W912CH-25-R-L008 Solicitation Amendment 0003.pdf

PDF 385 KB Posted

Attached to
CAA Grounds Maintenance and Snow Removal Federal contract opportunity
Solicitation number
W912CH-25-R-L008
Issued by
Department of the Army

About this file

This is Amendment 0003 to solicitation W912CH25RL008, issued by the U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) with an effective date of December 17, 2024.

The amendment adds Attachment 004 containing answers to contractor questions about CAA Grounds maintenance and snow removal services. The amendment updates the Table of Contents to include this new attachment while maintaining the previous attachments: Attachment 001 (Wage Determination dated December 2, 2024), Attachment 002 (Instructions on Visiting CAA dated December 3, 2024), and Attachment 003 (On-Site Pictures of Facility dated December 3, 2024). All other terms and conditions of the original solicitation remain unchanged, and the amendment extends the time for receipt of offers.

View the file

Other files for this federal contract opportunity

Other files attached to CAA Grounds Maintenance and Snow Removal, newest first.
File Type Posted
W912CH-25-R-L008 Solicitation Amendment 0003.pdf PDF
CAA Grounds Maintenance Questions Answered.docx DOCX document
CAA Grounds Maintenance Questions Answered Approved.docx DOCX document
W912CH-25-R-L008 Solicitation Amendment 0002.pdf PDF
Attachment 002-Instruction on Visiting CAA_update 20 Aug 2024.pptx PPTX presentation
W912CH-25-R-L008 Solicitation Amendment 001.pdf PDF
Attachment 003- On Site Pictures of Facility.docx DOCX document
W912CH-25-R-L008_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .

15A. NAME AND TIT LE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA

FAR (48 CFR) 53.243

See page tw o for details...

1. CO NTRACT ID CODE P AGE OF P AGES

J 1 3

16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)

16C. DAT E SIGNED

BY

16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contract ing Officer )(Signature of person authorized t o sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X W912CH25RL008

X 9B. DAT ED (SEE IT EM 11)

03-Dec-2024

10B. DAT ED (SEE IT EM 13)

9A. AMENDMENT OF SOLICITAT ION NO.

11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS

X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer X is ext ended, is not extended.

Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:

(a) By compl eti ng Items 8 and 15, and returning 1 copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;

or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN

REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.

12. ACCOUNTING AND APPROPRIATION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:

D. OT HER (Specify type of modification and authorit y)

E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0003

2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Dec-2024

CODE

W6QK ACC- DTA

SYDNEY HUSTON

6501 E. 11 MILE ROAD

DETROIT ARSENAL MI 48397- 5000

W912CH 7. AD MINISTERED BY (If other t han item 6)

4. REQUISITION/PU RCHASE REQ. NO.

CODE

See I tem 6

FACILITY CODECODE

EMAIL:TEL:

W912CH25RL008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

The purpose of Amendment 0003 is to add the Contractor asked questions with the correct answers.

1. Attachment 004 has been added to post the answers to the questions asked.

2. All other terms and conditions of the Solicitation remain the same.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment 003- On Site

Pictures of Facility

03-DEC-2024

Attachment 2 Attachment 002- Instruction on Visiting

CAA

03-DEC-2024

Attachment 3 Attachment 001- Wage Determination

02-DEC-2024

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment 003- On Site

Pictures of Facility

03-DEC-2024

Attachment 2 Attachment 002- Instruction on Visiting

CAA

03-DEC-2024

Attachment 3 Attachment 001- Wage Determination

02-DEC-2024

Attachment 4 Questions Answered for CAA Grounds

17-DEC-2024

(End of Summary of Changes)

W912CH25RL008

File details come from the government source that posted it. Updated .