B.08.03 Solicitation Amendment 0004 W912DQ21B1002 (SF 30).pdf

PDF 181 KB Posted

Attached to
Manhattan Levee Flood Risk Management Project Federal contract opportunity
Solicitation number
W912DQ21B1002
Issued by
Department of the Army Corps of Engineers Engineering District Kansas City

About this file

This document provides details on a federal construction solicitation for the Manhattan Levee Flood Risk Management Project in Manhattan, Kansas. The U.S. Army Corps of Engineers, Kansas City District intends to issue an invitation for bid for construction activities including approximately 14,600 feet of levee raises, underseepage control measures including 26 relief wells and 9,200 linear feet of berms, modification and replacement of drainage structures, and numerous utility relocations. The estimated value of the contract is between $25 million and $100 million. The solicitation is expected to be available on April 21, 2021 on SAM.gov. Interested offerors must register in SAM prior to bid submission. Bids are due on the date specified in the solicitation. The estimated period of performance is 913 days from notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Manhattan Levee Flood Risk Management Project, newest first.
File Type Posted
C.04.01 Abstract of Offers.xlsx XLSX spreadsheet
B.08.03 Solicitation Amendment 0004-Attach I.pdf PDF
B.08.03 Solicitation Amendment 0004-Attach. G.pdf PDF
B.08.03 Solicitation Amendment-0004 Volume 2 Plans.pdf PDF
B.08.03 Solicitation Amendment 0004-Attach.K.pdf PDF
B.08.03 Solicitation Amendment-0004 Volume 1 Plans.pdf PDF
B.08.03 Solicitation Amendment 0004-Attach. B.pdf PDF
B.08.03 Solicitation Amendment 003 Volume 1 Plan Sheets Reduced.pdf PDF
B.08.03 Solicitation Amendment 0003 Volume 2 Plan Sheets.pdf PDF
B.08.03 Solicitation Amendment 0003 - Spec Attachment N - Div VII Sec 7300.pdf PDF
B.08.03 Solicitation Amendment 003 Volume 1 Plan Sheets.pdf PDF
B.08.03 Solicitation Amendment 0003 Manhattan Pilot Hole Logs.pdf PDF
B.08.03 Solicitation Amendment 0003 Manhattan Borrow Test Pit Logs.pdf PDF
B.08.03 Solicitation Amendment 0003 SF 30 MFRM Amdt 3 Pg 2.pdf PDF
B.08.03 Solicitation Amendment 0002 How To Obtain CADD Drawing.pdf PDF
B.08.03 Solicitation Amendment 0002 MFRM_CS301.pdf PDF
B.08.03 Solicitation Amendment 0002 MFRM_G-001.pdf PDF
B.08.03 Solicitation Amendment 0002 MFRM_CS501.pdf PDF
B.08.03 Solicitation Amendment 0002 (SF 30).pdf PDF
B.08.03 Solicitation Amendment 0002 MFRM_SF135.pdf PDF
B.08.03 Solicitation Amendment 0002 Riley Co CUP for Levee Borrow June 2021.pdf PDF
I.01.11 Site Visit Sign-In Sheet.pdf PDF
B.08.03 Solicitation Amendment 0001 (Approved).pdf PDF
B.08.02 MFRM Solicitation and Specifications (6-17-21).pdf PDF
NOTICE TO BIDDERS.docx DOCX document
B.08.02 MFRM PLANS - VOLUME 2.pdf PDF
Manhattan Virtual Industry Day UNOFFICIAL SLIDES.pptx PPTX presentation
A.02.10 Vendors List From Industry Day.xlsx XLSX spreadsheet
A.01.23 Updated Industry Day Information (1).docx DOCX document
A.01.23 Industry Day Information (1).pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

To provide potential bidders information to prepare their bids.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ21B1002

X 9B. DATED (SEE ITEM 11)

17-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Aug-2021

CODE

USACE, KANSAS CITY 1

FEDERAL BLDG CT 601 E 12TH ST ROOM 647

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ21B1002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SOLICITATION AMENDMENT 0004

Kansas River Flood Protection Project Manhattan Unit Levee Raise Manhattan, KS

PN: 477526

The SOLICITATION is amended as follows:

NOTE: Deleted text is shown in RED with strikethrough. Added text is shown in GREEN with underline.

1. CONTRACTING:

The RED strikethrough means the below Clause/Provision have been deleted from the solicitation. Added Clause/ Provision is shown in GREEN with underline.

52.217-3 EVALUATION EXCLUSIVE OF OPTIONS (APR 1984)

52.225-10 Notice of Buy American Act Requirement-Construction Materials

52.225-12 Notice of Buy American Act Requirement- Construction Materials under Trade Agreements.

Potential Bidders see clause 52.217-5 EVALUATION OF OPTIONS in the solicitation.

All amendments must be acknowledge in order for your bid to be acceptable.

2. SPECIFICATIONS:

Delete and Replace as shown below:

32 00 01.00 23 – Storm, Roadway, Trails and Select Utilities at Hayes Drive Part 1 – General

1.1 – Overview

Change the Section from 3.3 to 3.9 in paragraph one and paragraph two. See below.

Section 3.3 3.9

Section 3.3 3.9

Para 1.2 – Submittals; SD-01 Preconstruction Submittals

Emergency Backfill Plan; G, RO

Submit for review and approval a detailed Emergency Backfill Plan as indication in Paragraph 1.4 Section 1.3.1.3 of the specification section.

Part 2 – Products & Materials Para 2.1 – Materials Furnished By The Contractor

The following product data will follow the material requirement listed in Attachment A Dicision Division 2 Section 2200 Sanitary Sewers under 2203.

Part 3 - Execution

3.4 – Test Reports

Water line Disinfection Report and Water Line Bacteriological Report as work progresses, weater water shall be sampled in accordance with Attachment I, Section 02675 Disinfection of Water System.

Water Line Pressure and Leakage Test

33 05 00.00 23 – Water and Sewer Relocations Part 1 – General

1.1 – Overview

The specifications provided as attachments list in Section 3.3 3.9 are applicable to all work described in Volume 2, Part A of the Kansas River Flood Project Manhattan Levee Raise.

On all questions concerning the acceptability of materials, the execution of the work, and conflicting interests of this Volume 2, Part A and the attachments listed in Section 3.3 3.9 and the Volume 1 Plans shall have City of Manhattan concurrent approval.

1.2 – Submittals SD-01 Preconstruction Submittals

Emergency Backfill Plan; G, RO

Submit for review and approval a detailed Emergency Backfill Plan as indication in Paragraph 1.3 Section 1.3.1.3 of the specification section.

3.4 – Test Reports

Add:

Water Line Pressure and Leakage Test

Para 3.9 Attachments

Add:

Attachment N, Division VII Section 7300 – Water Service Connections

33 26 00.00 23 - Relief Wells Para. 3.5.2

Add the following verbiage at the end of the sentence:

or other pumping into or out of the ground will be allowed within 3000 ft in any direction of the pumped well location or calculate the distance between the well being tested and the well with zero affect then multiplied by 2, or whichever is greater.

35 41 00 – Levee Construction Para. 2.2.5 - Coarse Drainage Gravel

ADD the following sentence to the end of the paragraph.

Coarse drainage gravel should be procured from a commercial source.

Para 2.2.6 – Filter Sand

ADD the following sentence to the end of the paragraph.

Filter sand should be procured from a commercial source.

Para 3.21.7 – Top Soil

ADD to the end of the last sentence.

and compacted as described in 3.21 COMPACTION.

ATTACHMENTS:

Attachment B:

Delete and Replace with a new section (see attached as Attachment B)

Attachment G (see attached as Attachment G)

Correct title name from “Attachment E” to “Attachment G”.

Paragraph 1.1.A

Correct to say “2-inch” rather than “-inch.”

Attachment I (see attached as Attachment I) Paragraph 3.2.B

Add to require a 1% available chlorine solution rather than a 200 ppm solution.

Attachment I (see attached as Attachment I) Paragraph 3.2.H.

Add H:

Flushing with a velocity of 2.5 feet per second must take place prior to chlorination except in the case where tablets or granules of calcium hypochlorite have been placed in the pipe during installation.

Attachment I (see attached as Attachment I) Paragraph 3.5.B

Add:

to clarify that the tests will be on bacteriological samples.

Attachment K – (see attached as Attachment K) Paragraph 2.1

Add C.:

Compliance with the Reduction of Lead in Drinking Water Act (2014) is required and all applicable products must meet the lead-free requirements and conform to NSF 372, where applicable.

3. DRAWINGS:

MFRM_C-SC01.dgn o MicroStation (.dgn) file has been provided in the project Plan Room for Cross Sections.

Download from the plan room with the instructions provided within the original project solicitation.

A copy of this file could only be downloaded in projnet.

VOLUME 1 DRAWINGS

o CS116 - Sheet Keynote 8 added.

o CS301 - Note 1 Revised.

o CS303 - A1 Note 5 Added.

o CS304 - A1 & E1 Note 1 Updated.

VOLUME 2 DRAWINGS

o Sheet 3 – Updated quantities for Part A line items 37 and 92 and Part B line item 2.

Added new line item 53.1.

o Sheet 10 – Added note 4 for separation requirements between water service and sanitary force main.

o Sheet 28 – Added 30”x12” tee and reconnection to existing well line.

o Sheet 51 – Increased length of pipe insulation on 12” water line by 20 feet.

o Sheet 62 – Crossed out City detail for pipe end seals for clarity. This detail is not needed.

SECTION 00 21 00 - INSTRUCTIONS

The following have been added by full text:

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

The following have been deleted:

52.217-3 Evaluation Exclusive Of Options APR 1984 52.225-10 Notice of Buy American Requirement--Construction

Materials

MAY 2014

(End of Summary of Changes)

File details come from the government source that posted it. Updated .