DRAWING
E
EA
EC
EF
EL
ELEC
EMER
EMT
EQL
EQPT
EW
EWC
EXST
EXP
EXPJT
EXT
EAST
EACH
EMPTY CONDUIT
EACH FACE
ELEVATION
ELECTRIC
EMERGENCY
ELECTRICAL METALLIC TUBING
EQUAL
EQUIPMENT
EACH WAY
ELECTRIC WATER COOLER
EXISTING
EXPANSION, EXPOSED
EXPANSION JOINT
EXTERIOR
FT
FTG
FOOT, FEET
FOOTING, FITTING
GA
GALV
GL
GOVT
GPM
GR
GND
GW
GYP
GAGE
GALVANIZED
GLASS
GOVERNMENT
GALLONS PER MINUTE
GRADE
GROUND
GROUND WATER
GYPSUM
H
HD
HDW
HGT
HORIZ
HP
HR
HW
HWL
HZ
HIGH, HATCH
HEAVY DUTY, HARD
HARDWARE
HEIGHT
HORIZONTAL
HORSEPOWER, HIGH PRESSURE
HOUR
HOT WATER, HEADWALL
HIGH WATER LEVEL
HERTZ
INL
ID
IN
INLET
INSIDE DIAMETER, INSIDE DIMENSION
INCH
LVR
LOUVER
MACH
MSNRY
MATL
MAX
MECH
MET
MH
MIN
MISC
MON
MP
MPH
MTD
MTG
MWP
MACHINE
MASONRY
MATERIAL
MAXIMUM
MECHANICAL
METAL
MANHOLE
MINIMUM
MISCELLANEOUS
MASONRY OPENING, MOTOR OPERATED
MEDIUM PRESSURE
MILES PER HOUR
MOUNTED
MOUNTING
MEMBRANE WATERPROOFING
PVC POLYVINYL CHLORIDE
POINT OF VERTICAL INTERSECTION
R
RAD
RCP
RCPT
RADIUS, RISER, RUBBER SHEATH
RADIUS, RADIO
REINFORCED CONCRETE PIPE
RECEPTACLE
TAN
TB
TC
TANGENT
TOP AND BOTTOM, TILE BASE
TOP OF CURB, TOP CHORD, TERRA COTTA
TEL
TEMP
TERM
TF
3/C
3/P
3WAY
THK
THR
THRU
TP
TS
TW
TYP
TELEPHONE
TEMPORARY, TEMPERATURE
TERMINAL
TOP OF FOOTING, TILE FLOOR
THREE CONDUCTOR
THREE POLE
THREE WAY
THICK
THRESHOLD, THRUST
THROUGH
TEST POINT
TOP OF STEEL, TOP OF SLAB
TOP OF WALL, TILE WAINSCOT
TYPICAL
UGND
UNO
UNDERGROUND
UNLESS NOTED OTHERWISE
V
VAC
VAR
VB
VC
VCP
VEH
VERT
VEST
VOL
VOLT, VALVE
VACUUM
VARIOUS, VARIABLE, VARIES
VALVE BOX
VARNISH CAMBRIC, VITRIFIED CLAY
VITRIFIED CLAY PIPE
VEHICLE
VERTICAL
VESTIBULE
VOLUME
W
W/
W/O
WB
WC
WD
WL
WP
WS
WT
WWM
WIDE, WASTE, WATT, WEST
WITH
WITHOUT
WET BULB, WOOD BASE, WIDE BAND
WATER CLOSET
WIDTH, WINDOW DIMENSION, WOOD DOOR
WATER LINE, WAVELENGTH, WORK LINE
WEATHERPROOF, WASTE PIPE
WASTE STACK, WATER SURFACE, WATERSTOP
WEIGHT
WELDED WIRE MESH
XFMR
X-STR
TRANSFORMER
EXTRA-STRENGTH
2:1 SLOPE 2 HORIZONTAL TO 1 VERTICAL
1 ON 2
1 VERTICAL ON 2 HORIZONTAL SLOPE
DEFLECTION ANGLE
QT QUARRY TILE, QUART
CONDITION IS SHOWN
SHEET ON WHICH THE
CONDITION IS DRAWN
OR SECTION OF THE
SHEET ON WHICH DETAIL
IDENTIFICATION NUMBER
DETAIL OR SECTION
DETAIL SYMBOLS
EXISTING MATERIAL
EXISTING CONCRETE
WOOD FINISH
WOOD IN SECTION
METAL IN SECTION
PLAS. CEM. & GROUT
MATERIALS
CONCRETE
GSU & CT
C M U/DEMOLTION
BRICK
ROCK
EARTH
ADH ADHESIVE
ASB ASBESTOS
CATCH BASIN
CB
CONCRETE MASONRY UNITSCMU
CUBIC
DR DRAIN, DRIVE, DRILL
GUT GUTTER
HPT
HIGH POINT
HNDRL HANDRAIL
MEMB
MEMBRANE
MO
MONUMENT
QTY QUANTITY
UPR UPPER
UV ULTRAVIOLET
VEL VELOCITY
WTR WATER
YEARYR
YD YARD
PVI
BC BOTTOM OF CURB, BOTTOM CHORD
AMPERE
INDEX OF DRAWINGS
MG
MILLION GALLON
PLATE
NO.
TITLE
DRAWING
NO.
SHEET
NO.
GENERAL
VICINITY AND LOCATION MAP, INDEX AND ABBREVIATIONS
40.34-01-G-000 G-000
2 GENERAL NOTES & SYMBOLS LEGEND 40.34-01-G-001 G-001
CIVIL
3 OVERALL SITE PLAN 40.34-01-C-101 C-101
4 30 MG CLEARWELL GRADING PLAN 40.34-01-C-102 C-102
5 15 MG CLEARWELL GRADING PLAN 40.34-01-C-103 C-103
6 CIVIL DETAILS 40.34-01-C-104 C-104
7 EROSION CONTROL PLAN COVER 40.34-01-CE-101 CE-101
8 EROSION CONTROL PLAN MARYLAND NOTES 40.34-01-CE-102 CE-102
9 EROSION CONTROL PLAN DISTRICT OF COLUMBIA NOTES 40.34-01-CE-103 CE-103
10 30 MG CLEARWELL EROSION CONTROL PLAN PHASE 1 40.34-01-CE-104 CE-104
11 30 MG CLEARWELL EROSION CONTROL PLAN PHASE 2 40.34-01-CE-105 CE-105
12 30 MG CLEARWELL EROSION CONTROL PLAN PHASE 3 40.34-01-CE-106 CE-106
13 15 MG CLEARWELL EROSION CONTROL PLAN PHASE 1 40.34-01-CE-107 CE-107
14 15 MG CLEARWELL EROSION CONTROL PLAN PHASE 2 40.34-01-CE-108 CE-108
15 15 MG CLEARWELL EROSION CONTROL PLAN PHASE 3 40.34-01-CE-109 CE-109
16 EROSION CONTROL DETAILS 40.34-01-CE-110 CE-110
17 EROSION CONTROL DETAILS 40.34-01-CE-111 CE-111
PROCESS
18 CLEARWELLS - GATE PLAN 40.34-01-M-101 M-101
19 15 MG CLEARWELL DRAINAGE CHAMBER DEMOLITION SECTION 40.34-01-M-102 M-102
20 15 MG CLEARWELL DRAINAGE CHAMBER MODIFICATIONS 40.34-01-M-103 M-103
21 30 MG CLEARWELL DRAINAGE CHAMBER ENLARGED PLANS 40.34-01-M-104 M-104
22 30 MG CLEARWELL DRAINAGE CHAMBER SECTIONS 40.34-01-M-105 M-105
23 30 MG CLEARWELL MIXING CHAMBER DEMOLITION PLANS 40.34-01-M-106 M-106
PLATE
NO.
TITLE
DRAWING
NO.
SHEET
NO.
24 30 MG CLEARWELL MIXING CHAMBER ENLARGED PLANS 40.34-01-M-107 M-107
25 30 MG CLEARWELL MIXING CHAMBER SECTIONS 40.34-01-M-108 M-108
26 VENTURI VAULT FLOW METER ENLARGED PLANS & SECTIONS 40.34-01-M-109 M-109
27 VENTURI VAULT FLOW METER SECTIONS 40.34-01-M-110 M-110
28 GATE HOUSE DEMO - PLAN AND SECTIONS 40.34-01-M-111 M-111
29 GATE HOUSE NEW - PLAN AND SECTIONS 40.34-01-M-112 M-112
30 SAMPLE DRAIN TO DALECARLIA PUMP STATION 40.34-01-M-113 M-113
31 SLUICE GATE REHABILITATION SUMMARY 40.34-01-M-201 M-201
32 DETAILS 40.34-01-M-901 M-901
STRUCTURAL
33 STRUCTURAL GENERAL NOTES 40.34-01-S-001 S-001
34 STRUCTURAL GENERAL NOTES 40.34-01-S-002 S-002
35 15 MG CLEARWELL DRAINAGE CHAMBER PLANS & SECTIONS 40.34-01-S-101 S-101
36 15 MG CLEARWELL DRAINAGE CHAMBER DETAILS 40.34-01-S-102 S-102
37 15 MG CLEARWELL NEW OUTLET GATE PLANS 40.34-01-S-103 S-103
38 15 MG CLEARWELL NEW OUTLET GATE SECTIONS AND DETAILS 40.34-01-S-104 S-104
39 15 MG CLEARWELL NEW OUTLET GATE SECTIONS AND DETAILS 40.34-01-S-105 S-105
40 30 MG CLEARWELL MIXING CHAMBER VAULT PLANS & SECTIONS 40.34-01-S-111 S-111
41 30 MG DRAINAGE CHAMBER PIPE CONNECTION FOR 36" GATE VALVE 40.34-01-S-112 S-112
30 MG CLEARWELL BAFFLE WALL PLAN, SECTIONS AND DETAILS
40.34-01-S-113 S-113
43 30 MG OVERFLOW STRUCTURE RODENT & INSECT SCREENS 40.34-01-S-114 S-114
44 VISITOR'S CENTER BASEMENT PLAN 40.34-01-S-121 S-121
45 VISITOR'S CENTER BASEMENT SECTIONS AND DETAILS 40.34-01-S-122 S-122
46 STRUCTURAL STANDARD DETAILS 40.34-01-S-901 S-901
47 STRUCTURAL STANDARD DETAILS 40.34-01-S-902 S-902
PLATE
NO.
TITLE
DRAWING
NO.
SHEET
NO.
BUILDING MECHANICAL
VISITOR'S CENTER NOTES, LEGEND AND EQUIPMENT SCHEDULES
40.34-01-H-101 H-101
49 VISITOR'S CENTER BASEMENT PLAN 40.34-01-H-102 H-102
50 HVAC DETAILS 40.34-01-H-501 H-501
ELECTRICAL
51 ELECTRICAL LEGEND AND NOTES 40.34-01-E-001 E-001
52 30 MG CLEARWELL ONE LINE DIAGRAMS 40.34-01-E-101 E-101
53 15 MG CLEARWELL ONE LINE DIAGRAMS 40.34-01-E-102 E-102
54 OVERALL ELECTRICAL SITE PLAN 40.34-01-E-201 E-201
55 30 MG CLEARWELL PARTIAL ELECTRICAL PLAN 40.34-01-E-210 E-210
56 30 MG CLEARWELL GATE HOUSE ELECTRICAL PLAN 40.34-01-E-211 E-211
57 30 MG CLEARWELL MIXING CHAMBER ELECTRICAL PLAN 40.34-01-E-212 E-212
58 VENTURI VAULT ELECTRICAL PLAN 40.34-01-E-213 E-213
59 FINISHED WATER PUMP STATION ELECTRICAL PLAN 40.34-01-E-214 E-214
60 15 MG CLEARWELL PARTIAL ELECTRICAL PLAN 40.34-01-E-220 E-220
61 15 MG CLEARWELL DRAINAGE CHAMBER ELECTRICAL PLAN 40.34-01-E-221 E-221
62 VISITOR'S CENTER BASEMENT ELECTRICAL PLAN 40.34-01-E-222 E-222
63 CHEMICAL BUILDING FIRST FLOOR ELECTRICAL PLAN 40.34-01-E-223 E-223
64 CHEMICAL BUILDING SECOND FLOOR ELECTRICAL PLAN 40.34-01-E-224 E-224
65 30 MG GATE HOUSE EQUIPMENT SCHEMATIC DIAGRAMS 40.34-01-E-301 E-301
66 30 MG CLEARWELL MIXING CHAMBER EQUIPMENT SCHEMATIC DIAGRAM 40.34-01-E-302 E-302
67 VENTURI VAULT FLOW TRANSMITTER SCHEMATIC DIAGRAM 40.34-01-E-303 E-303
68 15 MG CLEARWELL LEAK DETECTION SYSTEM SCHEMATIC DIAGRAMS 40.34-01-E-304 E-304
69 VISITOR'S CENTER DUCT SMOKE DETECTOR SCHEMATIC DIAGRAM 40.34-01-E-305 E-305
70 ELECTRICAL INSTALLATION DETAILS 40.34-01-E-901 E-901
COL
CONC
COND
CONN
CONST
CONT
CONTR
CONV
COLUMN
CONCRETE
CONDITION, CONDUCTOR
CONNECTION
CONSTRUCTION
CONTINUOUS, CONTROL
CONVERTER
CONTRACTION, CONTRACTOR
COP
COPPER
F
FABX
FD
FDN
FDR
FF
FHY
FHC
FIG
FIN
FLG
FLUOR
4WAY
FPM
FR
FAHRENHEIT, FIRE
FIRE ALARM BOX
FLOOR DRAIN
FOUNDATION
FEEDER
FINISHED FLOOR
FIRE HYDRANT
FIRE HOSE CABINET
FIGURE
FINISH
FLANGE, FLOORING
FLUORESCENT
FOUR WAY
FEET PER MINUTE
FRAME
FULL SIZE, FAR SIDE
FLOOR, FLOOR LINE, FLASHING, FLUSH
FL
FS
INSUL
INTR
INVT
INSULATION, INSULATE
INTERIOR
INVERT
JB
JC
JCT
JKT
JT
JUNCTION BOX
JANITOR CLOSET, JOINT COMPOUND
JUNCTION
JACKET
JOINT
K
KCP
KO
KV
KVA
KW
KIPS (1000 LBS)
KEENE'S CEMENT PLASTER
KNOCK OUT
KILOVOLT
KILOVOLT-AMPERE
KILOWATT
LAV
LB
LC
LL
LLH
LLV
LT
LAVATORY
POUND
LENGTH OF CHORD, LOW CARBON
LIVE LOAD
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LIGHT
LG
LENGTH
LP
LOW POINT, LOW PRESSURE
N
NEC
NEUT
NIC
NO
NOM
NTS
NORTH
NECESSARY
NEUTRAL
NOT IN CONTRACT
NUMBER
NOMINAL
NOT TO SCALE
OA
OC
OCB
OD
OPNG
OPP
OVHD
OUTSIDE AIR, OVERALL
ON CENTER
OIL CIRCUIT BREAKER
OUTSIDE DIAMETER
OPENING
OPPOSITE
OVERHEAD
P
PB
PC
PF
PI
PIV
PL
PLAS
PLYWD
PNL
POV
PRELIM
PRI
PS
PSF
PSI
PT
PILASTER, PITCH
PULL BOX, PUSH BUTTON
POINT OF CURVE, PIECE
PROFILE, POWER FACTOR
POINT OF INTERSECTION
POST INDICATOR VALVE
PLACE, PLATE, PROPERTY LINE
PLASTER
PLYWOOD
PANEL
PRIVATELY OWNED VEHICLE
PRELIMINARY
PRIMARY
PULL SWITCH, POLYSTYRENE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POINT, POINT OF TANGENCY
NS
NEAR SIDE
PREMOLDED EXPANSION JOINTPEJ
PIPE RAILPR
PRMLD PREMOLDED
RDCR
REG
REINF
RELOC
REPL
REQD
REV
RF
RL
RM
RMV
RW
ROOF DRAIN, ROAD
REDUCER
REGULATOR, REGISTER
REINFORCEMENT
RELOCATED
REPLACE
REQUIRED
REVISION
ROOF
ROOF LEADER
ROOM
REMOVE
RIGHT OF WAY
S
SAN
SCHED
SD
SECT
SERV
SH
1PH
SKCP
SL
SP
SPC
SPDT
SPEC
SPST
SQ
SST
ST
STA
STD
STL
STR
SPRT
SUSP
SW
SWBD
SWGR
SOUTH, SECTION MODULUS
SANITARY
SCHEDULE
STORM DRAIN
SECTION
SERVICE
SHEET
SINGLE PHASE
SUSPENDED KEENE'S CEMENT PLASTER
SLOPE, SEA LEVEL
SINGLE POLE
SUSPENDED PLASTER CEILING
SINGLE POLE DOUBLE THROW
SPECIFICATION
SINGLE POLE SINGLE THROW
SQUARE
STAINLESS STEEL
STREAM, SINGLE THROW, STREET
STATION
STANDARD
STEEL
STREAM, STRENGTH, STRAIGHT
SUPPORT
SUSPENDED
SWITCH
SWITCHBOARD
SWITCHGEAR
RPM REVOLUTIONS PER MINUTE
RR REMOVE AND REPLACE, RAILROAD
SEW
SEWER, SEWERAGE
STRL
STRUCTURAL
SYMM
SYMMETRICAL
RD
SUBMITTED:
CHIEF, ENGINEERING & PLANNING BRANCH
CHIEF, WASHINGTON AQUEDUCT DIVISION
APPROVED:
RECOMMENDED:
COLONEL, C. OF E. DISTRICT ENGINEER
APPROVED FOR:
DATE:
REV DATE DESCRIPTION BY
DRAWING NUMBER PLATE
SCALE:
DATE:
DESIGNED BY:
CAD BY:
CHECKED BY:
U.S. ARMY ENGINEER DISTRICT, BALTIMORE
CORPS OF ENGINEERS
BALTIMORE, MARYLAND
US Army Corps of Engineers
SHEET:
GENERAL
WASHINGTON AQUEDUCT
DALECARLIA WATER TREATMENT PLANT, WASHINGTON, D.C.
G-000
40.34-01-G-000
JULY 2020AS SHOWN
G.A.
O.G.
S.S.
VICINITY AND LOCATION MAPS,
INDEX AND ABBREVIATIONS
0 07/10/20 ORIGINAL DOCUMENTS, ISSUED FOR CONSTRUCTION O.G.
CLEARWELLS MAINTENANCE AND
IMPROVEMENTS
P:\01 Active Projects\M001-USACE_Baltimore\M001000102-Dalecarlia Clearwells\31 Authoring Cad Files\GENERAL\G-000.dwg, 7/10/2020 10:28:26 AM, ARCH full bleed E1 (30.00 x 42.00 Inches)
This document was originally issued and sealed by George Ajy, DC PE No. 922227, on
07/10/2020. This document shall not be considered a certified document.
REV DATE DESCRIPTION BY
DRAWING NUMBER PLATE
SCALE:
DATE:
DESIGNED BY:
CAD BY:
CHECKED BY:
U.S. ARMY ENGINEER DISTRICT, BALTIMORE
CORPS OF ENGINEERS
BALTIMORE, MARYLAND
US Army Corps of Engineers
SHEET:
G-001
40.34-01-G-001
NONE
G.A.
O.G.
S.S
GENERAL
WASHINGTON AQUEDUCT
DALECARLIA WATER TREATMENT PLANT, WASHINGTON, D.C.
GENERAL NOTES & SYMBOLS
LEGEND
CLEARWELLS MAINTENANCE AND
IMPROVEMENTS
SS
MANHOLE
STORM INLET
STORM PIPE - 'U' TYPE ENDWALL
BRIDGE
MATCH LINE
UNDERGROUND CABLE
WATER SERVICE
UNDER GROUND ELECTRIC
PVC PIPING
OVERHEAD ELECTRIC
WS WS
PVC PVC
UNDER GROUND TELEPHONE
SANITARY SEWER LATERAL (SINGLE SERVICE)
SANITARY SEWER LATERAL (DOUBLE SERVICE)
WATER METER (SINGLE SERVICE)
WATER METER (DOUBLE SERVICE)
GATE VALVE
CHECK VALVE
FIRE HYDRANT
F.F. XX.XX
X.00 (EDGE OF PVMT)
X.50 (TOP OF CURB)
SPOT ELEVATION
CONCRETE
EARTH
GRAVEL/RIP-RAP
SAND
DRAINAGE FLOW ARROW (IMPERVIOUS AREA)
DRAINAGE FLOW ARROW (PERVIOUS AREA)
RESIDENTIAL STREET LIGHT
SIGN
AREA TO BE MULCHED
SOD
PROPOSED PAVEMENT
CHAIN LINK FENCE
X
STORM MANHOLE
PROPOSED OVERLAY
TREE REMOVAL/DEMOLITION
SILT FENCE
AREA TO BE SAW CUT & REMOVED
1. UNDERGROUND UTILITIES ARE SHOWN FOR THE CONVENIENCE OF THE
CONTRACTOR ONLY.
THE CONTRACTOR SHALL COORDINATE WITH WASHINGTON AQUEDUCT
AND SHALL ACCURATELY LOCATE AND UNCOVER ALL EXISTING UTILITIES
BEFORE BEGINNING CONSTRUCTION.
ANY DAMAGE RESULTING FROM THE CONTRACTOR'S OPERATIONS SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE.
WHERE CROSSING OF EXISTING UTILITIES OCCUR, PROVIDE 12" MINIMUM
CLEARANCE EXCEPT WATER MAINS SHALL BE 18".
2. SEWER AND WATER SERVICE SHALL BE MAINTAINED DURING ENTIRE
CONSTRUCTION PERIOD OR TEMPORARY FACILITIES PROVIDED.
3. MINIMUM COVER OVER PIPING SHALL BE 48", BELOW FINISHED GRADE
UNLESS OTHERWISE SHOWN OR SPECIFIED.
4. IF UNSATISFACTORY MATERIAL FOR ADEQUATE BEARING IS
ENCOUNTERED AT THE NORMAL SUBGRADE, THE UNSATISFACTORY
MATERIAL SHALL BE REMOVED AND REPLACED WITH SUITABLE
FOUNDATION STABILIZATION MATERIAL AS SPECIFIED.
5. THE CONTRACTOR SHALL NOT DISTURB AREAS OUTSIDE THE IDENTIFIED
LIMITS OF DISTURBANCE.
6. REFER TO SPECIFICATION 01 14 00, WORK RESTRICTIONS, FOR DETAILED
INFORMATION ON SEQUENCING AND MAXIMUM OUTAGE DURATIONS.
GENERAL NOTES:
CONSTRUCTION NOTES:
1. LAY PIPE TO UNIFORM GRADE BETWEEN INDICATED ELEVATION POINTS.
2. SIZE OF FITTINGS SHOWN ON PLANS SHALL CORRESPOND TO ADJACENT
STRAIGHT RUN OF PIPE, UNLESS OTHERWISE INDICATED. TYPE OF JOINT
AND FITTING MATERIAL SHALL BE THE SAME AS SHOWN FOR ADJACENT
STRAIGHT RUN OF PIPE.
3. LOCATION AND NUMBER OF PIPE HANGERS AND PIPE SUPPORTS SHOWN
IS ONLY APPROXIMATE. FINAL SUPPORT REQUIREMENTS SHALL BE
DETERMINED BY THE CONTRACTOR.
4. ALL JOINTS SHALL BE WATERTIGHT. WALL PIPES SHALL BE USED
WHEREVER PIPING PASSES FROM A STRUCTURE TO BACKFILL.
5. ALL FLEXIBLE CONNECTORS OR FLANGED COUPLING ADAPTERS SHALL BE
PROVIDED WITH THRUST TIES, OR ANCHORS, UNLESS OTHERWISE NOTED.
6. SYMBOLS, LEGENDS, AND PIPE USE IDENTIFICATIONS SHOWN SHALL BE
FOLLOWED THROUGHOUT THE PLANS, WHEREVER APPLICABLE.
NOT ALL OF THE VARIOUS PIPING COMPONENTS ARE NECESSARILY
USED IN THE PROJECT.
1. ALL DIMENSIONS FOR EQUIPMENT PROVIDED IN THIS CONTRACT TO
BE VERIFIED BY CONTRACTOR.
2. REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL AND OTHER DISCIPLINES
OF DRAWINGS FOR ADDITIONAL NOTES.
GENERAL PIPING NOTES:
CIVIL LEGEND
THIS IS A STANDARD SYMBOLS & LEGEND SHEET,
THEREFORE SOME SYMBOLS MAY NOT APPEAR ON
THIS SHEET AND NOT ON THE DRAWINGS.
NOTES:
PROPOSED FINISH
FLOOR ELEVATION
BUILDING
CURB AND GUTTER
EDGE OF PAVEMENT
EXISTING CONTOURS
WASHINGTON AQUEDUCT DIVISION NAME:
O.G.
SUPER SILT FENCESSF
LIMITS OF CLEARWELL
LIMITS OF DISTURBANCE
LOD
STATE BOUNDARY
PROPOSED CONTOURS
PUBLIC TELEPHONE BOOTH
KM ID
TRAFFIC LIGHT BOX
CONCRETE LIGHT POLE
UTILITY POLE
SPOT ELEVATIONS
PROPERTY POINT
WATER MANHOLE
WATER METER
CONTROL STATION
ELECTRIC UTILITY MANHOLE
TELEPHONE MANHOLE
STORM SEWER MANHOLE
CATCH BASINS
SANITARY SEWER MANHOLE
TELEPHONE POLE
CONCRETE POWER POLE
WOODEN POWER POLE
WOODEN LIGHT POLE
STORM SEWER LINE
WATER VALVE
STM
TEL
E
FIRE HYDRANT
CURB INLET
SANITARY CLEAN OUT
TELEPHONE LINE
POWER LINE
S
SANITARY SEWER LINE
EXISTING PALM TREE
EXISTING TREE
GUY CABLE
SIGN
CONCRETE GUTTER
TEL/E TELEPHONE/ELECTRIC LINE
B.S. BUS STOP
GAS VALVE
GAS MANHOLE
C.TV
CABLE TV BOX
PROPERTY LINE
CHAIN LINK FENCE WITH CONC. BASE
CENTER LINE
EB
ELECTRIC BOX
METAL FENCE
EXISTING STRUCTURES
WATER EDGE
1. THE HORIZONTAL CONTROL USED ON THIS PLAN ARE MD1900 AND ELEV.
ARE REFERRED TO ORTHOMETRIC HEIGHT (GEOID 2012B).
2. ALL HORIZONTAL MEASUREMENTS ARE IN US FEET UNLESS OTHERWISE
SPECIFIED.
2. COORDINATE SYSTEM WAS ESTABLISHED BY GNSS OBSERVATIONS USING
TRIMBLE DOUBLE FREQUENCY RECEIVERS AND NGS/NOAA OPUS FOR
POST PROCESSING.
4. THE INFORMATION DEPICTED ON THIS PLAN REPRESENTS THE
RESULTS OF THE SURVEY PERFORMED ON THE DATE INDICATED ON C-101.
5. THE INFORMATION PROVIDED ON THIS PLAN SHOW ALL CURRENTLY
EXISTING STRUCTURES, PROPERTIES AND UTILITIES ABOVE OR BELOW
THE GROUND AS REVEALED BY OBSERVABLE EVIDENCE OVER GROUND
INSPECTION.
6. VERTICAL CONTROL IS BASED ON NAVD 88 DATUM. ELEVATIONS WITHIN
EXISTING BUILDINGS USED WAD DATUM. ALL TOPO AND ELEVATIONS
OUTSIDE OF EXISTING BUILDINGS USE NAVD 88. THE DIFFERENCE IN
DATUMS DOES NOT AFFECT THE PROJECT DESIGN. TO CONVERT NAVD
ELEVATIONS TO WASHINGTON AQUEDUCT DATUM SUBTRACT 0.15 FEET.
I.E.: 139.95 (NAVD) - 0.15 = 139.80 (WAD)
SURVEYORS NOTE:
LEGEND
JULY 2020
0 07/10/20 ORIGINAL DOCUMENTS, ISSUED FOR CONSTRUCTION
P:\01 Active Projects\M001-USACE_Baltimore\M001000102-Dalecarlia Clearwells\31 Authoring Cad Files\GENERAL\G-001.dwg, 7/10/2020 10:32:35 AM, ARCH full bleed E1 (30.00 x 42.00 Inches)
This document was originally issued and sealed by George Ajy, DC PE No. 922227, on
07/10/2020. This document shall not be
P
A
R
K
I N
G
A
R
E
A
P
A
R
K
I N
G
A
R
E
A
P
A
R
K
I N
G
A
R
E
A
P
A
R
K
I N
G
A
R
E
A
PARKING AREA
S
ID
E W
A L K
S
I D
E
W
A
L
K
S
ID
E W
A L K
S
I D
E
W
A
L
K
CHLORINE
BUILDING
HYPO-
CHLORITE &
CAUSTIC
SODA
FACILITY
SUPER STRUCTURE
GATEHOUSE
DALECARLIA PUMPING
STATION
D-10 PUMP
STA.
D-54
GUARD
GOUSE
LOADING
AREA
A/C
GATE
DALECARLIA
MAINTENANCE
BUILDING
WAREHOUSE
BUILDING
DALECARLIA
VISITOR CENTER
(OLD PUMP STA.)
DISPATCH
BUILDING
D-51
WASH
WATER
TANK
T
R
A
I
L B
R
I
D
G
E
FILTERS
BUILDING
C
A
P
I T
L
C
R
E
S
C
E
N
T
A
I L
I N
L
E
T
PLANTING
PLANTING
PLANTING
PLANTING
PLANTING
PLANTING
PLANTING
PLANTING
PLANTING
DALECARLIA
CHEMICAL
BUILDING
PLANTING
GATE
EXHAUST
VENT
EXHAUST
VENT
BRIDGE
SUPPORT
BRIDGE
SUPPORT
ELECTRICAL
TRANSFORMER
ELECTRICAL
TRANSFORMER
ELECTRICAL
TRANSFORMER
ELECTRICAL
TRANSFORMER
ELECTRICAL
TRANSFORMER
POND
GATE
S
I D
E
W
A
L
K
RAIN
METER
PLANTING
PARKING
AREA
P L A
N T
I N
G
PLANTING
GATE
VALVE
GATE
VALVE
GATE
VALVE
GATE
VALVE
GRAVEL
GRAVEL
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
R
E
T
A
I N
I
G
W
L
L
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
PULLBOX 8-538
WATER
VALVE
E
E
E
E
E
E
E
E
E
E
30" WASH WATER
MH 8-471
MH 8-470
GATE VALVE
4-194
FH 8-540A
8-537
8-450
V-8-2-DC
V130
FILTERED WATER
RESERVOIR
F
I L
T
E
I
F
L
U
E
N
T
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
RAIN
METER
CAMERA POLE
S
T
M
S T
M
TRAFFIC LIGHT
E L E
C . P
A N
E L
GATE
VALVE 4-250
PULL BOX
PULL BOX
PULL BOX
PULL BOX
L
F
U
O
L
PULL BOX
CARPENTER
SHOP
AUTOMOTIVE
SHOP
STORE ROOM
GATE
PLANTING
WASHINGTON/MARYLAND
CONCRETE MONUMENT
BOUNDARY LINE
GAS PUMPS
INTERCEPTION
MH
ELEC.
PANEL
GATES
GATE
VALVE
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
ELEC.
BUILDING D-23
TRAFFIC LIGHT
GATE
VALVE
ELEC. PANEL
ELEC.
UNDERGROUND
HIGH
VOLTAGE MH
EX.BY-PASS
CHAMBER NO. 1
EX.BY-PASS
CHAMBER NO. 2
R
A
M
P
P
L
A
N
T
I N
G
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
A
I
R
S
T
M
S
T
M
S
T
M
S
T
M
STAIR
S
I
D
E
W
A
L
K
R
P
S I D
E W
A L K
T E
L E
T E
L E
T E
L E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T
E
L
E
DALECARLIA
RESERVOIR
S
T
M
S
T
M
S
T
M
S
T
M
E
X
I S
T
I
E
E
K
WATER
EDGE
M ac A
R
TH
U R
B O
U
LE
V A
R D
N W
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
M
A
R
Y
L
A
N
D
D
I
S
T
R
I
F
L
O
M
B
I
A
M
A
R
Y
L
A
N
D
D
I
S
T
R
I
L
O
M
B
I
A
M ac A
R
TH
U R
BO
U
LEVAR
D
N W
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
O.G.
M a c
A
R
T H
U
B
U
L E
V
A
D
C-101
30 MG CLEARWELL
15 MG
CLEARWELL
OVERFLOW OUTLET
IMPROVEMENTS AND
ACCESS ROAD
30 MG CHEMICAL MIXING
CHAMBER
30 MG CLEARWELL
DRAINAGE CHAMBER
MODIFICATIONS
15 MG CLEARWELL
DRAINAGE CHAMBER
MODIFICATIONS
SEE DRAWING C-102
FOR GRADING PLAN
REV DATE DESCRIPTION BY
DRAWING NUMBER PLATE
SCALE:
DATE:
DESIGNED BY:
CAD BY:
CHECKED BY:
U.S. ARMY ENGINEER DISTRICT, BALTIMORE
CORPS OF ENGINEERS
BALTIMORE, MARYLAND
US Army Corps of Engineers
SHEET:
CIVIL
WASHINGTON AQUEDUCT
DALECARLIA WATER TREATMENT PLANT, WASHINGTON, D.C.
40.34-01-C-101
AS SHOWN
G.A.
O.G.
S.S.
OVERALL SITE PLAN
CLEARWELLS MAINTENANCE AND
IMPROVEMENTS
LIMITS OF DISTURBANCE
M
A
R
Y
L
A
N
D
D
I
S
T
R
I
C
O
L
U
M
B
I
A
LIMITS OF 30 MG
CLEARWELL
(NOTE 1)
LIMITS OF 15 MG
CLEARWELL (NOTE 1)
1. ALL CONSTRUCTION EQUIPMENT AND LOADING MUST
NOT EXCEED THE ALLOWED 60 PSF (MAXIMUM) LIVE
LOADING. FOR SPECIFIC CRITERIA OF EACH
CLEARWELL, SEE NOTES ON SHEETS C-102 AND C-103.
2. LIMITS OF DISTURBED AREA:
TOTAL PROJECT DISTURBED AREA = 6.4 ACRES
MARYLAND = 4.6 ACRES
DISTRICT OF COLUMBIA = 1.8 ACRES
3. SEE SPECIFICATION 01 14 00 (WORK RESTRICTIONS)
FOR SEQUENCE OF CONSTRUCTION.
4. CONTRACTOR TO INSTALL REMAINDER OF MEMBRANE
DURING RE-GRADING ACTIVITIES. APPROXIMATE AREA
AND LOCATION SHOWN. LIMIT BOTH MEMBRANE AND
LOD TO EDGE OF CURB, SEE C-103.
5. CONTRACTOR TO COORDINATE VOLUME OF SOIL
ON SITE AND ON STOCKPILE AREA. SOIL WITHIN
STOCKPILE AREA MUST NOT EXCEED 500 CU YARDS.
NOTES
BAFFLE WALL REPAIRS (TYP.)
SEE DETAIL ON SHEET S-113
SLUICE GATE MODIFICATIONS (TYP)
CONDUIT FLOW METER
VISITOR'S CENTER
BASEMENT IMPROVEMENTS
WASHINGTON AQUEDUCT DIVISION NAME:
80' X 20' STAGING AND TRAILER AREA
LIMIT OF DISTURBANCE
MEMBRANE COVERING (SEE NOTE 4)
ADAPTED FROM BASE PLANS PREPARED BY:
Fss LAND SURVEYORS AND SONSULANTS
P.O.BOX 2075, AIBONITO, P.R. 00705
(F)787-746-5039
AUGUST 6, 2018
REPLACE AND RE-ROUTE
GATE HOUSE INSTRUMENT
CLUSTER DRAIN LINE
STOCKPILE AND
LAYDOWN AREA
SLUICE GATE ADDITION
LIMITS OF DISTURBANCE
SEE DRAWING C-103
FOR GRADING PLAN
JULY 2020
0 07/10/20 ORIGINAL DOCUMENTS, ISSUED FOR CONSTRUCTION
P:\01 Active Projects\M001-USACE_Baltimore\M001000102-Dalecarlia Clearwells\31 Authoring Cad Files\CIVIL\C-101 - key plan.dwg, 7/10/2020 9:53:04 AM, ARCH full bleed E1 (30.00 x 42.00 Inches)
This document was originally issued and sealed by George Ajy, DC PE No. 922227, on
07/10/2020. This document shall not be
R
K
I N
G
A
R
E
A
PARKING AREA
CHLORINE
BUILDING
HYPO-
CHLORITE &
CAUSTIC
SODA
FACILITY
SUPER STRUCTURE
GATEHOUSE
DALECARLIA PUMPING
STATION
PLANTING
EXHAUST
VENT
EXHAUST
VENT
ELECTRICAL
TRANSFORMER
ELECTRICAL
TRANSFORMER
ELECTRICAL
TRANSFORMER
ELECTRICAL
TRANSFORMER
ELECTRICAL
TRANSFORMER
POND
GATE
S
I D
E
W
A
L
K
GATE
VALVE
GATE
VALVE
GATE
VALVE
GATE
VALVE
GRAVEL
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
R
E
T
A
I N
I
L
L
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
S
S
S
S
S
S
S
S
S
S
T
M
S
T
M
S
T
M
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
FH 8-540A
S
S
S
GATE
VALVE 4-250
S
S
S
S
S
S
GATE
VALVE
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
EX.BY-PASS
CHAMBER NO. 1
EX.BY-PASS
CHAMBER NO. 2
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T
E
L
E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
T E
L E
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
M ac A
R
TH
U R
BO
U
LEVAR
D
N W
M
A
R
Y
L
A
N
D
D
I
S
T
R
I
L
O
M
B
I
A
A
B
REV DATE DESCRIPTION BY
DRAWING NUMBER PLATE
SCALE:
DATE:
DESIGNED BY:
CAD BY:
CHECKED BY:
U.S. ARMY ENGINEER DISTRICT, BALTIMORE
CORPS OF ENGINEERS
BALTIMORE, MARYLAND
US Army Corps of Engineers
SHEET:
CIVIL
WASHINGTON AQUEDUCT
DALECARLIA WATER TREATMENT PLANT, WASHINGTON, D.C.
40.34-01-C-102
AS SHOWN
G.A.
Y.Z.
S.S.
30 MG CLEARWELL
GRADING PLAN
CLEARWELLS MAINTENANCE AND
IMPROVEMENTS
C-102
LIMITS OF
DISTURBANCE
30 MG CLEARWELL CUT AND FILL VOLUMES (CU. YDS)
CUT FILL NET
329 479
150(FILL)
J.M.
1. CONTRACTOR TO RE-GRADE OVER THE CLEARWELL TO
THE CONTOURS AND DRAINAGE PATTERNS INDICATED ON
THIS SHEET. THE OBJECTIVE IS TO RE-GRADE AND DRAIN
AWAY ALL WATER TO CATCH BASINS ON THE SOUTH AND
WEST SIDES AND NATURAL SWALES ON THE NORTH AND
EAST SIDES .
2. EXISTING STRUCTURES TO REMAIN AND NOT BE DISTURBED
DURING RE-GRADING. RE-GRADING AROUND THESE AND NEW
STRUCTURES SHALL DRAIN WATER AWAY FROM EXISTING
STRUCTURES.
3. CONTRACTOR TO RETAIN EXISTING CATCH BASINS
UNLESS GRADING PLANS REQUIRE REPLACEMENT.
4. CONTRACTOR TO VERIFY EXISTING STORM WATER
NETWORK AT SOUTH SIDE OF 30MG CLEARWELL AND
AND CCTV AND CLEAN INDICATED STORM SEWER LINES
(APPROXIMATELY 256 L.F. 12" STORM SEWER).
5. THE TOTAL ROOF LOAD SHALL NOT EXCEED 300 PSF
UNIFORM LOAD. UNDER NO CIRCUMSTANCES SHALL
THE BALANCED LIVE LOADING EXCEED 60 PSF. THE
COMBINED UNIFORM ROOF LOADING SHALL CONSISTS
OF ONE OF THE FOLLOWING COMBINATIONS
a. A MAXIMUM EARTH FILL HEIGHT OF 2'-0” AND 60 PSF
(MAXIMUM) LIVE LOADING.
b. A MAXIMUM EARTH FILL HEIGHT OF 2'-9” AND 20 PSF
(MAXIMUM) LIVE LOADING.
c. AN INTERPOLATION BETWEEN OPTIONS A AND B NOT
EXCEEDING 300 PSF COMBINED LOADING.
6. ALL CONSTRUCTION EQUIPMENT AND LOADING MUST
NOT EXCEED THE ALLOWED 60 PSF (MAXIMUM) LIVE
LOADING.
7. CONTRACTOR TO VERIFY EXISTING UTILITIES FOR
INSTALLATION OF 2" PVC SAMPLE DRAIN. CONTRACTOR
TO VERIFY AND MAINTAIN MIN 3' COVER FOR SAMPLE DRAIN
OUTSIDE OF CLEARWELL. 2" PVC SAMPLE DRAIN SHOWN IS A
CONTINUATION OF THAT SHOWN IN GATE HOUSE ON M-112
AND IS TERMINATED ON M-113.
8. CONTRACTOR TO RESTORE SITE AND ESTABLISH
VEGETATIVE STABILIZATION AFTER RE-GRADING.
9. FUEL STORAGE AND OTHER POSSIBLE CONTAMINATION
RISKS TO FINISHED WATER STORAGE DURING
CONSTRUCTION MUST BE KEPT AT MINIMUM 50 FEET FROM
THE BOUNDARIES OF EACH CLEARWELL. ADDITIONALLY
RE-FUELING OF ALL EQUIPMENT DURING CONSTRUCTION
SHALL BE DONE IN VICINITY OF LAYDOWN AREA AND/OR AT
LEAST 200 FEET FROM THE LIMITS OF CLEARWELL.
10.CONTRACTOR TO PREVENT ANY SOIL OR OTHER FOREIGN
MATTER POLLUTION INTO CLEARWELL.
11. CONTRACTOR TO WRAP 2" SAMPLE LINE IN
" FOAM PIPE
INSULATION TO PREVENT FREEZING.
NOTES
EL 139.57
LIMITS OF DISTURBANCE
LIMITS OF GRADING
INSTALL NEW WINGWALL
AND FLAP VALVE ON 48"
OVERFLOW LINE
TEMPORARY
CONSTRUCTION
ACCESS ROAD TO
HEADWALL
EXIST.12"
STORM SEWER
CCTV AND CLEAN
EXIST. STORM SEWER
SEE NOTE 4
TRAILER AND LAYDOWN AREA
SLOPE GRADING TO TOP OF
EXIST. GRATE ELEVATION
SLOPE GRADING TO TOP OF
EXIST. GRATE ELEVATION
EL. 140.68
EL. 140.48
EL. 140.54
EL. 140.59
EL. 140.64
EL. 140.1
SLOPE GRADING TO TOP OF
EXIST. GRATE ELEVATION
EL 139.95
EL. 139.7
EL. 137.5
EL. 137.0
HORIZONTAL DIRECTIONAL DRILL
2" PIPE FOR ROAD CROSSING
SEE NOTE 7
2" PVC SAMPLE DRAIN
APPROX. LENGTH: 140'
EXISTING
GATE HOUSE
NOTE 2
(TYP.)
OVERFLOW INLET
SCREEN INSTALLATION
WASHINGTON AQUEDUCT DIVISION NAME:
JULY 2020
0 07/10/20 ORIGINAL DOCUMENTS, ISSUED FOR CONSTRUCTION
SEE M-113 FOR
CONTINUATION
This document was originally issued and sealed by George Ajy, DC PE No. 922227, on
07/10/2020. This document shall not be
S
ID
E W
A L K
S
I D
E
W
A
L
K
S
ID
E W
A L K
S
I D
E
W
A
L
K
D-10 PUMP
STA.
D-54
GUARD
GOUSE
DALECARLIA
ADMINISTRATION
BUILDING
VISITOR CENTER
(OLD PUMP STA.)
FILTERS
BUILDING
I N
L
E
T
PLANTING
PLANTING
PLANTING
PLANTING
PLANTING
DALECARLIA
CHEMICAL
BUILDING
PLANTING
RAIN
METER
PLANTING
PULLBOX 8-538
WATER
VALVE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
30" WASH WATER
MH 8-471
MH 8-470
GATE VALVE
4-194
8-537
8-450
FILTERED WATER
RESERVOIR
S
S
S
S
S
S
S
S
S
S
S
F
I L
T
F
L
U
E
N
T
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
S T
M
RAIN
METER
S
T
M
S
T
M
S
T
M
S
T
M
S T
M
S T
M
PULL BOX
PULL BOX
PULL BOX
PULL BOX
PULL BOX
TRAFFIC LIGHT
GATE
VALVE
ELEC. PANEL
ELEC.
UNDERGROUND
HIGH
VOLTAGE MH
T E
L E
T E
L E
T E
L E
T E
L E
M
A
R
Y
L
A
N
D
D
I
S
T
R
I
L
O
M
B
I
A
M ac A
R
TH
U R
BO
U
LEVAR
D
N W
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
REV DATE DESCRIPTION BY
DRAWING NUMBER PLATE
SCALE:
DATE:
DESIGNED BY:
CAD BY:
CHECKED BY:
U.S. ARMY ENGINEER DISTRICT, BALTIMORE
CORPS OF ENGINEERS
BALTIMORE, MARYLAND
US Army Corps of Engineers
SHEET:
CIVIL
WASHINGTON AQUEDUCT
DALECARLIA WATER TREATMENT PLANT, WASHINGTON, D.C.
40.34-01-C-103
AS SHOWN
G.A.
J.M.
S.S.
15 MG CLEARWELL
GRADING PLAN
CLEARWELLS MAINTENANCE AND
IMPROVEMENTS
C-103
CCTV AND CLEAN
EXIST. STORM SEWER
NOTE 2
12" RCP
15 MG CLEARWELL CUT AND FILL VOLUMES (CU. YDS)
CUT FILL NET
116 236
120 (FILL)
J.M.
WASHINGTON AQUEDUCT DIVISION NAME:
1. CONTRACTOR TO RETAIN EXISTING CATCH BASINS.
2. CONTRACTOR TO CCTV AND CLEAN INDICATED STORM
SEWER LINES. APPROXIMATE LENGTH IS 320 L.F.
3. CONTRACTOR TO INSTALL REMAINDER OF
WATERPROOF MEMBRANE; APPROXIMATE AREA AND
ESTIMATED AREA OF INSTALLATION IS 500 SF
LOCATION SHOWN.
4. THE TOTAL ROOF LOAD OVER CLEARWELL SHALL NOT
EXCEED 300 PSF UNIFORM LOAD. THIS UNIFORM LOAD
CONSISTS OF A MAXIMUM EARTH FILL HEIGHT OF 2'-0”
AND 60 PSF (MAXIMUM) LIVE LOADING.
5. ALL CONSTRUCTION EQUIPMENT AND LOADING MUST
NOT EXCEED THE ALLOWED 60 PSF (MAXIMUM) LIVE
LOADING.
6. CONTRACTOR TO REPLACE AND RESTORE IF EXISTING
MEMBRANE IS DAMAGED DURING CONSTRUCTION.
7. CONTRACTOR TO RESTORE SITE AND ESTABLISH
VEGETATIVE STABILIZATION AFTER RE-GRADING.
8. FUEL STORAGE AND OTHER POSSIBLE CONTAMINATION
RISKS TO FINISHED WATER STORAGE DURING
CONSTRUCTION MUST BE KEPT AT MINIMUM 50 FEET
FROM THE BOUNDARIES OF EACH CLEARWELL.
NOTES
MEMBRANE COVERING
NOTE 3, NOTE 6
LIMITS OF
DISTURBANCE
LIMITS OF
GRADING
SLOPE GRADING TO TOP OF
EXIST. GRATE ELEVATION
SLOPE GRADING TO TOP OF
EXIST. GRATE ELEVATION
EL. 148.33
EL. 147.64
EL. 147.52
15 MG CLEARWELL
DRAINAGE CHAMBER
MODIFICATIONS
CONTRACTOR TO DEMO AND
RE-PAVE THE SIDEWALK AS
NEEDED
JULY 2020
0 07/10/20 ORIGINAL DOCUMENTS, ISSUED FOR CONSTRUCTION
P:\01 Active Projects\M001-USACE_Baltimore\M001000102-Dalecarlia Clearwells\31 Authoring Cad Files\CIVIL\C-103.dwg, 7/10/2020 9:58:42 AM, ARCH full bleed E1 (30.00 x 42.00 Inches)
This document was originally issued and sealed by George Ajy, DC PE No. 922227, on
07/10/2020. This document shall not be
C-104
C GRAVEL ACCESS ROAD
L
4" CR-6 STONE
12" AGGREGATE AASHTO NO. 1
2% SLOPE
2% SLOPE
COMPACTED SUBGRADE (95% OF MAXIMUM DENSITY ASTM D1557)
6'-0"
12'-0" DRIVE AISLE
NONWOVEN GEOTEXTILE
MEETING AASHTO M-288 FOR
STABLIZATION FABRIC
12' TEMPORARY ACCESS ROAD
SCALE: NONE
CONSTRUCTION SPECIFICATIONS
1. PREPARE SUBGRADE AND PLACE NONWOVEN GEOTEXTILE.
2. MAINTAIN ACCESS ROAD IN A CONDITION THAT MINIMIZES TRACKING OF SEDIMENT.
ADD STONE OR MAKE OTHER REPAIRS AS CONDITIONS DEMAND TO MAINTAIN
CLEAN SURFACE, MOUNTABLE BERM, AND SPECIFIED DIMENSIONS.
3. IMMEDIATELY REMOVE STONE AND/OR SEDIMENT SPILLED, DROPPED, OR
TRACKED ONTO ADJACENT ROADWAY.
4. WASHING ROADWAY TO REMOVE MUD TRACKED ONTO PAVEMENT IS NOT ACCEPTABLE
UNLESS WASH WATER IS DIRECTED TO AN APPROVED SEDIMENT CONTROL TREATMENT STRUCTURE.
5. AFTER CONSTRUCTION, REMOVE TEMPORARY ACCESS ROAD AND RESTORE TO ORIGINAL
CONDITION WITH SEED OR SOD.
MEMBRANE TERMINATION
SCALE: NONE
3/8" X 3" S. STL.
CONCRETE
EXPANSION
ANCHORS @ 6" O.C.
60 MIL HDPE
WATERPROOF
MEMBRANE TO
MATCH EXISTING
EXIST. CONC. ROOF SLAB
1/4" x 2" S. STL. BATTEN BAR
1/4" x 2" NEOPRENE GASKET
M
I N
WASHINGTON AQUEDUCT DIVISION NAME:
Y.Z.
REV DATE DESCRIPTION BY
DRAWING NUMBER PLATE
SCALE:
DATE:
DESIGNED BY:
CAD BY:
CHECKED BY:
U.S. ARMY ENGINEER DISTRICT, BALTIMORE
CORPS OF ENGINEERS
BALTIMORE, MARYLAND
US Army Corps of Engineers
SHEET:
CIVIL
WASHINGTON AQUEDUCT
DALECARLIA WATER TREATMENT PLANT, WASHINGTON, D.C.
40.34-01-C-104
AS SHOWN
G.A.
Y.Z.
S.S.
CIVIL DETAILS
CLEARWELLS MAINTENANCE AND
IMPROVEMENTS
CONCRETE HEADWALL WITH FLAP VALVE
NTS
1. CONTRACTOR TO INSTALL FLAP GATE ON EXISTING
OVERFLOW PIPE.
2. RESTORE FINISHED GRADES TO EXISTING CONDITIONS
AFTER EXCAVATION AND BACKFILL.
3. INVERT ELEVATION BASED ON RECORD DRAWING USING WAD COORDINATE
SYSTEM. CONTRACTOR TO VERIFY IN FIELD.
NOTES
EXIST. CONC WALL
EXIST. MEMBRANE
CONTINUOUS EXTRUSION WELD NEW
AND EXISTING MEMBRANE LAYERS
TOGETHER. LAP PER MFR'S
RECOMMENDATIONS.
DEMOLITION
RECONSTRUCTION
REMOVE EXISTING RACK
REMOVE PORTION OF
EXISTING CONCRETE
CONTRACTOR TO PROVIDE BRACING
AS REQUIRED TO ENSURE HEADWALL
DOES NOT MOVE UNTIL NEW CONCRETE
SLAB HAS ATTAINED ITS 28-DAY DESIGN
COMPRESSIVE STRENGTH
FLAP GATE MOUNTED
TO EXISTING CONCRETE
TOC EL 112.00
(WAD DATUM)
NEW 8" THICK CONCRETE SLAB. MATCH
ORIGINAL WIDTH
#4X3'-0" ADHESIVE DOWEL
WITH 6" EMBED AT 12",
EACH END CENTERED
IN SLAB DEPTH
#4@12" EW. 2" CLEAR
FROM TOP
9'-0"
9"
JUTE & ASPHALT
JOINT
TAMPED EARTH
1'-0"
JUTE & ASPHALT
JOINT
TAMPED EARTH
48" CONCRETE CULVERT FROM
EXISTING 30 MG CLEARWELL
OVERFLOW PIPE
9'-0"
9"
1'-0"
TOC EL 146.5
EXISTING GRADE EL ±148.5
48" CONCRETE CULVERT FROM
EXISTING 30 MG CLEARWELL
OVERFLOW PIPE
APPROX 4-FT - SEE NOTE 1
NOTES:
1. CONTRACTOR TO VERIFY THE DEPTH OF EXCAVATION AND
BACKFILL REQUIRED FOR MEMBRANE TERMINATION.
2. FOR GENERAL STRUCTURAL NOTES, SEE SHEET S-001 AND S-002.
JULY 2020
0 07/10/20 ORIGINAL DOCUMENTS, ISSUED FOR CONSTRUCTION
1/4" R
SEE PLAN FOR WIDTH
4"
1"
SLOPE TO DRAIN 1/4": 1' - 0"
FINISHED GRADE, SLOPE
AWAY FROM SIDEWALK (TYP.)
X
X X
X
6 X 6- W1.4 X W1.4 WWF
BROOM FINISH
COMPACTED
SUBGRADE
CONCRETE SIDEWALK DETAILS
NTS
C-104C-102
C-104C-103
C-104C-101
P:\01 Active Projects\M001-USACE_Baltimore\M001000102-Dalecarlia Clearwells\31 Authoring Cad Files\CIVIL\C-104.dwg, 7/10/2020 10:05:55 AM, ARCH full bleed E1 (30.00 x 42.00 Inches)
This document was originally issued and sealed by George Ajy, DC PE No. 922227, on
07/10/2020. This document shall not be
CE-101
EROSION CONTROL PLAN
COVER
WASHINGTON AQUEDUCT
DALECARLIA WATER TREATMENT PLANT, WASHINGTON, DC
CLEARWELLS MAINTENANCE & IMPROVEMENTS
VICINITY MAPLOCATION MAP
WASHINGTON AQUEDUCT
DALECARLIA WATER
TREATMENT PLANT
N
McMILLAN WATER
TREATMENT PLANT
DALECARLIA WATER TREATMENT PLANT
SHEET INDEX
SHEET NAME DWG NUMBER
EROSION CONTROL COVER SHEET CE-101
EROSION CONTROL PLAN MARYLAND NOTES CE-102
EROSION CONTROL PLAN DISTRICT OF COLUMBIA NOTES CE-103
30 MG CLEARWELL EROSION CONTROL PLAN PHASE 1 CE-104
30 MG CLEARWELL EROSION CONTROL PLAN PHASE 2 CE-105
30 MG CLEARWELL EROSION CONTROL PLAN PHASE 3 CE-106
15 MG CLEARWELL EROSION CONTROL PLAN PHASE 1 CE-107
15 MG CLEARWELL EROSION CONTROL PLAN PHASE 2 CE-108
15 MG CLEARWELL EROSION CONTROL PLAN PHASE 3 CE-109
EROSION CONTROL STANDARD DETAILS CE-110
EROSION CONTROL STANDARD DETAILS CE-111
FEMA FLOODPLAIN MAP
DATE: 07/10/20
EROSION SEDIMENTATION & POLLUTION CONTROL PLANS
DALECARLIA WATER TREATMENT PLANT
WASHINGTON DC, 20016
SITE DATA:
DISTURBED ACREAGE = ±6.4 ACRES
DISTURBED ACERAGE (MARYLAND) = ±4.6 ACRES
DISTURBED ACERAGE (DISTRICT OF COLUMBIA) = ±1.8 ACRES
LAND DISTURBANCE CONSTRUCTION ACTIVITY SEQUENCE
THE FOLLOWING SEQUENCES ARE TO BE IMPLEMENTED IN THE ORDER SHOWN UNLESS INCLEMENT WEATHER, SITE CONDITIONS, REVISIONS, PRE-CONSTRUCTION CONFERENCE, ETC, DICTATES A DEVIATION FROM THIS
SCHEDULE. IF A DEVIATION IS UNDERTAKEN OR ANTICIPATED. THE ENGINEER SHALL BE NOTIFIED AND THE
CHANGE OF SEQUENCE SHALL BE RECORDED IN THE DAILY LOG.
PHASE 2 - INTERMEDIATE
CONSTRUCTION
PHASE 2 - INTERMEDIATE
OPERATE, MAINTAIN, AND
MONITOR SEDIMENT &
EROSION CONTROLS
PHASE 1 - INITIAL
INSTALL E&S CONTROLS
* SEDIMENT AND EROSION CONTROL MEASURES TO BE INSPECTED DAILY. MAINTAIN BMP'S THROUGHOUT LAND DISTURBANCE ACTIVITY.
(SEE SPECIFIC PHASE SCHEDULES ON INITIAL, INTERMEDIATE AND FINAL ESC PLANS)
PHASE 3 - FINAL
REMOVE E&S CONTROLS
HYDROSEED DISTURBED AREA
AFTER DEMOBILIZATION
GENERAL CONSTRUCTION SCHEDULE
BEGIN CONSTRUCTION
2 4 6 8 10 12
Y.Z.
40.34-01-CE-101
REV DATE DESCRIPTION BY
DRAWING NUMBER PLATE
SCALE:
DATE:
DESIGNED BY:
CAD BY:
CHECKED BY:
U.S. ARMY ENGINEER DISTRICT, BALTIMORE
CORPS OF ENGINEERS
BALTIMORE, MARYLAND
US Army Corps of Engineers
SHEET:
CIVIL
WASHINGTON AQUEDUCT
DALECARLIA WATER TREATMENT PLANT, WASHINGTON, D.C.
AS SHOWN
G.A.
Y.Z.
Y.Z.
CLEARWELLS MAINTENANCE AND
IMPROVEMENTS
14 16
MONTHS AFTER BEGINNING CONSTRUCTION
WASHINGTON AQUEDUCT DIVISION NAME:
JULY 2020
0 07/10/20 ORIGINAL DOCUMENTS, ISSUED FOR CONSTRUCTION
P:\01 Active Projects\M001-USACE_Baltimore\M001000102-Dalecarlia Clearwells\31 Authoring Cad Files\CIVIL\CE-101-103 Erosion Control Notes.dwg, 7/10/2020 10:10:04 AM, ARCH full bleed E1 (30.00 x 42.00 Inches)
This document was originally issued and sealed by George Ajy, DC PE No. 922227, on
07/10/2020. This document shall not be
CE-102
MARYLAND NOTES
MDE EROSION, SEDIMENTATION, AND POLLUTION CONTROL GENERAL NOTES
THE REQUIREMENT OF ANY OF THE FOLLOWING INDIVIDUAL NOTES NOT APPLICABLE TO THE SUBJECT
PROJECT IS NOT BINDING UPON THE APPLICANT OR THE APPLICANT'S CONTRACTOR.
1. THE CONTRACTOR SHALL NOTIFY THE MARYLAND DEPARTMENT OF THE ENVIRONMENT (MDE) SEDIMENT CONTROL INSPECTOR AT 410-901-4020 AT LEAST 48 HOURS PRIOR TO COMMENCING ANY LAND DISTURBING ACTIVITIES AND, UNLESS WAIVED BY THE SEDIMENT CONTROL INSPECTOR, SHALL BE REQUIRED TO HOLD A PRE-CONSTRUCTION MEETING AT THE PROJECT SITE. THE CONTRACTOR MUST PROVIDE THE NAME OF THE PERSON ON THE SITE WHO IS RESPONSIBLE FOR INSPECTION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL MEASURES AND A COPY OF THEIR GREEN CARD TO THE SEDIMENT CONTROL INSPECTOR.
2. ALL PROJECTS WITH CONSTRUCTION ACTIVITIES DISTURBING 1 ACRE OR MORE ARE REQUIRED TO SUBMIT A GENERAL PERMIT (NOI) TO MDE TO COMPLY WITH THE GENERAL PERMIT FOR CONSTRUCTION ACTIVITY FOR STORMWATER DISCHARGES. THE GENERAL PERMIT (NOI) MUST BE APPROVED PRIOR TO DISTURBANCE ACTIVITIES. TO OBTAIN A GENERAL PERMIT (NOI) FORM, CONTACT THE PERMITS COORDINATOR AT THE MDE COMPLIANCE PROGRAM AT 410-537-3510.
3. THE LIMIT OF DISTURBANCE SHALL BE CLEARLY DELINEATED IN THE FIELD PRIOR TO THE PRE-CONSTRUCTION MEETING AND ANY GRADING ACTIVITIES TO
ENSURE COMPLIANCE WITH
THE APPROVED PLAN.
4. THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MUST BE KEPT AT THE PROJECT SITE.
5. THE MDE RESERVES THE RIGHT TO MODIFY THE EROSION AND SEDIMENT CONTROL PLANS.
6. THE MDE MAY REVOKE THE APPROVAL OF THE EROSION AND SEDIMENT CONTROL PLAN IF WORK PERFORMED AT THE PROJECT SITE DOES NOT CONFORM TO THE PROVISIONS OF THE GRADING PERMIT, TO THE APPROVED PLAN OR TO ANY WRITTEN INSTRUCTIONS FROM MDE.
7. THE CONTRACTOR MUST REQUEST THAT THE SEDIMENT CONTROL INSPECTOR APPROVE WORK COMPLETED IN ACCORDANCE WITH THE APPROVED EROSION
AND SEDIMENT CONTROL PLAN, AT THE FOLLOWING POINTS OF PROJECT DEVELOPMENT:
a. UPON COMPLETION OF THE INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES BUT BEFORE PROCEEDING WITH ANY OTHER EARTH DISTURBANCE OR GRADING. OTHER BUILDING OR GRADING INSPECTION APPROVALS MAY NOT BE AUTHORIZED UNTIL THIS INITIAL APPROVAL BY MDE IS MADE.
b. PRIOR TO REMOVAL OR MODIFICATION OF ANY SEDIMENT CONTROL STRUCTURE(S).
c. UPON FINAL STABILIZATION OF THE SITE AND PRIOR TO THE REMOVAL OF ANY SEDIMENT CONTROL MEASURES.
8. THE CONTRACTOR SHALL CONSTRUCT ALL EROSION AND SEDIMENT CONTROL MEASURES PER THE APPROVED PLAN AND CONSTRUCTION SEQUENCE AND SHALL HAVE THEM INSPECTED AND APPROVED BY THE SEDIMENT CONTROL INSPECTOR PRIOR TO BEGINNING ANY OTHER LAND DISTURBANCES.
9. THE CONTRACTOR SHALL ENSURE THAT ALL RUNOFF FROM DISTURBED AREAS IS DIRECTED TO THE SEDIMENT CONTROL DEVICES AND SHALL NOT REMOVE ANY EROSION OR SEDIMENT CONTROL MEASURE WITHOUT PRIOR PERMISSION FROM THE SEDIMENT CONTROL INSPECTOR.
10. THE FOLLOWING MINOR PLAN MODIFICATIONS MAY BE APPROVED BY THE SEDIMENT CONTROL INSPECTOR IN THE FIELD:
a. SEDIMENT CONTROL STRUCTURES (EXCEPT BASINS AND TRAPS) MAY BE MOVED TO MEET THE EXISTING CONTOURS AND FIELD CONDITIONS, WHEN MOVING
THESE STRUCTURES WOULD HAVE NO IMPACT ON THEIR FUNCTION OR DESIGN CRITERIA.
b. SUBSTITUTION OF PERIMETER CONTROL MEASURES MAY BE MADE PROVIDED THE MEASURE SUBSTITUTED IS EQUIVALENT (I.E., SILT FENCE FOR STRAW BALES) OR IS AN UPGRADE OF THE ORIGINAL MEASURE (I.E., SILT FENCE TO A PERIMETER BERM WITH PROPERLY SIZED OUTLET).
c. ADDITION AND EXTENSION OF PERIMETER CONTROLS (INCLUDING STONE CONSTRUCTION ENTRANCES) MAY BE MADE TO MEET FIELD CONDITIONS. ANY MODIFICATIONS TO THE PLAN WHICH ARE NOT LISTED ABOVE REQUIRE THE PLAN TO BE SUBMITTED TO THE MDE FOR REVIEW AND APPROVAL.
11. THE CONTRACTOR SHALL PROTECT ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS TO PREVENT THE DEPOSITION OF MATERIALS ONTO PUBLIC ROADS.
ALL MATERIALS DEPOSITED ONTO PUBLIC ROADS SHALL BE REMOVED IMMEDIATELY.
12. ON-SITE TEMPORARY STOCKPILE AREAS MUST BE PLACED AS SHOWN ON THE APPROVED PLAN. IF THE CONSTRUCTION SCHEDULE IS TO EXCEED 3 DAYS, THE STOCKPILE AREAS MUST BE STABILIZED. STOCKPILE AREAS SHOULD NOT EXCEED FIFTEEN FEET IN HEIGHT. IF A STOCKPILE IS TO EXCEED FIFTEEN FEET IN HEIGHT, IT MUST BE SHOWN ON THE PLAN TO BE TERRACED WITH PIPE SLOPE DRAINS INSTALLED AND APPROVED BY MDE. UPON THE COMPLETION OF THE USE OF THE STOCKPILE AREA, EXISTING GROUND SURFACES SHALL BE RESTORED TO THEIR ORIGINAL CONDITIONS AND PERMANENTLY STABILIZED.
13. VARIOUS STEPS IN THE SEQUENCE OF CONSTRUCTION MAY REQUIRE THE CONTRACTOR TO REMOVE EXCESS EXCAVATED MATERIAL TO AN APPROVED LOCATION OR TO IMPORT MATERIAL FROM AN APPROVED LOCATION. FOR PURPOSES OF THIS PLAN, AN APPROVED LOCATION SHALL BE ONE WHICH IS OPERATING UNDER APPROVED EROSION AND SEDIMENT CONTROL PLAN AND AN ACTIVE GRADING PERMIT AT THE TIME OF CONSTRUCTION.
14. THE CONTRACTOR SHALL INSPECT DAILY AND MAINTAIN CONTINUOUSLY IN AN EFFECTIVE OPERATING CONDITION ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SUCH TIME AS THEY ARE REMOVED WITH PRIOR PERMISSION FROM THE SEDIMENT CONTROL INSPECTOR.
15. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT OR TEMPORARY STABILIZATION SHALL BE COMPLETED WITHIN:
a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTROLS, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES EQUAL TO OR
GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1), AND
b. SEVEN (7) DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS ON THE PROJECT SITE. THE ABOVE REQUIREMENTS DO NOT APPLY TO THOSE AREAS WHICH ARE SHOWN ON THE PLAN AND ARE CURRENTLY BEING USED FOR MATERIAL STORAGE OR FOR THOSE AREAS ON WHICH ACTUAL CONSTRUCTION ACTIVITIES ARE CURRENTLY BEING PERFORMED OR TO INTERIOR AREAS OF A SURFACE MINE SITE WHERE THE STABILIZATION MATERIAL WOULD CONTAMINATE THE RECOVERABLE RESOURCE. MAINTENANCE SHALL BE PERFORMED AS NECESSARY TO ENSURE THAT THE STABILIZED AREAS CONTINUOUSLY MEET THE APPROPRIATE REQUIREMENTS
OF THE MOST CURRENT MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND
SEDIMENT CONTROL.
16. SEDIMENT CONTROL PRACTICES WILL BE MAINTAINED UNTIL THE ENTIRE CONTRIBUTING AREA TO THE PRACTICE HAS BEEN PERMANENTLY STABILIZED AND MEETS THE SATISFACTION OF THE SEDIMENT CONTROL INSPECTOR. SEDIMENT CONTROLS MAY ONLY BE REMOVED WITH THE AUTHORIZATION OF THE SEDIMENT
CONTROL INSPECTOR.
17. ALL AREAS DISTURBED BY THE REMOVAL OF SEDIMENT CONTROL DEVICES MUST BE IMMEDIATELY STABILIZED.
18. SURFACE DRAINAGE FLOWS OVER UNSTABILIZED CUT AND FILL SLOPES SHALL BE CONTROLLED BY EITHER PREVENTING DRAINAGE FLOWS FROM TRAVERSING THE SLOPES OR BY INSTALLING PROTECTIVE DEVICES TO CONVEY THE WATER DOWNSLOPE WITHOUT CAUSING EROSION. DIKES SHALL BE INSTALLED AND MAINTAINED AT THE TOP OF CUT OR FILL SLOPES UNTIL THE SLOPE AND DRAINAGE AREA TO IT ARE FULLY STABILIZED, AT WHICH TIME THE DIKES MUST BE REMOVED AND FINAL GRADING DONE TO PROMOTE SHEET FLOW DRAINAGE. EROSION CONTROL MEASURES MUST BE IMPLEMENTED AT POINTS OF CONCENTRATED FLOW
WHERE EROSION IS LIKELY TO OCCUR.
19. NO PERMANENT CUT OR FILL SLOPE WITH A GRADIENT STEEPER THAN 3:1 WILL BE PERMITTED IN LAWN MAINTENANCE AREAS. A SLOPE GRADIENT OF UP TO 2:1 WILL BE PERMITTED IN NON-MAINTENANCE AREAS PROVIDED THAT THOSE AREAS ARE INDICATED ON THE EROSION AND SEDIMENT CONTROL PLANS WITH A LOW-MAINTENANCEGROUND COVER SPECIFIED FOR PERMANENT STABILIZATION. SLOPE GRADIENT STEEPER THAN 2:1 WILL NOT BE PERMITTED WITH VEGETATION
STABILIZATION.
20. ALL FLOW LINES ARE TO BE STABILIZED WITH SOD OR SEED WITH EROSION CONTROL MATTING TO A DEPTH OF FLOW OF 1 FOOT.
21. SEDIMENT TRAPS OR BASINS ARE NOT PERMITTED WITHIN 20 FEET OF A FOUNDATION WHICH IS EXISTING OR UNDER CONSTRUCTION. NO STRUCTURE MAY BE
CONSTRUCTED WITHIN 20 FEET OF AN ACTIVE SEDIMENT TRAP OR BASIN.
22. TEMPORARY SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE CLEANED OUT AND RESTORED TO THE ORIGINAL DIMENSIONS WHEN SEDIMENT HAS
ACCUMULATED TO ONE HALF (1/2) THE WET STORAGE DEPTH OF THE TRAP OR BASIN.
STABLIZATION NOTES
1. SOIL PREPARATION
a) TEMPORARY STABILIZATION
i) SEEDBED PREPARATION CONSISTS OF LOOSENING SOIL TO A DEPTH OF 3 TO 5 INCHES BY MEANS OF SUITABLE AGRICULTURAL OR CONSTRUCTION EQUIPMENT, SUCH AS DISC HARROWS OR CHISEL PLOWS OR RIPPERS MOUNTED ON CONSTRUCTION EQUIPMENT. AFTER THE SOIL IS LOOSENED, IT MUST NOTBE ROLLED OR DRAGGED SMOOTH BUT LEFT IN THE ROUGHENED CONDITION. SLOPES 3:1 OR FLATTER ARE TO BE TRACKED WITH RIDGES RUNNING PARALLEL TO THE CONTOUR OF
THE SLOPE.
ii) APPLY FERTILIZER AND LIME AS PRESCRIBED ON THE PLANS.
iii) INCORPORATE LIME AND FERTILIZER INTO THE TOP 3 TO 5 INCHES OF SOIL BY DISKING OR OTHER SUITABLE MEANS.
2. PERMANENT STABILIZATION
a) A SOIL TEST IS REQUIRED FOR ANY EARTH DISTURBANCE OF 5 ACRES OR MORE. THE MINIMUM SOIL CONDITIONS REQUIRED FOR PERMANENT VEGETATIVE
ESTABLISHMENT ARE:
i) SOIL PH BETWEEN 6.0 AND 7.0.
ii) SOLUBLE SALTS LESS THAN 500 PARTS PER MILLION (PPM).
iii) SOIL CONTAINS LESS THAN 40 PERCENT CLAY BUT ENOUGH FINE GRAINED MATERIAL (GREATER THAN 30 PERCENT SILT PLUS CLAY) TO PROVIDE THE CAPACITY TO HOLD A MODERATE AMOUNT OF MOISTURE. AN EXCEPTION: F LOVEGRASS WILL BE PLANTED, THEN A SANDY SOIL (LESS THAN 30 PERCENT SILT PLUS CLAY) WOULD
BE ACCEPTABLE.
iv) SOIL CONTAINS 1.5 PERCENT MINIMUM ORGANIC MATTER BY WEIGHT.
v) SOIL CONTAINS SUFFICIENT PORE SPACE TO PERMIT ADEQUATE ROOT PENETRATION.
b) APPLICATION OF AMENDMENTS OR TOPSOIL IS REQUIRED IF ON-SITE SOILS DO NOT MEET THE ABOVE CONDITIONS.
c) GRADED AREAS MUST BE MAINTAINED IN A TRUE AND EVEN GRADE AS SPECIFIED ON THE APPROVED PLAN, THEN SCARIFIED OR OTHERWISE LOOSENED TO A
DEPTH OF 3 TO 5 INCHES.
d) APPLY SOIL AMENDMENTS AS SPECIFIED ON THE APPROVED PLAN OR AS INDICATED BY THE RESULTS OF A SOIL TEST.
e) MIX SOIL AMENDMENTS INTO THE TOP 3 TO 5 INCHES OF SOIL BY DISKING OR OTHER SUITABLE MEANS.RAKE LAWN AREAS TO SMOOTH THE SURFACE, REMOVE LARGE OBJECTS LIKE STONES AND BRANCHES,AND READY THE AREA FOR SEED APPLICATION. LOOSEN SURFACE SOIL BY DRAGGING WITH A HEAVY CHAIN OR OTHER EQUIPMENT TO ROUGHEN THE SURFACE WHERE SITE CONDITIONS WILL NOT PERMIT NORMAL SEEDBED PREPARATION. TRACK SLOPES 3:1 OR FLATTER WITH TRACKED EQUIPMENT LEAVING THE SOIL IN AN IRREGULAR CONDITION WITH RIDGES RUNNING PARALLEL TO THE CONTOUR OF THE SLOPE.LEAVE THE TOP 1 TO 3 INCHES OF SOIL LOOSE AND FRIABLE. SEEDBED LOOSENING MAY BE UNNECESSARY ON NEWLY DISTURBED AREAS.
3. TOPSOILING
a) TOPSOIL IS PLACED OVER PREPARED SUBSOIL PRIOR TO ESTABLISHMENT OF PERMANENT VEGETATION THE PURPOSE IS TO PROVIDE A SUITABLE SOIL MEDIUM FOR VEGETATIVE GROWTH. SOILS OF CONCERN HAVE LOW MOISTURE CONTENT, LOW NUTRIENT LEVELS, LOW PH, MATERIALS TOXIC TO PLANTS, AND/OR
UNACCEPTABLE SOIL GRADATION.
b) TOPSOIL SALVAGED FROM AN EXISTING SITE MAY BE USED PROVIDED IT MEETS THE STANDARDS AS SETFORTH IN THESE SPECIFICATIONS. TYPICALLY, THE DEPTH OF TOPSOIL TO BE SALVAGED FOR A GIVEN SOIL TYPE CAN BE FOUND IN THE REPRESENTATIVE SOIL PROFILE SECTION IN THE SOIL SURVEY PUBLISHED BY
USDA-NRCS.
c) TOPSOILING IS LIMITED TO AREAS HAVING 2:1 OR FLATTER SLOPES WHERE:
i) THE TEXTURE OF THE EXPOSED SUBSOIL/PARENT MATERIAL IS NOT ADEQUATE TO PRODUCE VEGETATIVE GROWTH.
ii) THE SOIL MATERIAL IS SO SHALLOW THAT THE ROOTING ZONE IS NOT DEEP ENOUGH TO SUPPORT PLANTS OR FURNISH CONTINUING SUPPLIES OF MOISTURE
AND PLANT NUTRIENTS.
iii) THE ORIGINAL SOIL TO BE VEGETATED CONTAINS MATERIAL TOXIC TO PLANT GROWTH.
iv) THE SOIL IS SO ACIDIC THAT TREATMENT WITH LIMESTONE IS NOT FEASIBLE.
d) AREAS HAVING SLOPES STEEPER THAN 2:1 REQUIRE SPECIAL CONSIDERATION AND DESIGN.
e) TOPSOIL SPECIFICATIONS: SOIL TO BE USED AS TOPSOIL MUST MEET THE FOLLOWING CRITERIA:
i) TOPSOIL MUST BE A LOAM, SANDY LOAM, CLAY LOAM, SILT LOAM, SANDY CLAY LOAM, OR LOAMY SANDS. OTHER SOILS MAY BE USED IF RECOMMENDED BY AN AGRONOMIST OR SOIL SCIENTIST AND APPROVED BY THE APPROPRIATE APPROVAL AUTHORITY. TOPSOIL MUST NOT BE A MIXTURE OF CONTRASTING TEXTURED
SUBSOILS AND MUST CONTAIN LESS THAN 5 PERCENT BY VOLUME OF
CINDERS, STONES, SLAG, COARSE FRAGMENTS, GRAVEL, STICKS, ROOTS, TRASH, OR OTHER MATERIALS LARGER THAN 1½ INCHES IN DIAMETER.
ii) TOPSOIL MUST BE FREE OF NOXIOUS PLANTS OR PLANT PARTS SUCH AS BERMUDA GRASS, QUACK GRASS, JOHNSON GRASS, NUT SEDGE, POISON IVY, THISTLE, OR OTHERS AS SPECIFIED.
iii) TOPSOIL SUBSTITUTES OR AMENDMENTS, AS RECOMMENDED BY A QUALIFIED AGRONOMIST OR SOIL SCIENTIST AND APPROVED BY THE APPROPRIATE
APPROVAL AUTHORITY, MAY BE USED IN LIE OF NATURAL TOPSOIL.
f) TOPSOIL APPLICATION
i) EROSION AND SEDIMENT CONTROL PRACTICES MUST BE MAINTAINED WHEN APPLYING TOPSOIL.
ii) UNIFORMLY DISTRIBUTE TOPSOIL IN A 5 TO 8 INCH LAYER AND LIGHTLY COMPACT TO A MINIMUM THICKNESS OF 4 INCHES. SPREADING IS TO BE PERFORMED IN
SUCH A MANNER THAT SODDING OR
SEEDING CAN PROCEED WITH A MINIMUM OF ADDITIONAL SOIL PREPARATION AND TILLAGE. ANY IRREGULARITIES IN THE SURFACE RESULTING FROM TOPSOILING OR
OTHER OPERATIONS MUST BE
CORRECTED IN ORDER TO PREVENT THE FORMATION OF DEPRESSIONS OR WATER POCKETS.
iii) TOPSOIL MUST NOT BE PLACED IF THE TOPSOIL OR SUBSOIL IS IN A FROZEN OR MUDDY CONDITION, WHEN THE SUBSOIL IS EXCESSIVELY WET OR IN A
CONDITION THAT MAY OTHERWISE BE
DETRIMENTAL TO PROPER GRADING AND SEEDBED PREPARATION.
4. SOIL AMENDMENTS (FERTILIZER AND LIME SPECIFICATIONS)
a) SOIL TESTS MUST BE PERFORMED TO DETERMINE THE EXACT RATIOS AND APPLICATION RATES FOR BOTH LIME AND FERTILIZER ON SITES HAVING DISTURBED AREAS OF 5…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .