Attachment A Continuation of Schedule B.xls

XLS spreadsheet 134 KB Posted

Attached to
MAES Set-Aside for 8(a), HUBZone and SDVOSB Business Classes Federal contract opportunity
Solicitation number
W912DR-10-R-0107
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

About this file

This is the Excell portion of Attachment A Continuation of Schedule B

View the file

Other files for this federal contract opportunity

Other files attached to MAES Set-Aside for 8(a), HUBZone and SDVOSB Business Classes, newest first.
File Type Posted
Chart 2 Revised 10-26-10.xlsx XLSX spreadsheet
Amendment 10 - Cost.pdf PDF
Amendment 0009 Clarification.pdf PDF
Attachment C Hypothetical Scenario revised 9-7-10.docx DOCX document
Attachment E Chart 1A revised 09-07-10 keb.docx DOCX document
Attachment A Schedule B revised 8-31-10.docx DOCX document
Attachment D Service Contractor Data Information Sheet 9-7-10 kEB.docx DOCX document
Amendment 0008 9-10-10.pdf PDF
Attachment A Continuation of Schedule B revised 09-07-10 keb.xls XLS spreadsheet
Attachment F CHART 1b revised 09-07-10 keb.docx DOCX document
Attachment G Chart 2 revised 09-07-10 keb.docx DOCX document
Attachment K- 2 Questions and Answers 09-07-2010.docx DOCX document
W912DR-10-R-0107 0007.pdf PDF
Attachment D Pre-Award Survey 8-13-10.docx DOCX document
Amendment 0006 8-20-10.pdf PDF
Attachment J - Questions and Answers 8-13-10.doc DOC document
Attachment J Questions and Answers for MAES SDVOSB 7-7-10.docx DOCX document
Amendment 0005 Conformed RFP 8-17-10.pdf PDF
Amendment 0005 Modification 8-17-10.pdf PDF
Attachment B PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment C Hypothetical Scenario.docx DOCX document
Attachment H Lobbying Form.pdf PDF
Attachment G Chart 2.docx DOCX document
Attachment E Chart 1A.docx DOCX document
Attachment D Pre-Award Survey.docx DOCX document
Attachment F CHART 1b.docx DOCX document
Attachment A Schedule B.docx DOCX document
Attachment I ACH EFT form.docx DOCX document
Amendmenrt No 4 8-03-10.pdf PDF
10-R-1017 Amendment 0003 7-1-10.pdf PDF
10-R-0107 Amendment 2 6-22-10.pdf PDF
10-R-0107 RFP 6-7-10 FBO.pdf PDF
09-R-0107 Amendment 0001.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rate Sheet

Multiple Award Environmental Services
Direct Labor by Job ClassificationDirect CostMultiplier From Attachment ETotal Cost
1Principal
2Senior PM
3Junior PM
4Senior Engineer
5Junior Engineer
6Safety Engineer
7Senior Mechanical Engineer
8Junior Mechanical Engineer
9Senior Electrical Engineer
10Junior Electrical Engineer
11Senior Civil Engineer
12Junior Civil Engineer
13Senior Sanitary Engineer
14Junior Sanitary Engineer
15Senior Structural Engineer
16Junior Structural Engineer
17Chemical Engineer
18Geotechnical Engineer
19Environmental Engineer
20Architect Engineer
21Soil Engineer
22Construction Manager
23Engineering Technician
24Laborer
25Landscape Engineer
26Landscape Architect
27Cost Estimator
28Cost Accoutant
29Budget Analyst
30Safety and Health Manager
31Industrial Hygienist (certified)
32Geohydrologist
33Senior Geologist
34Junior Geologist
35Senior Geophysicist
36Junior Geophysicist
37Senior Scientist
38Junior Scientist
39Senior Hydrogeologist
40Junior Hydrogeologist
41Senior Geochemist
42Junior Geochemist
43Senior Chemist
44Junior Chemist
45Certified Lab Technician
46Lab Technician
47Analytical Chemist
48Professional Planner
49Spec Writer
50Senior Environmental Analyst
51Junior Environmental Analyst
52Senior Biologist
53Junior Biologist
54Senior Environmental Scientist
55Junior Environmental Scientist
56Certified Health Physicist
57Health Physicist
58Regulatory Specialist
59Site Safety & Health Officer
60Senior UXO Supervisor(SUXOS)
61UXO Safety Officer (UXOSO)
62UXO Quality Control Specialist (UXOQCS)
63UXO Technician III
64UXO Technician II
65UXO Technician I
66UXO Sweep Personnel
67UXO Project Manager
68Personnel Protective Equipment
69Level "D" Protection
70Level "C" Protection
71Level "B" Protection
72Quality Control Manager
73Illustrator/Draftsperson
74Computer Scientist/Operator
75Technician (General)
76Computer Technician
77Administrative Assistant
78Secretary
79Clerical
80Other Direct Cost: Proposed Multiplier Only
Equipment
Material
Supplies
Travel
Subcontractor

&LSolicitation W912DR-10-R-0107, Attachment A, Continuation of Schedule B &R&P

H

Rev. No.:0COST ESTIMATE FOR TASKDate:0
YEAR 1
TASK NUMBER AND TITLE:0
SUMMARY LABOR HOURS BY WORK ELEMENTLABOR HOURS BY CATEGORYTOTAL
SUBTSK000000000SUBTASK
WBSWORK ELEMENT DESCRIPTIONQty.Units000000000HOURS
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL LABOR HOURS FOR SUBTASK0.00.00.00.00.00.00.00.00.00.0
HOURS -- FIELD LIMITED0.00.00.00.00.00.00.00.00.00.0
00.00.00.00.00.00.00.00.00.00.0
00.00.00.00.00.00.00.00.00.00.0
DIRECT LABOR RATE FOR PROJECT CATEGORY$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL DIRECT LABOR - FIELD LIMITED0000000000
00000000000
00000000000
SCHEDULE FOR TASKSTART (MO.):1END (MO.):1
SUMMARY COSTS FOR TASKFIELD LIMITED000
RATE OR UNITTOTALRATE OR UNITTOTALRATE OR UNITTOTAL
DIRECT LABOR HOURS0.00.00.00.0
DIRECT LABOR DOLLARS$0$0$0$0
LABOR FRINGE, OVERHEAD, AND G&A0.00%0.00%0.00%$00.00%0.00%0.00%$00.00%0.00%0.00%$0$0
TRAVEL$0$0
MATERIALS$0$0
LVE SURCHARGE (Low Value Equipment)0.00%$0$0
G&A ON ODCs0.00%0.00%0.00%$0$0
S/SDB TEAM SUBCONTRACTOR COSTS$0$0
TEAM S/SDB SUBCONTRACT G&A0.00%0.00%0.00%$0$0
OTHER SUBCONTRACTOR COST$0$0
OTHER SUBCONTRACT G&A0.00%0.00%0.00%$0$0
TOTAL COSTS WITHOUT FEE$0$0
FEE0.00%0.00%0.00%0.00%$0$0
TOTAL COST PLUS FEE$0$0$0$0
TRAVEL REQUIREMENTSNumber ofNo. PeopleNo. of DaysTrain/No. RentalCar Rate +Local TravelParkingTolls, Taxi,
DEST.PURPOSE/DESCRIPTIONTripsPer TripPer TripAirfarePer DiemCarsDaily ExpnseMiles& Misc.TOTALS
0
0
0
0
0
0
0
TOTAL FOR SUBTASK0
MATERIALS/SUPPLIES/EQUIPMENTBASIS FOR COST ESTIMATE
ITEM DESCRIPTIONNo. LotsQty./LotUnitsUnit PriceTOTAL
0
0
0
0
0
0
0
0
0
0
TOTAL FOR SUBTASK0
SUBCONTRACTED SERVICESBASIS FOR COST ESTIMATE
TEAM S/SDB SUBCONTRACTED SERVICES:FirmQuantityUnitsUnit PriceTOTAL
0
0
0
OTHER SUBCONTRACTED SERVICES:
0
0
0
0
0
0
TOTAL TEAM S/SDB SUBCONTRACTS0TOTAL OTHER SUBS0

I

Rev. No.:0COST ESTIMATE FOR TASKDate:0
YEAR 1
TASK NUMBER AND TITLE:0COST ESTIMATES FOR:
SUMMARY LABOR HOURS BY WORK ELEMENTLABOR HOURS BY CATEGORYTOTALNUMBERLOTNO. UNITSUNITSTOTAL NO.UNITSUNITTOTALPRICINGTOTAL
SUBTSK000000000SUBTASKFIRMOF LOTSDESCR.PER LOTOF UNITSCOSTBASE COSTFACTORCOST
WBSWORK ELEMENT DESCRIPTIONQty.Units000000000HOURSItem:
0.000010
0.000010
0.000010
0.000010
0.000010
0.000010
0.000010
0.000010
0.000010
0.000010
0.000010
0.000010
0.000010
0.0
0.000010
TOTAL LABOR HOURS FOR SUBTASK0.00.00.00.00.00.00.00.00.00.000010
HOURS -- FIELD LIMITED0.00.00.00.00.00.00.00.00.00.000010
00.00.00.00.00.00.00.00.00.00.000010
00.00.00.00.00.00.00.00.00.00.0
DIRECT LABOR RATE FOR PROJECT CATEGORY$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.0000010
TOTAL DIRECT LABOR - FIELD LIMITED000000000000010
0000000000000010
00000000000TOTAL COST0
SCHEDULE FOR TASKSTART (MO.):1END (MO.):1
SUMMARY COSTS FOR TASKFIELD LIMITED000
RATE OR UNITTOTALRATE OR UNITTOTALRATE OR UNITTOTAL
DIRECT LABOR HOURS0.00.00.00.0
DIRECT LABOR DOLLARS$0$0$0$0
LABOR FRINGE, OVERHEAD, AND G&A0.00%0.00%0.00%$00.00%0.00%0.00%$00.00%0.00%0.00%$0$0
TRAVEL$0$0$0$0
MATERIALS$0$0$0$0
LVE SURCHARGE (Low Value Equipment)$00.00%$0$0$0
G&A ON ODCs0.00%$00.00%$00.00%$0$0
S/SDB TEAM SUBCONTRACTOR COSTS$0$0$0$0
TEAM S/SDB SUBCONTRACT G&A0.00%$00.00%$00.00%$0$0
OTHER SUBCONTRACTOR COST$0$0$0$0
OTHER SUBCONTRACT G&A0.00%$00.00%$00.00%$0$0
TOTAL COSTS WITHOUT FEE$0$0$0$0
FEE0.00%0.00%$00.00%$00.00%$0$0
TOTAL COST PLUS FEE$0$0$0$0
TRAVEL REQUIREMENTSNumber ofNo. PeopleNo. of DaysTrain/No. RentalCar Rate +Local TravelParkingTolls, Taxi,
DEST.PURPOSE/DESCRIPTIONTripsPer TripPer TripAirfarePer DiemCarsDaily ExpnseMiles& Misc.TOTALS
0
0
0
0
0
0
0
TOTAL FOR SUBTASK0
MATERIALS/SUPPLIES/EQUIPMENTBASIS FOR COST ESTIMATE
ITEM DESCRIPTIONNo. LotsQty./LotUnitsUnit PriceTOTAL
0
0
0
0
0
0
0
0
0
0
TOTAL FOR SUBTASK0
SUBCONTRACTED SERVICESBASIS FOR COST ESTIMATE
TEAM S/SDB SUBCONTRACTED SERVICES:FirmQuantityUnitsUnit PriceTOTAL
0
0
0
OTHER SUBCONTRACTED SERVICES:
0
0
0
0
0
0
TOTAL TEAM S/SDB SUBCONTRACTS0TOTAL OTHER SUBS0

J

Rev. No.:0COST ESTIMATE FOR TASKDate:0
TASK NUMBER AND TITLE:
SUMMARY LABOR HOURS BY WORK ELEMENTLABOR HOURS BY CATEGORYTOTAL
SUBTSK000000000SUBTASK
WBSWORK ELEMENT DESCRIPTIONQty.Units000000000HOURS
01-0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL LABOR HOURS FOR SUBTASK0.00.00.00.00.00.00.00.00.00.0
HOURS -- FIELD LIMITED0.00.00.00.00.00.00.00.00.00.0
00.00.00.00.00.00.00.00.00.00.0
00.00.00.00.00.00.00.00.00.00.0
DIRECT LABOR RATE FOR PROJECT CATEGORY$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL DIRECT LABOR - FIELD LIMITED0000000000
00000000000
00000000000
SCHEDULE FOR TASKSTART (MO.):1END (MO.):1
SUMMARY COSTS FOR TASKFIELD LIMITED000
RATE OR UNITTOTALRATE OR UNITTOTALRATE OR UNITTOTAL
DIRECT LABOR HOURS0.00.00.00.0
DIRECT LABOR DOLLARS$0$0$0$0
LABOR FRINGE, OVERHEAD, AND G&A0.00%0.00%0.00%$00.00%0.00%0.00%$00.00%0.00%0.00%$0$0
TRAVEL$0$0.00$0.00$0
MATERIALS$0$0.00$0.00$0
LVE SURCHARGE (Low Value Equipment)$00.00%$0$0$0
G&A ON ODCs0.00%$00.00%$00.00%$0$0
S/SDB TEAM SUBCONTRACTOR COSTS$0$0$0$0
TEAM S/SDB SUBCONTRACT G&A0.00%$00.00%$00.00%$0$0
OTHER SUBCONTRACTOR COST$0$0$0$0
OTHER SUBCONTRACT G&A0.00%$00.00%$00.00%$0$0
TOTAL COSTS WITHOUT FEE$0$0$0$0
FEE0.00%0.00%$00.00%$00.00%$0$0
TOTAL COST PLUS FEE$0$0$0$0
TRAVEL REQUIREMENTSNumber ofNo. PeopleNo. of DaysTrain/No. RentalCar Rate +Local TravelParkingTolls, Taxi,
DEST.PURPOSE/DESCRIPTIONTripsPer TripPer TripAirfarePer DiemCarsDaily ExpnseMiles& Misc.TOTALS
0
0
0
0
0
0
0
TOTAL FOR SUBTASK0
MATERIALS/SUPPLIES/EQUIPMENTBASIS FOR COST ESTIMATE
ITEM DESCRIPTIONNo. LotsQty./LotUnitsUnit PriceTOTAL
0
0
0
0
0
0
0
0
0
0
TOTAL FOR SUBTASK0
SUBCONTRACTED SERVICESBASIS FOR COST ESTIMATE
TEAM S/SDB SUBCONTRACTED SERVICES:FirmQuantityUnitsUnit PriceTOTAL
0
0
0
OTHER SUBCONTRACTED SERVICES:
0
0
0
0
0
0
TOTAL TEAM S/SDB SUBCONTRACTS0TOTAL OTHER SUBS0

K

Rev. No.:0COST ESTIMATE FOR TASKDate:0
TASK NUMBER AND TITLE:0
SUMMARY LABOR HOURS BY WORK ELEMENTLABOR HOURS BY CATEGORYTOTAL
SUBTSK000000000SUBTASK
WBSWORK ELEMENT DESCRIPTIONQty.Units000000000HOURS
01-0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL LABOR HOURS FOR SUBTASK0.00.00.00.00.00.00.00.00.00.0
HOURS -- FIELD LIMITED0.00.00.00.00.00.00.00.00.00.0
00.00.00.00.00.00.00.00.00.00.0
00.00.00.00.00.00.00.00.00.00.0
DIRECT LABOR RATE FOR PROJECT CATEGORY$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL DIRECT LABOR - FIELD LIMITED0000000000
00000000000
00000000000
SCHEDULE FOR TASKSTART (MO.):1END (MO.):1
SUMMARY COSTS FOR TASKFIELD LIMITED000
RATE OR UNITTOTALRATE OR UNITTOTALRATE OR UNITTOTAL
DIRECT LABOR HOURS0.00.00.00.0
DIRECT LABOR DOLLARS$0$0$0$0
LABOR FRINGE, OVERHEAD, AND G&A0.00%0.00%0.00%$00.00%0.00%0.00%$00.00%0.00%0.00%$0$0
TRAVEL$0$0.00$0.00$0
MATERIALS$0$0.00$0.00$0
LVE SURCHARGE (Low Value Equipment)$00.00%$0$0$0
G&A ON ODCs0.00%$00.00%$00.00%$0$0
S/SDB TEAM SUBCONTRACTOR COSTS$0$0$0$0
TEAM S/SDB SUBCONTRACT G&A0.00%$00.00%$00.00%$0$0
OTHER SUBCONTRACTOR COST$0$0$0$0
OTHER SUBCONTRACT G&A0.00%$00.00%$00.00%$0$0
TOTAL COSTS WITHOUT FEE$0$0$0$0
FEE0.00%0.00%$00.00%$00.00%$0$0
TOTAL COST PLUS FEE$0$0$0$0
TRAVEL REQUIREMENTSNumber ofNo. PeopleNo. of DaysTrain/No. RentalCar Rate +Local TravelParkingTolls, Taxi,
DEST.PURPOSE/DESCRIPTIONTripsPer TripPer TripAirfarePer DiemCarsDaily ExpnseMiles& Misc.TOTALS
0
0
0
0
0
0
0
TOTAL FOR SUBTASK0
MATERIALS/SUPPLIES/EQUIPMENTBASIS FOR COST ESTIMATE
ITEM DESCRIPTIONNo. LotsQty./LotUnitsUnit PriceTOTAL
0
0
0
0
0
0
0
0
0
0
TOTAL FOR SUBTASK0
SUBCONTRACTED SERVICESBASIS FOR COST ESTIMATE
TEAM S/SDB SUBCONTRACTED SERVICES:FirmQuantityUnitsUnit PriceTOTAL
0
0
0
OTHER SUBCONTRACTED SERVICES:
0
0
0
0
0
0
TOTAL TEAM S/SDB SUBCONTRACTS0TOTAL OTHER SUBS0

L

Rev. No.:0COST ESTIMATE FOR TASKDate:0
TASK NUMBER AND TITLE:0
SUMMARY LABOR HOURS BY WORK ELEMENTLABOR HOURS BY CATEGORYTOTAL
SUBTSK000000000SUBTASK
WBSWORK ELEMENT DESCRIPTIONQty.Units000000000HOURS
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL LABOR HOURS FOR SUBTASK0.00.00.00.00.00.00.00.00.00.0
HOURS -- FIELD LIMITED0.00.00.00.00.00.00.00.00.00.0
00.00.00.00.00.00.00.00.00.00.0
00.00.00.00.00.00.00.00.00.00.0
DIRECT LABOR RATE FOR PROJECT CATEGORY$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL DIRECT LABOR - FIELD LIMITED0000000000
00000000000
00000000000
SCHEDULE FOR TASKSTART (MO.):1END (MO.):1
SUMMARY COSTS FOR TASKFIELD LIMITED000
RATE OR UNITTOTALRATE OR UNITTOTALRATE OR UNITTOTAL
DIRECT LABOR HOURS0.00.00.00.0
DIRECT LABOR DOLLARS$0$0$0$0
LABOR FRINGE, OVERHEAD, AND G&A0.00%0.00%0.00%$00.00%0.00%0.00%$00.00%0.00%0.00%$0$0
TRAVEL$0$0.00$0.00$0
MATERIALS$0$0.00$0.00$0
LVE SURCHARGE (Low Value Equipment)$00.00%$0$0$0
G&A ON ODCs0.00%$00.00%$00.00%$0$0
S/SDB TEAM SUBCONTRACTOR COSTS$0$0$0$0
TEAM S/SDB SUBCONTRACT G&A0.00%$00.00%$00.00%$0$0
OTHER SUBCONTRACTOR COST$0$0$0$0
OTHER SUBCONTRACT G&A0.00%$00.00%$00.00%$0$0
TOTAL COSTS WITHOUT FEE$0$0$0$0
FEE0.00%0.00%$00.00%$00.00%$0$0
TOTAL COST PLUS FEE$0$0$0$0
TRAVEL REQUIREMENTSNumber ofNo. PeopleNo. of DaysTrain/No. RentalCar Rate +Local TravelParkingTolls, Taxi,
DEST.PURPOSE/DESCRIPTIONTripsPer TripPer TripAirfarePer DiemCarsDaily ExpnseMiles& Misc.TOTALS
0
0
0
0
0
0
0
TOTAL FOR SUBTASK0
MATERIALS/SUPPLIES/EQUIPMENTBASIS FOR COST ESTIMATE
ITEM DESCRIPTIONNo. LotsQty./LotUnitsUnit PriceTOTAL
0
0
0
0
0
0
0
0
0
0
TOTAL FOR SUBTASK0
SUBCONTRACTED SERVICESBASIS FOR COST ESTIMATE
TEAM S/SDB SUBCONTRACTED SERVICES:FirmQuantityUnitsUnit PriceTOTAL
0
0
0
OTHER SUBCONTRACTED SERVICES:
0
0
0
0
0
0
TOTAL TEAM S/SDB SUBCONTRACTS0TOTAL OTHER SUBS0

File details come from the government source that posted it. Updated .