Exhibit C_Basins and Drains.xls
XLS spreadsheet 47 KB Posted
- Solicitation number
- W912CM24Q0005
About this file
This solicitation is for a hybrid fixed price and time and materials contract to provide maintenance and repair services for multiple separator systems at U.S. Army Garrison Wiesbaden in Germany. The base scope includes emptying, cleaning, inspecting, repairing, and transporting residue from petroleum, oil and lubricant separators, mud traps, oil tanks, drains, rainwater retention basins, water treatment plants, grease separators, potato starch separators, and septic tanks and wastewater pump stations. The contract would be for one base year and two option years, with a proposed start date of April 15, 2024. The regular preventive maintenance would be firm fixed price while on-call and emergency maintenance would be time and materials. Quotes are due by April 5, 2024. Payments will be processed through WAWF. Offerors must be registered in SAM to submit a quote. The soliciting agency is the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit C
| Only use coloum "U-Price in EURO"! | |||||||
| Lfd. Nr. | Installation | Bldg # | Description | QTY | Dimensions | SF -Volume (m3) | U-price in EURO |
| 1 | Mc Cully Bks | 7200 | Rainwater Retention Basin | 1 | 60x10x2.5 m | 1500 | |
| 2 | Mc Cully Bks | 7200 | Rainwater Retention Basin | 1 | 30x10x2.5 m | 750 | |
| 3 | Mc Cully Bks | 6290 | Rainwater Retention Basin | 1 | 45x15x4m | 2700 | |
| 4 | Mc Cully Bks | 6290 | Rainwater Retention Basin | 1 | 45x15x4 m | 2700 | |
| 5 | Mc Cully Bks | 6290 | Rainwater Retention Basin | 1 | 30x11x4 m | 1320 | |
| 6 | Clay Caserne | WS901 | Rainwater Retention Basin | 1 | 40x7x3 | 314 | |
| 7 | Clay Caserne | 1455 | Rainwater Retention Basin 1 | 1 | 5x10x4 m | 200 | |
| 8 | Clay Caserne | 1455 | Rainwater Retention Basin 2 | 1 | 5x10x4 m | 200 | |
| 9 | Clay Caserne | 1455 | Rainwater Retention Basin 3 | 1 | 35x17x4 m | 2380 | |
| Basin | 200 m3 | 2 | |||||
| Basin | 314 m3 | 1 | |||||
| Basin | 750 m3 | 1 | |||||
| Basin | 1320-1500m3 | 2 | |||||
| Basin | 2300-2700 m3 | 3 | |||||
| Lfd. Nr. | Installation | Bldg # | Description | QTY | Dimensions | SF -Volume (m3) | U-price in EURO |
| 1 | Clay Caserne | 1224 | Drain | 1 | 60m*0.40 m*0.60 m | 14.40 | |
| 2 | Clay Caserne | 1657 | Drain | 1 | 15m*0.3m*0.5m | 2.25 | |
| 3 | TMP | 7539 | Drain | 1 | 17m*0.25m*0.35m | 1.49 |
&L&D&C&"-,Bold"&18Inventory List of Basins and Drains&R&"-,Bold"&18Exhibit C&"-,Regular"&11 &L&F&RPage &P
File details come from the government source that posted it. Updated .