Attachment 4.docx

DOCX document 16 KB Posted

Attached to
Maintenance and Repair of Multiple Separator System USAG Wiesbaden, Germany (OCONUS)
Solicitation number
W912CM24Q0005
Issued by

About this file

This document appears to be a collection of questions and answers related to a federal contract opportunity for the maintenance and repair of multiple separator systems at U.S. Army Garrison (USAG) Wiesbaden, Germany.

The key details are: The Regional Contracting Office intends to competitively award a hybrid fixed price (FFP) and time and materials (T&M) contract for maintenance and repair (M&R) of POL separators, mud traps, oil tanks, drains, rainwater retention basins, water treatment plants, grease separators, potato starch separators, and septic tanks at USAG Wiesbaden. The contract will consist of one base year and two option years, with a proposed start date of April 15, 2024. The RFQ and any amendments will be posted to www.sam.gov, and offerors must be registered in the System for Award Management (SAM) database. Responses are due by April 5, 2024 at 1000 CET Germany. Payments will be processed through the Wide Area Work Flow (WAWF) system.

View the file

Other files

File Type Posted
W912CM24Q0005 P00007.pdf PDF
W912CM24Q0005 P0006.pdf PDF
Attachment 2- Price Book New Version April 29 2024.xlsx XLSX spreadsheet
Exhibit A_Invent. POL- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
Attachment 2 - Price Book New Version April 23 2024.xlsx XLSX spreadsheet
W912CM24Q0005 - P00005.pdf PDF
Exhibit C_Invent. Basin-Without_unit_price New Version April 23,2024.xls XLS spreadsheet
Exhibit B_Invent. Mud- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
Exhibit D_Invent. Grease and Septic- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
W912CM24Q0005 P00004.pdf PDF
(11Apr24) W912CM24Q0005 P0003.pdf PDF
W912CM24Q0005 P00002.pdf PDF
Attachment 3 - Answer to Questions asked.pdf PDF
W912CM24Q0005 P00001.pdf PDF
Attachment 3 - Answer to asked Question.pdf PDF
Exhibit A_Invent. POL- Without_unit_prices New Version March 27, 2024.xlsx XLSX spreadsheet
Exhibit E_Waste Water Pump Stations.xlsx XLSX spreadsheet
Exhibit C_Basins and Drains.xls XLS spreadsheet
Attachment 2 - Price Book.xlsx XLSX spreadsheet
Exhibit D_Grease Separators and Septic Tanks.xlsx XLSX spreadsheet
Exhibit A_POL Separators.xlsx XLSX spreadsheet
Exhibit B_Mud Traps.xlsx XLSX spreadsheet
W912CM24Q0005.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Question Does USAG Wiesbaden provide the contractor with a waste disposal certificate to transport USAG Waste (Einzelentsorgungsnachweis)?

Yes, this will be provided.

How often is the Grease Separator cleaned?

It depends where the Grease Separator is located, the ones that are more frequent used need to be cleaned twice a month. Further Details can be found in the Price Book as well as the Inventory List

What needs to happen after a Grease Separator is cleaned?

After the Grease Separator is cleaned it needs to be filled with water which can be taken from hydrants. It is important that no hoses are left in the open next to the hydrant.

How long does it take to clean all the Grease Separators?

Historically, it has taken 2-3 Days to clean all the Separators.

Are there any Key’s need for the cleaning Tour?

All the keys that are needed for the cleaning Tour will be provided upon request when needed to perform.

When are the next Tüv due for the Systems?

The Tüv Inspection vary depending on the system, as a result of the question an updated Inventory List has been for Exhibit A_Invent. POL to reflect when the last inspection has taken place.

As a result of the site visit it was discovered that some systems were not listed, therefore the following exhibits have been updated as a result to include all existing inventory requiring service: Exhibit A_Invent. POL- Without_unit_Prices New Version April 23,2024, Exhibit B_Mud Traps New Version April 23, 2024, Exhibit C_Basins and Drains New Version April 23,2024, Exhibit D_Grease Separators and Septic Tanks New Version April 23,2024 and Attachment 2 – Price Book New Version April 23,2024.

It appears the Coalescence separators are listed as well as POL separators, but there are 2 subclins in CLIN X002. Shall we name a price in E002 for the complete cleaning, or JUST the additional work required to perform cleaning on these coalescence separators?

The contractor shall ONLY price the additional work into E002.

Question in regard to the Potato Starch Separator (Building #1052)

How often does the Potato Starch Separator need to be cleaned?

The Potato Starch Separator needs to be cleaned every 3 Months.

Are the Tools provided to open the Separator?

The special tools required to open the separator will not be provided and are the responsibility of the contractor.

Will there be Hot Water available?

The kitchen has hot water which can be used for cleaning purposes.

Can the Hoses for the Potato Strach be stored?

At present it is not clear if the DFAC, will allow storage in Building #1052. Therefore the quoters shall not assume this can be stored.

Rainwater retention System

How often is the Rainwater retention System cleaned?

The rainwater retention system needs to cleaned once per year. Please note this sometimes may require rescheduling during certain months in the year (April-Sept during bird breeding season when birds are present).

Can the Water be Discarded over the Sewer?

The water from the rainwater retention system can be discarded via the sewers.

What about the Mud Traps?

As a result, from the Site Visit it was discovered that the System was not Part of the Inventory List and has been added to Exhibit A

Are there specific vehicle requirements to access the septic tanks on the Golf Course?

The two Septic Tanks that are located on the Golf Course are only accessible by the “Golf Cart Trail”. This can be driven on, however it is a trail and not rated for heavy machinery. The contractor should consider use of a smaller vehicle or other means to ensure they comply with FAR 52.237-2 Protection Of Government Buildings, Equipment, And Vegetation.