GA_SS_SOW_-_16-_EUF_AREA_2016.doc

DOC document 69 KB Posted

Attached to
Gate Attendant Services - Tulsa District Federal contract opportunity
Solicitation number
W912BV-16-T-0008
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

View the file

Other files for this federal contract opportunity

Other files attached to Gate Attendant Services - Tulsa District, newest first.
File Type Posted
GA_SS_SOW_-16-_KANSAS_AREA.docx DOCX document
GA_SS_SOW_-_16_-_FORT_GIBSON_AREA.docx DOCX document
GA_SS_SOW_-16-_RED_RIVER_AREA.docx DOCX document
GA_SS_SOW_-_16-_NORTHERN_AREA.docx DOCX document
GA_SS_SOW_-_16-_EUF_AREA_2016.doc DOC document
Amendment_1_w_attachment.pdf PDF
GA_SS_SOW_-_16_-_FORT_GIBSON_AREA.docx DOCX document
Solicitation_W912BV-16-T-0008.pdf PDF
GA_SS_SOW_-_16-_NORTHERN_AREA.docx DOCX document
GA_SS_SOW_-16-_KANSAS_AREA.docx DOCX document
GA_SS_SOW_-16-_RED_RIVER_AREA.docx DOCX document
Bidder's_Inquiry_Info_Section-Gate_Attendants.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE SPECIFIC SCOPE OF WORK

2016 GATE ATTENDANTS

VARIOUS PUBLIC SITE AREAS (PSAs)

TULSA DISTRICT, US ARMY CORPS OF ENGINEERS

EUFAULA AREA

SOLICITATION NO.

05 November 2015 Locations:

OKLAHOMA

Eufaula Lake:

Brooken Cove – Shift A

Brooken Cove – Shift B

Ladybird Landing

Gentry Creek

Porum Landing – Shift A

Porum Landing – Shift B

Belle Starr – Shift B

EUFAULA LAKE, OK

BROOKEN COVE - SHIFT A

GATE ATTENDANT SERVICES

POC for this location is Cathi Carr, 918-799-5843 X 3112

In addition to the requirements stated in the GENERAL SCOPE OF WORK, the following work will be performed at this location.

1. Period of performance is 1 April through 30 September.

a. Start work date is 1 April.

b. End work date is the last scheduled workday on or before 30 September.

c. Work a rotating schedule with 5 days on/5 days off throughout the work period.

d. Regular work hours are: 10:30 a.m. - 10:30 p.m.

2. Brooken Cove PUA has 77 camp sites and 3 group shelters.

a. A camping pad is provided and the contractor is required to remain onsite overnight during scheduled duty days to provide for security and emergency access.

b. Open entrance gates at 6 a.m., and close/lock entrance gates at 10 p.m. each work day.

c. On-duty contractor is solely responsible during their 5-day shift. However, cooperation is required between Shifts A and B contractors for smooth transition between shifts.

d. Be present in the gate house at all times during the 12 hour work shift.

e. Patrol PUA no less than 3 times each work day.

f. Boat ramp parking areas will be checked at the beginning of each shift to identify day user vehicles that have failed to pay a launch fee. Tag number and description of vehicle in violation shall be reported to a ranger on duty.

g. Each reservable campsite in the park has a bollard signpost to indicate availability of each site. Ensure each bollard is updated daily after 6 p.m. to reflect availability of the site. See "Bollard Policy" page 24, Eufaula Lake Gate Attendant Manual.

h. Remit all fees collected to NRRS, by postal service, via cashier’s check (cost paid by contactor). Responsible for delivering all required paperwork to the Eufaula Area Office at the end of each work shift as instructed by the COR.

i. Attend a mandatory monthly meeting, even if the meeting is on a scheduled day off.

j. Provide all cleaning materials and office tools/supplies including but not limited to pens, pencils, staplers, mop, broom, dust pan, etc.

k. Mow grass around the gate entrance complex. The COR will specify the area to be mowed and the frequency of mowing. Mowing may be required during each 5-day work shift.

l. Contractor will furnish lawn mower/weed eater and fuel for their operation.

3. Security bond is $5000 (see “General Requirements”).

PRICING SCHEDULE

GATE ATTENDANT SERVICES

EUFAULA LAKE, OK

BROOKEN COVE - SHIFT A

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

Unit Total

Description Quantity Unit Price Amount

BASE ITEMS:

2016 - 2017 Contract Period

DAYS

OPTION 1:

2017 - 2018 Contract Period

DAYS

OPTION 2:

2018 - 2019 Contract Period

DAYS

TOTAL (Base, Option 1, & Option 2)

Contractor Name (printed) Signature

EUFAULA LAKE, OK

BROOKEN COVE - SHIFT B

GATE ATTENDANT SERVICES

POC for this location is Cathi Carr, 918-799-5843 X 3112 In addition to the requirements stated in the GENERAL SCOPE OF WORK, the following work will be performed at this location.

2. Brooken Cove PUA has 77 camp sites and 3 group shelters.

a. A camping pad is provided and the contractor is required to remain onsite overnight during scheduled duty days to provide for security and emergency access.

c. On-duty contractor is solely responsible during their 5-day shift. However, cooperation is required between Shifts A and B contractors for smooth transition between shifts.

f. Boat ramp parking areas will be checked at the beginning of each shift to identify day user vehicles that have failed to pay a launch fee. Tag number and description of vehicle in violation shall be reported to a ranger on duty.

g. Each reservable campsite in the park has a bollard signpost to indicate availability of each site. Ensure each bollard is updated daily after 6 p.m. to reflect availability of the site. See "Bollard Policy" page 24, Eufaula Lake Gate Attendant Manual.

h. Remit all fees collected to NRRS, by postal service, via cashier’s check (cost paid by contactor). Responsible for delivering all required paperwork to the Eufaula Area Office at the end of each work shift as instructed by the COR.

j. Provide all cleaning materials and office tools/supplies including but not limited to pens, pencils, staplers, mop, broom, dust pan, etc.

k. Mow grass around the gate entrance complex. The COR will specify the area to be mowed and the frequency of mowing. Mowing may be required during each 5-day work shift.

PRICING SCHEDULE

GATE ATTENDANT SERVICES

EUFAULA LAKE, OK

BROOKEN COVE - SHIFT B

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

Description Quantity Unit Price Amount

BASE ITEMS:

2016 - 2017 Contract Period

DAYS

OPTION 1:

2017 - 2018 Contract Period

DAYS

OPTION 2:

2018 - 2019 Contract Period

DAYS

TOTAL (Base, Option 1, & Option 2)

Contractor Name (printed) Signature

EUFAULA LAKE, OK

LADYBIRD LANDING

GATE ATTENDANT SERVICES

POC for this location is Cathi Carr, 918-799-5843

In addition to the requirements stated in the GENERAL SCOPE OF WORK, the following work will be performed at this location.

a. Start work date is the first scheduled work day on or after 1 April.

c. Work Thursday through Monday, throughout the work period. However, if the 4th of July falls on a non-workday, the contractor will be required to work the holiday.

d Regular work hours are: 10:30 a.m. - 10:30 p.m.

2. Ladybird Landing PUA has 57 camp sites and 1 group shelter.

a. A camping pad is provided and the contractor is required to remain onsite overnight during scheduled duty days to provide for security and emergency access.

b. Open/unlock entrance gates at 6 a.m., close/lock entrance gates at 10 p.m. each work day.

c. Be present in the gate house at all times during the 12 hour work shift.

d. Patrol PUA no less than 3 times each work day.

e. Boat ramp parking areas will be checked at the beginning of each shift to identify day user vehicles that have failed to pay a launch fee. Tag number and description of vehicle in violation shall be reported to a ranger on duty.

f. Each reservable campsite in the park has a bollard signpost to indicate availability of each site. Ensure each bollard is updated daily after 6 p.m. to reflect availability of the site. See "Bollard Policy" page 24, Eufaula Lake Gate Attendant Manual.

g. Remit all fees collected to NRRS, by postal service, via cashier’s check (cost paid by contactor). Responsible for delivering all required paperwork to the Eufaula Area Office at the end of each work shift as instructed by the COR.

h. Attend a mandatory monthly meeting, even if the meeting is on a scheduled day off.

i. Provide all cleaning materials and office tools/supplies including but not limited to pens, pencils, staplers, mop, broom, dust pan, etc.

j. Mow grass around the gate entrance complex. The COR will specify the area to be mowed and the frequency of mowing. Mowing may be required during each 5-day work shift.

k. Contractor will furnish lawn mower/weed eater and fuel for their operation.

PRICING SCHEDULE

GATE ATTENDANT SERVICES

EUFAULA LAKE, OK

LADYBIRD LANDING

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

Description Quantity Unit Price Amount

BASE ITEMS:

2016 - 2017 Contract Period

DAYS

OPTION 1:

2017 - 2018 Contract Period

DAYS

OPTION 2:

2018 - 2019 Contract Period

DAYS

TOTAL (Base, Option 1, & Option 2)

Contractor Name (printed) Signature

EUFAULA LAKE, OK

GENTRY CREEK

GATE ATTENDANT SERVICES

POC for this location is Cathi Carr, 918-799-5843

In addition to the requirements stated in the GENERAL SCOPE OF WORK, the following work will be performed at this location.

a. Start work date is the first scheduled work day on or after 1 April.

c. Work Thursday through Monday, throughout the work period. However, if the 4th of July falls on a non-workday, the contractor will be required to work the holiday.

d Regular work hours are: 10:30 a.m. - 10:30 p.m.

2. Gentry Creek PUA has 37 camp sites and no group shelter.

a. A camping pad is provided and the contractor is required to remain onsite overnight during scheduled duty days to provide for security and emergency access.

b. Open/unlock entrance gates at 6 a.m., close/lock entrance gates at 10 p.m. each work day.

c. Be present in the gate house at all times during the 12 hour work shift.

d. Patrol PUA no less than 3 times each work day.

e. Boat ramp parking areas will be checked at the beginning of each shift to identify day user vehicles that have failed to pay a launch fee. Tag number and description of vehicle in violation shall be reported to a ranger on duty.

f. Each reservable campsite in the park has a bollard signpost to indicate availability of each site. Ensure each bollard is updated daily after 6 p.m. to reflect availability of the site. See "Bollard Policy" page 24, Eufaula Lake Gate Attendant Manual.

g. Remit all fees collected to NRRS, by postal service, via cashier’s check (cost paid by contactor). Responsible for delivering all required paperwork to the Eufaula Area Office at the end of each work shift as instructed by the COR.

h. Attend a mandatory monthly meeting, even if the meeting is on a scheduled day off.

i. Provide all cleaning materials and office tools/supplies including but not limited to pens, pencils, staplers, mop, broom, dust pan, etc.

j. Mow grass around the gate entrance complex. The COR will specify the area to be mowed and the frequency of mowing. Mowing may be required during each 5-day work shift.

k. Contractor will furnish lawn mower/weed eater and fuel for their operation.

PRICING SCHEDULE

GATE ATTENDANT SERVICES

EUFAULA LAKE, OK

GENTRY CREEK

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

Description Quantity Unit Price Amount

BASE ITEMS:

2016 - 2017 Contract Period

DAYS

OPTION 1:

2017 - 2018 Contract Period

DAYS

OPTION 2:

2018 - 2019 Contract Period

DAYS

TOTAL (Base, Option 1, & Option 2)

Contractor Name (printed) Signature

EUFAULA LAKE, OK

PORUM LANDING - SHIFT A

GATE ATTENDANT SERVICES

POC for this location is Cathi Carr, 918-799-5843

In addition to the requirements stated in the GENERAL SCOPE OF WORK, the following work will be performed at this location.

2. Porum Landing PUA has 52 camp sites and 2 group shelters.

a. A camping pad is provided and the contractor is required to remain onsite overnight during scheduled duty days to provide for security and emergency access.

c. On-duty contractor is solely responsible during their 5-day shift. However, cooperation is required between Shifts A and B contractors for smooth transition between shifts.

f. Boat ramp parking areas will be checked at the beginning of each shift to identify day user vehicles that have failed to pay a launch fee. Tag number and description of vehicle in violation shall be reported to a ranger on duty.

g. Each reservable campsite in the park has a bollard signpost to indicate availability of each site. Ensure each bollard is updated daily after 6 p.m. to reflect availability of the site. See "Bollard Policy" page 24, Eufaula Lake Gate Attendant Manual.

h. Remit all fees collected to NRRS, by postal service, via cashier’s check (cost paid by contactor). Responsible for delivering all required paperwork to the Eufaula Area Office at the end of each work shift as instructed by the COR.

j. Provide all cleaning materials and office tools/supplies including but not limited to pens, pencils, staplers, mop, broom, dust pan, etc.

k. Mow grass around the gate entrance complex. The COR will specify the area to be mowed and the frequency of mowing. Mowing may be required during each 5-day work shift.

PRICING SCHEDULE

GATE ATTENDANT SERVICES

EUFAULA LAKE, OK

PORUM LANDING - SHIFT A

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

Description Quantity Unit Price Amount

BASE ITEMS:

2016 - 2017 Contract Period

DAYS

OPTION 1:

2017 - 2018 Contract Period

DAYS

OPTION 2:

2018 - 2019 Contract Period

DAYS

TOTAL (Base, Option 1, & Option 2)

Contractor Name (printed) Signature

EUFAULA LAKE, OK

PORUM LANDING - SHIFT B

GATE ATTENDANT SERVICES

POC for this location is Cathi Carr, 918-799-5843

In addition to the requirements stated in the GENERAL SCOPE OF WORK, the following work will be performed at this location.

2. Porum Landing PUA has 52 camp sites and 2 group shelters.

a. A camping pad is provided and the contractor is required to remain onsite overnight during scheduled duty days to provide for security and emergency access.

c. On-duty contractor is solely responsible during their 5-day shift. However, cooperation is required between Shifts A and B contractors for smooth transition between shifts.

f. Boat ramp parking areas will be checked at the beginning of each shift to identify day user vehicles that have failed to pay a launch fee. Tag number and description of vehicle in violation shall be reported to a ranger on duty.

g. Each reservable campsite in the park has a bollard signpost to indicate availability of each site. Ensure each bollard is updated daily after 6 p.m. to reflect availability of the site. See "Bollard Policy" page 24, Eufaula Lake Gate Attendant Manual.

h. Remit all fees collected to NRRS, by postal service, via cashier’s check (cost paid by contactor). Responsible for delivering all required paperwork to the Eufaula Area Office at the end of each work shift as instructed by the COR.

j. Provide all cleaning materials and office tools/supplies including but not limited to pens, pencils, staplers, mop, broom, dust pan, etc.

k. Mow grass around the gate entrance complex. The COR will specify the area to be mowed and the frequency of mowing. Mowing may be required during each 5-day work shift.

PRICING SCHEDULE

GATE ATTENDANT SERVICES

EUFAULA LAKE, OK

PORUM LANDING - SHIFT B

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

Description Quantity Unit Price Amount

BASE ITEMS:

2016 - 2017 Contract Period

DAYS

OPTION 1:

2017 - 2018 Contract Period

DAYS

OPTION 2:

2018 - 2019 Contract Period

DAYS

TOTAL (Base, Option 1, & Option 2)

Contractor Name (printed) Signature

EUFAULA LAKE, OK

BELLE STARR - SHIFT B

GATE ATTENDANT SERVICES

POC for this location is Cathi Carr, 918-799-5843

In addition to the requirements stated in the GENERAL SCOPE OF WORK, the following work will be performed at this location.

2. Belle Starr PUA has 116 camp sites and 2 group shelters.

a. A camping pad is provided and the contractor is required to remain onsite overnight during scheduled duty days to provide for security and emergency access.

c. On-duty contractor is solely responsible during their 5-day shift. However, cooperation is required between Shifts A and B contractors for smooth transition between shifts.

f. Boat ramp parking areas will be checked at the beginning of each shift to identify day user vehicles that have failed to pay a launch fee. Tag number and description of vehicle in violation shall be reported to a ranger on duty.

g. Each reservable campsite in the park has a bollard signpost to indicate availability of each site. Ensure each bollard is updated daily after 6 p.m. to reflect availability of the site. See "Bollard Policy" page 24, Eufaula Lake Gate Attendant Manual.

h. Remit all fees collected to NRRS, by postal service, via cashier’s check (cost paid by contactor). Responsible for delivering all required paperwork to the Eufaula Area Office at the end of each work shift as instructed by the COR.

j. Provide all cleaning materials and office tools/supplies including but not limited to pens, pencils, staplers, mop, broom, dust pan, etc.

k. Mow grass around the gate entrance complex. The COR will specify the area to be mowed and the frequency of mowing. Mowing may be required during each 5-day work shift.

PRICING SCHEDULE

GATE ATTENDANT SERVICES

EUFAULA LAKE, OK

BELLE STARR - SHIFT B

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

Description Quantity Unit Price Amount

BASE ITEMS:

2016 - 2017 Contract Period

DAYS

OPTION 1:

2017 - 2018 Contract Period

DAYS

OPTION 2:

2018 - 2019 Contract Period

DAYS

TOTAL (Base, Option 1, & Option 2)

Contractor Name (printed) Signature

File details come from the government source that posted it. Updated .