B.08.03 Solicitation Amendment 0004-Attach I.pdf
PDF 75 KB Posted
- Attached to
- Manhattan Levee Flood Risk Management Project Federal contract opportunity
- Solicitation number
- W912DQ21B1002
About this file
This document contains details for a federal construction contract solicitation and the related federal contract opportunity. The solicitation amendment provides specifications for the disinfection of water systems for a project updating the Manhattan, Kansas Flood Risk Management levee. Key requirements include disinfecting potable and raw water lines using AWWA-approved chemicals, submitting disinfection and testing plans, and conducting hydrostatic pressure testing and bacteriological sampling to verify the absence of coliform bacteria before placing lines in service. The related federal contract opportunity notices an upcoming Invitation for Bid for construction activities on the Manhattan Levee Flood Risk Management Project. Work includes raising approximately 14,600 feet of levee along the Big Blue and Kansas Rivers, underseepage control measures, drainage structure modifications, and numerous utility relocations. The project value is estimated between $25-100 million. The performance period is anticipated at 913 days after notice to proceed. The solicitation is expected to be available on April 21, 2021 through the SAM website. Bids are due on the date specified in the solicitation.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02675-1
ATTACHMENT I
SECTION 02675
DISINFECTION OF WATER SYSTEM
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Disinfection of potable and raw water systems.
1.2 RELATED SECTIONS
A. Section 33 05 00 - Water and Sewer Relocations.
B. Attachment B, Division II Section 2300 Waterlines.
1.3 REFERENCES
A. AWWA B300 - Standard for Hypochlorites.
B. AWWA B301 - Standard for Liquid Chlorine.
C. AWWA B302 - Standard for Ammonium Sulfate.
D. AWWA B303 - Standard for Sodium Chlorite.
E. AWWA C651 - Standards for Disinfecting Water Mains.
1.4 SUBMITTALS FOR INFORMATION
A. Section 01 33 00 – Submittal Procedures
B. Test Reports: Indicate results comparative to specified requirements.
C. Submit detailed disinfection plan for all water mains.
D. Certificate: Certify that cleanliness of water distribution system meets or exceeds specified requirements.
1.5 PROJECT RECORD DOCUMENTS
A. Submit under provisions of Section 01 33 00 – Submittal Procedures.
B. Disinfection testing to be completed on finished water lines only.
C. Disinfection Report:
1. Type and form of disinfectant used.
2. Date and time of disinfectant injection start and time of completion.
3. Test locations.
4. Initial and 24-hour disinfectant residuals quantity in treated water in ppm for each outlet tested.
02675-2
5. Date and time of flushing start and completion.
6. Disinfectant residual after flushing in ppm for each outlet tested.
D. Bacteriological Report:
1. Date issued, project name, and testing laboratory name, address, and telephone number.
2. Time and date of water sample collection.
3. Name of person collecting samples.
4. Test locations.
5. Initial and 24-hour disinfectant residuals in ppm for each outlet tested.
6. Coliform bacteria test results for outlet tested.
7. Certification that water conforms, or fails to conform, to bacterial standards of
Kansas Department of Health and Environment (KDHE)
8. Minimum 2 samples collected 24 hours apart demonstrating zero coliform present.
1.6 QUALITY ASSURANCE
A. Perform Work in accordance with AWWA C651.
B. Testing Firm: Company specializing in testing potable water systems, certified by the
KDHE.
1.7 REGULATORY REQUIREMENTS
A. Conform to KDHE code or regulation for performing the work of this Section.
B. Provide certificate of compliance from KDHE indicating approval of water system.
PART 2 - PRODUCTS
2.1 DISINFECTION CHEMICALS
A. Chemicals: AWWA B300, Hypochlorite, AWWA B301, Liquid Chlorine, AWWA B302, Ammonium Sulfate, and AWWA B303, Sodium Chlorite.
B. All water treatment chemicals used must be NSF 60 product certified.
PART 3 - EXECUTION
3.1 PREPARATION
A. At least 15 days prior to starting any disinfection work, the Contractor shall submit to the Engineer a detailed flushing and disinfection plan. The plan shall be coordinated with the Owner and shall cover the method and procedure proposed, to include coordination, sequence of operations, equipment to be used (including temporary flushing devices, et cetera), the manner of filling and flushing of lines, and the neutralization and disposal of wasted water. (All chlorinated water discharged to drainage courses shall be neutralized by dilution or chemical treatment).
B. The Contractor shall coordinate flushing and disinfection work with adjacent work as necessary to preclude work interference or duplication of effort and to expedite the overall progress of the work.
02675-3
C. The Contractor shall provide all necessary piping connections, temporary valves, sampling taps, pumps, disinfectant, neutralization agents, testing laboratory services, and all other items of equipment or facilities required to complete the disinfection work.
D. Water required for flushing and disinfection work will be provided as stipulated in the temporary facilities section.
E. Verify that piping system has been cleaned, inspected, and pressure tested.
3.2 EXECUTION
A. Provide and attach equipment required to execute work of this Section.
B. At connections and cut-ins, swab all new pipe fittings, valves, and the open ends of the existing pipe with a 1% (10,000 ppm) available chlorine solution immediately before assembly.
C. Disinfect all portions of the new water line with an approved chlorine compound to provide 50 ppm chlorine throughout the system and let stand for 24 hours. Residual after 24 hours shall be not less than 10 ppm. If it is less than 10 ppm, re-chlorinate. If it is 10 ppm or greater, flush the system.
D. Circulate and flush at a rate sufficient to produce a cleansing velocity of 2.5 fps until required cleanliness is achieved.
E. Flush and clean with domestic water.
F. Replace permanent system devices removed for disinfection.
G. Contain and treat water containing excessive chlorine residuals. Methods for de-chlorination are found in Appendix D of the “Policies, General Considerations, and Design Requirements for Public Water Supply Systems Kansas”, 2008 edition, and/or AWWA C655 Field Dechlorination.
H. Flushing with a velocity of 2.5 feet per second must take place prior to chlorination except in the case where tablets or granules of calcium hypochlorite have been placed in the pipe during installation.
3.3 TESTS
A. The Contractor shall collect two water samples 24 hours apart for each continuous section of new water main at two separate sampling locations that are at least 1,000 feet apart. Where continuous sections of new water main are less than 1,000 feet long, one sampling location per continuous section will be adequate. The samples will be analyzed for bacteriological quality. Two consecutive tests at each sampling location must show the absence of coliform bacteria prior to placing water mains into service.
B. If portions of main are placed in service before the entire system, those portions shall be tested according to 3.2 Part B given above.
C. All costs for testing or re-testing due to failed tests will be at the Contractor's expense.
D. Test samples in accordance with ANSI/AWWA C651.
02675-4
3.4 PRESSURE TESTING
A. Perform hydrostatic testing on new water mains in accordance with Attachment B, Division II Section 2300 prior to disinfection procedures.
3.5 FIELD QUALITY CONTROL
A. Section 01 45 00.00 10 - Quality Assurance: Field inspection and testing.
B. Test bacteriological samples in accordance with AWWA C651.
END OF SECTION