Attachment 2 - Price Book.xlsx
XLSX spreadsheet 59 KB Posted
- Solicitation number
- W912CM24Q0005
About this file
This is a solicitation for a hybrid fixed price and time and materials contract to provide maintenance and repair services for multiple separator systems at U.S. Army Garrison Wiesbaden in Germany. The one base year and two option year contract will require emptying, cleaning, inspection, repair, and transport of residue from petroleum, oil and lubricant separators, mud traps, oil tanks, drains, rainwater retention basins, water treatment plants, grease separators, potato starch separators, and septic tanks and wastewater pump stations. Responses are due by April 5, 2024. The Regional Contracting Office intends to competitively award this non-personal services contract, which will have firm fixed pricing for regular preventive maintenance and time and materials pricing for on-call and emergency services. Payments will be processed through WAWF. Offerors must be registered in SAM to submit a response.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Fiscal Year | Contract Year | Period of Performance | Total Price per year (12 months) € | Total price per year (12 months) $ | Exchange rate |
| FY 24 | base year | Period of Performanc starts on or about 15 April through 12 Months | € 45,454.00 | $ 46,391.10 | 0.9798 |
| FY 25 | 1st option year | End of Base Year through 12 Months | € 47,726.18 | $ 48,710.12 | 0.9798 |
| FY 26 | 2nd option year | End of Option Year 1 through 12 Months | € 50,694.53 | $ 51,739.67 | 0.9798 |
| € 143,874.70 | $ 146,840.89 |
base year PRICEBOOK Separators USE GREEN CELLS ONLY, REST WILL CALCULATE AUTOMATICALLY !
| Contract | Contract Year | POP Date | Exchangerate | |||
| base year | PoP starts on or about 15 April through 12 Months | $0.9798 | ||||
| LINE ITEM NUMBER | ELIN | ITEM/SERVICE DESCRIPTION | QTY | FREQUENCY PER MONTH | ||
| MONTH | ||||||
| FREQUENCY PER YEAR | ||||||
| UNIT OF MEASURE | ||||||
| EA | UNIT PRICE | |||||
| € | TOTAL PRICE |
| UNIT PRICE | |
| $ | TOTAL PRICE |
| 0001 | The contractor shall provide PM services for grease separators, Potato Starch separators, Septic Tanks, including emptying, cleaning, transportation and disposal IAW PWS. | 1 | Job | 0.00 € | 0.00 € | $ - 0 | $0.00 | ||||
| Grease Separators | |||||||||||
| Grease Separators 1m3: | 12 | 11 | 134 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1214, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1531, two times per month. | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5119, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6263, Mess Hall, inactive, one time per year. | 1 | - | 1 | 1 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6244, Snack Bar, inactive, one time per year. | 1 | - | 1 | 1 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6431, Dagger, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7762, PX Asia bambo PX Front side, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7884, Youth Center, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7894, School Hberg, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7896, School Hberg, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7885, CDC, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7920, School Hberg, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Grease Separators 2 m3: | 1 | 2 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1011, CAC, two times per month. | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Grease Separators 3 m3: | 7 | 8 | 97 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1023 N, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1052, two times per month. | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1502, CDC, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 4007, inactive, one time per year | 1 | - | 1 | 1 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7778, School, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7850, PX, two times per month | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7891, Entertainment Center, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Potato Starch Separators | |||||||||||
| Potato Starch Separators 1 m3: | 1 | 0 | 4 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1052, one time every 3 months | 1 | - | 4 | 4 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks | |||||||||||
| Septic Tanks 3 m3: | 3 | 0 | 18 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 5140, field WC next field # 5, 6times per year | 1 | - | 6 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5141, field WC next field # 11, 6 times per year | 1 | - | 6 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5142, rest room, 6 times per year | 1 | - | 6 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 4 m3: | 1 | 0 | 2 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1214, every 6 months | 1 | - | 2 | 2 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 7 m3: | 1 | 1 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. #5136, car maintenance, volume 7 m3, once a month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 8 m3: | 5 | 3 | 45 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. #1004, back yard south/west, car maintenance, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1857, next to 1657 south, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5128, rest room, events only, service on call required | 1 | - | 3 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5130, one time every four months | 1 | - | 3 | 3 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6980, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 14 m3: | 1 | 2 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 2601, Egelsbach, two times per month | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 21 m3: | 1 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||||
| Bldg. # 6984, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 32 m2: | 1 | 2 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 5119, Club House, two times per month | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Inspections | |||||||||||
| Inspection of grease separators by expert (visual test) (one time per year), volume 1- 3 m3. | 20 | - | 1 | 20 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Maintenance inspections of potato starch separators by experts (one time per year) | 1 | - | 1 | 2 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| 0002 | Cleaning and Inspection of Multiple Seperators | Job | 0.00 € | $0.00 | |||||||
| E001 | Cleaning of Petroleum Oil Lubricant (POL) Separators | 39 | Job | € 0.00 | $0.00 | ||||||
| NG 1,5 – 15, at different locations, as shown on Exhibit A |
| 22 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 20 - 40, at different locations, as shown on Exhibit A |
| 9 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 65-80, at different locations, as shown on Exhibit A | ||||||||
| 2 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 100+, at different locations, as shown on Exhibit A |
| 6 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E002 | Cleaning of Coalescence Separators | 11 | Job | € 0.00 | $0.00 | |||||
| NG 1,5 – 15, at different locations, as shown on Exhibit A |
| 2 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 20 – 40, at different locations, as shown on Exhibit A |
| 3 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 65-85, at different locations, as shown on Exhibit A |
| 0 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 100+, at different locations, as shown on Exhibit A |
| 6 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E003 | Cleaning and Inspection of Mud Traps | 35 | Job | € 0.00 | $0.00 | |||||
| 100- 1,000 Liter, as shown on Exhibit B |
| 4 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| 1,000- 3,500 Liter, as shown on Exhibit B |
| 5 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| 3,500- 7,000 Liter, as shown on Exhibit B |
| 19 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| 10,000 Liter, as shown on Exhibit B |
| 2 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| 21,000 Liter, as shown on Exhibit B | |||||||||||
| 4 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| 22,000-60,000 Liter, as shown on Exhibit B | |||||||||||
| 1 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| E004 | Cleaning and Inspection of external Oil Tank 10,000 Liter, as shown on Exhibit A | ||||||||||
| 2 | - | 1 | 1 | Job | € 0.00 | $0.00 | |||||
| Bldg. #1455, near #1224, Clay, 15.000L, Exhibit A | 2 | - | 1 | 1 | Job | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E005 | Cleaning and Inspection of Drains | 3 | Job | € 0.00 | $0.00 | ||||||
| Bldg. #1224,Clay, 14.4 m3 |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| Bldg. #1657, 2.25m3, Clay |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Bldg. #7539, 1.5m3, TMP | ||||||||||
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E006 | Cleaning and inspection of Rainwater Retention Basin | 7 | Job | € 0.00 | $0.00 | |||||
| Bldg. #1455, 200 m3, Clay |
| 2 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| WS901, 314 m3, Clay |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| Bldg. #7200, 750 m3, Mc Cully | ||||||||
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| Bldg. #6290, 1,320m3, Mc Cully |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| Bldg. #7200, 1500m3, Mc Cully | 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Bldg. # 1455, 2380m3, Clay |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| Bldg. # 6290, 2700m3, Mc Cully | 2 | - | 1 | 1 | EA | € 0.00 | € - 0 | $0.00 | $0.00 | ||
| E0007 | Disposal of up to 650 metric tons of POL residues (PWS 5.2.1.3.10) | 700 | N/A | 12 | N/A | Metric Ton | € 0.00 | € 0.00 | $0.00 | $0.00 | |
| 0003 | Maintenance and Inspection of waste water pump stations | 6 | - | 1 | 4 | Job | € 0.00 | € 0.00 | $0.00 | $0.00 | |
| 0004 | General Inspection of POL and Grease separators | 40 | Job | € 0.00 | € 0.00 | $0.00 | $0.00 | ||||
| 0005 | On Demand Services (T&M) | Job | € 45,454.00 | $46,391.10 | |||||||
| Hourly rates to perform on - call repairs including compensation for travel cost . Monday through Friday between 07.30 and 16.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.3) | 40 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Hourly rates to perform on - call repairs, including compensation for travel cost. Monday through Friday between 07.30 and 16.00hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4) | 8 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Hourly rates to perform on - call repairs, including compensation for travel cost. Saturday between 00.00 and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4) | 8 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Hourly rates to perform on - call repairs, including compensation for travel cost. Sundays and German Holidays between 00.00 hours and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4) | 8 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E0008 | Material (T&M) | 1 | 1 | Job | € 45,454.00 |
Bayer, Maurice LN USA USAREUR: Bayer, Maurice LN USA USAREUR:
GOV Estimate, do not change !
| $46,391.10 | $46,391.10 | ||||||||||
| 0006 | E0009 | Monthly visual inspection on all grease and POL separators | 70 | EA | € 0.00 | $0.00 | |||||
| visual inspection of grease separators | 20 | 1 | 12 | 12 | EA | € - 0 | € 0.00 | $0.00 | $0.00 | ||
| visual inspection of POL separators NG 1-80 | 38 | 1 | 12 | 12 | EA | € - 0 | € 0.00 | $0.00 | $0.00 | ||
| visual inspection of POL separators NG 80+ | 12 | 1 | 12 | 12 | EA | € - 0 | € 0.00 | $0.00 | $0.00 | ||
| TOTAL PRICE BASE YEAR | 45,454.00 € | $46,391.10 |
1st option year PRICEBOOK Separators USE GREEN CELLS ONLY, REST WILL CALCULATE AUTOMATICALLY !
| Contract | Contract Year | POP Date | Exchangerate | |||
| 1st option year | End of Base Year through 12 Months | $0.9798 | ||||
| LINE ITEM NUMBER | ELIN | ITEM/SERVICE DESCRIPTION | QTY | FREQUENCY PER MONTH | ||
| MONTH | ||||||
| FREQUENCY PER YEAR | ||||||
| UNIT OF MEASURE | ||||||
| EA | UNIT PRICE | |||||
| € | TOTAL PRICE |
| UNIT PRICE | |
| $ | TOTAL PRICE |
| 1001 | The contractor shall provide PM services for grease separators, Potato Starch separators, Septic Tanks, including emptying, cleaning, transportation and disposal IAW PWS. | 1 | Job | 0.00 € | 0.00 € | $ - 0 | $0.00 | ||||
| Grease Separators | |||||||||||
| Grease Separators 1m3: | 12 | 11 | 134 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1214, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1531, two times per month. | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5119, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6263, Mess Hall, inactive, one time per year. | 1 | - | 1 | 1 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6244, Snack Bar, inactive, one time per year. | 1 | - | 1 | 1 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6431, Dagger, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7762, PX Asia bambo PX Front side, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7884, Youth Center, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7894, School Hberg, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7896, School Hberg, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7885, CDC, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7920, School Hberg, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Grease Separators 2 m3: | 1 | 2 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1011, CAC, two times per month. | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Grease Separators 3 m3: | 7 | 8 | 97 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1023 N, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1052, two times per month. | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1502, CDC, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 4007, inactive, one time per year | 1 | - | 1 | 1 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7778, School, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7850, PX, two times per month | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7891, Entertainment Center, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Potato Starch Separators | |||||||||||
| Potato Starch Separators 1 m3: | 1 | 0 | 4 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1052, one time every 3 months | 1 | - | 4 | 4 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks | |||||||||||
| Septic Tanks 3 m3: | 3 | 0 | 18 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 5140, field WC next field # 5, 6times per year | 1 | - | 6 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5141, field WC next field # 11, 6 times per year | 1 | - | 6 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5142, rest room, 6 times per year | 1 | - | 6 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 4 m3: | 1 | 0 | 2 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1214, every 6 months | 1 | - | 2 | 2 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 7 m3: | 1 | 1 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. #5136, car maintenance, volume 7 m3, once a month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 8 m3: | 5 | 3 | 45 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. #1004, back yard south/west, car maintenance, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1857, next to 1657 south, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5128, rest room, events only, service on call required | 1 | - | 3 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5130, one time every four months | 1 | - | 3 | 3 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6980, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 14 m3: | 1 | 2 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 2601, Egelsbach, two times per month | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 21 m3: | 1 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||||
| Bldg. # 6984, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 32 m2: | 1 | 2 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 5119, Club House, two times per month | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Inspections | |||||||||||
| Inspection of grease separators by expert (visual test) (one time per year), volume 1- 3 m3. | 20 | - | 1 | 20 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Maintenance inspections of potato starch separators by experts (one time per year) | 1 | - | 1 | 2 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| 1002 | Cleaning and Inspection of Multiple Seperators | Job | 0.00 € | $0.00 | |||||||
| E001 | Cleaning of Petroleum Oil Lubricant (POL) Separators | 39 | Job | € 0.00 | $0.00 | ||||||
| NG 1,5 – 15, at different locations, as shown on Exhibit A |
| 22 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 20 - 40, at different locations, as shown on Exhibit A |
| 9 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 65-80, at different locations, as shown on Exhibit A | ||||||||
| 2 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 100+, at different locations, as shown on Exhibit A |
| 6 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E002 | Cleaning of Coalescence Separators | 11 | Job | € 0.00 | $0.00 | |||||
| NG 1,5 – 15, at different locations, as shown on Exhibit A |
| 2 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 20 – 40, at different locations, as shown on Exhibit A |
| 3 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 65-85, at different locations, as shown on Exhibit A |
| 0 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 100+, at different locations, as shown on Exhibit A |
| 6 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E003 | Cleaning and Inspection of Mud Traps | 35 | Job | € 0.00 | $0.00 | |||||
| 100- 1,000 Liter, as shown on Exhibit B |
| 4 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| 1,000- 3,500 Liter, as shown on Exhibit B |
| 5 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| 3,500- 7,000 Liter, as shown on Exhibit B |
| 19 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| 10,000 Liter, as shown on Exhibit B |
| 2 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| 21,000 Liter, as shown on Exhibit B | |||||||||||
| 4 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| 22,000-60,000 Liter, as shown on Exhibit B | |||||||||||
| 1 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| E004 | Cleaning and Inspection of external Oil Tank 10,000 Liter, as shown on Exhibit A | ||||||||||
| 2 | - | 1 | 1 | Job | € 0.00 | $0.00 | |||||
| Bldg. #1455, near #1224, Clay, 15.000L, Exhibit A | 2 | - | 1 | 1 | Job | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E005 | Cleaning and Inspection of Drains | 3 | Job | € 0.00 | $0.00 | ||||||
| Bldg. #1224,Clay, 14.4 m3 |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| Bldg. #1657, 2.25m3, Clay |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Bldg. #7539, 1.5m3, TMP | ||||||||||
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E006 | Cleaning and inspection of Rainwater Retention Basin | 7 | Job | € 0.00 | $0.00 | |||||
| Bldg. #1455, 200 m3, Clay |
| 2 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| WS901, 314 m3, Clay |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| Bldg. #7200, 750 m3, Mc Cully | ||||||||
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| Bldg. #6290, 1,320m3, Mc Cully |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| Bldg. #7200, 1500m3, Mc Cully | 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Bldg. # 1455, 2380m3, Clay |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| Bldg. # 6290, 2700m3, Mc Cully | 2 | - | 1 | 1 | EA | € 0.00 | € - 0 | $0.00 | $0.00 | ||
| E0007 | Disposal of up to 650 metric tons of POL residues (PWS 5.2.1.3.10) | 700 | N/A | 12 | N/A | Metric Ton | € 0.00 | € 0.00 | $0.00 | $0.00 | |
| 1003 | Maintenance and Inspection of waste water pump stations | 6 | - | 1 | 4 | Job | € 0.00 | € 0.00 | $0.00 | $0.00 | |
| 1004 | General Inspection of POL and Grease separators | 40 | Job | € 0.00 | € 0.00 | $0.00 | $0.00 | ||||
| 1005 | On Demand Services (T&M) | Job | € 47,726.18 | $48,710.12 | |||||||
| Hourly rates to perform on - call repairs including compensation for travel cost . Monday through Friday between 07.30 and 16.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.3) | 40 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Hourly rates to perform on - call repairs, including compensation for travel cost. Monday through Friday between 07.30 and 16.00hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4) | 8 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Hourly rates to perform on - call repairs, including compensation for travel cost. Saturday between 00.00 and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4) | 8 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Hourly rates to perform on - call repairs, including compensation for travel cost. Sundays and German Holidays between 00.00 hours and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4) | 8 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E0008 | Material (T&M) | 1 | 1 | Job | € 45,453.50 |
Bayer, Maurice LN USA USAREUR: Bayer, Maurice LN USA USAREUR:
GOV Estimate, do not change !
| $46,390.59 | $46,390.59 | ||||||||||
| 1006 | E0009 | Monthly visual inspection on all grease and POL separators | 70 | EA | € 0.00 | $0.00 | |||||
| visual inspection of grease separators | 20 | 1 | 12 | 12 | EA | € - 0 | € 0.00 | $0.00 | $0.00 | ||
| visual inspection of POL separators NG 1-80 | 38 | 1 | 12 | 12 | EA | € - 0 | € 0.00 | $0.00 | $0.00 | ||
| visual inspection of POL separators NG 80+ | 12 | 1 | 12 | 12 | EA | € - 0 | € 0.00 | $0.00 | $0.00 | ||
| TOTAL PRICE 1st option year | 47,726.18 € | $48,710.12 |
2nd option year PRICEBOOK Separators USE GREEN CELLS ONLY, REST WILL CALCULATE AUTOMATICALLY !
| Contract | Contract Year | POP Date | Exchangerate | |||
| 2nd option year | End of Option Year 1 through 12 Months | $0.9798 | ||||
| LINE ITEM NUMBER | ELIN | ITEM/SERVICE DESCRIPTION | QTY | FREQUENCY PER MONTH | ||
| MONTH | ||||||
| FREQUENCY PER YEAR | ||||||
| UNIT OF MEASURE | ||||||
| EA | UNIT PRICE | |||||
| € | TOTAL PRICE |
| UNIT PRICE | |
| $ | TOTAL PRICE |
| 2001 | The contractor shall provide PM services for grease separators, Potato Starch separators, Septic Tanks, including emptying, cleaning, transportation and disposal IAW PWS. | 1 | Job | 0.00 € | 0.00 € | $ - 0 | $0.00 | ||||
| Grease Separators | |||||||||||
| Grease Separators 1m3: | 12 | 11 | 134 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1214, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1531, two times per month. | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5119, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6263, Mess Hall, inactive, one time per year. | 1 | - | 1 | 1 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6244, Snack Bar, inactive, one time per year. | 1 | - | 1 | 1 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6431, Dagger, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7762, PX Asia bambo PX Front side, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7884, Youth Center, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7894, School Hberg, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7896, School Hberg, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7885, CDC, one time per month. | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7920, School Hberg, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Grease Separators 2 m3: | 1 | 2 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1011, CAC, two times per month. | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Grease Separators 3 m3: | 7 | 8 | 97 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1023 N, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1052, two times per month. | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1502, CDC, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 4007, inactive, one time per year | 1 | - | 1 | 1 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7778, School, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7850, PX, two times per month | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 7891, Entertainment Center, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Potato Starch Separators | |||||||||||
| Potato Starch Separators 1 m3: | 1 | 0 | 4 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1052, one time every 3 months | 1 | - | 4 | 4 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks | |||||||||||
| Septic Tanks 3 m3: | 3 | 0 | 18 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 5140, field WC next field # 5, 6times per year | 1 | - | 6 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5141, field WC next field # 11, 6 times per year | 1 | - | 6 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5142, rest room, 6 times per year | 1 | - | 6 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 4 m3: | 1 | 0 | 2 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 1214, every 6 months | 1 | - | 2 | 2 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 7 m3: | 1 | 1 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. #5136, car maintenance, volume 7 m3, once a month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 8 m3: | 5 | 3 | 45 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. #1004, back yard south/west, car maintenance, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 1857, next to 1657 south, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5128, rest room, events only, service on call required | 1 | - | 3 | 6 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 5130, one time every four months | 1 | - | 3 | 3 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Bldg. # 6980, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 14 m3: | 1 | 2 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 2601, Egelsbach, two times per month | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 21 m3: | 1 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||||
| Bldg. # 6984, one time per month | 1 | 1 | 12 | 12 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Septic Tanks 32 m2: | 1 | 2 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | |||
| Bldg. # 5119, Club House, two times per month | 1 | 2 | 12 | 24 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Inspections | |||||||||||
| Inspection of grease separators by expert (visual test) (one time per year), volume 1- 3 m3. | 20 | - | 1 | 20 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| Maintenance inspections of potato starch separators by experts (one time per year) | 1 | - | 1 | 2 | EA | 0.00 € | 0.00 € | $0.00 | $0.00 | ||
| 2002 | Cleaning and Inspection of Multiple Seperators | Job | 0.00 € | $0.00 | |||||||
| E001 | Cleaning of Petroleum Oil Lubricant (POL) Separators | 39 | Job | € 0.00 | $0.00 | ||||||
| NG 1,5 – 15, at different locations, as shown on Exhibit A |
| 22 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 20 - 40, at different locations, as shown on Exhibit A |
| 9 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 65-80, at different locations, as shown on Exhibit A | ||||||||
| 2 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 100+, at different locations, as shown on Exhibit A |
| 6 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E002 | Cleaning of Coalescence Separators | 11 | Job | € 0.00 | $0.00 | |||||
| NG 1,5 – 15, at different locations, as shown on Exhibit A |
| 2 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 20 – 40, at different locations, as shown on Exhibit A |
| 3 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 65-85, at different locations, as shown on Exhibit A |
| 0 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| NG 100+, at different locations, as shown on Exhibit A |
| 6 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E003 | Cleaning and Inspection of Mud Traps | 35 | Job | € 0.00 | $0.00 | |||||
| 100- 1,000 Liter, as shown on Exhibit B |
| 4 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| 1,000- 3,500 Liter, as shown on Exhibit B |
| 5 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| 3,500- 7,000 Liter, as shown on Exhibit B |
| 19 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| 10,000 Liter, as shown on Exhibit B |
| 2 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| 21,000 Liter, as shown on Exhibit B | |||||||||||
| 4 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| 22,000-60,000 Liter, as shown on Exhibit B | |||||||||||
| 1 | - | 2 | 2 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| E004 | Cleaning and Inspection of external Oil Tank 10,000 Liter, as shown on Exhibit A | ||||||||||
| 2 | - | 1 | 1 | Job | € 0.00 | $0.00 | |||||
| Bldg. #1455, near #1224, Clay, 15.000L, Exhibit A | 2 | - | 1 | 1 | Job | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E005 | Cleaning and Inspection of Drains | 3 | Job | € 0.00 | $0.00 | ||||||
| Bldg. #1224,Clay, 14.4 m3 |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| Bldg. #1657, 2.25m3, Clay |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Bldg. #7539, 1.5m3, TMP | ||||||||||
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E006 | Cleaning and inspection of Rainwater Retention Basin | 7 | Job | € 0.00 | $0.00 | |||||
| Bldg. #1455, 200 m3, Clay |
| 2 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| WS901, 314 m3, Clay |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| Bldg. #7200, 750 m3, Mc Cully | ||||||||
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 |
| Bldg. #6290, 1,320m3, Mc Cully |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| Bldg. #7200, 1500m3, Mc Cully | 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Bldg. # 1455, 2380m3, Clay |
| 1 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | |||
| Bldg. # 6290, 2700m3, Mc Cully | 2 | - | 1 | 1 | EA | € 0.00 | € - 0 | $0.00 | $0.00 | ||
| E0007 | Disposal of up to 650 metric tons of POL residues (PWS 5.2.1.3.10) | 700 | N/A | 12 | N/A | Metric Ton | € 0.00 | € 0.00 | $0.00 | $0.00 | |
| 2003 | Maintenance and Inspection of waste water pump stations | 6 | - | 1 | 4 | Job | € 0.00 | € 0.00 | $0.00 | $0.00 | |
| 2004 | General Inspection of POL and Grease separators | 40 | Job | € 0.00 | € 0.00 | $0.00 | $0.00 | ||||
| 2005 | On Demand Services (T&M) | Job | € 50,694.53 | $51,739.67 | |||||||
| Hourly rates to perform on - call repairs including compensation for travel cost . Monday through Friday between 07.30 and 16.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.3) | 40 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Hourly rates to perform on - call repairs, including compensation for travel cost. Monday through Friday between 07.30 and 16.00hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4) | 8 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Hourly rates to perform on - call repairs, including compensation for travel cost. Saturday between 00.00 and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4) | 8 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| Hourly rates to perform on - call repairs, including compensation for travel cost. Sundays and German Holidays between 00.00 hours and 24.00 hours. In accordance with Performance Work Statement (PWS-Para. 5.2.3.4) | 8 | - | 1 | 1 | EA | € 0.00 | € 0.00 | $0.00 | $0.00 | ||
| E0008 | Material (T&M) | 1 | 1 | Job | € 48,280.50 |
Bayer, Maurice LN USA USAREUR: Bayer, Maurice LN USA USAREUR:
GOV Estimate, do not change !
| $49,275.87 | $49,275.87 | ||||||||||
| 2006 | E0009 | Monthly visual inspection on all grease and POL separators | 70 | EA | € 0.00 | $0.00 | |||||
| visual inspection of grease separators | 20 | 1 | 12 | 12 | EA | € - 0 | € 0.00 | $0.00 | $0.00 | ||
| visual inspection of POL separators NG 1-80 | 38 | 1 | 12 | 12 | EA | € - 0 | € 0.00 | $0.00 | $0.00 | ||
| visual inspection of POL separators NG 80+ | 12 | 1 | 12 | 12 | EA | € - 0 | € 0.00 | $0.00 | $0.00 | ||
| TOTAL PRICE 2nd option year | 50,694.53 € | $51,739.67 |
File details come from the government source that posted it. Updated .