T-1
ROAD/PARKING PAVING AND MARKING
INSTALL AND REPAIR CONCRETE ELEMENTS
FORT BUCHANAN, PUERTO RICO
US ARMY GARRISON
TITLE SHEET, LOCATION MAP, BUCHANAN SITE MAP AND INDEX OF DRAWINGS
SITE PLAN
R-1
ROAD/PARKING PAVING AND MARKING
INSTALL AND REPAIR CONCRETE ELEMENTS
FORT BUCHANAN, PUERTO RICO
US ARMY GARRISON
COURT NO. 1
COURT NO. 2
AAFES
NATIONAL GUARD - BLDGS. 540,
GARRISON BUILDINGS
1st MSC ARMY RESERVE BUILDINGS
COMMISSARY
DDESS
BANCO POPULAR - BLDG. 501
CREDIT UNION - BLDG. 673
HOUSING BUILDINGS
MWR ACTIVITIES
CUSTOMS - BLDG. 295
ARCC - BLDG. 399
541, 563, 607
GARRISON/348th TSB - BLDG. 218
IG/CID
ENVIRONMENTAL NOTES:
PROTECTED AREAS OF "PALO DE ROSA"
PROTECTED AREAS OF "BOA" HABITAT
PROTECTED AREAS OF "MOGOTES"
PROTECTED AREAS OF WETLANDS
FLOODPLAINS
APPROXIMATE AREA = 722,001 SF
APPROXIMATE AREA = 4,438,302 SF
APPROXIMATE AREA = 149,500
CREEKS
L E G E N D:
BUILDINGS FOR DEMOLITION
HEALTH - BLDGS. 21, 676 & 228
NAVY RESERVE - BLDGS. 73,74,75,
GARRISON & AAFES - BLDG. 613
CCV - BLDGS. 225, 227
VCC & VET CLINIC STORAGE - BLDG. 670
77 & 78
SCALE IN FEET
400 4000 1200800
SYSTEM REFLECTS CONDITIONS AS OF APRIL 2017
UPDATED DATA ON SITE MAP DISTRIBUTION
SOLAR PANELS
SURFACE ASPHALT PATCHINGSHOULDER REPAIRCONTRACTION JOINT CONSTRUCTION JOINTEXPANSION JOINTCONCRETE PAVEMENT JOINT DETAILS FULL DEPTH PATCHASPHALT OVERLAY WITHOUT COLD MILLING ASPHALT OVERLAY WITH COLD MILLINGMANHOLE RAISING DETAIL STEEL EXTENSION FOR MANHOLE COVERSBITUMINOUS PAVEMENT SECTION ASPHALT OVERLAY WITH INTERLAYERCONCRETE DRAINAGE GUTTER DETAILTYPICAL PATCH FOR RIGID PAVEMENTFULL DEPTH PATCH R-2
CONTRACT DRAWING DETAILS
ROAD/PARKING PAVING AND MARKING
INSTALL AND REPAIR CONCRETE ELEMENTS
FORT BUCHANAN, PUERTO RICO
CONCRETE TRUCK VEHICLE WHEEL STOPPRECAST CONCTETE AUTOMOVILE WHEEL STOP ALUMINUM SOLAR SAFETY ROAD MARKERS R-4
RECYCLED RUBBER AUTOMOVILE WHEEL STOP Ø 1-3/8" 3/4" 5/8" THROUGH TYPICAL RAIL MOUNTINGDETAILS OF RAIL ELEMENT AND FLARED END SECTIONCABLE ANCHOR ASSEMBLY
BEARING PLATE
END SECTION (ROUNDED)TYPICAL LAYOUT - BRICKLAYER PATTERN TYPICAL LAYOUT - HERRINGBONE PATTERN GEOBLOCK COMPONENTS
ROAD/PARKING PAVING AND MARKING
INSTALL AND REPAIR CONCRETE ELEMENTS
FORT BUCHANAN, PUERTO RICO
US ARMY GARRISON
CONTRACT DRAWING DETAILS
CONCRETE SHALLOW GUTTER DETAIL
R-5
6" > 4" WASHED STONE (RIP RAP)
2" TOP SOIL 2" TOP SOIL
BANK SLOPE
(> 1.5%)
- BIOSWALE
STEEL OR WOOD POST
SUPPORT MESH
GEOTEXTILE
BACKFILLED AND COMPACTED SOIL
FLOW
MIN.TRENCH
LIMITS OF CLEARING
FLOW
MIN.TRENCH
F
I
L
S
O
P
E
EXISTING GROUND
(UNDISTRIBUTED)
FLOW
T O
E
O
F
S
L O
P E
FLOW
1. USE DRAINAGE DITCH INSTALLATION FOR FLOW CONDITIONS ONLY
WHEN SPECIFIED ON EROSION CONTROL PLAN.
2. ALTERNATE PREASSEMBLED SILT FENCE OPTIONS WILL BE ALLOWED
AS LONG AS SPECIFIED DIMENSIONS ARE SATISFIED. FOLLOW
MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION PROCEDURES.
ALL TYPES MUST ENSURE SILT FENCE REMAINS ATTACHED TO, AND
DOES NOT SLIDE DOWN, SUPPORTING POSTS.
3. INSTALL SILT FENCE ALONG AROUND GROUND CONTOURS. CURVE ENDS
OF SILT FENCE UPGRADE TO PREVENT WATER FROM RUNNING AROUND THE ENDS.
4. 10 FT. (MAX.) SPACING WITH FENCE SUPPORT.
6 FT. (MAX.) SPACING WITHOUT FENCE SUPPORT.
NOTES:POST AND GEOTEXTILE INSTALLATION DETAIL SILT INSTALLATION AT TOE OF FILL - ELEVATIONSILT FENCE INSTALLATION IN A DRAINAGE DITCH SILT INSTALLATION AT TOE OF FILL - PLAN
4" CONCRETE 4500 PSI @
28 DAYS
" MAX
AGGREGATE DIAMETER
1" FINAL GRADING SAND
3" CRUSHED GRAVEL
STONE BASE COMPACTED
@ 95% MAX DRY DENSITY
GEOTEXTILE FABRIC
3"-1" MIN. DIAMETER
WASHED STONE
SUB-BASE COMPACTED @
75% MAX DRY DENSITY
GEOTEXTILE FABRIC
REBAR IN ACCORDANCE
TO THE
GRASS / CONCRETE
SYSTEM SPECIFICATION4" PERVIOUS PAVEMENT SECTION DETAIL 6" CONCRETE 4500 PSI @
28 DAYS
" MAX
AGGREGATE DIAMETER
1" FINAL GRADING SAND
3" CRUSHED GRAVEL
STONE BASE COMPACTED
@ 95% MAX DRY DENSITY
GEOTEXTILE FABRIC
5'-1" MIN. DIAMETER
WASHED STONE
SUB-BASE COMPACTED @
75% MAX DRY DENSITY
GEOTEXTILE FABRIC
REBAR IN ACCORDANCE
TO THE
GRASS / CONCRETE
SYSTEM SPECIFICATION6" PERVIOUS PAVEMENT SECTION DETAILGEOTEXTILE FABRIC
ROAD/PARKING PAVING AND MARKING
INSTALL AND REPAIR CONCRETE ELEMENTS
FORT BUCHANAN, PUERTO RICO
CONTRACT DRAWING DETAILS
POLYURETHANE LINNEN
| NEW ASPHALT AND CONCRETE CONTRACT 1 |
| NEW ASPHALT AND CONCRETE CONTRACT 2 |
| NEW ASPHALT AND CONCRETE CONTRACT 3 |
| NEW ASPHALT AND CONCRETE CONTRACT 4 |
| NEW ASPHALT AND CONCRETE CONTRACT 5 |
| NEW ASPHALT AND CONCRETE CONTRACT 6 |
| NEW ASPHALT AND CONCRETE CONTRACT 6.1 |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
File details come from the government source that posted it.