Maintenance and Repair of Multiple Separator System USAG Wiesbaden, Germany (OCONUS)
Solicitation number
W912CM24Q0005
Issued by

About this file

This document is a price book for a federal contract opportunity related to the maintenance and repair of multiple separator systems at U.S. Army Garrison (USAG) Wiesbaden, Germany. The contract consists of one base year and two option years, with a proposed performance start date of on or about April 15, 2024.

The contract will be a hybrid fixed-price (FFP) and time-and-materials (T&M) contract for the emptying, cleaning, inspection, repair, and transportation of residue disposal for petroleum, oil and lubricant (POL) separators, mud traps, oil tanks, drains, rainwater retention basins, water treatment plants, grease separators, potato starch separators, septic tanks, and wastewater pump stations. The regular preventive maintenance will be FFP, while the on-call/emergency maintenance will be T&M. The price book provides detailed pricing information for these services over the three-year contract period, including escalation rates and exchange rates.

View the file

Other files

File Type Posted
W912CM24Q0005 P00007.pdf PDF
W912CM24Q0005 P0006.pdf PDF
Attachment 2- Price Book New Version April 29 2024.xlsx XLSX spreadsheet
Attachment 4.docx DOCX document
Exhibit A_Invent. POL- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
W912CM24Q0005 - P00005.pdf PDF
Exhibit C_Invent. Basin-Without_unit_price New Version April 23,2024.xls XLS spreadsheet
Exhibit B_Invent. Mud- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
Exhibit D_Invent. Grease and Septic- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
W912CM24Q0005 P00004.pdf PDF
(11Apr24) W912CM24Q0005 P0003.pdf PDF
W912CM24Q0005 P00002.pdf PDF
Attachment 3 - Answer to Questions asked.pdf PDF
W912CM24Q0005 P00001.pdf PDF
Attachment 3 - Answer to asked Question.pdf PDF
Exhibit A_Invent. POL- Without_unit_prices New Version March 27, 2024.xlsx XLSX spreadsheet
Exhibit E_Waste Water Pump Stations.xlsx XLSX spreadsheet
Exhibit C_Basins and Drains.xls XLS spreadsheet
Attachment 2 - Price Book.xlsx XLSX spreadsheet
Exhibit D_Grease Separators and Septic Tanks.xlsx XLSX spreadsheet
Exhibit A_POL Separators.xlsx XLSX spreadsheet
Exhibit B_Mud Traps.xlsx XLSX spreadsheet
W912CM24Q0005.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Fiscal YearContract YearPeriod of PerformanceTotal Price per year (12 months) €Total price per year (12 months) $Exchange rateInflation rate
FY 23base yearMay 2024- May 2025€ 45,454.00$ 46,391.100.97985%
FY 241st option yearMay 2025- May 2026€ 47,726.18$ 48,710.120.97985%
FY 252nd option yearMay 2026- May 2027€ 50,694.53$ 51,739.670.97985%
€ 143,874.70$ 146,840.89

base year PRICEBOOK Separators USE GREEN CELLS ONLY, REST WILL CALCULATE AUTOMATICALLY !

ContractContract YearPOP DateExchangerate
W912CM24Pxxxxbase year$0.9798
LINE ITEM NUMBERELINITEM/SERVICE DESCRIPTIONQTYFREQUENCY PER MONTH
MONTH
FREQUENCY PER YEAR
UNIT OF MEASURE
EAUNIT PRICE
€TOTAL PRICE
UNIT PRICE
$TOTAL PRICE
0001The contractor shall provide PM services for grease separators, Potato Starch separators, Septic Tanks, including emptying, cleaning, transportation and disposal IAW PWS.1Job0.00 €0.00 €$ - 0$0.00
Grease Separators
Grease Separators 1m3:1011132EA0.00 €0.00 €$0.00$0.00
Bldg. # 1214, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 1531, two times per month.121224EA0.00 €$0.00$0.00
Bldg. # 5119, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 6431, Dagger, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7762, PX Asia bambo PX Front side, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7884, Youth Center, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7894, School Hberg, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7896, School Hberg, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7885, CDC, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7920, School Hberg, one time per month111212EA0.00 €$0.00$0.00
Grease Separators 2 m3:1224EA0.00 €0.00 €$0.00$0.00
Bldg. # 1011, CAC, two times per month.121224EA0.00 €$0.00$0.00
Grease Separators 3 m3:6896EA0.00 €0.00 €$0.00$0.00
Bldg. # 1023 N, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 1052, two times per month.121224EA0.00 €$0.00$0.00
Bldg. # 1502, CDC, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7778, School, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7850, PX, two times per month121224EA0.00 €$0.00$0.00
Bldg. # 7891, Entertainment Center, one time per month111212EA0.00 €$0.00$0.00
Potato Starch Separators
Potato Starch Separators 1 m3:104EA0.00 €0.00 €$0.00$0.00
Bldg. # 1052, one time every 3 months1-44EA0.00 €$0.00$0.00
Septic Tanks
Septic Tanks 3 m3:3018EA0.00 €0.00 €$0.00$0.00
Bldg. # 5140, field WC next field # 5, 6times per year1-66EA0.00 €$0.00$0.00
Bldg. # 5141, field WC next field # 11, 6 times per year1-66EA0.00 €$0.00$0.00
Bldg. # 5142, rest room, 6 times per year1-66EA0.00 €$0.00$0.00
Septic Tanks 7 m3:1224EA0.00 €0.00 €$0.00$0.00
Bldg. #5136, car maintenance, volume 7 m3, twice a month121224EA0.00 €$0.00$0.00
Septic Tanks 8 m3:3336EA0.00 €0.00 €$0.00$0.00
Bldg. #1004, back yard south/west, car maintenance, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 1857, next to 1657 south, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 6980, one time per month111212EA0.00 €$0.00$0.00
Septic Tanks 14 m3:1224EA0.00 €0.00 €$0.00$0.00
Bldg. # 2601, Egelsbach, two times per month121224EA0.00 €$0.00$0.00
Septic Tanks 21 m3:112EA0.00 €0.00 €$0.00$0.00
Bldg. # 6984, one time per month111212EA0.00 €$0.00$0.00
Septic Tanks 32 m2:1224EA0.00 €0.00 €$0.00$0.00
Bldg. # 5119, Club House, two times per month121224EA0.00 €$0.00$0.00
Inspections
Inspection of grease separators by expert (visual test) (one time per year), volume 1- 3 m3.17-117EA0.00 €$0.00$0.00
Maintenance inspections of potato starch separators by experts (one time per year)1-12EA0.00 €$0.00$0.00
0002Cleaning and Inspection of Multiple SeperatorsJob0.00 €$0.00
E001Cleaning of Petroleum Oil Lubricant (POL) Separators35Job€ 0.00$0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
18-11EA€ 0.00$0.00$0.00
NG 20 - 40, at different locations, as shown on Exhibit A
10-11EA€ 0.00$0.00$0.00
NG 65-80, at different locations, as shown on Exhibit A
1-11EA€ 0.00$0.00$0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00$0.00$0.00
E002Cleaning of Coalescence Separators11Job€ 0.00$0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
2-11EA€ 0.00$0.00$0.00
NG 20 – 40, at different locations, as shown on Exhibit A
3-11EA€ 0.00$0.00$0.00
NG 65-85, at different locations, as shown on Exhibit A
0-11EA€ 0.00$0.00$0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00$0.00$0.00
E003Cleaning and Inspection of Mud Traps36Job€ 0.00$0.00
100- 1,000 Liter, as shown on Exhibit B
2-22EA€ 0.00$0.00$0.00
1,000- 3,500 Liter, as shown on Exhibit B
8-22EA€ 0.00$0.00$0.00
3,500- 7,000 Liter, as shown on Exhibit B
17-22EA€ 0.00$0.00$0.00
10,000 Liter, as shown on Exhibit B
3-22EA€ 0.00$0.00$0.00
21,000 Liter, as shown on Exhibit B
4-22EA€ 0.00$0.00$0.00
22,000-60,000 Liter, as shown on Exhibit B
2-22EA€ 0.00$0.00$0.00
E004Cleaning and Inspection of external Oil Tank 15,000 Liter, as shown on Exhibit A
2-11Job€ 0.00$0.00
Bldg. #1455, near #1224, Clay, 15.000L, Exhibit A2-11Job€ 0.00$0.00$0.00
E005Cleaning and Inspection of Drains2Job€ 0.00$0.00
Bldg. #1224,Clay, 14.4 m3
1-11EA€ 0.00$0.00$0.00
Bldg. #7539, 1.5m3, TMP
1-11EA€ 0.00$0.00$0.00
E006Cleaning and inspection of Rainwater Retention Basin7Job€ 0.00$0.00
Bldg. #1455, 200 m3, Clay
2-11EA€ 0.00$0.00$0.00
WS901, 314 m3, Clay
1-11EA€ 0.00$0.00$0.00
Bldg. #7200, 750 m3, Mc Cully
1-11EA€ 0.00$0.00$0.00
Bldg. #6290, 1,320m3, Mc Cully
1-11EA€ 0.00$0.00$0.00
Bldg. #7200, 1500m3, Mc Cully1-11EA€ 0.00$0.00$0.00
Bldg. # 1455, 2380m3, Clay
1-11EA€ 0.00$0.00$0.00
Bldg. # 6290, 2700m3, Mc Cully1-11EA€ - 0$0.00$0.00
Bldg.# 7513, 10 m3, Kastel support Annex211EA€ - 0$0.00$0.00
E0007Disposal of up to 700 metric tons of POL residues (PWS 5.2.1.3.10)700N/A12N/AMetric Ton€ 0.00$0.00$0.00
0003Maintenance and Inspection of waste water pump stations6-14Job€ 0.00$0.00$0.00
0004General Inspection of POL and Grease separators40Job€ 0.00$0.00$0.00
0005On Demand Services (T&M)Job€ 45,454.00$46,391.10
Hourly rates to perform on - call repairs including compensation for travel cost . Monday through Friday between 07.30 and 16.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.3)40-11EA€ 0.00$0.00$0.00
Hourly rates to perform on - call repairs, including compensation for travel cost. Monday through Friday between 07.30 and 16.00hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8-11EA€ 0.00$0.00$0.00
Hourly rates to perform on - call repairs, including compensation for travel cost. Saturday between 00.00 and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8-11EA€ 0.00$0.00$0.00
Hourly rates to perform on - call repairs, including compensation for travel cost. Sundays and German Holidays between 00.00 hours and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8-11EA€ 0.00$0.00$0.00
E0008Material (T&M)11Job€ 45,454.00

Bayer, Maurice LN USA USAREUR: Bayer, Maurice LN USA USAREUR:

GOV Estimate, do not change !

$46,391.10$46,391.10
0006E0009Monthly visual inspection on all grease and POL separators63EA€ 0.00$0.00
visual inspection of grease separators1711212EA€ 0.00$0.00$0.00
visual inspection of POL separators NG 1-803411212EA€ 0.00$0.00$0.00
visual inspection of POL separators NG 80+1211212EA€ 0.00$0.00$0.00
TOTAL PRICE BASE YEAR45,454.00 €$46,391.10

1st option year PRICEBOOK Separators USE GREEN CELLS ONLY, REST WILL CALCULATE AUTOMATICALLY !

ContractContract YearPOP DateInflation rateExchangerate
W912CM24Pxxxx1st option year5%$0.9798
LINE ITEM NUMBERELINITEM/SERVICE DESCRIPTIONQTYFREQUENCY PER MONTH
MONTH
FREQUENCY PER YEAR
UNIT OF MEASURE
EAUNIT PRICE
€TOTAL PRICE
UNIT PRICE
$TOTAL PRICE
1001The contractor shall provide PM services for grease separators, Potato Starch separators, Septic Tanks, including emptying, cleaning, transportation and disposal IAW PWS.1Job0.00 €0.00 €$ - 0$0.00
Grease Separators
Grease Separators 1m3:1011132EA0.00 €0.00 €$0.00$0.00
Bldg. # 1214, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 1531, two times per month.121224EA0.00 €$0.00$0.00
Bldg. # 5119, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 6431, Dagger, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7762, PX Asia bambo PX Front side, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7884, Youth Center, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7894, School Hberg, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7896, School Hberg, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7885, CDC, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7920, School Hberg, one time per month111212EA0.00 €$0.00$0.00
Grease Separators 2 m3:1224EA0.00 €0.00 €$0.00$0.00
Bldg. # 1011, CAC, two times per month.121224EA0.00 €$0.00$0.00
Grease Separators 3 m3:6896EA0.00 €0.00 €$0.00$0.00
Bldg. # 1023 N, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 1052, two times per month.121224EA0.00 €$0.00$0.00
Bldg. # 1502, CDC, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7778, School, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7850, PX, two times per month121224EA0.00 €$0.00$0.00
Bldg. # 7891, Entertainment Center, one time per month111212EA0.00 €$0.00$0.00
Potato Starch Separators
Potato Starch Separators 1 m3:104EA0.00 €0.00 €$0.00$0.00
Bldg. # 1052, one time every 3 months1-44EA0.00 €$0.00$0.00
Septic Tanks
Septic Tanks 3 m3:3018EA0.00 €0.00 €$0.00$0.00
Bldg. # 5140, field WC next field # 5, 6times per year1-66EA0.00 €$0.00$0.00
Bldg. # 5141, field WC next field # 11, 6 times per year1-66EA0.00 €$0.00$0.00
Bldg. # 5142, rest room, 6 times per year1-66EA0.00 €$0.00$0.00
Septic Tanks 7 m3:1224EA0.00 €0.00 €$0.00$0.00
Bldg. #5136, car maintenance, volume 7 m3, twice a month121224EA0.00 €$0.00$0.00
Septic Tanks 8 m3:3336EA0.00 €0.00 €$0.00$0.00
Bldg. #1004, back yard south/west, car maintenance, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 1857, next to 1657 south, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 6980, one time per month111212EA0.00 €$0.00$0.00
Septic Tanks 14 m3:1224EA0.00 €0.00 €$0.00$0.00
Bldg. # 2601, Egelsbach, two times per month121224EA0.00 €$0.00$0.00
Septic Tanks 21 m3:112EA0.00 €0.00 €$0.00$0.00
Bldg. # 6984, one time per month111212EA0.00 €$0.00$0.00
Septic Tanks 32 m2:1224EA0.00 €0.00 €$0.00$0.00
Bldg. # 5119, Club House, two times per month121224EA0.00 €$0.00$0.00
Inspections
Inspection of grease separators by expert (visual test) (one time per year), volume 1- 3 m3.17-117EA0.00 €$0.00$0.00
Maintenance inspections of potato starch separators by experts (one time per year)1-12EA0.00 €$0.00$0.00
1002Cleaning and Inspection of Multiple SeperatorsJob0.00 €$0.00
E001Cleaning of Petroleum Oil Lubricant (POL) Separators35Job€ 0.00$0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
18-11EA€ 0.00$0.00$0.00
NG 20 - 40, at different locations, as shown on Exhibit A
10-11EA€ 0.00$0.00$0.00
NG 65-80, at different locations, as shown on Exhibit A
1-11EA€ 0.00$0.00$0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00$0.00$0.00
E002Cleaning of Coalescence Separators11Job€ 0.00$0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
2-11EA€ 0.00$0.00$0.00
NG 20 – 40, at different locations, as shown on Exhibit A
3-11EA€ 0.00$0.00$0.00
NG 65-85, at different locations, as shown on Exhibit A
0-11EA€ 0.00$0.00$0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00$0.00$0.00
E003Cleaning and Inspection of Mud Traps36Job€ 0.00$0.00
100- 1,000 Liter, as shown on Exhibit B
2-22EA€ 0.00$0.00$0.00
1,000- 3,500 Liter, as shown on Exhibit B
8-22EA€ 0.00$0.00$0.00
3,500- 7,000 Liter, as shown on Exhibit B
17-22EA€ 0.00$0.00$0.00
10,000 Liter, as shown on Exhibit B
3-22EA€ 0.00$0.00$0.00
21,000 Liter, as shown on Exhibit B
4-22EA€ 0.00$0.00$0.00
22,000-60,000 Liter, as shown on Exhibit B
2-22EA€ 0.00$0.00$0.00
E004Cleaning and Inspection of external Oil Tank 15,000 Liter, as shown on Exhibit A
2-11Job€ 0.00$0.00
Bldg. #1455, near #1224, Clay, 15.000L, Exhibit A2-11Job€ 0.00$0.00$0.00
E005Cleaning and Inspection of Drains3Job€ 0.00$0.00
Bldg. #1224,Clay, 14.4 m3
1-11EA€ 0.00$0.00$0.00
Bldg. #1657, 2.25m3, Clay
1-11EA€ 0.00$0.00$0.00
Bldg. #7539, 1.5m3, TMP
1-11EA€ 0.00$0.00$0.00
E006Cleaning and inspection of Rainwater Retention Basin7Job€ 0.00$0.00
Bldg. #1455, 200 m3, Clay
2-11EA€ 0.00$0.00$0.00
WS901, 314 m3, Clay
1-11EA€ 0.00$0.00$0.00
Bldg. #7200, 750 m3, Mc Cully
1-11EA€ 0.00$0.00$0.00
Bldg. #6290, 1,320m3, Mc Cully
1-11EA€ 0.00$0.00$0.00
Bldg. #7200, 1500m3, Mc Cully1-11EA€ 0.00$0.00$0.00
Bldg. # 1455, 2380m3, Clay
1-11EA€ 0.00$0.00$0.00
Bldg. # 6290, 2700m3, Mc Cully1-11EA€ - 0$0.00$0.00
Bldg.# 7513, 10 m3, Kastel support Annex211EA€ - 0$0.00$0.00
E0007Disposal of up to 700 metric tons of POL residues (PWS 5.2.1.3.10)700N/A12N/AMetric Ton€ 0.00$0.00$0.00
1003Maintenance and Inspection of waste water pump stations6-14Job€ 0.00$0.00$0.00
1004General Inspection of POL and Grease separators40Job€ 0.00$0.00$0.00
1005On Demand Services (T&M)Job€ 47,726.18$48,710.12
Hourly rates to perform on - call repairs including compensation for travel cost . Monday through Friday between 07.30 and 16.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.3)40-11EA€ 0.00$0.00$0.00
Hourly rates to perform on - call repairs, including compensation for travel cost. Monday through Friday between 07.30 and 16.00hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8-11EA€ 0.00$0.00$0.00
Hourly rates to perform on - call repairs, including compensation for travel cost. Saturday between 00.00 and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8-11EA€ 0.00$0.00$0.00
Hourly rates to perform on - call repairs, including compensation for travel cost. Sundays and German Holidays between 00.00 hours and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8-11EA€ 0.00$0.00$0.00
E0008Material (T&M)11Job€ 45,453.50

Bayer, Maurice LN USA USAREUR: Bayer, Maurice LN USA USAREUR:

GOV Estimate, do not change !

$46,390.59$46,390.59
1006E0009Monthly visual inspection on all grease and POL separators63EA€ 0.00$0.00
visual inspection of grease separators1711212EA€ 0.00$0.00$0.00
visual inspection of POL separators NG 1-803411212EA€ 0.00$0.00$0.00
visual inspection of POL separators NG 80+1211212EA€ 0.00$0.00$0.00
TOTAL PRICE 1st option year47,726.18 €$48,710.12

2nd option year PRICEBOOK Separators USE GREEN CELLS ONLY, REST WILL CALCULATE AUTOMATICALLY !

ContractContract YearPOP DateInflation rateExchangerate
W912CM24Pxxxx2nd option year5%$0.9798
LINE ITEM NUMBERELINITEM/SERVICE DESCRIPTIONQTYFREQUENCY PER MONTH
MONTH
FREQUENCY PER YEAR
UNIT OF MEASURE
EAUNIT PRICE
€TOTAL PRICE
UNIT PRICE
$TOTAL PRICE
2001The contractor shall provide PM services for grease separators, Potato Starch separators, Septic Tanks, including emptying, cleaning, transportation and disposal IAW PWS.1Job0.00 €0.00 €$ - 0$0.00
Grease Separators
Grease Separators 1m3:1011132EA0.00 €0.00 €$0.00$0.00
Bldg. # 1214, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 1531, two times per month.121224EA0.00 €$0.00$0.00
Bldg. # 5119, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 6431, Dagger, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7762, PX Asia bambo PX Front side, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7884, Youth Center, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7894, School Hberg, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7896, School Hberg, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7885, CDC, one time per month.111212EA0.00 €$0.00$0.00
Bldg. # 7920, School Hberg, one time per month111212EA0.00 €$0.00$0.00
Grease Separators 2 m3:1224EA0.00 €0.00 €$0.00$0.00
Bldg. # 1011, CAC, two times per month.121224EA0.00 €$0.00$0.00
Grease Separators 3 m3:6896EA0.00 €0.00 €$0.00$0.00
Bldg. # 1023 N, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 1052, two times per month.121224EA0.00 €$0.00$0.00
Bldg. # 1502, CDC, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7778, School, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 7850, PX, two times per month121224EA0.00 €$0.00$0.00
Bldg. # 7891, Entertainment Center, one time per month111212EA0.00 €$0.00$0.00
Potato Starch Separators
Potato Starch Separators 1 m3:104EA0.00 €0.00 €$0.00$0.00
Bldg. # 1052, one time every 3 months1-44EA0.00 €$0.00$0.00
Septic Tanks
Septic Tanks 3 m3:3018EA0.00 €0.00 €$0.00$0.00
Bldg. # 5140, field WC next field # 5, 6times per year1-66EA0.00 €$0.00$0.00
Bldg. # 5141, field WC next field # 11, 6 times per year1-66EA0.00 €$0.00$0.00
Bldg. # 5142, rest room, 6 times per year1-66EA0.00 €$0.00$0.00
Septic Tanks 7 m3:1112EA0.00 €0.00 €$0.00$0.00
Bldg. #5136, car maintenance, volume 7 m3, twice a month111212EA0.00 €$0.00$0.00
Septic Tanks 8 m3:3336EA0.00 €0.00 €$0.00$0.00
Bldg. #1004, back yard south/west, car maintenance, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 1857, next to 1657 south, one time per month111212EA0.00 €$0.00$0.00
Bldg. # 6980, one time per month111212EA0.00 €$0.00$0.00
Septic Tanks 14 m3:1224EA0.00 €0.00 €$0.00$0.00
Bldg. # 2601, Egelsbach, two times per month121224EA0.00 €$0.00$0.00
Septic Tanks 21 m3:112EA0.00 €0.00 €$0.00$0.00
Bldg. # 6984, one time per month111212EA0.00 €$0.00$0.00
Septic Tanks 32 m2:1224EA0.00 €0.00 €$0.00$0.00
Bldg. # 5119, Club House, two times per month121224EA0.00 €$0.00$0.00
Inspections
Inspection of grease separators by expert (visual test) (one time per year), volume 1- 3 m3.17-117EA0.00 €$0.00$0.00
Maintenance inspections of potato starch separators by experts (one time per year)1-12EA0.00 €$0.00$0.00
2002Cleaning and Inspection of Multiple SeperatorsJob0.00 €$0.00
E001Cleaning of Petroleum Oil Lubricant (POL) Separators35Job€ 0.00$0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
18-11EA€ 0.00$0.00$0.00
NG 20 - 40, at different locations, as shown on Exhibit A
10-11EA€ 0.00$0.00$0.00
NG 65-80, at different locations, as shown on Exhibit A
1-11EA€ 0.00$0.00$0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00$0.00$0.00
E002Cleaning of Coalescence Separators11Job€ 0.00$0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
2-11EA€ 0.00$0.00$0.00
NG 20 – 40, at different locations, as shown on Exhibit A
3-11EA€ 0.00$0.00$0.00
NG 65-85, at different locations, as shown on Exhibit A
0-11EA€ 0.00$0.00$0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00$0.00$0.00
E003Cleaning and Inspection of Mud Traps36Job€ 0.00$0.00
100- 1,000 Liter, as shown on Exhibit B
2-22EA€ 0.00$0.00$0.00
1,000- 3,500 Liter, as shown on Exhibit B
8-22EA€ 0.00$0.00$0.00
3,500- 7,000 Liter, as shown on Exhibit B
17-22EA€ 0.00$0.00$0.00
10,000 Liter, as shown on Exhibit B
3-22EA€ 0.00$0.00$0.00
21,000 Liter, as shown on Exhibit B
4-22EA€ 0.00$0.00$0.00
22,000-60,000 Liter, as shown on Exhibit B
2-22EA€ 0.00$0.00$0.00
E004Cleaning and Inspection of external Oil Tank 15,000 Liter, as shown on Exhibit A
2-11Job€ 0.00$0.00
Bldg. #1455, near #1224, Clay, 15.000L, Exhibit A2-11Job€ 0.00$0.00$0.00
E005Cleaning and Inspection of Drains3Job€ 0.00$0.00
Bldg. #1224,Clay, 14.4 m3
1-11EA€ 0.00$0.00$0.00
Bldg. #1657, 2.25m3, Clay
1-11EA€ 0.00$0.00$0.00
Bldg. #7539, 1.5m3, TMP
1-11EA€ 0.00$0.00$0.00
E006Cleaning and inspection of Rainwater Retention Basin7Job€ 0.00$0.00
Bldg. #1455, 200 m3, Clay
2-11EA€ 0.00$0.00$0.00
WS901, 314 m3, Clay
1-11EA€ 0.00$0.00$0.00
Bldg. #7200, 750 m3, Mc Cully
1-11EA€ 0.00$0.00$0.00
Bldg. #6290, 1,320m3, Mc Cully
1-11EA€ 0.00$0.00$0.00
Bldg. #7200, 1500m3, Mc Cully1-11EA€ 0.00$0.00$0.00
Bldg. # 1455, 2380m3, Clay
1-11EA€ 0.00$0.00$0.00
Bldg. # 6290, 2700m3, Mc Cully1-11EA€ - 0$0.00$0.00
Bldg.# 7513, 10 m3, Kastel support Annex211EA€ - 0$0.00$0.00
E0007Disposal of up to 700 metric tons of POL residues (PWS 5.2.1.3.10)700N/A12N/AMetric Ton€ 0.00$0.00$0.00
2003Maintenance and Inspection of waste water pump stations6-14Job€ 0.00$0.00$0.00
2004General Inspection of POL and Grease separators40Job€ 0.00$0.00$0.00
2005On Demand Services (T&M)Job€ 50,694.53$51,739.67
Hourly rates to perform on - call repairs including compensation for travel cost . Monday through Friday between 07.30 and 16.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.3)40-11EA€ 0.00$0.00$0.00
Hourly rates to perform on - call repairs, including compensation for travel cost. Monday through Friday between 07.30 and 16.00hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8-11EA€ 0.00$0.00$0.00
Hourly rates to perform on - call repairs, including compensation for travel cost. Saturday between 00.00 and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8-11EA€ 0.00$0.00$0.00
Hourly rates to perform on - call repairs, including compensation for travel cost. Sundays and German Holidays between 00.00 hours and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8-11EA€ 0.00$0.00$0.00
E0008Material (T&M)11Job€ 48,280.50

Bayer, Maurice LN USA USAREUR: Bayer, Maurice LN USA USAREUR:

GOV Estimate, do not change !

$49,275.87$49,275.87
2006E0009Monthly visual inspection on all grease and POL separators63EA€ 0.00$0.00
visual inspection of grease separators1711212EA€ 0.00$0.00$0.00
visual inspection of POL separators NG 1-803411212EA€ 0.00$0.00$0.00
visual inspection of POL separators NG 80+1211212EA€ 0.00$0.00$0.00
TOTAL PRICE 2nd option year50,694.53 €$51,739.67