B.08.03 Solicitation Amendment 0004-Attach. G.pdf

PDF 76 KB Posted

Attached to
Manhattan Levee Flood Risk Management Project Federal contract opportunity
Solicitation number
W912DQ21B1002
Issued by
Department of the Army Corps of Engineers Engineering District Kansas City

About this file

This document provides details for an upcoming construction solicitation for the Manhattan Levee Flood Risk Management Project. The U.S. Army Corps of Engineers, Kansas City District, will issue an invitation for bid for construction activities including approximately 14,600 feet of levee raises, underseepage control measures involving 26 relief wells and 9,200 feet of berms, modifying and replacing drainage structures, and numerous utility relocations. The estimated value is between $25-100 million. The NAICS code is 237990. The estimated performance period is 913 days after notice to proceed. No pre-solicitation conference is currently planned but details will be provided in the solicitation if one is scheduled. Bids are due on the date specified in the solicitation, which is expected to be available on or around April 21, 2021 via the SAM.gov website. Offerors must have an active SAM registration to be considered for award.

View the file

Other files for this federal contract opportunity

Other files attached to Manhattan Levee Flood Risk Management Project, newest first.
File Type Posted
C.04.01 Abstract of Offers.xlsx XLSX spreadsheet
B.08.03 Solicitation Amendment 0004 W912DQ21B1002 (SF 30).pdf PDF
B.08.03 Solicitation Amendment 0004-Attach I.pdf PDF
B.08.03 Solicitation Amendment-0004 Volume 1 Plans.pdf PDF
B.08.03 Solicitation Amendment 0004-Attach. B.pdf PDF
B.08.03 Solicitation Amendment-0004 Volume 2 Plans.pdf PDF
B.08.03 Solicitation Amendment 0004-Attach.K.pdf PDF
B.08.03 Solicitation Amendment 003 Volume 1 Plan Sheets Reduced.pdf PDF
B.08.03 Solicitation Amendment 003 Volume 1 Plan Sheets.pdf PDF
B.08.03 Solicitation Amendment 0003 Manhattan Pilot Hole Logs.pdf PDF
B.08.03 Solicitation Amendment 0003 Manhattan Borrow Test Pit Logs.pdf PDF
B.08.03 Solicitation Amendment 0003 SF 30 MFRM Amdt 3 Pg 2.pdf PDF
B.08.03 Solicitation Amendment 0003 Volume 2 Plan Sheets.pdf PDF
B.08.03 Solicitation Amendment 0003 - Spec Attachment N - Div VII Sec 7300.pdf PDF
B.08.03 Solicitation Amendment 0002 How To Obtain CADD Drawing.pdf PDF
B.08.03 Solicitation Amendment 0002 MFRM_CS301.pdf PDF
B.08.03 Solicitation Amendment 0002 MFRM_G-001.pdf PDF
B.08.03 Solicitation Amendment 0002 MFRM_CS501.pdf PDF
B.08.03 Solicitation Amendment 0002 (SF 30).pdf PDF
B.08.03 Solicitation Amendment 0002 Riley Co CUP for Levee Borrow June 2021.pdf PDF
B.08.03 Solicitation Amendment 0002 MFRM_SF135.pdf PDF
I.01.11 Site Visit Sign-In Sheet.pdf PDF
B.08.03 Solicitation Amendment 0001 (Approved).pdf PDF
B.08.02 MFRM Solicitation and Specifications (6-17-21).pdf PDF
B.08.02 MFRM PLANS - VOLUME 2.pdf PDF
NOTICE TO BIDDERS.docx DOCX document
Manhattan Virtual Industry Day UNOFFICIAL SLIDES.pptx PPTX presentation
A.02.10 Vendors List From Industry Day.xlsx XLSX spreadsheet
A.01.23 Updated Industry Day Information (1).docx DOCX document
A.01.23 Industry Day Information (1).pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01640-1

ATTACHMENT G

SECTION 01640

PIPE SCHEDULE

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Schedule of 2-inch and larger pipelines indicating the type and service for pipe to be used. Pipe materials, installation requirements, and testing for pipe listed in the schedule are covered in other sections.

B. All pipelines indicated on the drawings or specified in other sections shall be furnished whether listed in the schedule or not.

1.2 RELATED REQUIREMENTS

A. Section 33 05 00 – Water and Sewer Relocations.

B. Attachment A, Division II Section 2200 – Sanitary Sewers

C. Attachment B, Division II Section 2300 – Waterlines

1.3 ALTERNATIVE PIPE MATERIALS

A. Where more than one pipe material is indicated in the schedule, the type of pipe material to be installed may be selected by the Contractor. The details on the drawings cover only one type of pipe for each line. If a different material is selected by the Contractor, all details of connections, jointing, wall fittings, support, anchorage, and harnesses shall be modified by the Contractor to produce an equivalent design acceptable to the Engineer.

1.4 WALL FITTING

A. Unless otherwise indicated on the drawings, a wall pipe, or sleeve will be required for all pipe passing through concrete or masonry block walls. All wall fittings and sleeves shall be as indicated on the drawings and as specified in the applicable piping section.

1.5 RESTRAINED JOINTS

A. Buried pipelines shall have restrained joints as indicated in Drawings. Restrained joints shall be designed for a pressure equal to or greater than the test or design pressure specified in the pipeline pressure and leakage testing section.

B. All connections to existing piping system are to be restrained. All restraints to be compatible with piping material.

01640-2

C. Restrained DIP Push-On Joints shall be Griffin "Snap-Lok", or equal.

D. Retainer Glands to be provided on all Mechanical Joint Fittings and at other locations as noted on the plans shall be EBAA Iron Sales “Megalug”, suitable for DIP applications, no exceptions. Provide transition gaskets and adapters as needed for connecting pipe and pipe fittings of different materials.

1.5 PIPE SCHEDULE

A. The abbreviations used in the following schedule and the specification covering the pipe material are as follows:

Abbreviation Pipe Material Specification Section

DIP Ductile Iron Pipe – Sanitary Sewers 2200 (Attachment A)

DIP Ductile Iron Pipe – Waterlines 2300 (Attachment B)

HDPE High Density Polyethylene – Fiber 16131 (Attachment L)

B. Pipe materials shall conform to the following schedule. All pipelines indicated on the drawings and all pipelines required for proper operation of the equipment furnished shall be provided whether listed in the schedule or not.

Pipe Size Pressure

(inches) Service Location Material Class

2” Fiber Optic Control Line Buried HDPE -

6” Hunters Island (Riley County) Water

Line Buried DIP

8” Konza Prairie Force Main Buried DIP 250

8” City WWTP Biosolids Lines (Qty: 2) Buried DIP 250

12/14” Blue Township Force Main Buried DIP 250

16” Konza Prairie Water Line Buried DIP 250

16” Blue Township Water Line Buried DIP 250

30” City Raw Water System Line Buried DIP 150

36” City Raw Water System Line Buried DIP 150

C. Ductile Iron Pipe in sanitary sewer applications shall be lined with Induron’s Protecto

401™ Ceramic Epoxy or approved equal.

D. All water mains shall contain 12 ga. (HDPE Coated) Steel-Clad Copper Tracer wire manufactured for direct bury service, Agave, Copperhead, or approved equal. Wire shall be continuous without breaks. Splices shall be made with petroleum-filled wire nut caps suitable for direct bury service, 3M direct bury splice DBR/Y, or equal. Bring tracer wire to surface as shown on the plans. Use with all non-metallic water main subsidiary to the project.

01640-3

PART 2 - PRODUCTS

Not Used.

PART 3 - EXECUTION

Not Used.

END OF SECTION