SUMMARY

Base$0
OPTION FY1$0
OPTION FY2$0
OPTION FY3$0
OPTION FY4$0
Extension OptionERROR:#REF!
TotalERROR:#REF!
Preparer's Name:Robert Burke
TitleConstruction Inspector
Email addressrobert.p.burke10.civ@mail.mil
date20170711
Signature
Phone Number787-707-2229
Reviewer's Name:Carlos Guzman
TitleCOR
Email addresscarlos.o.guzman.civ@mail.mil
date20170711
signature
Phone Number787-707-3991

NOTE: This IGCE was prepared before seeking any official quote. The price was obtain from historical data of previous contract W912C3-12-D-0001 and cost in the market as well as the RSMeans 2016 for base year. Additional option year prices, were projected as a 2.25% cost increase per option year based on national average inflation rate. Quantities of Line Items, incorporated within the CLINs were estimated based on the amount of paved surfaces, buildings, and future expansion plans, within the Installation.

Base Year CLINs

SectionELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
Asphalt0001AAAsphalt Pavement Overlay (2" Two inches depth)Work includes preparation of surface (i.e. mechanical broom cleaning), application of tack coat, placing HMAC and compacting it to 2”. In accordance with drawings and specifications within this contract30000SQYD
0001ABAsphalt Pavement Overlay (Additional inch 1"depth)Work includes preparation of surface (i.e. mechanical broom cleaning), application of tack coat, placing HMAC and compacting it to 1”. In accordance with drawings and specifications within this contract3000SQYD
0001ACSurface Asphalt Patching 2"Saw cutting, excavation and removal of a 2” thick section of existing wearing surface. Applying a tack coat prior to placing HMAC and compacting it to a uniform compacted thickness of 2”. In accordance with drawings and specifications within this contract3000SQFT
0001ADFull Depth Asphalt Patching 8" – Lean Concrete BaseSaw cutting and removal of HMAC layer (to include 6” overlap of existing base course on all sides). Excavation to a total depth of 8” from surface. Compaction of exposed subbase/ground and installation of 6 mil polyurethane sheets. Placing 1,000 psi lean concrete to a depth of 6” or compacting 6” of base course of cruched gravel. Cure concrete. Apply tack coat, lay and compact 2” of new HMAC. In accordance with drawings and specifications within this contract15000SQFT
0001AEFull Depth Asphalt Patching 10” – lean concreteSaw cutting and removal of HMAC layer (to include 6” overlap of existing base course on all sides). Excavation to a total depth of 10” from surface. Compaction of exposed subbase/ground and installation of 6 mil polyurethane sheets. Placing 1,000 psi lean concrete to a depth of 8” or compacting 8” of base course. Cure concrete. Apply tack coat, lay and compact 2” of new HMAC. In accordance with drawings and specifications within this contract15000SQFT
0001AFPavement Cold Milling, Asphalt or Concrete 2"depthWork includes using a cold milling machine to remove 2” of pavement (concrete or asphalt). In accordance with drawings and specifications within this contract3000SQYD
0001AGPavement Cold Milling, Asphalt or Concrete each additional inchWork includes using a cold milling machine to remove an additional inch of pavement (concrete or asphalt). In accordance with drawings and specifications within this contract1500SQYD
0001AHConcrete Shallow Gutter at Paving AreaLine items includes, Concrete (see detail drawing); Rebar (see detail drawing); Excavation, Form work. Base preparation is not included. In accordance with drawings and specifications within this contract100LNFT
Foundations & Base Material0001AJShoulder RepairWork includes replacing topsoil with suitable material for compaction. In accordance with drawings and specifications within this contract2000SQFT
0001AKAdditional Base Course Replacement 6"If full depth renders unsuitable material under excavation, this line items accounts for removing and disposing said material up to a depth of 6” and replacing with 6” suitable base material. In accordance with drawings and specifications within this contract2000SQYD
0001ALAdditional Base Course Replacement 12"If full depth renders unsuitable material under excavation, this line items accounts for removing and disposing said material up to a depth of 12” and replacing with 12” suitable base material. In accordance with drawings and specifications within this contract1500SQYD
0001AMAdditional Base Course Replacement 1"If full depth renders unsuitable material under excavation, this line items accounts for removing and disposing said material an additional inch in and replacing with 1” suitable base material. In accordance with drawings and specifications within this contract500SQYD
0001ANSub-Base Course gabion rock 6" inches layerThis line items accounts for removing and disposing 6” of material and placing a geotextile separation fabric on the soil. Placing a 6” layer of washed 6”-minus gabion rock with a 100% of material passing the 2” sieve. In accordance with drawings and specifications within this contract500SQYD
0001APGeotextile InterlayerWork includes the installation of the geotextile fabric layer. In accordance with drawings and specifications within this contract800SQYD
0001AQRaising Manholes and/or GratingsWork includes selective demolition, welding, placing of reinforced concrete and/or placing and compacting HMAC around the finished work area. In accordance with drawings and specifications within this contract20EA
0001ARRaising Water Valves, Electrical BoxesWork includes selective demolition, welding, placing of reinforced concrete and/or placing and compacting HMAC around the finished work area. In accordance with drawings and specifications within this contract20EA
Concrete0001ASConcrete Handicap Ramp including truncated domesWork includes selective demolition of existing concrete elements in addition to surface preparation, concrete formwork and placing concrete, installing truncated domes and finishing the surface. In accordance with drawings and specifications within this contract10EA
0001ATConcrete Curb Type ALine items includes, concrete (see detail drawing), rebar, excavation, form work; 1.5 cubic foot of crushed stone Base preparation - 0’6” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil In accordance with drawings and specifications within this contract3000LNFT
0001AUConcrete Curb Type BLine items includes, concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; 1.5 cubic foot of crushed stone Base preparation - 0’6” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract2000LNFT
0001AVPlasterLine item includes bonding agent, base coat and finish coat. In accordance with drawings and specifications within this contract2000SY
0001AWTypical sidewalk detailLine items includes: reinforcement #3@12" o.c. e.w. , and sidewalk thickened edges (see detail drawing), 4” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract15000LF
0001AX4" thick slab (comp) #4 @ 14" x 14"3500psi, 4 inches depth, #4bar, 12" O.C., including, 6” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract10000SF
0001AY5" thick slab (comp) #5 @12" x 12"3500psi, 5 inches depth, #4bar, 12" O.C., including, 6” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract10000SF
0001AZ6" thick Concrete Slab3500psi, 6 inches depth, #5bar, 12" O.C., including, 6” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract8000SQFT
0001BA8" thick slab (comp) #5 @12" x 12"3500psi, 8 inches depth, #5bar, 12" O.C., including, 6” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract10000SF
0001BBDELETE THIS ITEM

Burke, Robert CIV USA IMCOM: Burke, Robert CIV USA IMCOM:

Needs CAD drawing for new itemsWall Section with 3500psi concrete, 6 inches wide, #5bar, 12" O.C., 8" depth - 24" wide footing including, 6” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract0LF
0001BCConcrete trench w/steel grating and frameLine items includes steel grating and frame, concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 1 cubic foot of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.200LF
0001BDTypical Open Concrete DrainLine items includes concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 1 cubic foot of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.200LF
0001BETypical Concrete ditchLine items includes concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 1 cubic foot of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.1500SF
0001BFGuard post 6" diameter pipe col conc. Filled and field paint with chain and footingLine items includes, concrete (see detail drawing 8/C4), 6" dia steel pipe, excavation, form work, and all material used for crushed stone base preparation and placing backfill; including 4” Topsoil In accordance with drawings and specifications within this contract100EA
0001BGConcrete PumpLine item includes: Use for concrete conveying and pumping to locations not accessible by conventional methods.30EA
0001BHR.w. 3'-6'includes: excavation, backfill and reinforcementLine items includes, concrete (see detail drawing), rebar, excavation, form work, weep pipe, 3/4" dia clean gravel filter material, geotech fabric; crushed stone Base preparation - 0’6” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil In accordance with drawings and specifications within this contract1000LF
0001BJPrecast concrete sound barrier wallIn accordance with drawings and specifications within this contract700SM
Traffic Control & Markings0001BKRemove traffic markingsRemove traffic markings by mechanical means, to include grinding, water blasting, sandblasting or shot blasting.250SQFT
0001BLFour (4") Inch Wide Traffic Lines (Traffic paint) Yellow, White, Blue or RedSurface preparation and application of paint. Meet MUTCD and FHWA applicable standards.8000LNFT
0001BMFour (4") Inch Wide Traffic Lines (Thermoplastic Reflective paint) Yellow/WhiteSurface preparation and application of paint. Meet MUTCD and FHWA applicable standards.20000LNFT
0001BNTraffic Arrows (Single) Thermoplastic Reflective PaintSurface preparation and application of paint. Meet MUTCD and FHWA applicable standards.50EA
0001BPTraffic Arrows (Double) Thermoplastic Reflective PaintSurface preparation and application of paint. Meet MUTCD and FHWA applicable standards.16EA
0001BQCrosswalksSurface preparation for striping of 24” x 60” thermoplastic reflective paint bands along the crosswalk. Cost is per linear feet of crosswalk length (roadway width). In accordance with drawings and specifications within this contract1000LNFT
0001BRHandicap Symbol PaintedMeet MUTCD and FHWA applicable standards.40EA
0001BSTraffic Signs(24"x12” or 18"x6") with the breakaway post systemMeet MUTCD and FHWA applicable standards.30EA
0001BTTraffic Signs(24"x24" or 24"x30") with the breakaway post systemMeet MUTCD and FHWA applicable standards.40EA
0001BUTraffic Signs(30"x30" or 36"x36”) with the breakaway post systemMeet MUTCD and FHWA applicable standards.80EA
0001BVExisting Traffic Signs removal and re-installation with the breakaway post systemMeet MUTCD and FHWA applicable standards.20EA
0001BWConcrete Wheel Stops, for Automotive, including installationIn accordance with drawings and specifications within this contract100EA
0001BXRecycled rubber Wheel Stops, for Automotive, including installationIn accordance with drawings and specifications within this contract100EA
0001BYConcrete Wheel Stops, for trucks, including installationIn accordance with drawings and specifications within this contract20EA
0001BZExisting Concrete Wheel Stops, for cars/trucks, removal and re-installationIn accordance with drawings and specifications within this contract150EA
0001CAExisting Concrete Wheel Stops, for cars/trucks, Removal and DisposalIn accordance with drawings and specifications within this contract150EA
0001CBRaised Reflective Pavement Lane Markers (White or Yellow both faces)Meet MUTCD and FHWA applicable standards.100EA
0001CCRaised Reflective Pavement Markers (White, Blue and Red Face)Meet MUTCD and FHWA applicable standards.100EA
0001CDSolar Raised Reflective Pavement Lane Markers (White, Blue or Yellow both faces)Meet MUTCD and FHWA applicable standards.100EA
0001CESolar Raised Reflective Pavement Lane Markers (White Face and Red Face)Meet MUTCD and FHWA applicable standards.100EA
0001CFGuard Rails, Single Face,12 GA.Line item includes posts, fasteners, railing, excavation, and installation in accordance to specifications and drawings within this contract.600LNFT
0001CGExisting Guard Rails, Single Face,12 GA. Removal including Posts( Returned to Gov. or Disposal)Line item includes posts, fasteners, railing, excavation, and installation in accordance to specifications and drawings within this contract.100LNFT
0001CHExisting Guard Rails Removal and re-installation, Single Face,12 GA. Including PostsLine item includes posts, fasteners, railing, excavation, and installation in accordance to specifications and drawings within this contract.200LNFT
Green Infrastruture0001CJGeoGrid Grass Pavers – GeoBlock® SystemLine item includes: 8 inches Compacted sandy gravel road base. GEOBLOCK®5150 (2 in x 20 in x 40) geogrid paving units laid in a herringbone pattern, 2 in. topsoil, overlaid with sod. In accordance with drawings and specifications within this contract2500SQFT
0001CK4 inch Pervious Concrete PavementLine item includes: excavation, 3 inches of 1inch min. dia compacted washed stone, 2 layers of geotextile fabric (see drawing details), 3inches of 1 inch max crushed stone, 1 inch final grading sand, GrassCrete® former, #4 rebar (placed in accordance to GrassCrete® specifications), topsoil place within concrete void spaces, grass seed, and constructed in accordance to drawings and specifications within this contract.4000SQFT
0001CL6 inch Pervious Concrete PavementLine item includes: excavation, 5 inches of 1 inch min. dia compacted washed stone, 2 layers of geotextile fabric (see drawing details), 3 inches of 1 inch max crushed stone, 1 inch final grading sand, GrassCrete® former, #4 rebar (placed in accordance to GrassCrete® specifications), topsoil place within concrete void spaces, grass seed, and constructed in accordance to drawings and specifications within this contract.2500SQFT
0001CMBio SwaleLine item includes: excavation, placement of stone, grading, topsoil, sodding, and in accordance with drawings and specifications within this contract2500LNFT
Drainage & Piping0001CNSingle inlet (10'0" hgt max)Line items includes concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 5 cubic yards of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.6EA
0001CPDouble inlet (17'-2" hgt max)Line items includes concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 5 cubic yards of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.4EA
0001CQSteel grating and frameLine items includes steel grating and frame in accordance with drawings and specifications within this contract.10EA
0001CRNew catch basin and framesLine items includes steel grating and frame, concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 5 cubic yards of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.10EA
0001CSHeadwallsLine items includes, concrete (see detail drawing), rebar, excavation, form work; crushed stone Base preparation - 0’4” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil In accordance with drawings and specifications within this contract8EA
0001CTConcrete drain transitionIn accordance with drawings and specifications within this contract1EA
0001CUExisting catch basin raiseIn accordance with drawings and specifications within this contract15EA
0001CVPvc drainage protectionIn accordance with drawings and specifications within this contract150LF
0001CWPvc drainage pipe 0.5"-2" dia completeIn accordance with drawings and specifications within this contract50LF
0001CXPvc drainage pipe 2"-4" dia completeIn accordance with drawings and specifications within this contract50LF
0001CYPvc drainage pipe 6" dia completeIn accordance with drawings and specifications within this contract50LF
0001CZPvc drainage pipe 8" dia completeIn accordance with drawings and specifications within this contract50LF
0001DAPvc drainage pipe 10" dia completeIn accordance with drawings and specifications within this contract100LF
0001DBPvc drainage pipe 12" dia completeIn accordance with drawings and specifications within this contract100LF
0001DCConcrete drainage pipe iii, 16" dia compIn accordance with drawings and specifications within this contract150LF
0001DDConcrete drainage pipe iii, 18" dia compIn accordance with drawings and specifications within this contract200LF
0001DEConcrete drainage pipe iii, 24" dia compIn accordance with drawings and specifications within this contract150LF
0001DFConcrete drainage pipe iii, 30" dia compIn accordance with drawings and specifications within this contract50LF
0001DGConcrete drainage pipe iii, 36" dia compIn accordance with drawings and specifications within this contract50LF
0001DH4" Preforated Drainage Pipe InstallationLine item includes all labor and material to place 4" drainage pipe at maxium depth of -3' per liner foot, In accordance with drawings and specifications within this contract2000LF
Sealants0001DJAsphalt Pavement Crack SealingThis line item is for crack sealing up to 2” wide cracks on pavement. Includes routing equipment with drill bit, crack cleaning and sealant. For cracks greater than ¾” depth backup material (i.e. backer rod) will be required. In accordance with drawings and specifications within this contract8000LNFT
0001DKAsphalt FOG SealingThis line item is a preventative maintenance treatment for existing asphalt surfaces. Fog seals are applied at 0.05 to 2.0 gallons/square yard of the diluted asphalt emulsion. In accordance with drawings and specifications within this contract15000SQYD
0001DLReplace joint sealantIn accordance with drawings and specifications within this contract100LF
Demolition0001DMRemove/dispose reinforce concreteIn accordance with drawings and specifications within this contract1200SF
0001DNSaw cutting concreteIn accordance with drawings and specifications within this contract4000LF
0001DPClearing and Grubbing, Including DisposalClearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Grubbing shall consist of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas. In accordance with drawings and specifications within this contract1000SQYD
Landscaping0001DQSod Planting including Top Soil2 inches of approved offsite Top Soil to be applied evenly throughout sod area. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Gaps between sod pieces shall not exceed 1inch. Immediately after sodding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width. In accordance with drawings and specifications within this contract3000SQYD
0001DRExcavation: additional beyond the incidentalIn accordance with drawings and specifications within this contract1000CY
0001DSBackfill: additional beyond the incidentalIn accordance with drawings and specifications within this contract1000CY
0001DTSilt FenceLine item includes: silt fence and installation in accordance to drawings and specifications within this contract.4000LNFT
Miscellaneous0001DUHandrail - 1.5" Schedule 80, 316 Stainless Steel PipeLine item includes: Material, welding, 2 Rail ADA configuration, labor, and installation400LNFT
0001DVHandrail - 1.5" Galvanized Steel Pipe, Pipe Schedule 40Line item includes: Material, welding, 2 Rail ADA configuration, primer and 2 coats paint, labor, and installation400LNFT
0001DWHandrail - 1.5" Aluminum, clear anodizedLine item includes: Material, welding, 2 Rail ADA configuration, satin finish, clear anodized, labor, and installation400LNFT
0001DXR.w. 6'-7'includes: excavation, backfill and reinforcementLine items includes, concrete (see detail drawing), rebar, excavation, form work, weep pipe, 3/4" dia clean gravel filter material, geotech fabric; crushed stone Base preparation - 0’6” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil In accordance with drawings and specifications within this contract400LF
0001DYR.w. 7'-10'includes: excavation, backfill and reinforcementLine items includes, concrete (see detail drawing), rebar, excavation, form work, weep pipe, 3/4" dia clean gravel filter material, geotech fabric; crushed stone Base preparation - 0’6” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil In accordance with drawings and specifications within this contract400LF
0001DZConcrete swale detail 3/C3Concrete swale detail 3/C380LF
0001EAPerformance Bonds1LS

1st Option Year CLINs

SectionELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
Asphalt1001AAAsphalt Pavement Overlay (2" Two inches depth)Work includes preparation of surface (i.e. mechanical broom cleaning), application of tack coat, placing HMAC and compacting it to 2”. In accordance with drawings and specifications within this contract30000SQYD
1001ABAsphalt Pavement Overlay (Additional inch 1"depth)Work includes preparation of surface (i.e. mechanical broom cleaning), application of tack coat, placing HMAC and compacting it to 1”. In accordance with drawings and specifications within this contract3000SQYD
1001ACSurface Asphalt Patching 2"Saw cutting, excavation and removal of a 2” thick section of existing wearing surface. Applying a tack coat prior to placing HMAC and compacting it to a uniform compacted thickness of 2”. In accordance with drawings and specifications within this contract3000SQFT
1001ADFull Depth Asphalt Patching 8" – Lean Concrete BaseSaw cutting and removal of HMAC layer (to include 6” overlap of existing base course on all sides). Excavation to a total depth of 8” from surface. Compaction of exposed subbase/ground and installation of 6 mil polyurethane sheets. Placing 1,000 psi lean concrete to a depth of 6” or compacting 6” of base course of cruched gravel. Cure concrete. Apply tack coat, lay and compact 2” of new HMAC. In accordance with drawings and specifications within this contract15000SQFT
1001AEFull Depth Asphalt Patching 10” – lean concreteSaw cutting and removal of HMAC layer (to include 6” overlap of existing base course on all sides). Excavation to a total depth of 10” from surface. Compaction of exposed subbase/ground and installation of 6 mil polyurethane sheets. Placing 1,000 psi lean concrete to a depth of 8” or compacting 8” of base course. Cure concrete. Apply tack coat, lay and compact 2” of new HMAC. In accordance with drawings and specifications within this contract15000SQFT
1001AFPavement Cold Milling, Asphalt or Concrete 2"depthWork includes using a cold milling machine to remove 2” of pavement (concrete or asphalt). In accordance with drawings and specifications within this contract3000SQYD
1001AGPavement Cold Milling, Asphalt or Concrete each additional inchWork includes using a cold milling machine to remove an additional inch of pavement (concrete or asphalt). In accordance with drawings and specifications within this contract1500SQYD
1001AHConcrete Shallow Gutter at Paving AreaLine items includes, Concrete (see detail drawing); Rebar (see detail drawing); Excavation, Form work. Base preparation is not included. In accordance with drawings and specifications within this contract100LNFT
Foundations & Base Material1001AJShoulder RepairWork includes replacing topsoil with suitable material for compaction. In accordance with drawings and specifications within this contract2000SQFT
1001AKAdditional Base Course Replacement 6"If full depth renders unsuitable material under excavation, this line items accounts for removing and disposing said material up to a depth of 6” and replacing with 6” suitable base material. In accordance with drawings and specifications within this contract2000SQYD
1001ALAdditional Base Course Replacement 12"If full depth renders unsuitable material under excavation, this line items accounts for removing and disposing said material up to a depth of 12” and replacing with 12” suitable base material. In accordance with drawings and specifications within this contract1500SQYD
1001AMAdditional Base Course Replacement 1"If full depth renders unsuitable material under excavation, this line items accounts for removing and disposing said material an additional inch in and replacing with 1” suitable base material. In accordance with drawings and specifications within this contract500SQYD
1001ANSub-Base Course gabion rock 6" inches layerThis line items accounts for removing and disposing 6” of material and placing a geotextile separation fabric on the soil. Placing a 6” layer of washed 6”-minus gabion rock with a 100% of material passing the 2” sieve. In accordance with drawings and specifications within this contract500SQYD
1001APGeotextile InterlayerWork includes the installation of the geotextile fabric layer. In accordance with drawings and specifications within this contract800SQYD
1001AQRaising Manholes and/or GratingsWork includes selective demolition, welding, placing of reinforced concrete and/or placing and compacting HMAC around the finished work area. In accordance with drawings and specifications within this contract20EA
1001ARRaising Water Valves, Electrical BoxesWork includes selective demolition, welding, placing of reinforced concrete and/or placing and compacting HMAC around the finished work area. In accordance with drawings and specifications within this contract20EA
Concrete1001ASConcrete Handicap Ramp including truncated domesWork includes selective demolition of existing concrete elements in addition to surface preparation, concrete formwork and placing concrete, installing truncated domes and finishing the surface. In accordance with drawings and specifications within this contract10EA
1001ATConcrete Curb Type ALine items includes, concrete (see detail drawing), rebar, excavation, form work; 1.5 cubic foot of crushed stone Base preparation - 0’6” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil In accordance with drawings and specifications within this contract3000LNFT
1001AUConcrete Curb Type BLine items includes, concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; 1.5 cubic foot of crushed stone Base preparation - 0’6” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract2000LNFT
1001AVPlasterLine item includes bonding agent, base coat and finish coat. In accordance with drawings and specifications within this contract2000SY
1001AWTypical sidewalk detailLine items includes: reinforcement #3@12" o.c. e.w. , and sidewalk thickened edges (see detail drawing), 4” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract15000LF
1001AX4" thick slab (comp) #4 @ 14" x 14"3500psi, 4 inches depth, #4bar, 12" O.C., including, 6” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract10000SF
1001AY5" thick slab (comp) #5 @12" x 12"3500psi, 5 inches depth, #4bar, 12" O.C., including, 6” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract10000SF
1001AZ6" thick Concrete Slab3500psi, 6 inches depth, #5bar, 12" O.C., including, 6” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract8000SQFT
1001BA8" thick slab (comp) #5 @12" x 12"3500psi, 8 inches depth, #5bar, 12" O.C., including, 6” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract10000SF
1001BBDELETE THIS ITEM

Burke, Robert CIV USA IMCOM: Burke, Robert CIV USA IMCOM:

Needs CAD drawing for new itemsWall Section with 3500psi concrete, 6 inches wide, #5bar, 12" O.C., 8" depth - 24" wide footing including, 6” compacted base course, plastic, excavation and form work. In accordance with drawings and specifications within this contract0LF
1001BCConcrete trench w/steel grating and frameLine items includes steel grating and frame, concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 1 cubic foot of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.200LF
1001BDTypical Open Concrete DrainLine items includes concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 1 cubic foot of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.200LF
1001BETypical Concrete ditchLine items includes concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 1 cubic foot of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.1500SF
1001BFGuard post 6" diameter pipe col conc. Filled and field paint with chain and footingLine items includes, concrete (see detail drawing 8/C4), 6" dia steel pipe, excavation, form work, and all material used for crushed stone base preparation and placing backfill; including 4” Topsoil In accordance with drawings and specifications within this contract100EA
1001BGConcrete PumpLine item includes: Use for concrete conveying and pumping to locations not accessible by conventional methods.30EA
1001BHR.w. 3'-6'includes: excavation, backfill and reinforcementLine items includes, concrete (see detail drawing), rebar, excavation, form work, weep pipe, 3/4" dia clean gravel filter material, geotech fabric; crushed stone Base preparation - 0’6” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil In accordance with drawings and specifications within this contract1000LF
1001BJPrecast concrete sound barrier wallIn accordance with drawings and specifications within this contract700SM
Traffic Control & Markings1001BKRemove traffic markingsRemove traffic markings by mechanical means, to include grinding, water blasting, sandblasting or shot blasting.250SQFT
1001BLFour (4") Inch Wide Traffic Lines (Traffic paint) Yellow, White, Blue or RedSurface preparation and application of paint. Meet MUTCD and FHWA applicable standards.8000LNFT
1001BMFour (4") Inch Wide Traffic Lines (Thermoplastic Reflective paint) Yellow/WhiteSurface preparation and application of paint. Meet MUTCD and FHWA applicable standards.20000LNFT
1001BNTraffic Arrows (Single) Thermoplastic Reflective PaintSurface preparation and application of paint. Meet MUTCD and FHWA applicable standards.50EA
1001BPTraffic Arrows (Double) Thermoplastic Reflective PaintSurface preparation and application of paint. Meet MUTCD and FHWA applicable standards.16EA
1001BQCrosswalksSurface preparation for striping of 24” x 60” thermoplastic reflective paint bands along the crosswalk. Cost is per linear feet of crosswalk length (roadway width). In accordance with drawings and specifications within this contract1000LNFT
1001BRHandicap Symbol PaintedMeet MUTCD and FHWA applicable standards.40EA
1001BSTraffic Signs(24"x12” or 18"x6") with the breakaway post systemMeet MUTCD and FHWA applicable standards.30EA
1001BTTraffic Signs(24"x24" or 24"x30") with the breakaway post systemMeet MUTCD and FHWA applicable standards.40EA
1001BUTraffic Signs(30"x30" or 36"x36”) with the breakaway post systemMeet MUTCD and FHWA applicable standards.80EA
1001BVExisting Traffic Signs removal and re-installation with the breakaway post systemMeet MUTCD and FHWA applicable standards.20EA
1001BWConcrete Wheel Stops, for Automotive, including installationIn accordance with drawings and specifications within this contract100EA
1001BXRecycled rubber Wheel Stops, for Automotive, including installationIn accordance with drawings and specifications within this contract100EA
1001BYConcrete Wheel Stops, for trucks, including installationIn accordance with drawings and specifications within this contract20EA
1001BZExisting Concrete Wheel Stops, for cars/trucks, removal and re-installationIn accordance with drawings and specifications within this contract150EA
1001CAExisting Concrete Wheel Stops, for cars/trucks, Removal and DisposalIn accordance with drawings and specifications within this contract150EA
1001CBRaised Reflective Pavement Lane Markers (White or Yellow both faces)Meet MUTCD and FHWA applicable standards.100EA
1001CCRaised Reflective Pavement Markers (White, Blue and Red Face)Meet MUTCD and FHWA applicable standards.100EA
1001CDSolar Raised Reflective Pavement Lane Markers (White, Blue or Yellow both faces)Meet MUTCD and FHWA applicable standards.100EA
1001CESolar Raised Reflective Pavement Lane Markers (White Face and Red Face)Meet MUTCD and FHWA applicable standards.100EA
1001CFGuard Rails, Single Face,12 GA.Line item includes posts, fasteners, railing, excavation, and installation in accordance to specifications and drawings within this contract.600LNFT
1001CGExisting Guard Rails, Single Face,12 GA. Removal including Posts( Returned to Gov. or Disposal)Line item includes posts, fasteners, railing, excavation, and installation in accordance to specifications and drawings within this contract.100LNFT
1001CHExisting Guard Rails Removal and re-installation, Single Face,12 GA. Including PostsLine item includes posts, fasteners, railing, excavation, and installation in accordance to specifications and drawings within this contract.200LNFT
Green Infrastruture1001CJGeoGrid Grass Pavers – GeoBlock® SystemLine item includes: 8 inches Compacted sandy gravel road base. GEOBLOCK®5150 (2 in x 20 in x 40) geogrid paving units laid in a herringbone pattern, 2 in. topsoil, overlaid with sod. In accordance with drawings and specifications within this contract2500SQFT
1001CK4 inch Pervious Concrete PavementLine item includes: excavation, 3 inches of 1inch min. dia compacted washed stone, 2 layers of geotextile fabric (see drawing details), 3inches of 1 inch max crushed stone, 1 inch final grading sand, GrassCrete® former, #4 rebar (placed in accordance to GrassCrete® specifications), topsoil place within concrete void spaces, grass seed, and constructed in accordance to drawings and specifications within this contract.4000SQFT
1001CL6 inch Pervious Concrete PavementLine item includes: excavation, 5 inches of 1 inch min. dia compacted washed stone, 2 layers of geotextile fabric (see drawing details), 3 inches of 1 inch max crushed stone, 1 inch final grading sand, GrassCrete® former, #4 rebar (placed in accordance to GrassCrete® specifications), topsoil place within concrete void spaces, grass seed, and constructed in accordance to drawings and specifications within this contract.2500SQFT
1001CMBio SwaleLine item includes: excavation, placement of stone, grading, topsoil, sodding, and in accordance with drawings and specifications within this contract2500LNFT
Drainage & Piping1001CNSingle inlet (10'0" hgt max)Line items includes concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 5 cubic yards of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.6EA
1001CPDouble inlet (17'-2" hgt max)Line items includes concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 5 cubic yards of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.4EA
1001CQSteel grating and frameLine items includes steel grating and frame in accordance with drawings and specifications within this contract.10EA
1001CRNew catch basin and framesLine items includes steel grating and frame, concrete (see detail drawing); Rebar (see detail drawing); Excavation, form work; compacted crushed stone Base preparation; 5 cubic yards of backfill, including 4” Topsoil. In accordance with drawings and specifications within this contract.10EA
1001CSHeadwallsLine items includes, concrete (see detail drawing), rebar, excavation, form work; crushed stone Base preparation - 0’4” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil In accordance with drawings and specifications within this contract8EA
1001CTConcrete drain transitionIn accordance with drawings and specifications within this contract1EA
1001CUExisting catch basin raiseIn accordance with drawings and specifications within this contract15EA
1001CVPvc drainage protectionIn accordance with drawings and specifications within this contract150LF
1001CWPvc drainage pipe 0.5"-2" dia completeIn accordance with drawings and specifications within this contract50LF
1001CXPvc drainage pipe 2"-4" dia completeIn accordance with drawings and specifications within this contract50LF
1001CYPvc drainage pipe 6" dia completeIn accordance with drawings and specifications within this contract50LF
1001CZPvc drainage pipe 8" dia completeIn accordance with drawings and specifications within this contract50LF
1001DAPvc drainage pipe 10" dia completeIn accordance with drawings and specifications within this contract100LF
1001DBPvc drainage pipe 12" dia completeIn accordance with drawings and specifications within this contract100LF
1001DCConcrete drainage pipe iii, 16" dia compIn accordance with drawings and specifications within this contract150LF
1001DDConcrete drainage pipe iii, 18" dia compIn accordance with drawings and specifications within this contract200LF
1001DEConcrete drainage pipe iii, 24" dia compIn accordance with drawings and specifications within this contract150LF
1001DFConcrete drainage pipe iii, 30" dia compIn accordance with drawings and specifications within this contract50LF
1001DGConcrete drainage pipe iii, 36" dia compIn accordance with drawings and specifications within this contract50LF
1001DH4" Preforated Drainage Pipe InstallationLine item includes all labor and material to place 4" drainage pipe at maxium depth of -3' per liner foot, In accordance with drawings and specifications within this contract2000LF
Sealants1001DJAsphalt Pavement Crack SealingThis line item is for crack sealing up to 2” wide cracks on pavement. Includes routing equipment with drill bit, crack cleaning and sealant. For cracks greater than ¾” depth backup material (i.e. backer rod) will be required. In accordance with drawings and specifications within this contract8000LNFT
1001DKAsphalt FOG SealingThis line item is a preventative maintenance treatment for existing asphalt surfaces. Fog seals are applied at 0.05 to 2.0 gallons/square yard of the diluted asphalt emulsion. In accordance with drawings and specifications within this contract15000SQYD
1001DLReplace joint sealantIn accordance with drawings and specifications within this contract100LF
Demolition1001DMRemove/dispose reinforce concreteIn accordance with drawings and specifications within this contract1200SF
1001DNSaw cutting concreteIn accordance with drawings and specifications within this contract4000LF
1001DPClearing and Grubbing, Including DisposalClearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Grubbing shall consist of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas. In accordance with drawings and specifications within this contract1000SQYD
Landscaping1001DQSod Planting including Top Soil2 inches of approved offsite Top Soil to be applied evenly throughout sod area. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Gaps between sod pieces shall not exceed 1inch. Immediately after sodding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width. In accordance with drawings and specifications within this contract3000SQYD
1001DRExcavation: additional beyond the incidentalIn accordance with drawings and specifications within this contract1000CY
1001DSBackfill: additional beyond the incidentalIn accordance with drawings and specifications within this contract1000CY
1001DTSilt FenceLine item includes: silt fence and installation in accordance to drawings and specifications within this contract.4000LNFT
Miscellaneous1001DUHandrail - 1.5" Schedule 80, 316 Stainless Steel PipeLine item includes: Material, welding, 2 Rail ADA configuration, labor, and installation400LNFT
1001DVHandrail - 1.5" Galvanized Steel Pipe, Pipe Schedule 40Line item includes: Material, welding, 2 Rail ADA configuration, primer and 2 coats paint, labor, and installation400LNFT
1001DWHandrail - 1.5" Aluminum, clear anodizedLine item includes: Material, welding, 2 Rail ADA configuration, satin finish, clear anodized, labor, and installation400LNFT
1001DXR.w. 6'-7'includes: excavation, backfill and reinforcementLine items includes, concrete (see detail drawing), rebar, excavation, form work, weep pipe, 3/4" dia clean gravel filter material, geotech fabric; crushed stone Base preparation - 0’6” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil In accordance with drawings and specifications within this contract400LF
1001DYR.w. 7'-10'includes: excavation, backfill and reinforcementLine items includes, concrete (see detail drawing), rebar, excavation, form work, weep pipe, 3/4" dia clean gravel filter material, geotech fabric; crushed stone Base preparation - 0’6” depth after compaction; 1 cubic foot of backfill, including 4” Topsoil In accordance with drawings and specifications within this contract400LF
1001DZConcrete swale detail 3/C3Concrete swale detail 3/C380LF
1001EAPerformance Bonds1LS

2nd Option Year CLINs

SectionELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
Asphalt2001AAAsphalt Pavement Overlay (2" Two inches depth)Work includes preparation of surface (i.e. mechanical broom cleaning), application of tack coat, placing HMAC and compacting it to 2”. In accordance with drawings and specifications within this contract30000SQYD
2001ABAsphalt Pavement Overlay (Additional inch 1"depth)Work includes preparation of surface (i.e. mechanical broom cleaning), application of tack coat, placing HMAC and compacting it to 1”. In accordance with drawings and specifications within this contract3000SQYD
2001ACSurface Asphalt Patching 2"Saw cutting, excavation and removal of a 2” thick section of existing wearing surface. Applying a tack coat prior to placing HMAC and compacting it to a uniform compacted thickness of 2”. In accordance with drawings and specifications within this contract3000SQFT
2001ADFull Depth Asphalt Patching 8" – Lean Concrete BaseSaw cutting and removal of HMAC layer (to include 6” overlap of existing base course on all sides). Excavation to a total depth of 8” from surface. Compaction of exposed subbase/ground and installation of 6 mil polyurethane sheets. Placing 1,000 psi lean concrete to a depth of 6” or compacting 6” of base course of cruched gravel. Cure concrete. Apply tack coat, lay and compact 2” of new HMAC. In accordance with drawings and specifications within this contract15000SQFT
2001AEFull Depth Asphalt Patching 10” – lean concreteSaw cutting and removal of HMAC layer (to include 6” overlap of existing base course on all sides). Excavation to a total depth of 10” from surface. Compaction of exposed subbase/ground and installation of 6 mil polyurethane sheets. Placing 1,000 psi lean concrete to a depth of 8” or compacting 8” of base course. Cure concrete. Apply tack coat, lay and compact 2” of new HMAC. In accordance with drawings and specifications within this contract15000SQFT
2001AFPavement Cold Milling, Asphalt or Concrete 2"depthWork includes using a cold milling machine to remove 2” of pavement (concrete or asphalt). In accordance with drawings and specifications within this contract3000SQYD
2001AGPavement Cold Milling, Asphalt or Concrete each additional inchWork includes using a cold milling machine to remove an additional inch of pavement (concrete or asphalt). In accordance with drawings and specifications within this contract1500SQYD
2001AHConcrete Shallow Gutter at Paving AreaLine items includes, Concrete (see detail drawing); Rebar (see detail drawing); Excavation, Form work. Base preparation is not included. In accordance with drawings and specifications within this contract100LNFT
Foundations & Base Material2001AJShoulder RepairWork includes replacing topsoil with suitable material for compaction. In accordance with drawings and specifications within this contract2000SQFT
2001AKAdditional Base Course Replacement 6"If full depth renders unsuitable material under excavation, this line items accounts for removing and disposing said material up to a depth of 6” and replacing with 6” suitable base material. In accordance with drawings and specifications within this contract2000SQYD
2001ALAdditional Base Course Replacement 12"If full depth renders unsuitable material under excavation, this line items accounts for removing and disposing said material up to a depth of 12” and replacing with 12” suitable base material. In accordance with drawings and specifications within this contract1500SQYD
2001AMAdditional Base Course Replacement 1"If full depth renders unsuitable material under excavation, this line items accounts for removing and disposing said material an additional inch in and replacing with 1” suitable base material. In accordance with drawings and specifications within this contract500SQYD
2001ANSub-Base Course gabion rock 6" inches layerThis line items accounts for removing and disposing 6” of material and placing a geotextile separation fabric on the soil. Placing a 6” layer of washed 6”-minus gabion rock with a 100% of material passing the 2” sieve. In accordance with drawings and specifications within this contract500SQYD
2001APGeotextile InterlayerWork includes the installation of the geotextile fabric layer. In accordance with drawings and specifications within this contract800SQYD
2001AQRaising Manholes and/or GratingsWork includes selective demolition, welding, placing of reinforced concrete and/or placing and compacting HMAC around the finished work area. In accordance with drawings and specifications within this contract20EA
2001ARRaising Water Valves, Electrical BoxesWork includes selective demolition, welding, placing of reinforced concrete and/or placing and compacting HMAC around the finished work area. In accordance with drawings and specifications within this contract20EA

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.