RFP 22-R-0029_Appendix A_Drawings.pdf
PDF 62 MB Posted
- Attached to
- AFLCMC-WAG B9201 RENOVATION, TINKER AFB, OK
- Solicitation number
- W912BV-22-R-0029
About this file
This solicitation notice is for the construction of a fully-designed renovation project located within Building 9201 at Tinker Air Force Base in Oklahoma. The project scope involves renovating approximately 35,000 square feet to create offices, conference rooms, entry ways, visitor control areas, restrooms, break rooms, mechanical rooms, electrical rooms, communications rooms, and common areas. The renovation will also include structural, mechanical, electrical and fire suppression upgrades, as well as demolishing abandoned paint equipment. The estimated construction duration is 545 calendar days.
This requirement is a 100% small business set-aside for North American Industry Classification System code 236220, with a small business size standard of $39.5M. The estimated contract value is between $10-25 million. A site visit will be held on June 30th, 2022 and inquiries must be submitted through the Bidder Inquiry system by July 12th. Proposals are due by July 22nd, 2022. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Tulsa.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .