22-R-0029_A0004_Revised Drawings.pdf
PDF 2 MB Posted
- Attached to
- AFLCMC-WAG B9201 RENOVATION, TINKER AFB, OK
- Solicitation number
- W912BV-22-R-0029
About this file
This solicitation notice is for the construction of a facility renovation project located at Building 9201 at Tinker Air Force Base in Oklahoma. The project scope involves renovating approximately 35,000 square feet to construct offices, conference rooms, entryway, visitor control, restrooms, open office space, break room, mechanical room, electrical room, communications room, sidewalks, and common areas. Structural, mechanical, electrical, and fire suppression upgrades are also required, along with demolition of abandoned equipment and structures.
The solicitation will be set aside for small businesses with a size standard of $39.5 million or less. The estimated construction cost is between $10-25 million. The construction duration is 545 calendar days. A site visit will be held on June 30, 2022 with registration required by June 28. Questions are due by July 12 and responses by amendment if needed. The solicitation closing date is July 22, 2022. The agency is the US Army Corps of Engineers and the facility is for the Air Force Life Cycle Management Center at Tinker Air Force Base.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERIOR & EXTERIOR BUILDING MOUNTED LIGHTING
FIXTURE SYMBOLS
SYMBOL DESCRIPTION
SINGLE FACE
DOUBLE FACE
TYPICAL LIGHTING FIXTURE SYMBOLS
TYPICAL LIGHTING FIXTURE SYMBOLS WITH BATTERY BACKUP OR
CONNECTED TO EMERGENCY CIRCUIT
EMERGENCY LIGHTING UNIT WITH ADJUSTABLE HEADS
CEILING FAN
LIGHTING TRACK WITH LIGHTS AS INDICATED
EXIT SIGN - PROVIDE ARROWS IF/AS INDICATED ON PLANS. SINGLE FACE =
TYPE "X1" AND DOUBLE FACE = TYPE "X2" UNLESS INDICATED OTHERWISE.
b HE
2 FILLED AREA INDICATES EMERGENCY LIGHTING (CIRCLE OR TRIANGLE)
'T' GRAPHIC ATTACHED TO SYMBOL INDICATES WALL MOUNTING
NUMBER INDICATES ASSOCIATED LIGHTING CIRCUIT
LOWER CASE LETTER INDICATES SWITCH CIRCUIT DESIGNATION IN SPACES WITH
MULTIPLE SWITCHING CIRCUITS. 'NL' INDICATES NIGHT LIGHTING UNSWITCHED FIXTURE
CAPITAL LETTER INDICATES FIXTURE TYPE. REFER TO FIXTURE SCHEDULE FOR
ADDITIONAL INFORMATION.
TYPICAL LIGHTING FIXTURE ANNOTATION
1. FIXTURE SYMBOLS ARE NOT INTENDED TO INDICATE ACTUAL PHYSICAL ATTRIBUTES OF FIXTURES.
2. REFER TO LIGHT FIXTURE SCHEDULE FOR FIXTURE DESCRIPTIONS, LUMEN AND POWER ATTRIBUTES, MOUNTING HEIGHTS AND OTHER LUMINAIRE INFORMATION.
3. EXACT LOCATION AND MOUNTING HEIGHTS OF ALL CEILING AND WALL MOUNTED FIXTURES SHALL BE
DETERMINED FROM ARCHITECTURAL RELECTED CEILING PLANS AND ELEVATIONS.
4. EMERGENCY BATTERY PACK SYSTEM ON LIGHT FIXTURES AND ALL EXIT SIGNS SHALL BE WIRED AHEAD
OF ANY SWITCH OR RELAY CONTROLLING THE CIRCUIT.
5. THE EXACT LOCATION OF ALL LIGHTING FIXTURES IN MECHANICAL SPACES SHALL BE FIELD
COORDINATED TO AVOID CONFLICT WITH THE MECHANICAL WORK.
6. THE EXACT LOCATION OF ALL LIGHTING FIXTURES IN TELECOMMUNICATIONS SPACES SHALL BE FIELD
COORDINATED TO AVOID CONFLICT WITH THE TELECOMMUNICATIONS WORK.
FIXTURE ANNOTATION NOTES
INTERIOR LIGHTING CONTROLS SYMBOLS
SYMBOL DESCRIPTION
LIGHT SWITCH OR CONTROLLER. REFER TO ROOM LIGHTING CONTROL TAG AND LIGHTING
CONTROL MATRIX FOR REQUIREMENTS. LOWER CASE LETTER INDICATES SWITCH CIRCUIT
DESIGNATION IN SPACES WITH MULTIPLE SWITCHING CIRCUITS. UPPER CASE LETTER
AND/OR NUMBER INDICATES SWITCH TYPE. SEE SUBSCRIPTS BELOW FOR MORE
INFORMATION.
1. REFER TO THE LIGHTING CONTROL SCHEDULE FOR SPACE LIGHTING CONTROL STRATEGIES.
2. CONTRACTOR SHALL ENSURE THAT LIGHTING CONTROL DEVICES ARE LOCATED AND INSTALLED
ACCORDING TO THE MANUFACTURERS RECOMMENDATIONS TO ENSURE THAT THE CONTROL SYSTEM
FUNCTIONS PER THE LIGHTING CONTROL STRATEGY INDICATED ON THE LIGHTING CONTROL SCHEDULE
AND THE SPECIFICATIONS.
3. OCCUPANCY AND VACANCY SENSORS SHALL BE DUAL TECHNOLOGY (ULTRASONIC AND PASSIVE
INFRARED), UNLESS NOTED OTHERWISE.
LIGHTING CONTROL NOTES
LIGHTING CONTROL TAG. REFER TO LIGHTING CONTROL MATRIX ON SHEET 1EL702.LC-XXX
DESCRIPTIONSYMBOL
MOUNTING
CEILING FLOORWALL
SUBSCRIPT INDICATES ADDITIONAL DEVICE TYPE INFORMATION. REFER
TO TYPE DESIGNATIONS FOR FURTHER INFORMATION.
NEMA 5-20R DUPLEX RECEPTACLE
NEMA 6-20R DUPLEX RECEPTACLE
NEMA 5-20R DUPLEX INTEGRAL GROUND FAULT INTERRUPT RECEPTACLE
NEMA 5-20R QUADRUPLEX RECEPTACLE
NEMA 6-20R RECEPTACLE
NEMA L6-30R SIMPLEX RECEPTACLE
MULTI-OUTLET RACEWAY, 20A, 250V, NEMA 6-20R DUPLEX RECEPTACLE
SPACED 24" ON CENTER. PROVIDE WITH BARRIER TO SEPARATE POWER
AND TELECOM WIRING.
JUNCTION BOXJ JJ
PULL BOX: SUBSCRIPT INDICATES DIMENSIONS (L / W / D)
6/4/4
PB
DEVICE TYPE DESIGNATIONS (NOTED BY SUBSCRIPT)
FP FURNITURE POWER
IG ISOLATED GROUND
MGB MAIN GROUND BAR
S SWITCHED
TV TELEVISION
WP WEATHERPROOF
42" DEVICE MOUNTING HEIGHT
POWER/COMMUNICATIONS FLOOR BOX WITH TWO SWITCHED DUPLEX
RECEPTACLES - REFER TO SHEET 1T-501 FOR COMMUNICATIONS
REQUIREMENTS.
P C
GROUND BARMGB
G GROUND BAR SBB SECONDARY BUS BAR
PBB PRIMARY BUS BAR
NEMA 5-20R OCCUPANCY CONTROLLED RECEPTACLE
(REFER TO SHEET 1EP503)
NEMA 5-20R QUADRUPLEX SWITCHED RECEPTACLE (ONE
DUPLEX SWITCHED, ONE DUPLEX UNSWITCHED)
A/V AUDIO / VIDEO
COMBINATION 220V (6-20R) & 120V (5-20R) RECEPTACLE FLOOR BOX
POWER DEVICES
X
X-XXX
X
X-XXX
DETAIL
NOT TO SCALE
DETAIL IDENTIFICATION NUMBER
DETAIL IDENTIFICATION NUMBER
NUMBER OF SHEET ON WHICH DETAIL IS DRAWN
SYMBOL WHERE DETAIL IS TAKEN
NUMBER OF SHEET ON WHICH DETAIL IS INDICATED
DESCRIPTIONSYMBOL
SHEET NOTE1
REVISION NOTE INDICATOR1
CROSS REFERENCING SYMBOL
MISCELLANEOUS SYMBOLS
SYMBOL DESCRIPTION
SAFETY SWITCH
NEMA ENCLOSURE RATING
SWITCH AMP RATING
30-15/3R
FUSE AMP RATING
(NF INDICATES NON-FUSED TYPE)
ENCLOSED CIRCUIT BREAKER
NEMA ENCLOSURE RATING
AIC RATING
100-22K/3R
TRIP RATING
(AMPS)(ST-SHUNT TRIP)
NEMA ENCLOSURE RATING
SWITCH AMP RATING
1/60-30/3R
TRIP RATING
(NF INDICATES NON-FUSED TYPE)
COMBINATION STARTER
ECB
NEMA STARTER SIZE
FULL VOLTAGE STARTER
(NO TRIP RATING)
MANUAL MOTOR STARTER
COMBINATION MOTOR
CONTROLLER
VARIABLE FREQUENCY DRIVE
MISCELLANEOUS MOTOR
CONNECTION
EMERGENCY POWER OFF (EPO
SWITCH)
NEMA ENCLOSURE RATING
NEMA RATING
NEMA RATING
NEMA RATING
MMS
RVS
VFD
M
TRANSFORMER
PANELBOARDRP1PANEL NAME
TRP1XMFR NAME
ELECTRICAL EQUIPMENT / MOTOR
CONNECTIONS
b
SPECIAL SYSTEMS DEVICES
DESCRIPTIONSYMBOL
BALANCE MAGNETIC SWITCH FOR IDSBMS
PHYSICAL ACCESS CONTROL SYSTEM (PACS) CARD READER WITH INTEGRAL KEY PAD
IDS PASSIVE INFRARED SENSOR
K KEY PAD FOR IDS
FIXED CAMERA FOR CLOSED CIRCUIT TELEVISION (CCTV)
POWER POLE
LINETYPES
LINETYPE DESCRIPTION
LINETYPE REPRESENTS NEW WORK TO BE INSTALLED
LINETYPE REPRESENTS EXISTING WORK TO REMAIN
LINETYPE REPRESENTS DEMOLITION WORK TO BE REMOVED
PUBLIC ADDRESS (PA) SYSTEM SPEAKER
MAGNETIC LOCK FOR PACS ML
S
ALL ELECTRICAL WORK SHALL COMPLY WITH
NATIONAL ELECTRICAL CODE (NFPA 70-2017),
NATIONAL FIRE ALARM AND SIGNALING CODE
(NFPA 72-2019), LIFE SAFETY CODE (NFPA
101-2021), LATEST EDITIONS OF ALL
APPLICABLE UNIFORM FACILITY CRITERIA
INCLUDING 3-501-01 (11.01.2019) AND 4-010-05
(10.01.2013), AIR FORCE TECHNICAL LETTERS,
TINKER AIR FORCE BASE ELECTRICAL
STANDARDS (2020), AND ICD-705 (05.26.2010),
IN ADDITION TO ALL LOCAL CODES AND
ORDANCES.
R
SWITCH TYPE DESIGNATIONS (NOTED BY SUBSCRIPT)
4 4-WAY R VISITOR WARNING LIGHT CONTROL (REFER TO
SHEET KEYNOTES AND DETAILS FOR MORE
INFORMATION.)
M MOTOR RATED SWITCH3 3-WAY
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
US Army Corps of Engineers ®
F
IL
E N
A M
E
1E-001
E L E
C T
R
IC
A L L
E G
E N
D
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
J W
E D
E L
A D
A V
IS
W F
O Y
T M
IZ
E
A P
R
IL
R E
A D
Y T
O A
D V
E R
T
IS
E
A F
L C
M C
F A
C
IL
IT
Y
D E
S
IG
N B
U
IL
D
IN
G
T U
L S
A D
IS
T
R
IC
T T
U L S
A O
K L A
H O
M A
N o n e E
-0 .d w g
W A
G G
R O
U P
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
1. PROVIDE SUMP PUMP WITH OIL SMART SYSTEM. TIE INTO BUILDING CONTROL SYSTEM.
REMARKS:
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
US Army Corps of Engineers ®
F
IL
E N
A M
E
1P-601
P L U
M B
IN
G
S C
H E
D U
L E
S
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
M B
E D
O
IS
M B
E D
O
IS
T C
A P
E C
E
A P
R
IL
R E
A D
Y T
O A
D V
E R
T
IS
E
A F
L C
M C
F A
C
IL
IT
Y
D E
S
IG
N B
U
IL
D
IN
G
T U
L S
A D
IS
T
R
IC
T T
U L S
A O
K L A
H O
M A
F B
U -S
C A
P
-6 .d w g
W A
G G
R O
U P
PLUMBING FIXTURE SCHEDULE
GENERAL ID INFO CONNECTION DIAMETERS
REMARKSUNIT No. TYPE MOUNTING TRIM TYPE CW HW TW WASTE VENT
EWC-1 ELECTRIC WATER COOLER - DUAL
HEIGHT - BOTTLE FILLER - ABA
WALL 1/2" 2" 2"
HB-1 HOSE BIBB - BRONZE WALL 3/4"
ICE-1 ICE MAKER BOX WALL 1/2"
LA-1 LAVATORY - ABA UNDERMOUNT 1/2" 1/2" 2" 2"
LA-1 FAUCET - SENSOR - HARDWIRE
LA-2 LAVATORY - ABA WALL 1/2" 1/2" 2" 2"
LA-2 FAUCET - SENSOR - HARDWIRE
MB-1 MOP BASIN FLOOR 1/2" 1/2" 3" 2"
MB-1 FAUCET - MANUAL
SK-1 BAR SINK COUNTER 1/2" 1/2" 2" 2"
SK-1 FAUCET - MANUAL
SK-2 SINK - DOUBLE BOWL COUNTER 1/2" 1/2" 2" 2" REMARKS
SK-2 -
SK-2 FAUCET - MANUAL
UR-1 URINAL WALL 3/4" 2" 2"
UR-1 FLUSH VALVE - SENSOR -
HARDWIRE
UR-1A URINAL - ABA WALL 3/4" 2" 2"
UR-1A FLUSH VALVE - SENSOR -
HARDWIRE
WC-1 WATER CLOSET WALL 1" 4" 2"
WC-1 FLUSH VALVE - SENSOR -
HARDWIRE
WC-1A WATER CLOSET - ABA WALL 1" 4" 2"
WC-1A FLUSH VALVE - SENSOR -
HARDWIRE
WH-1 WALL HYDRANT WALL 3/4"
ELECTRIC WATER HEATER SCHEDULE
GENERAL ID INFO
TEMPERATURE
RISE TANK
VOLUME
RECOVERY
RATE
HEATING
CAPACITY
ELECTRICAL DATA
REMARKSUNIT No. LOCATION TYPE EWT LWT VOLTS PHASE HERTZ
WAG-EWH-1 MECH ROOM ELECTRIC WATER HEATER 40 °F 140 °F 80 gal 49 gal/h 12 kW 480 V 3 60 Hz
PUMP SCHEDULE
GENERAL ID INFO UNIT ELECTRICAL DATA
REMARKSUNIT No. LOCATION SYSTEM SERVED TYPE FLOW HEAD
CONTROL
TYPE
MOTOR
SPEED
(rpm) VOLTS PHASE HERTZ
SP-6 MECH ROOM WEST TUNNEL
STORM
SUMP 50 GPM 12.90 psi VFD/NONE 3450 120 V 1 60 Hz 1
WAG-RCP-1 MECH ROOM HOT WATER
RETURN
INLINE 3 GPM 8.66 psi VFD/NONE 3300 120 V 1 60 Hz
CALIBRATED BALANCING VALVE SCHEDULE
GENERAL ID INFO
DESIGN
FLOW
REMARKSUNIT No. LOCATION TYPE IP
CBV-01 JAN 106 CALIBRATED
BALANCING
VALVE
0.50
GPM
DIAL FOR FLOW CALIBRATION, THREADED CONNECTION, DIFFERENTIAL
PRESSURE READ-OUT PORTS, NSF-61 COMPLIANT
CBV-02 JAN 106 CALIBRATED
BALANCING
VALVE
0.75
GPM
DIAL FOR FLOW CALIBRATION, THREADED CONNECTION, DIFFERENTIAL
PRESSURE READ-OUT PORTS, NSF-61 COMPLIANT
CBV-03 JAN 106 CALIBRATED
BALANCING
VALVE
0.50
GPM
DIAL FOR FLOW CALIBRATION, THREADED CONNECTION, DIFFERENTIAL
PRESSURE READ-OUT PORTS, NSF-61 COMPLIANT
CBV-04 JAN 106 CALIBRATED
BALANCING
VALVE
0.50
GPM
DIAL FOR FLOW CALIBRATION, THREADED CONNECTION, DIFFERENTIAL
PRESSURE READ-OUT PORTS, NSF-61 COMPLIANT
CBV-05 JAN 106 CALIBRATED
BALANCING
VALVE
0.75
GPM
DIAL FOR FLOW CALIBRATION, THREADED CONNECTION, DIFFERENTIAL
PRESSURE READ-OUT PORTS, NSF-61 COMPLIANT
EXPANSION TANK SCHEDULE
GENERAL ID INFO VOLUME
ACCEPTANCE
VOLUME
SYSTEM FILL
PRESSURE
REMARKSUNIT No. LOCATION IP IP IP SI
WAG-ET-1 MECH
ROOM
3 gal 2 gal 128.8 psi 128.79 psi
DRAIN SCHEDULE
GENERAL ID INFO SANITARY
CONNECTION REMARKSUNIT No. TYPE
FD-1 FLOOR DRAIN - LIGHT
DUTY
3" PROVIDE WITH TRAP GUARD
FD-2 FLOOR DRAIN - MEDIUM
DUTY
4" PROVIDE WITH TRAP GUARD
FS-2 FLOOR SINK - HALF
GRATE
4"
WATER METER SCHEDULE
UNIT No. LOCATION TYPE
CONNECTION
DIAMETER
DESIGN FLOW
RATE
REMOTE
READER
BAS
CONNECTIVITY
REMARKS
WAG-WM-1 MECH RM
ELECTROMAGNETIC FLOW
METER
3" 0 GPM Yes
WM-1
WATER
RISER RM
ELECTROMAGNETIC FLOW
METER
3" 0 GPM Yes
THERMOSTATIC MIXING VALVE SCHEDULE
GENERAL ID INFO ELECTRICAL INFO
PRESSURE
LOSS
TEMPERATURE
REMARKSUNIT No. LOCATION TYPE
VOLTAG
E PHASE HERTZ INLET OUTLET
WAG-TMV-1 MECH RM MASTER 120 V 1 60 Hz 0.00 psi 131 °F
86.
125.
A
M E
N D
M E
N T
/2 /2
(E)6"ST
1 SUMP 6
(E) 6" ST
IE 1265.26
(E) 6"
FOUNDATION
DRAIN
IE 1273.67
6" IW
IE 1283.5
(E) 6" FOUNDATION
DRAIN
IE 1273.67
(E) 6" ST
IE 1265.23
(E) 6" ST
IE 1265.42
(E) 6"
FOUNDATION
DRAIN
IE 1273.67
(E) 8" ST
IE 1282.73
(E) 8" ST
IE 1281.52
(E) 8" ST
IE 1283.06
(E) SUMP 9
(E) 3"IW
(E) 2"CA
(E) 6"
FOUNDATION
DRAIN
IE 1273.67
(E) 2"IW
15 16 17 18 19 2114 2013
PE.5
15.6 17.216.5 17.5 18.5 19.5 20.515.514.513.512.5
(E) SUMP 5
(E) SUMP 7
(E) SUMP 4
GRAPHIC SCALE: = 1'-0"
16' 08' 32' 48'16'
1/16"GRAPHIC SCALE: = 1'-0"
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
US Army Corps of Engineers ®
F
IL
E N
A M
E
1PD100
D E
M O
L
IT
IO
N
P L A
N
T U
N N
E L
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
M B
E D
O
IS
M B
E D
O
IS
T C
A P
E C
E
A P
R
IL
R E
A D
Y T
O A
D V
E R
T
IS
E
A F
L C
M C
F A
C
IL
IT
Y
D E
S
IG
N B
U
IL
D
IN
G
T U
L S
A D
IS
T
R
IC
T T
U L S
A O
K L A
H O
M A
F B
U -S
C A
P
D .d w g
W A
G G
R O
U P
SCALE: 1/16" = 1'-0"
DEMOLITION PLAN - TUNNEL
SHEET KEYNOTES
1 REMOVE SUMP PUMP 6. ASSOCIATED DISCHARGE
PIPING, AND COMPRESSED AIR LINES COMPLETE.
PUMP TO BE REPLACED IN NEW WORK. REFER TO
NEW WORK PLANS FOR MORE INFORMATION.
2 REMOVE 2"INDUSTRIAL WASTE PIPING
3 REMOVE 2"INDUSTRIAL WASTE PIPING TO ABOVE
LEVEL ONE. REFER TO FIRST FLOOR DEMO PLAN
FOR MORE INFORMATION.
GENERAL SHEET NOTES
1 CONTRACTOR SHALL PATCH ALL SURFACES IN
AREA OF DEMOLITION IN PREPARATION FOR NEW
CONSTRUCTION.
2 COORDINATE EXTENT OF WALL DEMOLITION WITH
NEW CONSTRUCTION.
3 REFER TO MECHANICAL, PLUMBING, AND
ELECTRICAL DRAWINGS FOR MECHANICAL,
PLUMBING, AND ELECTRICAL DEMOLITIONA DN NEW
NORK.
4 (E) SUMP 9 SERVING STORM FOUNDATION DRAIN
SYSTEM TO REMAIN.
5 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS AND EXTENTS PRIOR TO
COMMENCING WITH DEMOLITION WHERE REMOVAL
OF EXISTING CONSTRUCTION IMPACTS NEW WORK.
6 REFER TO NEW WORK PLANS FOR EXTENT OF NEW
WORK.
7 FINISHED FLOOR ELEVATION = 1285.00
A
M E
N D
M E
N T
/2 /2
1PP110
P
D
P
D
P
D
P
D
P
D
1P D
1P D
1P D
1P D
3"IW PIPING UP
TO FLOOR DRAIN
3"IW PIPING
UP TO
FLOOR
DRAIN
3"IW PIPING UP
TO FLOOR DRAIN
3"IW
3"IW
3"IW
(E) 2"
CHEM
PIPING
12"IW
12"IW
4" POTABLE WATER
16"IW
16"IW
8" NONPOTABLE
4"V
6"IW
3"IW 5
17 18 19 21 22
PC
PD
PD.5
PE
15.8
PB.6
PB
PC.5
PE.5
17.2 17.5 18.5 19.5 20.5 21.5
(E) SUMP 4
WAG KEY PLAN
B
A
C
D
E
GRAPHIC SCALE: = 1'-0"
16' 08' 32' 48'16'
1/16"GRAPHIC SCALE: = 1'-0"
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
US Army Corps of Engineers ®
F
IL
E N
A M
E
1PD110
D E
M O
L
IT
IO
N
P L A
N
L E
V E
L O
N E
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
M B
E D
O
IS
M B
E D
O
IS
T C
A P
E C
E
A P
R
IL
R E
A D
Y T
O A
D V
E R
T
IS
E
A F
L C
M C
F A
C
IL
IT
Y
D E
S
IG
N B
U
IL
D
IN
G
T U
L S
A D
IS
T
R
IC
T T
U L S
A O
K L A
H O
M A
F B
U -S
C A
P
D .d w g
W A
G G
R O
U P
SHEET KEYNOTES
1 4"V UP TO REMAIN
2 NOT USED.
3 EXISTING PUMP TO REMAIN
4 REMOVE INDUSTRIAL WASTE PIPING BACK TO COLUMNS
PE13 AND BACK TO SUMP 7. REFER TO SHEET 1PD100
FOR MORE INFORMATION.
5 REMOVE EXISTING 8" WATER RISER, BACKFLOW
PREVENTER, PRESSURE REDUCING VALVE, PIPING AND
ASSOCIATED COMPONENTS COMPLETE. PREPARE FOR
INSTALLATION OF NEW RISER. REFER TO NEW WORK ON
DRAWING 1PP110
6 EXISTING RISER CUT AT FLOOR.
7 REMOVE WATER PIPING BACK TO AND WITHIN LIMITS OF
CONSTRUCTION
SCALE: NTS1PD110
WATER RISER SECTION - DEMOLITION2
SCALE: 1/16" = 1'-0"
DEMOLITION PLAN - LEVEL 1
GENERAL SHEET NOTES
1 CONTRACTOR SHALL PATCH ALL SURFACES IN AREA OF
DEMOLITION IN PREPARATION FOR NEW CONSTRUCTION.
2 COORDINATE EXTENT OF WALL DEMOLITION WITH NEW
CONSTRUCTION.
3 REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL
DRAWINGS FOR MECHANICAL, PLUMBING, AND
ELECTRICAL DEMOLITION AND NEW NORK.
4 REMOVE ALL COMPRESSED AIR PIPING, HANGERS, AND
SUPPORTS COMPLETE WITHIN AREA OF WORK UNLESS
EXPLICITLY WRITTEN OTHERWISE.
5 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS AND EXTENTS PRIOR TO COMMENCING WITH
DEMOLITION WHERE REMOVAL OF EXISTING
CONSTRUCTION IMPACTS NEW WORK.
6 REFER TO NEW WORK PLANS FOR EXTENT OF NEW
WORK.
7 REMOVE ALL WATER PIPING (POTABLE AND NON
POTABLE), HANGERS, AND SUPPORTS COMPLETE WITHIN
AREA OF WORK UNLESS EXPLICITLY WRITTEN
OTHERWISE.
8 REMOVE ALL INDUSTRIAL WASTE PIPING, HANGERS, AND
SUPPORTS COMPLETE WITHIN AREA OF WORK UNLESS
EXPLICITLY WRITTEN OTHERWISE.
9 REMOVE ALL CHEMICAL PIPING, HANGERS, AND
SUPPORTS COMPLETE WITHIN AREA OF WORK UNLESS
EXPLICITLY WRITTEN OTHERWISE.
A
M E
N D
M E
N T
/2 /2
(E) 6" ST
IE 1265.26
(E) 6" FOUNDATION
DRAIN
IE 1273.67
(E) 6" ST
IE 1265.23
(E) 6" ST
IE 1265.42
(E) 6"
FOUNDATION
DRAIN
IE 1273.67
(E) 8" ST
IE 1282.73
(E) 8" ST
IE 1281.52
(E) 8" ST
IE 1283.06
(E) 6"
FOUNDATION
DRAIN
IE 1273.67
(E) MANHOLE
APPROXIMATE IE IS GREATER THAN
16' BELOW FINISHED FLOOR
(E) MANHOLE
(E) MANHOLE
4" SA
1P-310
1P-310
1P-310
1P-310
4" SA
IE 1278.25
(E) 72" ST
(E) 24" SA
SP-6
2" FM
3" CW
54" SA
4" SA
4" SA
4" SA
12 4" SA
IE 1278.42
(E) SUMP 9
4" SA
IE 1281.25
2 4" SA
IE 1283
1P-310
4" SA
IE 1283
4" SA
IE 1279.34
15 16 17 18 19 2114 2013
PE.5
15.6 17.216.5 17.5 18.5 19.5 20.515.514.513.512.5
S1
1P-901
(E) SUMP 5
GRAPHIC SCALE: = 1'-0"
16' 08' 32' 48'16'
1/16"GRAPHIC SCALE: = 1'-0"
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
US Army Corps of Engineers ®
F
IL
E N
A M
E
1PP100
N E
W W
O R
K P
L A
N
T U
N N
E L
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
M B
E D
O
IS
M .B
E D
O
IS
T C
A P
E C
E
A P
R
IL
R E
A D
Y T
O A
D V
E R
T
IS
E
A F
L C
M C
F A
C
IL
IT
Y
D E
S
IG
N B
U
IL
D
IN
G
T U
L S
A D
IS
T
R
IC
T T
U L S
A O
K L A
H O
M A
F B
U -S
C A
P
P .d w g
W A
G G
R O
U P
SCALE: 1/16" = 1'-0"
NEW WORK PLAN - TUNNEL
SHEET KEYNOTES
1 CONNECT NEW 4"SA TO EXISTING MANHOLE.
2 4"SA UP TO FCO
3 2"FM UP TO 1ST FLOOR
4 3"CW UP
5 4"SA P-TRAP UP TO FLOOR SINK
6 4"SA P-TRAP UP TO FLOOR DRAIN
7 3"SA P-TRAP UP TO FLOOR DRAIN
8 2"SA UP TO SINK
9 2"SA UP
10 4"SA UP
11 3"SA UP
12 4"SA FOR FUTURE CONNECTION. TURN UP AND
PROVIDE FCO.
13 2"V UP
14 2"SA UP TO EWC-1
GENERAL SHEET NOTES
1 FINISHED FLOOR ELEVATION = 1285.00
2 (E) SUMP 9 SERVING STORM FOUNDATION
DRAIN SYSTEM IS EXISTING TO REMAIN.
3 REFER TO MECHANICAL, PLUMBING, AND
ELECTRICAL DRAWINGS FOR DEMOLITION
AND NEW WORK.
4 CORE DRILL TUNNEL WALLS AND 1ST FLOOR
SLAB AS REQUIRED FOR INSTALLATION.
REFER TO PENETRATION DETAILS ON
DRAWING 1P-502.
A
M E
N D
M E
N T
/2 /2
1P-401
1P-402
1P-403
IPT OFFICE
CYBER OFFICE
IPT OFFICE
OPEN OFFICE 2
OPEN OFFICE 3
OPEN OFFICE 4
PK OFFICE
OPEN OFFICE 1
BREAKOUT
SMALL CONFERENCE
SMALL CONFERENCE
SOURCE SELECTION ROOM
SUPPORT COPIER142
ELECTRICAL
UNCLASSIFIED WORK AREA
IT BUILD
SECURITY
SERVER
IT STORAGE
ADMIN
FM DIRECTOR
CONFERENCE
PK DIRECTOR
DEP DIRECTOR
LG SUP
IT SUP
135A
SUPER
154A
SUPER
153A
SUPER
152A
SUPER
151A
SUPER
CORRIDOR
CORRIDOR
SEC SUP
LOBBY115
TRAINING
COMM
ELECTRICAL
FCO
FCO
FS-2
FCO
15 16 17 18 19 21
PC
PD
PD.5
PE
15.8
PB.6
PC.5
14 2013
PE.5
15.6 17.216.5 17.5 18.5 19.5 20.515.514.513.5
(E) MANHOLE
APPROXIMATE IE IS GREATER THAN
16' BELOW FINISHED FLOOR
(E) 2" CHEM
PIPING
PIPE ROUTED
ABOVE GRADE
IN CEILING
SPACE
2" FM1
WAG KEY PLAN
B
A
C
D
E
GRAPHIC SCALE: = 1'-0"
32' 016' 64' 96'32'
1/32"GRAPHIC SCALE: = 1'-0"
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
US Army Corps of Engineers ®
F
IL
E N
A M
E
1PP111
O V
E R
A L L S
A N
IT
A
R Y
P L A
N
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
M B
E D
O
IS
M B
E D
O
IS
T C
A P
E C
E
A P
R
IL
R E
A D
Y T
O A
D V
E R
T
IS
E
A F
L C
M C
F A
C
IL
IT
Y
D E
S
IG
N B
U
IL
D
IN
G
T U
L S
A D
IS
T
R
IC
T T
U L S
A O
K L A
H O
M A
F B
U -S
C A
P
P .d w g
W A
G G
R O
U P
SCALE: 1/16" = 1'-0"
OVERALL SANITARY PLAN
SHEET KEYNOTES
1 2"FM DOWN TO SP-6
2 2"FM DOWN TO FLOOR SINK FS-2.
A
M E
N D
M E
N T
/2 /2
DESCRIPTIONSYMBOL
MOUNTING
CEILING FLOORWALL
SUBSCRIPT INDICATES ADDITIONAL DEVICE TYPE INFORMATION. REFER
TO SHEET T-501 FOR FURTHER INFORMATION.
COMMUNICATIONS DATA OUTLET
COMMUNICATIONS VOICE OUTLET
JUNCTION BOX. SUBCRIPT 'A/V' INDICATES AUDIO/VISUAL JUNCTION BOX.
POWER/COMMUNICATIONS FLOOR BOX
POKE THROUGH BOX - REFER TO DETAILS FOR OUTLET CONFIGURATION
COMMUNICATIONS EQUIPMENT CABINET
FLOOR BOX - REFER TO DETAILS FOR OUTLET CONFIGURATION
COMMUNICATIONS DEVICES
FB
P C
J JJ
LAN RACK - 19" WIDE x 7'-0" TALL
CABLE TRAY
TELEPHONE BACKBOARD
X
X-XXX
X
X-XXX
DETAIL
NOT TO SCALE
DETAIL IDENTIFICATION NUMBER
DETAIL IDENTIFICATION NUMBER
NUMBER OF SHEET ON WHICH DETAIL IS DRAWN
SYMBOL WHERE DETAIL IS TAKEN
NUMBER OF SHEET ON WHICH DETAIL IS INDICATED
DESCRIPTIONSYMBOL
SHEET NOTE1
REVISION NOTE INDICATOR1
CROSS REFERENCING SYMBOL
MISCELLANEOUS SYMBOLS
ALL COMMUNICATIONS WORK SHALL COMPLY
WITH NATIONAL ELECTRICAL CODE (NFPA
70-2017), NATIONAL FIRE ALARM AND
SIGNALING CODE (NFPA 72-2019), LIFE SAFETY
CODE (NFPA 101-2021), LATEST EDITIONS OF
ALL APPLICABLE UNIFORM FACILITY CRITERIA
INCLUDING 3-580-01 (06.01.2016) AND 4-010-05
(10.01.2013), LATEST EDITIONS OF ALL
APPLICABLE TIA STANDARDS, AIR FORCE
TECHNICAL LETTERS, TINKER AIR FORCE
BASE ELECTRICAL STANDARDS (2020), AND
ICD-705 (05.26.2010), IN ADDITION TO ALL
LOCAL CODES AND ORDANCES.
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
US Army Corps of Engineers ®
F
IL
E N
A M
E
1T-001
C O
M M
U N
IC
A
T
IO
N S
L E
G E
N D
G
E N
E R
A L N
O T
E S
A
N D
A B
B R
E V
IA
T
IO
N
S
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
J W
E D
E L
A D
A V
IS
W F
O Y
T M
IZ
E
A P
R
IL
R E
A D
Y T
O A
D V
E R
T
IS
E
A F
L C
M C
F A
C
IL
IT
Y
D E
S
IG
N B
U
IL
D
IN
G
T U
L S
A D
IS
T
R
IC
T T
U L S
A O
K L A
H O
M A
N o n e T
-0 .d w g
W A
G G
R O
U P
COMMUNICATIONS GENERAL NOTES
1. CONTRACTOR SHALL VERIFY QUANTITY OF ALL PATCH PANELS, AND OTHER RELATED COMPONENTS
NEEDED FOR A COMPLETE AND WORKING TURN KEY COMMUNICATIONS SYSTEM WITH AN
ADDITIONAL 25% SPARE.
2. CONTRACTOR SHALL SUPPLY FACTORY TERMINATED FIBER OPTIC PATCH CABLES AS NEEDED AND
REQUIRED FOR A COMPLETE AND WORKING TURN KEY COMMUNICATIONS SYSTEM. CONTRACTOR
SHALL SUPPLY ADDITIONAL 25% AS SPARES AFTER INSTALLATION.
3. TOTAL LENGTH OF HORIZONTAL CABLE FROM TELECOMMUNICATIONS RACK TO WORKSTATION
OUTLET SHALL REMAIN UNDER 295' PER EIA/TIA.
4. EACH PBB AND SBB SHALL BE BONDED TO THE STEEL WITHIN THE SAME ROOM WITH A #3/0 AWG
CONDUCTOR. BONDING CONDUCTORS SHALL BE INSTALLED IN PVC CONDUIT AND SHALL BE AS
SHORT AND STRAIGHT AS POSSIBLE.
5. PENETRATIONS OF FIRE-RATED PARTITIONS, WALLS, OR FLOORS BY DATA AND COMMUNICATION
WIRING OR CABLE SHALL BE THROUGH MECHANICAL MODULAR, RE-ENTERABLE FIRE STOPPING
DEVICE(S) CONTAINING SELF-SEALING INTUMESCENT INSERTS PER SPECIFICATION SECTION
07 84 00. INITIAL FILL CAPACITY SHALL NOT EXCEED 40%.
6. INSTALL BOTTOM OF CABLE TRAY A MINIMUM OF 6” ABOVE THE SUSPENDED CEILING, AND PROVIDE A MINIMUM OF 12” OF CLEARANCE ABOVE CABLE TRAYS FOR FUTURE ACCESS. WHERE CABLE TRAY
IS CROSSING PERPENDICULAR UNDER OTHER UTILITIES/STRUCTURE/OTHER ITEMS , MINIMUM
CLEARANCE ABOVE CABLE TRAY MAY BE REDUCED TO 6" .
7. CABLE TRAY SHALL BE USED FOR LOW VOLTAGE SIGNAL CABLING ONLY.
8. COMMUNICATIONS CABLES SHALL ONLY BE INSTALLED IN CABLE TRAY OR CONDUIT. OPEN WIRING
IS NOT ALLOWED.
9. COMMUNICATION OUTLETS SHALL BE MOUNTED AT 18” AFF UNO.
10. MODULAR FURNITURE SYSTEM CONNECTIONS (UP TO 2 WORKSTATIONS) REQUIRE A 2 INCH LIQUID- TIGHT FLEXIBLE METAL CONDUIT AND FITTINGS TO CONNECT EACH WALL BOX TO THE ACOUSTIC
PANEL RACEWAY.
11. PROVIDE DUPLEX LC CONNECTIONS FOR ALL FIBER TERMINATIONS.
12. PROVIDE A GREEN FIBER OPTIC CABLE JACKET FOR ALL GREEN NETWORK CABLES, A RED FIBER OPTIC CABLE JACKET FOR ALL RED NETWORK CABLES, AN ORANGE FIBER OPTIC CABLE JACKET FOR ALL ORANGE NETWORK CABLES, AND A PURPLE FIBER OPTIC CABLE JACKET FOR ALL PURPLE
NETWORK CABLES. OUTLET JACKS FOR EACH NETWORK SHALL MATCH THE COLOR OF THE
NETWORK CABLES.
13. ALL FIBER OPTIC PATCH PANELS, CONNECTORS, AND JACKS SHALL BE BY THE SAME
MANUFACTURER.
14. ANY MOTOR, TRANSFORMER OR OTHER ELECTRICAL DEVICE GREATER THAN 5KVA SHALL HAVE A MINIMUM OF A 47" BUFFER FROM ANY WALL OF THE TELECOMMUNICATIONS ROOM / SERVER ROOM.
15. PROVIDE A 4” MECHANICAL FIRE-STOPPING SLEEVE FOR EACH PENETRATION OF ANY
TELECOMMUNICATIONS SPACE. FILL RATIO SHALL NOT EXCEED 40%.
16. TELECOMMUNICATIONS CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL REQUIRED
NETWORK COMPONENTS, INCLUDING MEDIA CONVERTERS AND/OR FIBER NETWORK CARDS, TO
CONNECT ALL REQUIRED SYSTEMS TO THE NIPRNET ACCESS SWITCH. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, ELECTRICAL METER CONNECTION TO DDC SYSTEM, FIRE ALARM SYSTEM TO
MONITORING, IDS SYSTEM TO MONITORING, AND CATV.
17. TELECOMMUNICATIONS SERVICE TO THIS SPACE IS ROUTED FROM AN EXISTING BASE COMM
SQUADRON COMMUNICATIONS ROOM LOCATED WITHIN THE PROJECT OFFICE AREA.
TELECOMMUNICATIONS CONTRACTOR SHALL UTILIZE EXISTING CABLE TRAY AS WELL AS NEW
CONDUITS/CABLE TRAYS TO EXTEND THE FIBER AND COPPER CABLES TO THE MAIN
COMMUNICATIONS ROOM IN THIS PROJECT'S BOUNDARY. REFER TO SHEETS 1T-110 AMD 1T-601 FOR
MORE INFORMATION. CONTRACTOR SHALL PROVIDE ALL TERMINATIONS AND TESTING OF ALL
CALBES ON BOTH ENDS.
NOM NOMINAL
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NORMALLY OPEN, NUMBER
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
PRELIM PRELIMINARY
PB PULL BOX, PUSH BUTTON
PH PHASE
P.O.C. POINT OF CONTACT
PRESS PRESSURE
PRI PRIMARY
PNL PANEL
PSI POUNDS PER SQUARE INCH
PR PAIR
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RAD RADIUS
RCPT RECEPTACLE
REQD REQUIRED
RPM REVOLUTIONS PER MINUTES
REV REVISION
RGS RIGID GALVANIZED STEEL
RMC RIGID METAL CONDUIT
RND ROUND
STA STATION
SCHED SCHEDULE
SECT SECTION
SP SINGLE POLE
SPEC SPECIFICATION
SPD SURGE-PROTECTIVE DEVICE
SQ SQUARE
SQ FT SQUARE FEET
STD STANDARD
STL STEEL
STRL STRUCTURAL
SW SWITCH
SYS SYSTEM
SBB SECONDARY BONDING BUSBAR
TYP TYPICAL
TEL TELEPHONE
TEMP TEMPORARY, TEMPERATURE
PBB PRIMARY BONDING BUSBAR
UTIL UTILITY
UGND UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER
SUPPLY
V VOLT(S)
VOL VOLUME
W/ WITH
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
XFMR TRANSFORMER
A/C AIR CONDITIONING
A.F.F. ABOVE FINISHED FLOOR
A.F.G. ABOVE FINISHED GRADE
AMP AMPERE
BLDG BUILDING
CKT CIRCUIT
CLG CEILING
CP CIRCULATING PUMP
CU COPPER
DOD DEPARTMENT OF DEFENSE
DIA DIAMETER
DIM DIMENSION
DISC DISCONNECT
DN DOWN
EA EACH
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EXH EXHAUST
EMT ELECTRICAL METALLIC TUBING
EXT EXTERIOR, EXTERNAL
FLEX FLEXIBLE
F FAHRENHEIT
FDR FEEDER
FIG FIGURE
FL FLOOR
FLA FULL LOAD AMPERES
FT FOOT, FEET
HTR HEATER
HH HANDHOLE
HID HIGH INTENSITY DISCHARGE
HP HORSEPOWER
HR HOUR
ID INSIDE DIAMETER
IN INCH(ES)
JB JUNCTION BOX
KV KILOVOLT
KWH KILOWATT HOUR
KVA KILOVOLT - AMPS
KW KILOWATT
KVAR KILOVOLT AMPS REACTIVE
KCMIL 1000 CIRCULAR MILS
KO KNOCK OUT
LV LOW VOLTAGE
LTG LIGHTING
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MTL METAL
MT MOUNT
MTG MOUNTING
MTD MOUNTED
MDP MAIN DISTRIBUTION PANEL
MAN MANUAL
MFR MANUFACTURER
MATL MATERIAL
MAX MAXIMUM
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MGB MAIN GROUNDING BUSBAR
MH MANHOLE, METAL HALIDE
MIN MINIMUM, MIN
NTS NOT TO SCALE
ABBREVIATIONS
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
| 1P-601.pdf |
| Sheets |
| 1P-601 - PLUMBING SCHEDULES |
| 1PD100 - DEMOLITION PLAN - TUNNEL |
| 1PD110 - DEMOLITION PLAN - LEVEL ONE |
| 1PP100 - NEW WORK PLAN - TUNNEL |
| 1PP111 - OVERALL SANITARY PLAN |
| 1PD100.pdf |
| Sheets |
| 1P-601 - PLUMBING SCHEDULES |
| 1PD100 - DEMOLITION PLAN - TUNNEL |
| 1PD110 - DEMOLITION PLAN - LEVEL ONE |
| 1PP100 - NEW WORK PLAN - TUNNEL |
| 1PP111 - OVERALL SANITARY PLAN |
| 1PD110.pdf |
| Sheets |
| 1PD110 - DEMOLITION PLAN - LEVEL ONE |
| 1PP111 - OVERALL SANITARY PLAN |
| 1PP100.pdf |
| Sheets |
| 1P-601 - PLUMBING SCHEDULES |
| 1PD100 - DEMOLITION PLAN - TUNNEL |
| 1PD110 - DEMOLITION PLAN - LEVEL ONE |
| 1PP100 - NEW WORK PLAN - TUNNEL |
| 1PP111 - OVERALL SANITARY PLAN |
| 1PP111.pdf |
| Sheets |
| 1PP111 - OVERALL SANITARY PLAN |
File details come from the government source that posted it. Updated .