Attachment 3 - Answer to asked Question.pdf

PDF 77 KB Posted

Attached to
Maintenance and Repair of Multiple Separator System USAG Wiesbaden, Germany (OCONUS)
Solicitation number
W912CM24Q0005
Issued by

About this file

This document appears to be a set of questions and answers related to a federal contract opportunity for the maintenance and repair of multiple separator systems at U.S. Army Garrison Wiesbaden, Germany. The key details are:

The contract will consist of one base year and two option years, with a proposed performance start date of on or about April 15, 2024. The contract will be for the emptying, cleaning, inspection, repairing, and transporting of residue disposal for petroleum, oil and lubricant (POL) separators, mud traps, oil tanks, drains and rainwater retention basins, water treatment plans, grease separators, potato starch separators, and septic tanks, and wastewater pump stations. The regular preventive maintenance will be Firm Fixed Price, and the On-Call/Emergency maintenance will be Time and Materials. Responses are due by April 5, 2024 at 1000 CET. Offerors must be registered in the System for Award Management (SAM) database. The solicitation number is W912CM24Q0005.

View the file

Other files

File Type Posted
W912CM24Q0005 P00007.pdf PDF
W912CM24Q0005 P0006.pdf PDF
Attachment 2- Price Book New Version April 29 2024.xlsx XLSX spreadsheet
Attachment 4.docx DOCX document
Exhibit A_Invent. POL- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
Attachment 2 - Price Book New Version April 23 2024.xlsx XLSX spreadsheet
W912CM24Q0005 - P00005.pdf PDF
Exhibit C_Invent. Basin-Without_unit_price New Version April 23,2024.xls XLS spreadsheet
Exhibit B_Invent. Mud- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
Exhibit D_Invent. Grease and Septic- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
W912CM24Q0005 P00004.pdf PDF
(11Apr24) W912CM24Q0005 P0003.pdf PDF
W912CM24Q0005 P00002.pdf PDF
Attachment 3 - Answer to Questions asked.pdf PDF
W912CM24Q0005 P00001.pdf PDF
Exhibit A_Invent. POL- Without_unit_prices New Version March 27, 2024.xlsx XLSX spreadsheet
Exhibit E_Waste Water Pump Stations.xlsx XLSX spreadsheet
Exhibit C_Basins and Drains.xls XLS spreadsheet
Attachment 2 - Price Book.xlsx XLSX spreadsheet
Exhibit D_Grease Separators and Septic Tanks.xlsx XLSX spreadsheet
Exhibit A_POL Separators.xlsx XLSX spreadsheet
Exhibit B_Mud Traps.xlsx XLSX spreadsheet
W912CM24Q0005.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. A�er emptying, cleaning, and visual inspec�on, water is needed again to refill the separator systems for the general inspec�on. Should this be included in the inspec�on price – meaning delivery of water for refilling – or do we have hydrants on-site with which we can fill the systems?

We have hydrants where the contractor can get the water to fill up the separators a�er cleaning/emptying.

2. How much sludge can be expected in the stormwater reten�on basins? Is it solid or more liquid?

Although we have the dimensions of the stormwater reten�on basins, we cannot es�mate how much needs to be disposed of. Do you have some key data from previous instances?

We have historical data of previous emptying (please see atached Basin Disposal Informa�on March 27, 2024), usually it took our current contractor several days to clean the RRB. For the consistence (solid or liquid) I can’t really tell, since there are many factors involved: how long it has not been cleaned, how much rain there was before cleaning, how hot it is outside, so basically a lot of weatherly impact.

3. What wastewater flows into the pump sta�ons? Wastewater from the separators? Domes�c wastewater? Rainwater? Is a disposal company needed to access the pumps? Can the pumps be pulled out from the top for maintenance?

3.1- Q: What wastewater flows into the pump sta�ons? Wastewater from the separators? Domes�c wastewater? Rainwater?

A: it is Wastewater from the separators.

3.2- Q: Is a disposal company needed to access the pumps?

A: Yes, the contractor will have access the pumps.

3.3- Q: Can the pumps be pulled out from the top for maintenance?

A: Yes, it is possible to pull the pumps out from the top for maintenance.

4. Where does the wastewater from the separator systems need to be disposed of? This informa�on is on your disposal cer�ficate. This is important for the disposal company to properly calculate the landfill trip.

The wastewater needs to be disposed at a cer�fied disposal company.

5. What is in the external oil tanks? Is it an oil-water mixture? Used oil? Is wastewater pumped into these tanks?

The external oil-tanks shall be in another contract – M&R liquid storage tanks. I really don’t know why they were in this contract in the first place, currently they get maintained by our tanks contractor.

Please find the updated (Exhibit A_Invent. POL – Without_unit_prices New Version March 27,2024)

6. Is there any informa�on more regarding this separator KSS DRMO (YARD) NG 6?

Unfortunately, we don’t have mor informa�on for this POL. Due to the age of the Separator and the missing Type plate is the only informa�on we have the size NG6. (Please find Atachment Picture of KSS DRMO (YARD) NG 6) with addi�onal Pictures)