This document provides details for a federal construction contract opportunity. The U.S. Army Corps of Engineers - Tulsa is soliciting firms for the construction of renovations to Building 9201 at Tinker Air Force Base in Oklahoma. The project scope involves constructing approximately 35,000 square feet of office, conference, and support spaces. It also includes structural, mechanical, electrical, and fire suppression upgrades as well as demolition of abandoned equipment. The estimated construction duration is 545 calendar days. This is a 100% small business set-aside with a NAICS code of 236220 and size standard of $39.5 million. A mandatory site visit will be held on June 30, 2022 at the specified locations. Inquiries must be submitted through the Bidder Inquiry system by July 12, 2022. The anticipated solicitation closing date is July 22, 2022.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0003

AFLCMC Facility, WAG Group

Bldg. 9201 Tinker AFB– Oklahoma

The revised/new sections/appendices/pages listed below are hereby added to or revised and made a part of the solicitation. Revised or added/deleted information can be located in the specifications by searching for an asterisk and amendment number (i.e., *AMxxx and AMxxx*). The beginning of the amendment will begin with *AM0003 and end with an AM0003* for each amended section.

The Solicitation Documents are revised as follows:

Delete the following specification pages and replace with the attached revised specification pages of the same number.

01 04 00 Coordination, Field Engineering, and Meetings (CORO) 01 30 00 Administrative Requirements 01 32 01.00 10 Project Schedule 01 33 00 Submittal Procedures 01 45 00.00 20 Quality Control (DBB) 02 41 00 Demolition and Deconstruction

Delete the following specifications and replace with the attached revised specifications of the same number (in their entirety).

06 41 16.00 10 Solid Surfacing Fabrications 07 21 16 Mineral Fiber Blanket Insulation 09 29 00 Gypsum Board 09 69 13 Rigid Grid Access Flooring 10 28 13 Toilet Accessories 21 13 13 Wet Pipe Sprinkler System, Fire Protection 23 05 93 Testing, Adjusting, and Balancing for HVAC 28 31 76 Interior Fire Alarm and Mass Notification System, Addressable

Added the following specifications (in their entirety).

10 51 13 Metal Lockers

Revised the following drawings – Appendix A.

1SD120 Level Two Framing Plan - Demo 1A-111 Partial Floor Plan A 1A-112 Partial Floor Plan B 1A-113 Partial Floor Plan C 1A-114 Partial Floor Plan D 1A-115 Partial Floor Plan E 1A-120 Composite Second Floor Plan 1A-141 Partial Reflected Ceiling Plan A 1A-400 Enlarged Restroom Plan and Elevations 1A-401 Restroom Details and Elevations 1A-420 Enlarged Breakroom Plan, Elevations and Details 1A-540 Wall Types 1A-560 Ceiling Details 1A-580 Miscellaneous Details 1A-610 Finish Schedule 1A-611 Finish Key & Notes 1F-001 Abbreviations, Legend, and Life Safety Code Analysis 1FX111 Fire Protection Partial Floor Plan A 1FA111 Fire Alarm and Mass Notification Partial Plan A 1FA601 Fire Alarm Riser Diagram 1P-001 Plumbing Legend

1M-603 Schedules 1EL111 Partial Lighting Plan A 1EY111 Partial Special Systems Plan A 1EY112 Partial Special Systems Plan B 1EY113 Partial Special Systems Plan C 1EY114 Partial Special Systems Plan D 1T-110 Composite Communications Plan

Delete the following from the Comprehensive Interior Design (CID) package and replace with the attached revised section

APPENDIX B Comprehensive Interior Design, Structural Interior

Design, Furniture, Fixtures & Equipment (Section 4 FF&E Specification Sheets)