Attachment 2- Price Book New Version April 29 2024.xlsx

XLSX spreadsheet 51 KB Posted

Attached to
Maintenance and Repair of Multiple Separator System USAG Wiesbaden, Germany (OCONUS)
Solicitation number
W912CM24Q0005
Issued by

About this file

This document is an attachment containing a price book for a federal contract opportunity related to the Maintenance and Repair (M&R) of Multiple Separator Systems at U.S. Army Garrison (USAG) Wiesbaden, Germany.

The price book details the services to be provided, including the emptying, cleaning, inspection, repair, and transportation of residue disposal for petroleum, oil, and lubricant (POL) separators, mud traps, oil tanks, drains, rainwater retention basins, water treatment plants, grease separators, potato starch separators, and septic tanks, as well as maintenance and inspection of wastewater pump stations. The contract includes a base year and two option years, with a proposed performance start date of April 15, 2024. The regular preventive maintenance will be Firm Fixed Price (FFP), and the On-Call/Emergency maintenance will be Time and Materials. Offerors must be registered in the System for Award Management (SAM) database at the time of submission.

View the file

Other files

File Type Posted
W912CM24Q0005 P00007.pdf PDF
W912CM24Q0005 P0006.pdf PDF
Attachment 4.docx DOCX document
Exhibit A_Invent. POL- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
Attachment 2 - Price Book New Version April 23 2024.xlsx XLSX spreadsheet
W912CM24Q0005 - P00005.pdf PDF
Exhibit C_Invent. Basin-Without_unit_price New Version April 23,2024.xls XLS spreadsheet
Exhibit B_Invent. Mud- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
Exhibit D_Invent. Grease and Septic- Without_unit_prices New Version April 23,2024.xlsx XLSX spreadsheet
W912CM24Q0005 P00004.pdf PDF
(11Apr24) W912CM24Q0005 P0003.pdf PDF
W912CM24Q0005 P00002.pdf PDF
Attachment 3 - Answer to Questions asked.pdf PDF
W912CM24Q0005 P00001.pdf PDF
Attachment 3 - Answer to asked Question.pdf PDF
Exhibit A_Invent. POL- Without_unit_prices New Version March 27, 2024.xlsx XLSX spreadsheet
Exhibit E_Waste Water Pump Stations.xlsx XLSX spreadsheet
Exhibit C_Basins and Drains.xls XLS spreadsheet
Attachment 2 - Price Book.xlsx XLSX spreadsheet
Exhibit D_Grease Separators and Septic Tanks.xlsx XLSX spreadsheet
Exhibit A_POL Separators.xlsx XLSX spreadsheet
Exhibit B_Mud Traps.xlsx XLSX spreadsheet
W912CM24Q0005.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Fiscal YearContract YearPeriod of PerformanceTotal Price per year (12 months) €
FY 23Base YearMay 2024- May 2025€ 45,500.00
FY 241st Option YearMay 2025- May 2026€ 47,800.00
FY 252nd Option YearMay 2026- May 2027€ 48,500.00
€ 141,800.00

Base Year PRICEBOOK Separators USE GREEN CELLS ONLY, REST WILL CALCULATE AUTOMATICALLY !

ContractContract YearPOP DateNote: Unit Price (Green Cells) is Price Per Service
W912CM24Pxxxxbase year
LINE ITEM NUMBERELINITEM/SERVICE DESCRIPTIONQTYFREQUENCY PER MONTH
MONTH
FREQUENCY PER YEAR
UNIT OF MEASURE
EAUNIT PRICE
€TOTAL PRICE
0001The contractor shall provide PM services for grease separators, Potato Starch separators, Septic Tanks, including emptying, cleaning, transportation and disposal IAW PWS.1Job0.00 €0.00 €
Grease Separators
E001Grease Separators 1m3:132EA0.00 €
Bldg. # 1214, one time per month.111212EA
Bldg. # 1531, two times per month.121224EA
Bldg. # 5119, one time per month.111212EA
Bldg. # 6431, Dagger, one time per month111212EA
Bldg. # 7762, PX Asia bambo PX Front side, one time per month111212EA
Bldg. # 7884, Youth Center, one time per month.111212EA
Bldg. # 7894, School Hberg, one time per month.111212EA
Bldg. # 7896, School Hberg, one time per month.111212EA
Bldg. # 7885, CDC, one time per month.111212EA
Bldg. # 7920, School Hberg, one time per month111212EA
E002Grease Separators 2 m3:24EA0.00 €
Bldg. # 1011, CAC, two times per month.121224EA
E003Grease Separators 3 m3:96EA0.00 €
Bldg. # 1023 N, one time per month111212EA
Bldg. # 1052, two times per month.121224EA
Bldg. # 1502, CDC, one time per month111212EA
Bldg. # 7778, School, one time per month111212EA
Bldg. # 7850, PX, two times per month121224EA
Bldg. # 7891, Entertainment Center, one time per month111212EA
Potato Starch Separators
E004Potato Starch Separators 1 m3:4EA0.00 €
Bldg. # 1052, one time every 3 months1-44EA
Septic Tanks
E005Septic Tanks 3 m3:18EA0.00 €
Bldg. # 5140, field WC next field # 5, 6times per year1-66EA
Bldg. # 5141, field WC next field # 11, 6 times per year1-66EA
Bldg. # 5142, rest room, 6 times per year1-66EA
E006Septic Tanks 7 m3:24EA0.00 €
Bldg. #5136, car maintenance, volume 7 m3, twice a month121224EA
E007Septic Tanks 8 m3:36EA0.00 €
Bldg. #1004, back yard south/west, car maintenance, one time per month111212EA
Bldg. # 1857, next to 1657 south, one time per month111212EA
Bldg. # 6980, one time per month111212EA
E008Septic Tanks 14 m3:24EA0.00 €
Bldg. # 2601, Egelsbach, two times per month121224EA
E009Septic Tanks 21 m3:12EA0.00 €
Bldg. # 6984, one time per month111212EA
E010Septic Tanks 32 m3:24EA0.00 €
Bldg. # 5119, Club House, two times per month121224EA
Inspections
E012Inspection of grease separators by expert (visual test) (one time per year), volume 1- 3 m3.17-117EA0.00 €
E013Maintenance inspections of potato starch separators by experts (one time per year)1-12EA0.00 €
0002Cleaning and Inspection of Multiple Seperators1Job0.00 €0.00 €
E001Cleaning of Petroleum Oil Lubricant (POL) Separators35Job€ 0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
18-11EA€ 0.00
NG 20 - 40, at different locations, as shown on Exhibit A
10-11EA€ 0.00
NG 65-80, at different locations, as shown on Exhibit A
1-11EA€ 0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00
E002Cleaning of Coalescence Separators11Job€ 0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
2-11EA€ 0.00
NG 20 – 40, at different locations, as shown on Exhibit A
3-11EA€ 0.00
NG 65-85, at different locations, as shown on Exhibit A
0-11EA€ 0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00
E003Cleaning and Inspection of Mud Traps72Job€ 0.00
100- 1,000 Liter, as shown on Exhibit B
2-22EA€ 0.00
1,000- 3,500 Liter, as shown on Exhibit B
8-22EA€ 0.00
3,500- 7,000 Liter, as shown on Exhibit B
17-22EA€ 0.00
10,000 Liter, as shown on Exhibit B
3-22EA€ 0.00
21,000 Liter, as shown on Exhibit B
4-22EA€ 0.00
22,000-60,000 Liter, as shown on Exhibit B
2-22EA€ 0.00
E004Cleaning and Inspection of external Oil Tank 15,000 Liter, as shown on Exhibit A
2Job€ 0.00
Bldg. #1455, near #1224, Clay, 15.000L, Exhibit A2-11Job€ 0.00
E005Cleaning and Inspection of Drains2Job€ 0.00
Bldg. #1224,Clay, 14.4 m3
1-11EA€ 0.00
Bldg. #7539, 1.5m3, TMP
1-11EA€ 0.00
E006Cleaning and inspection of Rainwater Retention Basin10Job€ 0.00
Bldg. #1455, 200 m3, Clay
2-11EA€ 0.00
WS901, 314 m3, Clay
1-11EA€ 0.00
Bldg. #7200, 750 m3, Mc Cully
1-11EA€ 0.00
Bldg. #6290, 1,320m3, Mc Cully
1-11EA€ 0.00
Bldg. #7200, 1500m3, Mc Cully1-11EA€ 0.00
Bldg. # 1455, 2380m3, Clay
1-11EA€ 0.00
Bldg. # 6290, 2700m3, Mc Cully1-11EA€ 0.00
Bldg.# 7513, 10 m3, Kastel support Annex211EA€ 0.00
E007Disposal of up to 700 metric tons of POL residues (PWS 5.2.1.3.10)700---Metric Ton€ 0.00
0003Maintenance and Inspection of waste water pump stations1Job€ 0.00€ 0.00
E001Monthly Visual Inspection611212EA€ 0.00
E002Preventative Maintenance6--4EA€ 0.00
0004General Inspection of POL and Grease separators40Job€ 0.00
0005On Demand Services (T&M)1Job€ 45,500.00€ 45,500.00
E001Hourly rates to perform on - call repairs including compensation for travel cost . Monday through Friday between 07.30 and 16.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.3)40---EA€ 0.00
E002Hourly rates to perform on - call repairs, including compensation for travel cost. Monday through Friday between 07.30 and 16.00hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8---EA€ 0.00
E003Hourly rates to perform on - call repairs, including compensation for travel cost. Saturday between 00.00 and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8---EA€ 0.00
E004Hourly rates to perform on - call repairs, including compensation for travel cost. Sundays and German Holidays between 00.00 hours and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8---EA€ 0.00
E005Material (T&M)1Job€ 45,500.00€ 45,500.00

Bayer, Maurice LN USA USAREUR: Bayer, Maurice LN USA USAREUR:

GOV Estimate, do not change !

0006Monthly visual inspection on all grease and POL separators1Job€ 0.00€ 0.00
E001Visual inspection of grease separators1711212EA€ 0.00
E002visual inspection of POL separators NG 1-853411212EA€ 0.00
E003Visual inspection of POL separators NG 85+1211212EA€ 0.00
TOTAL PRICE BASE YEAR€ 45,500.00

Option Year 1 PRICEBOOK Separators USE GREEN CELLS ONLY, REST WILL CALCULATE AUTOMATICALLY !

ContractContract YearPOP DateNote: Unit Price (In Green Cells is Price Per Service)
W912CM24PxxxxOption Year 1
LINE ITEM NUMBERELINITEM/SERVICE DESCRIPTIONQTYFREQUENCY PER MONTH
MONTH
FREQUENCY PER YEAR
UNIT OF MEASURE
EAUNIT PRICE
€TOTAL PRICE
1001The contractor shall provide PM services for grease separators, Potato Starch separators, Septic Tanks, including emptying, cleaning, transportation and disposal IAW PWS.1Job0.00 €0.00 €
Grease Separators
E001Grease Separators 1m3:132EA0.00 €
Bldg. # 1214, one time per month.111212EA
Bldg. # 1531, two times per month.121224EA
Bldg. # 5119, one time per month.111212EA
Bldg. # 6431, Dagger, one time per month111212EA
Bldg. # 7762, PX Asia bambo PX Front side, one time per month111212EA
Bldg. # 7884, Youth Center, one time per month.111212EA
Bldg. # 7894, School Hberg, one time per month.111212EA
Bldg. # 7896, School Hberg, one time per month.111212EA
Bldg. # 7885, CDC, one time per month.111212EA
Bldg. # 7920, School Hberg, one time per month111212EA
E002Grease Separators 2 m3:24EA0.00 €
Bldg. # 1011, CAC, two times per month.121224EA
E003Grease Separators 3 m3:96EA0.00 €
Bldg. # 1023 N, one time per month111212EA
Bldg. # 1052, two times per month.121224EA
Bldg. # 1502, CDC, one time per month111212EA
Bldg. # 7778, School, one time per month111212EA
Bldg. # 7850, PX, two times per month121224EA
Bldg. # 7891, Entertainment Center, one time per month111212EA
Potato Starch Separators
E004Potato Starch Separators 1 m3:4EA0.00 €
Bldg. # 1052, one time every 3 months1-44EA
Septic Tanks
E005Septic Tanks 3 m3:18EA0.00 €
Bldg. # 5140, field WC next field # 5, 6times per year1-66EA
Bldg. # 5141, field WC next field # 11, 6 times per year1-66EA
Bldg. # 5142, rest room, 6 times per year1-66EA
E006Septic Tanks 7 m3:24EA0.00 €
Bldg. #5136, car maintenance, volume 7 m3, twice a month121224EA
E007Septic Tanks 8 m3:36EA0.00 €
Bldg. #1004, back yard south/west, car maintenance, one time per month111212EA
Bldg. # 1857, next to 1657 south, one time per month111212EA
Bldg. # 6980, one time per month111212EA
E008Septic Tanks 14 m3:24EA0.00 €
Bldg. # 2601, Egelsbach, two times per month121224EA
E009Septic Tanks 21 m3:12EA0.00 €
Bldg. # 6984, one time per month111212EA
E010Septic Tanks 32 m3:24EA0.00 €
Bldg. # 5119, Club House, two times per month121224EA
Inspections
E012Inspection of grease separators by expert (visual test) (one time per year), volume 1- 3 m3.17-117EA0.00 €
E013Maintenance inspections of potato starch separators by experts (one time per year)1-12EA0.00 €
1002Cleaning and Inspection of Multiple Seperators1Job0.00 €0.00 €
E001Cleaning of Petroleum Oil Lubricant (POL) Separators35Job€ 0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
18-11EA€ 0.00
NG 20 - 40, at different locations, as shown on Exhibit A
10-11EA€ 0.00
NG 65-80, at different locations, as shown on Exhibit A
1-11EA€ 0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00
E002Cleaning of Coalescence Separators11Job€ 0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
2-11EA€ 0.00
NG 20 – 40, at different locations, as shown on Exhibit A
3-11EA€ 0.00
NG 65-85, at different locations, as shown on Exhibit A
0-11EA€ 0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00
E003Cleaning and Inspection of Mud Traps72Job€ 0.00
100- 1,000 Liter, as shown on Exhibit B
2-22EA€ 0.00
1,000- 3,500 Liter, as shown on Exhibit B
8-22EA€ 0.00
3,500- 7,000 Liter, as shown on Exhibit B
17-22EA€ 0.00
10,000 Liter, as shown on Exhibit B
3-22EA€ 0.00
21,000 Liter, as shown on Exhibit B
4-22EA€ 0.00
22,000-60,000 Liter, as shown on Exhibit B
2-22EA€ 0.00
E004Cleaning and Inspection of external Oil Tank 15,000 Liter, as shown on Exhibit A
2Job€ 0.00
Bldg. #1455, near #1224, Clay, 15.000L, Exhibit A2-11Job€ 0.00
E005Cleaning and Inspection of Drains2Job€ 0.00
Bldg. #1224,Clay, 14.4 m3
1-11EA€ 0.00
Bldg. #7539, 1.5m3, TMP
1-11EA€ 0.00
E006Cleaning and inspection of Rainwater Retention Basin10Job€ 0.00
Bldg. #1455, 200 m3, Clay
2-11EA€ 0.00
WS901, 314 m3, Clay
1-11EA€ 0.00
Bldg. #7200, 750 m3, Mc Cully
1-11EA€ 0.00
Bldg. #6290, 1,320m3, Mc Cully
1-11EA€ 0.00
Bldg. #7200, 1500m3, Mc Cully1-11EA€ 0.00
Bldg. # 1455, 2380m3, Clay
1-11EA€ 0.00
Bldg. # 6290, 2700m3, Mc Cully1-11EA€ 0.00
Bldg.# 7513, 10 m3, Kastel support Annex211EA€ 0.00
E007Disposal of up to 700 metric tons of POL residues (PWS 5.2.1.3.10)700---Metric Ton€ 0.00
1003Maintenance and Inspection of waste water pump stations1Job€ 0.00€ 0.00
E001Monthly Visual Inspection611212EA€ 0.00
E002Preventative Maintenance6--4EA€ 0.00
1004General Inspection of POL and Grease separators40Job€ 0.00
1005On Demand Services (T&M)1Job€ 47,800.00€ 47,800.00
E001Hourly rates to perform on - call repairs including compensation for travel cost . Monday through Friday between 07.30 and 16.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.3)40---EA€ 0.00
E002Hourly rates to perform on - call repairs, including compensation for travel cost. Monday through Friday between 07.30 and 16.00hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8---EA€ 0.00
E003Hourly rates to perform on - call repairs, including compensation for travel cost. Saturday between 00.00 and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8---EA€ 0.00
E004Hourly rates to perform on - call repairs, including compensation for travel cost. Sundays and German Holidays between 00.00 hours and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8---EA€ 0.00
E005Material (T&M)1Job€ 47,800.00€ 47,800.00

Bayer, Maurice LN USA USAREUR: Bayer, Maurice LN USA USAREUR:

GOV Estimate, do not change !

1006Monthly visual inspection on all grease and POL separators1Job€ 0.00€ 0.00
E001Visual inspection of grease separators1711212EA€ 0.00
E002visual inspection of POL separators NG 1-853411212EA€ 0.00
E003Visual inspection of POL separators NG 85+1211212EA€ 0.00
TOTAL PRICE OPTION YEAR 1€ 47,800.00

Option Year 2 PRICEBOOK Separators USE GREEN CELLS ONLY, REST WILL CALCULATE AUTOMATICALLY !

ContractContract YearPOP DateNote: Unit Price (In Green Cells is Price Per Service)
W912CM24PxxxxOption Year 2
LINE ITEM NUMBERELINITEM/SERVICE DESCRIPTIONQTYFREQUENCY PER MONTH
MONTH
FREQUENCY PER YEAR
UNIT OF MEASURE
EAUNIT PRICE
€TOTAL PRICE
2001The contractor shall provide PM services for grease separators, Potato Starch separators, Septic Tanks, including emptying, cleaning, transportation and disposal IAW PWS.1Job0.00 €0.00 €
Grease Separators
E001Grease Separators 1m3:132EA0.00 €
Bldg. # 1214, one time per month.111212EA
Bldg. # 1531, two times per month.121224EA
Bldg. # 5119, one time per month.111212EA
Bldg. # 6431, Dagger, one time per month111212EA
Bldg. # 7762, PX Asia bambo PX Front side, one time per month111212EA
Bldg. # 7884, Youth Center, one time per month.111212EA
Bldg. # 7894, School Hberg, one time per month.111212EA
Bldg. # 7896, School Hberg, one time per month.111212EA
Bldg. # 7885, CDC, one time per month.111212EA
Bldg. # 7920, School Hberg, one time per month111212EA
E002Grease Separators 2 m3:24EA0.00 €
Bldg. # 1011, CAC, two times per month.121224EA
E003Grease Separators 3 m3:96EA0.00 €
Bldg. # 1023 N, one time per month111212EA
Bldg. # 1052, two times per month.121224EA
Bldg. # 1502, CDC, one time per month111212EA
Bldg. # 7778, School, one time per month111212EA
Bldg. # 7850, PX, two times per month121224EA
Bldg. # 7891, Entertainment Center, one time per month111212EA
Potato Starch Separators
E004Potato Starch Separators 1 m3:4EA0.00 €
Bldg. # 1052, one time every 3 months1-44EA
Septic Tanks
E005Septic Tanks 3 m3:18EA0.00 €
Bldg. # 5140, field WC next field # 5, 6times per year1-66EA
Bldg. # 5141, field WC next field # 11, 6 times per year1-66EA
Bldg. # 5142, rest room, 6 times per year1-66EA
E006Septic Tanks 7 m3:24EA0.00 €
Bldg. #5136, car maintenance, volume 7 m3, twice a month121224EA
E007Septic Tanks 8 m3:36EA0.00 €
Bldg. #1004, back yard south/west, car maintenance, one time per month111212EA
Bldg. # 1857, next to 1657 south, one time per month111212EA
Bldg. # 6980, one time per month111212EA
E008Septic Tanks 14 m3:24EA0.00 €
Bldg. # 2601, Egelsbach, two times per month121224EA
E009Septic Tanks 21 m3:12EA0.00 €
Bldg. # 6984, one time per month111212EA
E010Septic Tanks 32 m3:24EA0.00 €
Bldg. # 5119, Club House, two times per month121224EA
Inspections
E012Inspection of grease separators by expert (visual test) (one time per year), volume 1- 3 m3.17-117EA0.00 €
E013Maintenance inspections of potato starch separators by experts (one time per year)1-12EA0.00 €
2002Cleaning and Inspection of Multiple Seperators1Job0.00 €0.00 €
E001Cleaning of Petroleum Oil Lubricant (POL) Separators35Job€ 0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
18-11EA€ 0.00
NG 20 - 40, at different locations, as shown on Exhibit A
10-11EA€ 0.00
NG 65-80, at different locations, as shown on Exhibit A
1-11EA€ 0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00
E002Cleaning of Coalescence Separators11Job€ 0.00
NG 1,5 – 15, at different locations, as shown on Exhibit A
2-11EA€ 0.00
NG 20 – 40, at different locations, as shown on Exhibit A
3-11EA€ 0.00
NG 65-85, at different locations, as shown on Exhibit A
0-11EA€ 0.00
NG 100+, at different locations, as shown on Exhibit A
6-11EA€ 0.00
E003Cleaning and Inspection of Mud Traps72Job€ 0.00
100- 1,000 Liter, as shown on Exhibit B
2-22EA€ 0.00
1,000- 3,500 Liter, as shown on Exhibit B
8-22EA€ 0.00
3,500- 7,000 Liter, as shown on Exhibit B
17-22EA€ 0.00
10,000 Liter, as shown on Exhibit B
3-22EA€ 0.00
21,000 Liter, as shown on Exhibit B
4-22EA€ 0.00
22,000-60,000 Liter, as shown on Exhibit B
2-22EA€ 0.00
E004Cleaning and Inspection of external Oil Tank 15,000 Liter, as shown on Exhibit A
2Job€ 0.00
Bldg. #1455, near #1224, Clay, 15.000L, Exhibit A2-11Job€ 0.00
E005Cleaning and Inspection of Drains2Job€ 0.00
Bldg. #1224,Clay, 14.4 m3
1-11EA€ 0.00
Bldg. #7539, 1.5m3, TMP
1-11EA€ 0.00
E006Cleaning and inspection of Rainwater Retention Basin10Job€ 0.00
Bldg. #1455, 200 m3, Clay
2-11EA€ 0.00
WS901, 314 m3, Clay
1-11EA€ 0.00
Bldg. #7200, 750 m3, Mc Cully
1-11EA€ 0.00
Bldg. #6290, 1,320m3, Mc Cully
1-11EA€ 0.00
Bldg. #7200, 1500m3, Mc Cully1-11EA€ 0.00
Bldg. # 1455, 2380m3, Clay
1-11EA€ 0.00
Bldg. # 6290, 2700m3, Mc Cully1-11EA€ 0.00
Bldg.# 7513, 10 m3, Kastel support Annex211EA€ 0.00
E007Disposal of up to 700 metric tons of POL residues (PWS 5.2.1.3.10)700---Metric Ton€ 0.00
2003Maintenance and Inspection of waste water pump stations1Job€ 0.00€ 0.00
E001Monthly Visual Inspection611212EA€ 0.00
E002Preventative Maintenance6--4EA€ 0.00
2004General Inspection of POL and Grease separators40Job€ 0.00
2005On Demand Services (T&M)1Job€ 48,500.00€ 48,500.00
E001Hourly rates to perform on - call repairs including compensation for travel cost . Monday through Friday between 07.30 and 16.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.3)40---EA€ 0.00
E002Hourly rates to perform on - call repairs, including compensation for travel cost. Monday through Friday between 07.30 and 16.00hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8---EA€ 0.00
E003Hourly rates to perform on - call repairs, including compensation for travel cost. Saturday between 00.00 and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8---EA€ 0.00
E004Hourly rates to perform on - call repairs, including compensation for travel cost. Sundays and German Holidays between 00.00 hours and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4)8---EA€ 0.00
E005Material (T&M)1Job€ 48,500.00€ 48,500.00

Bayer, Maurice LN USA USAREUR: Bayer, Maurice LN USA USAREUR:

GOV Estimate, do not change !

2006Monthly visual inspection on all grease and POL separators1Job€ 0.00€ 0.00
E001Visual inspection of grease separators1711212EA€ 0.00
E002visual inspection of POL separators NG 1-853411212EA€ 0.00
E003Visual inspection of POL separators NG 85+1211212EA€ 0.00
TOTAL PRICE OPTION YEAR 2€ 48,500.00