W912CH-25-R-L008 Solicitation Amendment 0003.pdf

PDF 383 KB Posted

Attached to
CAA Grounds Maintenance and Snow Removal Federal contract opportunity
Solicitation number
W912CH-25-R-L008
Issued by
Department of the Army

About this file

This is Amendment 0003 to solicitation W912CH25RL008, issued by the U.S. Army Contracting Command - Detroit Arsenal on December 17, 2024. The amendment adds Attachment 004 containing answers to contractor questions regarding the CAA Grounds Maintenance and Snow Removal contract opportunity.

The amendment modifies the Table of Contents to add the new Attachment 4 "Questions Answered for CAA Grounds" dated December 17, 2024, while maintaining the existing attachments: Attachment 1 (On-Site Pictures of Facility), Attachment 2 (Instructions on Visiting CAA), and Attachment 3 (Wage Determination). The due date for receipt of offers has been extended, though the specific extended date is not provided in the amendment. All other terms and conditions of the solicitation remain unchanged.

View the file

Other files for this federal contract opportunity

Other files attached to CAA Grounds Maintenance and Snow Removal, newest first.
File Type Posted
CAA Grounds Maintenance Questions Answered.docx DOCX document
W912CH-25-R-L008 Solicitation Amendment 0003.pdf PDF
CAA Grounds Maintenance Questions Answered Approved.docx DOCX document
W912CH-25-R-L008 Solicitation Amendment 0002.pdf PDF
Attachment 002-Instruction on Visiting CAA_update 20 Aug 2024.pptx PPTX presentation
W912CH-25-R-L008 Solicitation Amendment 001.pdf PDF
Attachment 003- On Site Pictures of Facility.docx DOCX document
W912CH-25-R-L008_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See page tw o for details...

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912CH25RL008

X 9B. DATED (SEE ITEM 11)

03-Dec-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0003

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Dec-2024

CODE

W6QK ACC-DTA

SYDNEY HUSTON

6501 E. 11 MILE ROAD

DETROIT ARSENAL MI 48397-5000

W912CH 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912CH25RL008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

The purpose of Amendment 0003 is to add the Contractor asked questions with the correct answers.

1. Attachment 004 has been added to post the answers to the questions asked.

2. All other terms and conditions of the Solicitation remain the same.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment 003- On Site

Pictures of Facility

03-DEC-2024

Attachment 2 Attachment 002- Instruction on Visiting

CAA

03-DEC-2024

Attachment 3 Attachment 001- Wage Determination

02-DEC-2024

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment 003- On Site

Pictures of Facility

03-DEC-2024

Attachment 2 Attachment 002- Instruction on Visiting

CAA

03-DEC-2024

Attachment 3 Attachment 001- Wage Determination

02-DEC-2024

Attachment 4 Questions Answered for CAA Grounds

17-DEC-2024

(End of Summary of Changes)

W912CH25RL008