RFP 22-R-0029_AFLCMC-WAG BLDG 9201 RENOVATION.pdf

PDF 17 MB Posted

Attached to
AFLCMC-WAG B9201 RENOVATION, TINKER AFB, OK
Solicitation number
W912BV-22-R-0029
Issued by

About this file

This document provides details of a solicitation notice for renovations to Building 9201 at Tinker Air Force Base in Oklahoma. The solicitation is for a firm-fixed price construction contract to fully renovate approximately 35,000 square feet within the 835,000 square foot building to create an ICD705-compliant facility for offices, conference rooms, and workspaces. Additional work includes structural, mechanical, electrical, and fire suppression upgrades as well as demolition of abandoned equipment. The estimated construction period is 545 calendar days. The solicitation will be set aside for small businesses with a size standard of $39.5 million or less. A site visit will be held on June 30th, with interested parties required to RSVP by June 28th. Questions must be submitted through the Bidder Inquiry system by July 12th. Proposals are due by July 22nd and will be evaluated using best value tradeoff. The solicitation is issued by the Department of the Army Corps of Engineers Tulsa District for renovations at Tinker Air Force Base.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 2022

CUI/UNCLASSIFIED

CUI/UNCLASSIFIED

REQUEST FOR PROPOSAL (RFP)

Solicitation No. W912BV-22-R-0029

FY 22 AFLCMC-WAG BLDG 9201 RENOVATION

Tinker Air Force Base, Oklahoma

BUILDING STONG

This page was intentionally left blank for duplex printing.

AFLCMC WAG Facility

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 00

00 11 00 00 21 16

00 22 16

00 45 00 00 72 00 00 73 00 00 73 46

DIVISION 01 - GENERAL REQUIREMENTS

01 04 00

01 30 00 08/18 01 30 01 10/19

01 32 01.00 10 24 MAR 2022

01 33 00 11/21 01 33 29 02/21

01 35 26.00 10 CESWT 03/18

01 42 00 02/19

SF 1442 & CLIN SCHEDULE

INSTRUCTIONS, CONDITIONS & NOTICES TO

OFFERERS

PROPOSAL SUBMISSION REQUIREMENTS,

EVALUATION CRITERIA AND BASIS OF AWARD

REPRESENTATIONS & CERTIFICATIONS

CONTRACT CLAUSES

SPECIAL CONTRACT REQUIREMENTS

WAGE DETERMINATION SCHEDULE

COORDINATION, FIELD ENGINEERING, AND

MEETINGS (CORO)

ADMINISTRATIVE REQUIREMENTS

ADDITIONAL ADMINISTRATIVE REQUIREMENTS

PROJECT SCHEDULE MILCON-SRM-O&M

SUBMITTAL PROCEDURES

SUSTAINABILITY REQUIREMENTS AND

REPORTING

GOVERNMENTAL SAFETY REQUIREMENTS (COAO)

SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 11/16, CHG 1: 02/20 QUALITY CONTROL (DBB)

01 45 00.15 10 06/18 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS 3.0 CM)

01 45 35 11/20 SPECIAL INSPECTIONS

01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS (TINKER)

01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 20.00 02 ENVIRONMENTAL PROTECTION (TAFB)

01 58 00 BULLETIN BOARD, PROJECT SIGN, AND

SAFETY SIGN

01 60 00.00 50 03/2018 MATERIAL AND EQUIPMENT

01 74 19 01/07 CONSTRUCTION AND DEMOLITION WASTE

MANAGEMENT

01 78 00.00 15 07/18 CLOSEOUT SUBMITTALS

01 78 23.10 10 11/2021 OPERATION AND MAINTENANCE DATA - COAO

01 91 00.15 10 05/19, CHG 2: 08/20 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 05/10, CHG 2: 02/19 DEMOLITION AND DECONSTRUCTION

02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 2: 05/21 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

PROJECT TABLE OF CONTENTS Page 2

05 05 23.16 08/18 STRUCTURAL WELDING

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 27 36 05/17, CHG 2: 08/20 SPRAY FOAM AIR BARRIERS

07 42 63 05/11, CHG 4: 08/20 FABRICATED WALL PANEL ASSEMBLIES

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 81 00 02/11 SPRAY-APPLIED FIREPROOFING

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 3: 08/20 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPETING

09 69 13 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING

09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES

PROJECT TABLE OF CONTENTS Page 3

12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION

12 59 00 08/17, CHG 1: 08/18 SYSTEMS FURNITURE

12 61 13 08/20 UPHOLSTERED AUDIENCE SEATING

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 73 05/20, CHG 1: 08/20 SEISMIC CONTROL FOR MECHANICAL

EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 02/14 COMMON PIPING FOR HVAC

23 05 48.00 40 08/15 VIBRATION AND SEISMIC CONTROLS FOR

HVAC PIPING AND EQUIPMENT

23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 11 20 05/20 FACILITY GAS PIPING

23 21 23 08/17 HYDRONIC PUMPS

23 30 00 05/20 HVAC AIR DISTRIBUTION

23 31 13.00 40 05/16 METAL DUCTS

23 52 43.00 20 05/15, CHG 2: 08/18 LOW PRESSURE WATER HEATING BOILERS

(UNDER 800,000 BTU/HR OUTPUT)

23 64 26 08/09, CHG 5: 11/19 CHILLED, CHILLED-HOT, AND CONDENSER

WATER PIPING SYSTEMS

23 73 13.00 40 05/17 MODULAR INDOOR CENTRAL-STATION

AIR-HANDLING UNITS

23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS, HVAC

25 05 11.02 05/21 CYBERSECURITY FOR MODERATE-IMPACT

FACILITY-RELATED CONTROL SYSTEMS -

FAMNS

25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DIVISION 26 - ELECTRICAL

48.00

10 10/07

08/08, CHG 1: 02/15

SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

APPARATUS INSPECTION AND TESTING

PROJECT TABLE OF CONTENTS Page 4

26 20 00 08/19, CHG 1: 11/19 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION

02/20, 05/20

CHG: 1 - 05/21ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 51 16 05/20 PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE

TESTING

28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION

31 63 16

31 - EARTHWORK

11/08 AUGER CAST GROUT PILES

DIVISION

32 17 23

32 - EXTERIOR IMPROVEMENTS

08/16, CHG 5: 11/18 PAVEMENT MARKINGS

APPENDIX A DRAWINGS

APPENDIX B COMPREHENSIVE INTERIOR DESIGN

STRUCTURAL INTERIOR DESIGN

FURNITURE, FIXTURES, & EQUIPMENT

APPENDIX C AUDIO VISUAL EQUIPMENT PACKAGE

APPENDIX D TINKER AFB- FACILITY STANDARDS

-- End of Project Table of Contents --

Project Title: AFLCMC-WAG B9201 Renovation (ICD-705), Tinker Air Force Base, Oklahoma

The NAICS code for this project is 236220, "Commercial and Institutional Building Construction". The size standard is $39,500,000.00.

In accordance with DFARS 236.204, the estimated magnitude of construction for this project is betw een $10,000,000 and $25,000,000.

Please Note: This solicitation requires the offeror to enter a National Institute of Standards and Technology (NIST) score in the Supplier

Performance Risk System (SPRS). The NIST score is required before an aw ard can be made.

Contract Specialist: MAJ Daniel K. Jernigan, daniel.k.jernigan@usace.army.mil.

DANIEL K JERNIGAN 918.669.7483

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED (RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________545 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________22 Jul 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

W912BV

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

918-669-7436FAX:TEL: TEL: FAX:

W912BV22R0029 7222 Jun 2022

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912BV22R0029

Section 00 11 00 - SF 1442 and CLIN Schedule

PRICE SCHEDULE

CLIN Description QTY Unit Unit Price Amount

BASE PROPOSAL

Construct Area for AFLCMC WAG Group, Building 9201

1 Job XXX $______________

0002 As-builts (See Note 8b) 1 Job XXX $______________

0003 O & M Manuals (See Note 8c) 1 Job XXX $______________

TOTAL BASE PROPOSAL (CLIN 0001 – 0003) INCLUSIVE: $______________

OPTIONS

Option One (1): Parking Lot Re-Stripping (See Note 9a)

1 Job XXX $______________

Option Two (2): Furniture, Fixtures, and Equipment (FF&E) (See Note 9b)

1 Job XXX $______________

Option Three (3): Audio and Visual Equipment (See Note 9c)

1 Job XXX $______________

SUB-TOTAL OPTIONS (CLIN 1001 – 3001) INCLUSIVE: $______________

TOTAL BASE PROPOSAL & OPTIONS (CLIN 0001 – 0003 & 1001 - 3001)

INCLUSIVE:

Proposed Contract Duration (See Note 6): ________________ Calendar Days

Pricing Schedule Notes

1. The offer shall submit pricing data on the latest Pricing Schedule as published in the solicitation or the latest amendment thereto. In lieu of indiciating addititions / deductions to line items, all Offerors should state their revised prices for each item.

2. Offerors must insert a price on all numbered items of the Pricing Schedule. Failure to do so will disqualify the Offer.

3. All quantities are estimated except where the unit is given as Lump Sum (LS).

4. If a modification to a proposal is submitted and provides for a lump-sum adjustment to the total estimated cost, the application of the lump-sum adjustment to each unit price and/or lump-sum price, in the Pricing Schedule must be stated or, if it is not stated, the Offeror agrees that the lump-sum adjustment shall be applied on the prorated basis to every litem in the Bidding Schedule.

5. All the extensions of the unit prices shown (if applicable) will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

6. The Offeror shall propose total contract duration in number of calendar days after the notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery.

The total number of proposed calendar days for construction through completion, ready for turnover shall not exceed the days shown at, SCR: 5.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number one (1) is the day after the date of the receipt of the NTP.

7. Award: Only one contract will be awarded under this solicitation.

8. Base Proposal:

a. Cost for CLIN 0001 shall include all associated construction area work for the AFLCMC WAG group facility, B9201.

b. Costs for CLIN 0002 shall include cost for all work associated with the preparation of As-Built drawings for this project.

c. Costs for CLIN 0003 shall include cost for all work associated with the preparation of Operation and Maintenance (O&M) manuals for this project.

9. Optional Bid Item Descriptions:

a. Option 1 (1001): Parking Lot Restriping: This Option shall include all work associated with the removal of any existing parking lot pavement striping and for the re-striping of the parking lot that is located southwest of Building 9201.

See drawings and specifications for further definition.

b. Option 2 (2001): Furnishings: This option shall include all work associated with the purchase and installation of all of the Furniture, Fixtures, and Equipment for the facility. See Solicitation documents, drawings, and specifications for further definition.

c. Option 3 (3001): Audio Visual Equipment: This Option shall provide purchasing and installing all equipment including cameras, AV switches, room controllers, mics, amplifiers, computer, projectors, televisions, and etcetera as required for the system to be fully operational as indicated on drawings. See Solicitation documents, drawings, and specifications for further definition.

10. Cost Breakdown Information: Upon request of the contracting officer, offerors may be required to provide cost and pricing data no sooner than 48 hours after the proposal due date. The format for submission will be determined by the contracting officer.

11. Award of Optional Proposal Items:

a. Option 1 (1001), at the option of the Government, may be exercised at any time from the date of Notice to Proceed (NTP) until 500 calendar days after NTP. If this option is exercised, an additional 45 calendar days will be added to the overall contract period-of-performance.

b. Option 2 (2001), at the option of the Government, may be exercised at any time from the date of NTP until 400 calendar days after NTP. If this option is exercised, no additional calendar days will be added to the overall contract period-of-performance.

c. Option 3 (3001), at the option of the Government, may be exercised at any time from the date of NTP until 400 calendar days after NTP. If this option is exercised, no additional calendar days will be added to the overall contract period-of-performance.

Section 00 21 16 - Instructions, Conditions & Notices to Offerors

INSTRUCTIONS TO OFFERORS

SECTION 00 21 16

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

1.0 GENERAL DESCRIPTION OF WORK

2.0 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

3.0 GOVERNMEMT SECURITY REQUIREMENTS

4.0 OFFEROR’S QUESTIONS AND COMMENTS

5.0 SMALL BUSINESS SIZE STANDARDS / NAICS CODE

6.0 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

7.0 ACCURACY IN PROPSALS

8.0 PROPOSAL SUBMITTALS

9.0 PROPOSAL FORMAT

10.0 JOINT VENTURE PROPOSAL REQUIREMENTS

11.0 DEVIATIONS AND EXCEPTIONS

12.0 ADDITIONAL INFORMATION

1.0 GENERAL DESCRIPTION OF WORK

This is a competitive best value trade-off solicitation for the construction of the building 9201 AFLCMC- WAG group facility located at Tinker Air Force Base, Oklahoma. The existing building was constructed in approximately 1999 and originally served as a General Motors paint facility. After sitting vacant for approximately fifteen years, the government intends renovate a portion of the building into an ICD-705 Compliant facility for the Air Force’s LCMC, WAG group.

The existing three-story building is approximately 875,000 gross square feet; however, the WAG LCMC facility will only occupy approximately 37,000 square feet and is limited to a portion of the ground floor. The LCMC WAG facility is made up of secure, semi-secure and unsecure areas. The project scope of work for the secure areas are primarily private and open office spaces, mantrap, storage, security office, breakout rooms, electrical room, conference rooms, server rooms, and a copier/shredder/disintegrator support space, and IT-related activities. The project scope of work for the semi-secure areas includes a visitor’s control, corridors, breakroom, unclassified work area, IT equipment build area, training room, and restrooms. The project scope of work for the unsecured areas includes facility entrances, entrance lobby, and corridors to the south.

The project also includes the construction of all associated mechanical, electrical, communications, fire protection, etc. to make this a complete and useable facility. In addition to meeting the program, security, and acoustic requirements for the project, making repairs and modifications to the existing building shall be undertaken. Following decommissioning of the automotive assembly plant, a certain amount of material salvage occurred. However, a significant amount of demolition and deconstruction of existing materials, equipment, and framing remains. This includes but is not limited to the paint booths and support framing located on the 2nd-floor areas, car lifts, substantial manufacturing-specific steel apparatuses, and a variety of smaller non-structural items specific to the auto assembly plant. Although the scope of new construction is limited to a portion of the first floor, the demolition scope shall include equipment above the first floor, from column lines 17 to 22; see Drawings for specific areas for demolition. There are multiple locations where large openings in the floors shall require infill. There are several locations where small curbs, uneven floors, and protruding bolts can be found on the existing floor. The existing curbs, bolts, uneven locations in the slabs shall be scraped, ground, infilled, patched, and leveled to a condition suitable for new flooring materials. In general, all existing materials which are not part of the structural frame, exterior envelope, exit stairs, or are not otherwise noted to be retained or reused, shall be demolished.

2.0 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at:

https://piee.eb.mil/

Solicitation No.: W912BV22R0029

It shall be the offeror’s responsibility to check PIEE for any amendments. The offeror shall submit all requested information specified in this solicitation.

3.0 GOVERNMENT SECURITY REQUIREMENTS

The offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either precontract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.

ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the U.S. Army Corps of Engineers mail room facility located at 2488 E. 81st Street, Tulsa, OK 74137-4290, if it does not contain a return mailing address. There will be no exceptions.

4.0 OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to the RFP shall be submitted via Bidders Inquiry (reference instructions below). Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a publicized question and answer on ProjNet’s Bidder Inquiry and/or written amendment to the solicitation. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

To submit and review bid inquiry items, an offeror will need to be a current registered user or self-register into the system. To self-register, go to the web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click login. Fill in all required information and click create user. Verify the information on the next screen is correct and click continue.

From this page you may view all bidder inquiries or add an inquiry. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.

The solicitation number is: W912BV22R0029 The Bidder Inquiry Key is: AH8A7A-MZW5XD

The bidder inquiry system will close for new inquiries seven (7) days prior to proposal due date to ensure adequate time to form an appropriate response and amend the solicitation, if necessary. Offerors are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The bidder inquiry technical help call center operates weekdays from 8AM to 5PM Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP. Offers will NOT be publicly opened.

Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

The point of contacts for this solicitation are:

Contract Specialist: MAJ Daniel K. Jernigan Telephone: 918-669-7483 E-mail: daniel.k.jernigan@usace.army.mil

Contracting Officer: Rudolfo J. Morales Telephone: 918-669-7275 E-mail: rudolfo.morales@usace.army.mil

Note: All questions and/or comments should reach the above referenced Contracting Office no later than seven (7) calendar days prior to the solicitation close date, so they may be given consideration or actions taken prior to receipt of offers. All requests for information must be submitted via ProjNet’s Bidder Inquiry (see above).

5.0 SMALL BUSINESS SIZE STANDARDS / NAICS CODE

The NAICS code for this project is 236220, "Commercial and Institutional Building Construction". The size standard is $39,500,000.00.

6.0 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This RFP does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

7.0 ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.

8.0 PROPOSAL SUBMITTALS

Electronic copies of the proposal and supporting documents shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. Proposals submitted by mail or hand carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. It is the responsibility of the Offeror to confirm receipt of proposals. All proposals received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR).

There are 10 general steps a vendor must follow in order to use PIEE application modules. A complete list can be viewed at the following site:

https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml#step5

For instructions on how to post an offer, please refer to the Posting Offer demo:

https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.

It is the Offeror’s responsibility to obtain written confirmation of receipt of all electronic files of the full proposal by the Tulsa District Contracting office. In the event the Solicitation Module is down, the alternate method for proposal submission is via email to: daniel.k.jernigan@usace.army.mil and rudolfo.morales@usace.army.mil ONLY. The Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method. Offerors are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before submission.

Electronic copies of proposal documents shall be compatible with the following software products: Adobe Acrobat Reader 11 and Microsoft Office Suite 2016. Narrative portions of the proposal shall be in Adobe Acrobat portable document file (pdf) searchable text format. The Offeror shall not embed sound or video (e.g., MPEG) files into the proposal files. Electronic files shall be clearly identified for each volume, section, and item.

9.0 PROPOSAL FORMAT

See Section 00 22 16, PROPOSAL INSTURCTIONS, SUBMISSION REQUIREMENTS, AND BASIS OF

AWARD.

10.0 JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.

11.0 DEVIATIONS AND EXCEPTIONS

Deviations and exceptions to the terms and conditions of the solicitation are neither encouraged nor desired. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the Offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer.

Notwithstanding the above, if deviations and exceptions are included with the offer, the Offeror shall list and describe in detail the deviations and/or exceptions on the first page of each Tab. All deviations and exceptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. The Offeror shall clearly describe on the Proposal Cover Sheet submitted with the Price Proposal any exception to the contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. This information will not be evaluated separately but may impact the evaluation of other factors.

12.0 ADDITIONAL INFORMATION

Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

END OF INSTRUCTIONS TO OFFERORS

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-20 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

NOV 2021

52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work

MAY 2014

52.236-28 Preparation of Proposals--Construction OCT 1997 252.215-7009 Proposal Adequacy Checklist JAN 2014 252.215-7010 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

JUL 2019

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.

(End of provision)

52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

U.S. Army Corp of Engineers – Tulsa District Attention: CECT-SWT (Rudolfo J. Morales) 2488 E. 81st Street Tulsa, OK 74137-4290

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) A site visit will be offered on 30 June 2022. Due to site location on a Department of Defense (DoD) Installation, strict entry requirements are enforced. Interested contractors who do not have current access to Tinker Air Force Base are advised to meet at 0800 at the Sante Fe Steakhouse parking lot near SE 29th St and S. Air Depot Blvd to facilitate installation access. Those contractors with access to Tinker Air Force Base are instructed to meet at Bldg. 590 no later than 1000. Bldg. 590 is the official location for the start of the site visit.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/

252.204-7019 NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (MAR 2022)

(a) Definitions.

Basic Assessment, Medium Assessment, and High Assessment have the meaning given in the clause 252.204-7020, NIST SP 800-171 DoD Assessments.

Covered contractor information system has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this solicitation.

(b) Requirement. In order to be considered for award, if the Offeror is required to implement NIST SP 800-171, the Offeror shall have a current assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) (see 252.204-7020) for each covered contractor information system that is relevant to the offer, contract, task order, or delivery order. The Basic, Medium, and High NIST SP 800-171 DoD Assessments are described in the NIST SP 800-171 DoD Assessment Methodology located at https://www.acq.osd.mil/asda/dpc/cp/cyber/safeguarding.html#nistSP800171.

(c) Procedures.

(1) The Offeror shall verify that summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) are posted in the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) for all covered contractor information systems relevant to the offer.

(2) If the Offeror does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the Offeror may conduct and submit a Basic Assessment to webptsmh@navy.mil for posting to SPRS in the format identified in paragraph (d) of this provision.

(d) Summary level scores. Summary level scores for all assessments will be posted 30 days post-assessment in SPRS to provide DoD Components visibility into the summary level scores of strategic assessments.

(1) Basic Assessments. An Offeror may follow the procedures in paragraph (c)(2) of this provision for posting Basic Assessments to SPRS.

(i) The email shall include the following information:

(A) Cybersecurity standard assessed (e.g., NIST SP 800-171 Rev 1).

(B) Organization conducting the assessment (e.g., Contractor self-assessment).

(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract--

(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and

(2) A brief description of the system security plan architecture, if more than one plan exists.

(D) Date the assessment was completed.

(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).

(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(ii) If multiple system security plans are addressed in the email described at paragraph (d)(1)(i) of this section, the Offeror shall use the following format for the report:

Brief CAGE codes description of Date of Total Date score of System security plan supported by this the plan assessment score 110 will plan architecture achieved

(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system assessed:

(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).

(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).

(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.

(iv) A brief description of the system security plan architecture, if more than one system security plan exists.

(v) Date and level of the assessment, i.e., medium or high.

(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).

(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(3) Accessibility.

(i) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).

(ii) Authorized representatives of the Offeror for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User's Guide for Awardees/Contractors available at https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf.

(iii) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this section.

DoD will retain and protect any such documentation as "Controlled Unclassified Information (CUI)" and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).

252.215-7012 REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)

The Offeror shall submit the cost portion of the proposal via the following electronic media:

See proposal submission instructions as outlined 00 21 16, Instructions, Conditions, and Notices to Offerors.

Section 00 22 16 - Proposal Submission Requirements, Evaluation Criteria, and Basis of Award

PROPOSAL INSTRUCTIONS

SECTION 00 22 16

PROPOSAL INSTRUCTIONS, SUBMISSION REQUIREMENTS AND EVALUATION

1.0 OVERVIEW

1.1 WHO CAN SUBMIT

2.0 BASIS OF AWARD

3.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

3.1 REQUIREMENTS FOR SEPARATE PRICE AND TECHNICAL PROPOSALS

3.2 DISCUSSIONS

3.3 GENERAL INSTRUCTIONS

3.4 SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL (VOLUME 1)

3.5 SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL (VOLUME 2)

4.0 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS

5.0 VOLUME ONE (1) – FACTOR ONE (1) – TECHNICAL

5.1 VOLUME ONE (1) – TAB A: SUBFACTOR ONE (1) - SPECIALIZED EXPERIENCE: PRIME

5.2 VOLUME ONE (1) – TAB B: SUBFACTOR TWO (2) - SPECIALIZED EXPERIENCE: KEY

SUBCONTRACTORS

5.3 VOLUME ONE (1) – TAB C: SUBFACTOR THREE (3) – KEY PERSONNEL

5.4 VOLUME ONE (1) – TAB D: SUBFACTOR FOUR (4) – ORGANIZATIONAL AND

TECHNICAL APPROACH

5.5 VOLUME ONE (1) – TAB E: SUBFACTOR FIVE (5) – PROPOSED CONTRACT DURATION

AND SUMMARY SCHEDULE

6.0 VOLUME ONE (1) – TAB F: FACTOR THREE (3) – PAST PERFORMANCE

6.1 SUBMISSION REQUIREMENTS

6.2 EVALUATION CRITERIA

7.0 VOLUME TWO (2) – PRICE PROPOSAL

7.1 GENERAL

8.0 EVALUATION PROCEDURES

8.1 SOURCE SELECTION EVALUATION BOARD

8.2 EVALUATION

8.3 DEFINITIONS

8.4 EVALUATION RATING SYSTEM

8.5 PAST PERFORMANCE EVALUATION SYSTEM

ATTACHMENTS:

ATTACHMENT ONE (1): COMPANY SPECIALIZED EXPERIENCE

ATTACHMENT TWO (2): NAVFAC/UASCE PAST PERFORMANCE QUESTIONNAIRE

ATTACHMENT THREE (3): KEY PERSONNEL RESUME

ATTACHMENT FOUR (4): LETTER OF COMMITMENT FOR KEY PERSONNEL

ATTACHMENT FIVE (5): LETTER OF COMMITMENT FOR KEY SUBCONTRACTORS

1.0 OVERVIEW

This is a competitive best value trade off solicitation for the construction project entitled AFLCMC, WAG Group Facility, B9201 located at Tinker Air Force Base, Oklahoma. The Government will evaluate the proposals in accordance with the criteria described herein and award a firm fixed price contract to the responsible firm whose proposal conforms to all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.

The selected contractor shall construct the project in accordance with the plans and specifications.

1.1 WHO CAN SUBMIT:

1.1.1 Firms formally organized as construction contractors, firms associated specifically for this project, consortia of firms, or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors.

1.1.2 Organization Conflicts of Interest (OCI) Disclosure: The Offeror shall provide a disclosure statement with its proposal which concisely describes all the relevant facts concerning past or present organizational conflicts of interest relating to work on this project. In the same statement, and if applicable, the Offeror shall provide information to assure the Government that the conflicts of interest have been mitigated and/or neutralized to the maximum extent possible. If a conflict of interest is discovered after award of this contract, the Contracting Office will decide whether to terminate the contract.

2.0 BASIS OF AWARD

The Contracting Officer intends to award a firm fixed-price contract to the responsible offeror whose proposal the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price. All technical factors are significantly more important than price. The intent of this solicitation is to obtain the best proposal for the required work. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract if the proposal contains a deficiency, as defined in FAR 15.001. The Government reserves the right to reject any offer if the offer is not in the best interest of the Government.

3.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

3.1 REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS

3.1.1 Each Offeror must submit both a Price Proposal and a Technical Proposal. The price proposal and the technical proposal must be submitted as separate volumes. Ensure that the outside of each separate volume is clearly marked to indicate its contents and the identity of the Offeror. Additionally, clearly identify the “original” price proposal and the “original” technical proposal on the outside cover.

3.1.2 The price proposal and the technical proposal must be received by the closing date and time set for receipt of proposals.

3.1.3 No dollar amounts from the price proposal are to be included in the technical proposal.

3.1.4 All information intended to be evaluated as part of the technical proposal must be submitted as part of the technical proposal (Volume 1). Do not merely cross-reference similar material in the price proposal, or vice versa. Do not include links to websites in lieu of incorporating information into your proposal.

3.1.5 Deviations and exceptions to the terms and conditions of the solicitation are not allowed.

Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the proposal may be deemed “unacceptable” and thus ineligible for award.

Any questions related to specific terms and conditions of the solicitation must be resolved prior to submission of the proposal. If the Offeror must make any assumptions prior to submitting the proposal, the Offeror shall list and describe in detail the assumptions on the first page of each tab. All assumptions shall be fully supported with the offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. The offeror shall clearly describe on the proposal cover sheet submitted with the price proposal any assumptions made concerning contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. This information will not be evaluated separately but may impact the evaluation of other factors.

3.2 DISCUSSIONS

The Government does not intend to enter into discussions with offerors prior to making an award. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined, and offerors will be notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).

3.3 GENERAL INSTRUCTIONS

3.3.1 Submit only the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages should be numbered.

3.3.2 Use only 8 ½ by 11-inch page…

This is the start of the file's text. The full file is on GovTribe.