Solicitation_W912BV-16-T-0008.pdf
PDF 603 KB Posted
- Attached to
- Gate Attendant Services - Tulsa District Federal contract opportunity
- Solicitation number
- W912BV-16-T-0008
About this file
Solicitation for Gate Attendant Services - Tulsa District
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| GA_SS_SOW_-_16-_EUF_AREA_2016.doc | DOC document | |
| GA_SS_SOW_-_16_-_FORT_GIBSON_AREA.docx | DOCX document | |
| GA_SS_SOW_-16-_RED_RIVER_AREA.docx | DOCX document | |
| GA_SS_SOW_-_16-_NORTHERN_AREA.docx | DOCX document | |
| Amendment_1_w_attachment.pdf | ||
| GA_SS_SOW_-16-_KANSAS_AREA.docx | DOCX document | |
| GA_SS_SOW_-_16-_NORTHERN_AREA.docx | DOCX document | |
| GA_SS_SOW_-16-_KANSAS_AREA.docx | DOCX document | |
| GA_SS_SOW_-_16-_EUF_AREA_2016.doc | DOC document | |
| GA_SS_SOW_-16-_RED_RIVER_AREA.docx | DOCX document | |
| GA_SS_SOW_-_16_-_FORT_GIBSON_AREA.docx | DOCX document | |
| Bidder's_Inquiry_Info_Section-Gate_Attendants.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912BV-16-T-0008 09-Dec-2015
b. TELEPHONE NUMBER
918.669.7173
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 19 Jan 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912BV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
AMY C FEEMSTER
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
7500000
NAICS:
721211
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF181
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912BV-16-T-0008
Section SF 30 - BLOCK 14 CONTINUATION PAGE
INSTRUCTIONS TO OFFERORS
Information and Instructions to Offerors 2016 Gate Attendant Openings – The U.S. Army Corps of Engineers – Tulsa District has the following locations open for Gate Attendant positions starting in the 2016 contract year.
Lake Public Use Area Fort Gibson Area:
Fort Gibson Lake Blue Bill – Shift B Fort Gibson Lake Flat Rock – Shift B Fort Gibson Lake Rocky Point – Shift B Tenkiller Lake Cookson Bend – Shift A Tenkiller Lake Cookson Bend – Shift B Tenkiller Lake Snake Creek – Shift A Tenkiller Lake Snake Creek – Shift B Tenkiller Lake Strayhorn Landing – Shift A Tenkiller Lake Strayhorn Landing – Shift B Eufaula Area:
Eufaula Lake Broken Cove – Shift A Eufaula Lake Broken Cove – Shift B Eufaula Lake Ladybird Landing Eufaula Lake Gentry Creek Eufaula Lake Porum Landing – Shift A Eufaula Lake Porum Landing – Shift B Eufaula Lake Belle Starr – Shift B Northern Area:
Birch Lake Birch Cove Canton Lake Canadian Campground – Shift A Canton Lake Canadian Campground – Shift B Canton Lake Sandy Cove – Shift B Canton Lake Big Bend – Shift B Copan Lake Washington Cove Fort Supply Lake Fort Supply Park – Shift B Keystone Lake Washington Irving South – Shift A Keystone Lake Washington Irving South – Shift B Oologah Lake Hawthorn Bluff Beach Kansas Area:
Council Grove Lake Canning Creek Cove Council Grove Lake Richey Cove Council Grove Lake Roving Council Grove Lake Santa Fe Trail Marion Lake Hillsboro Cove – Shift A Marion Lake Hillsboro Cove – Shift B Marion Lake Cottonwood Point – Shift B Red River Area:
Pat Mayse Lake Sander’s Cove – Shift A Texoma Lake Buncombe Creek Texoma Lake Johnson Creek/Lakeside – Rover Pine Creek Little River Park – Shift A Pine Creek Little River Park – Shift B
If you have never had a Government Contract and need to know where to start, read below.
Note: When accessing any websites referenced in this solicitation it is recommended you type the internet address in the address bar or your web browser instead of using a search engine as you may be directed to the wrong website.
1. Obtain a DUNS number at http://www.dnb.com/ or by calling 1-866-705-5711. At the DNB website, click on the tab “D-U-N-S NUMBER” on the top right of the page. It is located under the search block. Scroll to the bottom of the webpage to select “Request a D-U-N-S Number for doing business with the government”. Click on “Get a D-U-N- S number” on the bottom left of the page. Complete the registration. A DUNS number is a mandatory data element for registering in the database SAM. It does not cost anything to obtain a DUNS number. Services to notify you of Government opportunities or help with Government contracting may be offered to you throughout the registration process and are at your option and expense. Any services requiring a fee that are offered to you through this website are not required by the Government to receive a contract. Once completed, the DUNS number may be available instantaneously or it will be emailed or mailed to you within a few days. If it is longer than a few days follow up with your registration status with DNB through the website or by telephone.
2. Register in SAM. You cannot register in SAM until you are assigned a DUNS number.
Once you receive your DUNS number access SAM at http://www.sam.gov to register. It does not cost anything to register in SAM. Click on “Create an Account” on the top right page under the user name and password login. Complete the information fields to register. The payment information you input in this website will be how and where you receive your payment for services. Include the NAICS code 721211 in your registration.
All persons contracting with the Corps of Engineers must be registered and remain in an “active status” in the SAM database throughout the contract period. You CAN NOT use a government employee’s information in your registration such as phone number, email address, name or physical address. It is your responsibility to provide this information or obtain this information for registration.
3. Submit your quote. While your information is processing follow the directions below under “I’m ready to submit a quote” to fill out the proper paperwork and submit. An award cannot be made to an offeror unless their registration is complete.
I’m ready to submit a quote.
Review the Following- Read the entire solicitation. Ensure you read the General Scope of Work and the Site Specific Scope of Work under Section C of this solicitation. These sections cover all the requirements for work that is to be performed. The General Scope of Work applies to all areas that are advertised.
The Site Specific Scope of Work details the work to be completed at a specific area such as the dates of performance, shift times, and special requirements (bonding and background checks).
Review the Successful Quote Checklist.
There are PTAC centers (Procurement Technical Assistance Centers) that can help submit your quote or getting registered in DNB or SAM. You can locate a PTAC center at http://www.aptac-us.org/new/Govt_Contracting/find.php. PTAC offers their services at little or no charge. You may need to access your local library or office supply store to print, scan, email, fax or mail your quote. There may be a fee for these services.
Return the Following-
1- A completed 1st page of the solicitation. If any amendments are issued a signed copy of the first page must also be returned. Please check http://www.fbo.gov for any issued amendments or sign up through http://www.fbo.gov to receive notifications of any issued amendment.
2- Completed Offeror’s Information Sheet – (Found on the next few pages.)
3- The Pricing Schedule for each area you are submitting a quote for. The Pricing schedule is the next page after the Site Specific Scope of Work of each area in Section C.
4- 52.212-3 paragraphs (c) through (o). If you have NOT filled out Representations &
Certifications through http://www.sam.gov, fill out 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS paragraphs
(c) through (o) in this solicitation. If any of the information to these questions has changed, update your SAM or submit the changes by filling out paragraphs (c) through (o). Please be aware if you choose to answer these questions by submitting them with your quote this will not update your SAM registration. You can find this in the solicitation under Section K under paragraph 52.212-3. The first question starts out:
“(1) Small business concern. The offeror represents as part of its offer that it ( ) is, ( ) is not a small business concern.” The questions cover about 10 pages in length. If anything does not apply write “N/A” .
Only return the pages listed above.
Email is the preferred method of submission but you may mail, fax or hand deliver your quote with the information below.
When mailing your quote ensure you write the address exactly as written below.
Tulsa District Corps of Engineers
ATTN; CECT-SWT-E, Amy C. Feemster and Veronica P. Freire
(W912BV-16-T-0008)
1645 SOUTH 101ST EAST AVE.
Tulsa, OK 74128
When emailing your quote ensure you put the solicitation number in the subject line. Ensure your attachment is legible. Send your quote as one attachment. DO NOT attach multiple files or attach each separate page as a file. PDF is the preferable format. If another format is used and we cannot open the file you will be contacted to resubmit your quote.
Email: amy.c.feemster@usace.army.mil
AND
Veronica.P.Freire@usace.army.mil
When faxing your quote use a cover page to address it to the attention of Amy C. Feemster and Veronica P. Freire and provide the solicitation number, your name, a telephone number you can be reached at and how many pages you are sending. This ensures we have received all pages of your quote.
FAX: 918-669-7495
OR
When hand delivering your quote it is best to call ahead so the Contract Specialist is aware of your arrival and arrangements can be made for someone to meet you at the building. Upon arriving you must enter through the visitor entrance and go through Security. Please inform Security you are delivering a quote to Contracting. A telephone is also available at Guest Services for them to call our office. You can only leave your quote with the designated Contract Specialist listed on the solicitation or a Contracting Officer. The time received is when Contracting is handed your quote.
ADDRESS: 1645 South 101st East Ave Tulsa, OK 74128
Contact: Amy Feemster at 918-669-7173
Veronica Freire at 918-669-4318
Offerors will be evaluated and award will be made to the lowest-priced, responsible offeror, whose quote conforms to the requirement of the solicitation.
All Gate Attendant contract terms consist of a Base-Year Plus Two (2) Option Years (2016 through 2019). Options may be exercised at the discretion of the Government. The total duration of this contract, including the exercising of any options under this provision, shall not exceed three (3) years.
OPTION YEARS:
Option to Extend the term of the contract (unilateral). The Government may extend the term of this contract by written notice to the contractor at least 60-days before the expiration date of the current performance period. This written notice will be issued in the form of a letter, requiring execution/agreement by both the Government and the contractor. The Government may informally contact the contractor prior to issuance of this written notice to ensure availability of the contractor for the extension period.
If the Option is exercised, the extended contract shall be considered to include Option Clause 52.217-9; however the Government retains the right not to extend the contract by exercising the option year(s).
PAYMENT INFORMATION:
1. Payment information is inputted into your http://www.sam.gov registration.
2. All payments are issued through our Finance Center located in Millington, TN.
3. Payment issues need to be addressed to the Finance Center.
4. Payments will be made on a monthly basis (30-Days).
5. Your registration in SAM must be active to receive payment.
This requirement is set aside as 100% Total Small Business. See Clause 52.219-
6, Notice of Total Small Business Set-Aside in this Request for Quotation for details. This clause includes all general conditions required by the Tulsa District Corps of Engineers for Gate Attendant positions.
SHIFTS OF TEN (10) HOURS OR GREATER REQUIRE TWO PERSONS
You will be asked to list the name(s) of the individual(s) to work as Gate Attendants.
The people listed cannot change during the duration of the contract and the work performed cannot be subcontracted. If any situation arises where any of the individuals cannot perform the contract duties the COR or Contracting Officer must be notified immediately.
Background check info If you are selected for award a background check will be required. Do not obtain the background check now. You will be instructed to do so if you are selected. All persons handling Government monies or accessing a Government computer system are required to have a current local law enforcement background check submitted to the Point of Contact (POC). The Corps of Engineers reserves the right to deny access to any individual who has any derogatory information in the background check or whose presence, in the opinion of the Contracting Officer, would be disruptive. Background check disqualifying factors include: Any felony conviction; a misdemeanor conviction within the previous five years for a crime of violence, drug use / possession, or theft. If an individual does not have a disqualifying factor but has a misdemeanor conviction then those individuals will be evaluated or considered on a case by case basis.
Successful Packet Checklist
___ You have a DUNS number or in process of receiving one.
___ You have registered in SAM at http://www.sam.gov. You can register in SAM once you have obtained your DUNS number.
____ You are currently active in SAM (http://www.sam.gov). SAM requires you log in annually to update your information to remain in an active status. Ensure to log in and make sure your account is active.
____ Your NAICS code listed in your SAM account is 721211. If you have not listed this code in your SAM account you must log in and add this number.
____ You have checked to see if any amendments have been issued on http://www.fbo.gov. If any amendments are issued acknowledge the amendment(s) by signing and returning the first page and any other documents that are mentioned in the amendment. If an amendment is issued after you have submitted your quote, submit the signed amendment. You do not need to resubmit your whole quote package.
____ NO cross outs or strike through marks. Submit a legible quote with no correction marks
____ You are ensuring your quote will be submitted before the due date and time. The due date and time is in block 8 on the first page of the solicitation. If any amendments are issued the date may be extended and the new date will be listed in the amendment. Quotes that are late and/or incomplete will not be considered for award.
____ Do not return every page of the solicitation. Only the documents listed.
____Fill out the First Page of the Solicitation and return
___Block 12 Discount for Prompt Payment. A prompt payment discount is the amount your invoice will be discounted if the Government pays your bill early. For example: If your invoice is for $100 and you offer a discount of 1% within 20 days, and the Government pays you within 20 days, your payment would be $99. If this block is empty we will default Net 30 (total net amount paid within 30 days).
___Block 17a include the following:
___ Name of Individual(s) as it appears in SAM ___ Address ___ Email
___ DUNS/Cage Code Numbers- If you are currently in the process of obtaining a DUNS number you can leave this blank.
___ Telephone number that you can be reached during the business hours of 8:00 a.m. to 4:30 p.m. CST
___Block 30a - Signature ___Block 30b – Print Name ___Block 30c – Date
Fill out the Pricing Schedule and Return
___Return the Pricing Schedule for each area you are submitting for. The Pricing Schedule for each area is located after each Site Specific Scope of Work in Section C.
___ Input a unit price and total price. The unit price is the amount you are quoting on a daily basis. The unit price (amount per day) multiplied by the number of days equals the total amount. For example if you are quoting a price of $100 per day and there are 90 days of work in the base year, the total price will be $9,000. ($100 x 90 = $9,000) ____Ensure all prices on line items are filled in. All line items must be priced to be considered for award. You will need to pay special attention to the start and end dates and the total number of work days posted in the Base year and each Option year because they may change.
____Unit prices must be rounded to the nearest cent (hundredths).
$20.56 IS an acceptable price.
$20.564 IS NOT an acceptable price.
Do not round total amount numbers.
___ Fill out your name as it appears in SAM and sign the bottom of each Pricing Schedule.
Offeror’s Information Sheet __Complete and return the Offeror’s Information Sheet provided on the next page.
You may apply to any of the areas listed in this solicitation. Preferences of your top 5 areas are given consideration when evaluating quotes. The Government will choose the location for Gate Attendants based on the best value to the Government.
Representations and Certifications
____ You have filled out the Representations and Certifications online OR have filled out Clause 52.212-3 paragraphs (c) through (o) in the solicitation.
How Quotes Will Be Evaluated
*** You may be selected for any areas that you have submitted quotes for even if it is not your 1st preference.
(i) Price evaluation: The government shall review acceptable offers by lowest price. Price reasonableness and affordability will also be evaluated.
(ii) Past Performance: The Government will review all CPARS evaluations regardless of project and may contact points of contacts or evaluate any information provided to the Contract Specialist or Contracting Officer to include USACE District Past Performance files. Offerors must demonstrate the following minimum acceptability standards:
All past or current performance must have overall ratings of Satisfactory, Acceptable or above.
Any derogatory information may be grounds for an Unacceptable rating.
Offerors with no past performance information will receive an “Acceptable” rating for this factor.
Award will be made to the lowest-priced, responsible offeror, whose quote conforms to the requirement of the solicitation.
Offeror’s Information Sheet
(W912BV-16-T-0008)
(Return this page with your quote.)
Name(s) as appears in SAM: _______________________________________________
Address: _______________________________________________
Phone or Contact No.: ________________________________________________
Email: ________________________________________________
Cage Code (SAM): ________________________________________________ (If you are registering and have not been assigned a cage code number yet write “Pending”.
List the individual(s) that will work as Gate Attendant(s).
1- _______________________
2-_________________________
PRIORITY LIST:
Please list up to five (5) locations, in the order of priority, that you wish to work as a
Gate Attendant. Ensure you submit a Pricing schedule for each location identified on your priority list.
1st Preference: ___________________________________________
2nd Preference: ___________________________________________
3rd Preference: ___________________________________________
4th Preference: ___________________________________________
5th Preference: ___________________________________________
BIDDER'S INQUIRY
INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS
USE OF BIDDER’S INQUIRY
Prospective offerors should submit questions and inquiries related to this solicitation in accordance with the following (telephonic inquiries will not be entertained):
a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.
4. The Solicitation Numbers are: W912BV-16-T-0008
The Bidder Inquiry Key is: 4MKNMU-9VQY9T
c. The Bidder Inquiry System will be unavailable for new inquiries 5 days prior to proposal due date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
g. The point of contact for this solicitation is:
Contract Specialist: Amy Feemster Telephone: 918-669-7173 E-MAIL: Amy.C.Feemster@usace.army.mil AND
Robert.E.Reed@usace.army.mil
Section C - Descriptions and Specifications
GENERAL SCOPE OF WORK
GENERAL SCOPE OF WORK
GATE ATTENDANT SERVICES
VARIOUS PUBLIC SITE AREAS (PSAs)
TULSA DISTRICT, U.S. ARMY CORPS OF ENGINEERS
OKLAHOMA, KANSAS, AND TEXAS
A. GENERAL CONTRACT REQUIREMENTS.
1. The contractor shall perform duties as outlined in this scope of work (SOW), and as identified in the “Site Specific SOW” (SS SOW) for individual Public Site Areas (PSA).
2. Whenever the term "contractor" or "gate attendant" (GA) is used in describing the requirements and responsibilities, the contractor is solely and fully responsible for ensuring the performance of the duties and responsibilities described.
3. Criminal Background Investigation.
a. All persons handling Government monies or accessing the Government computer system, under this contract, shall have a current (within 90 days of submission) local law enforcement background check. Information shall be submitted to the Contracting Officer’s Representative (COR)/Point of Contact (POC) no less than 5 working days prior to the needed day of entry. Contractor shall be approved by the Government before they will be allowed to begin the required pre-performance training or perform work.
b. Gate Attendant shall maintain a clean and orderly appearance consistent of regular hygiene, free of offensive or strong odors and conduct themselves in a professional manner. If Appearance, Odor or Demeanor should become unacceptable by evaluation of the COR/POC or Lake Manager to be disruptive to employees, other Contractors (Gate Attendants) in performing services or to the public, the contract will be terminated for cause by the Contracting Officer (KO). The Government reserves the right to deny access to any individuals who has any derogatory information in their background check. All background checks must be conducted by a law enforcement agency (i.e., Sheriff’s Office, Police Department, etc) within the state in which the person resides.
c. Individuals will be allowed to begin training if they do not have any disqualifying factors. Background check disqualifying factors include: Any felony conviction; a misdemeanor conviction within the previous five years for a crime of violence, drug use/possession, or theft.
If an individual does not have a disqualifying factor, but has a misdemeanor conviction, those individuals will be evaluated or considered on a case by case basis.
d. Provide “Criminal Investigation” background information on all persons that may perform work under this contract. This information shall be submitted with the contractor’s quote, if available.
e. By execution of the contract, the contractor certifies that all persons providing such services under the contract are so qualified.
4. Security bonding. Contractor shall be fully bonded/insured to secure funds not received by the Government; in amounts stated in the Site Specific SOWs (Suspected theft of Government monies or supplies will result in immediate termination and criminal prosecution.). The contractor shall not start work until proof of such bond or security is furnished. The contractor has the following options to fulfill this requirement:
a. Obtain a fidelity bond from an insurance agent with the US Army Corps of Engineers, Tulsa District COE, named as the recipient. Cost is approximately 10% of the bond; or
b. Furnish an irrevocable, unconditional letter of credit from a financial institution in the specified amount.
c. Security bonding shall remain in full force for the duration of the contract period (1 year from award of contract) and for a minimum of 60 days past the completion of the contract end date.
d. Final payment shall not be made under the terms of this contract until all funds are reconciled to the satisfaction of the Government.
e. Condition in the bond requires the bonding company to notify the Corps of Engineers before the bond is modified, terminated or cancelled, prior to the original terminations dates.
5. Past performance reference information shall be provided with contractor’s quotation.
Contractors who have had a contract or purchase order “Terminated for Default” or “Termination for Cause” by the Government during the previous five years shall not be eligible for contract award. If this is discovered after award, the contract will be terminated.
6. Experience in the use of a computer is required for most GA positions (unless otherwise noted in the Site Specific Scope of Work/SS SOW). If contractor is unable to properly operate the computer and use the National Recreation Reservation Service (NRRS) program, the contractor will be deemed unable to perform the contract requirements and the contract will be terminated by the KO.
7. Work consists of a variety of duties managing the PSAs/day use areas as stated in section “E.
GATE ATTENDANT GENERAL DUTIES” below; and/or as stated in the SS SOWs.
8. The contract consists of a one (1) year Base period, and two(2) 1-year Option Periods. Each contract period is twelve (12) months. The total duration of this contract, including the exercise of any Options, shall not exceed three (3) years. Exercising of an Option Period is at the sole discretion of the Government.
a. Actual performance period(s) for each PSA are stated in the SS SOWs.
b. The performance start and end dates will vary from year to year based on scheduled work days. However, work will start no earlier or end no later than stated performance periods for each PUA. The contractor shall contact the Lake Office within 5 days upon receipt of the initial contract award as well as any modification to exercise any Option Period to coordinate the work schedule.
9. The Government reserves the right to select which PSA and/or project the contractor shall work, should the contractor submit offers at more than one location.
10. Gate attendant services shall only be performed by the individuals listed in the Offeror’s Information Sheet. If for any reason the contractor cannot perform the prescribed work, the contract will be terminated by the KO.
11. The contractor shall abide by all Corps of Engineers management actions and decisions, and will follow all directions given to them by the POC and/or the KO, both verbal and written. The contractor shall not voice any negative opinions to the public or express derogatory statements which may lead to termination of the contract.
12. Gate attendants shall be courteous and display a professional attitude to the public at all times. Gate attendants will call Park Rangers immediately to assist if they encounter any problem with a park visitor. The contractor will cooperate fully with other contractors, camp hosts, volunteers, etc., and any problems will be resolved by the POC or KO.
13. Payment shall be processed on a monthly basis. Payment will be made based upon the amount proposed by the contractor and awarded by the Government. All payments will be made via Electronic Funds Transfer (EFT).
B. CONTRACTOR FURNISHED EQUIPMENT/MATERIALS, ETC.:
1. This contract requires two (2) individuals to fulfill the duties during the performance period (unless otherwise noted in the SS SOW). One person is required to occupy the gatehouse at all times during the work shift, and one person to be available for required park surveillance or other duties.
2. The contractor is required to live on-site in a contractor-furnished trailer/camper, to be parked at a location designated by the POC (usually near the entrance of the PSA or as otherwise stated in the SS SOW).
a. The contractor’s campsite shall be maintained in a clean and sanitary condition at all times and in accordance with CFR Title 36 at all times.
b. The contractor shall not have unauthorized storage buildings, satellite receivers or similar items on the site.
c. Dog pens, horse corrals, poultry cages or similar facilities for pets or the raising of animals shall not be permitted. All pets will be confined or on a leash of six feet or less in length. Horses, cattle, other large livestock, or exotic pets are not permitted. Any animal exhibiting dangerous or aggressive behavior will not be permitted, and shall be removed from Government property immediately. Pets are not permitted in the gatehouse at any time.
d. Any items detracting from the overall appearance of the site must be removed as instructed by the POC.
3. The contractor will provide their own transportation for conducting duties or providing surveillance within the park, including transportation to other nearby parks for duties that may be required in the SOW. This will also include transportation for banking and mailing activities, or any other activities covered in the SOW. All vehicle expenses, including fuel, are the responsibility of the contractor.
4. The contractor will pay the cost of postage and cashier’s checks for fee transmittals (unless otherwise stated in the Site Specific SOWs).
5. The contractor will provide some minor materials, supplies, and equipment to accomplish the work set forth in this contract, other than those items listed as furnished by the Government (see
SS SOW).
6. The contractor may be required to provide supplies and materials necessary to clean the gatehouse. (see SS SOW).
7. The contractor may be required to provide a lawn mower/weed eater and fuel for their operation. (see SS SOW).
8. All expenses related to performance of work should be included in the contractors’ proposed price. Separate payment will not be made for incidental expenses noted above.
C. GOVERNMENT FURNISHED EQUIPMENT/MATERIALS:
1. A site for a self-contained trailer/camper with electric and water utilities supplied by the Government (unless otherwise noted in the SS SOW). A sanitary dump will be available near the entrance of the park. In some cases, a trailer holding tank or a direct sanitary hookup may be available. Communications equipment (radio or telephone) will be provided at the gatehouse.
Radio and telephone usage procedures shall follow Corps of Engineers standards as instructed by the POC.
2. The standard electrical pedestal is equipped with a 30 amp GFI breaker, which is adequate for most camp trailers (some locations may have 50 amp service). This may not be adequate for units having appliances such as microwave ovens, washers, dryers, dishwashers, televisions, and air conditioners running at the same time. The electrical pedestals shall not be modified to accommodate any additional load demands.
3. Gatehouse with gate, informational handout materials/pamphlets, copies of CFR Title 36 (rules and regulations) and campground maps.
4. Computer equipment and printers necessary to operate the NRRS and fee collection system.
Other office equipment and supplies as deemed necessary to conduct official business.
5. Vest with Corps of Engineers identification, ball cap with Corps patch, and name tag that shall be worn while on duty.
6. Lawn mower and associated equipment and supplies for mowing or trimming in the immediate vicinity of the gatehouse may be provided by the Government, unless otherwise required to be provided by the contractor. (See SS SOW).
7. Landscape equipment and materials (See SS SOW).
8. The contractor will be required to sign a hand receipt for all property for which he/she will be responsible and will retain accountability until the contract period has ended, at which time the Government resumes responsibility via written accountability for those items. In the case of any loss, the contractor shall reimburse the Government the cost of replacement of the item.
D. TRAINING REQUIREMENTS:
1. Mandatory training on the NRRS computer program is required prior to the start of the performance period. The training and general orientation will require from three (3) to five (5) days, as determined by the POC for each location. The contractor will be required to attend this training prior to the actual start date of the performance period. The amount of time required to attend training must be factored into the proposed price, as separate payment will not be made.
Contractors who are unwilling or unable to learn the NRRS computer program will be terminated.
2. During the three (3) to five (5) day training, other training and orientation will be provided such as general handling of Government funds, courteousness to the public, radio and telephone usage, personal and visitor safety requirements, and any other aspects of gate attendant duties, some of which may be specific to a particular position or PSA.
3. The contractor shall become familiar with campground policies and the rules and regulations that relate to Corps of Engineers lands ("Title 36"). If a violation is noted, the contractor is to make the first contact, keeping it friendly, and inform the person(s) of the violation. The contractor will not pursue enforcement. If a violation persists, the contractor will then contact a Park Ranger.
E. GATE ATTENDANT GENERAL DUTIES:
1. Gate attendants will perform specific duties daily to implement the reservation, fee collection, and campground management program in accordance with established procedures. Duties include, but are not limited to, the following:
a. Register/process campers with reservations. Check site availability for customers without reservations; assign walk-up sites or un-reserved campsites. Register using NRRS system to account for collection of fees. The contractor will utilize the NRRS computer program for all transactions whether a site has been reserved or not. This will include accepting credit cards and processing them through the NRRS system.
b. Collect and account for fees generated; maintain current on-site records. (May be required to collect day use fees in multipurpose PSAs) (See SS SOWs).
c. Sell Corps annual days use permits and America the Beautiful Passes as required by the Lake Manager. All monies, receipts, and registers for these sales will be handled and accounted for as instructed by the Lake Manager.
d. Provide on-site reservations through NRRS. The contractor shall not take advance reservations over the phone, but will provide advance reservation services for on-site customers, as directed by the instructions from NRRS and instructed by the POC.
e. Post reserved facilities. Post reservation signs or cones at picnic shelters, group camping areas, or individual campsites, as instructed by the COR, whether or not the facility is reserved through the NRRS.
f. Receive daily arrival reports.
g. Prepare and forward all associated reports and transmit funds through designated channels. (Instructions will be given during pre-work training sessions).
h. Inform visitors of proper use of park facilities, for example:
(1) Advise campers to utilize developed facilities only and not camp at undeveloped areas on the lake.
(2) Advise all visitors to park and operate vehicles or camping units only on paved surfaces or at designated overflow areas.
(3) Inform visitors about maintaining quiet hours.
i. Inform campers who did not vacate their site when expected, to return to the gatehouse to pay additional camping fees.
j. Inspect the PSA a minimum of two times each day during regular duty hours; scheduled at least 2 1/2 hours apart. At least one inspection should be scheduled just prior to quiet hours to ensure the fees for all occupied sites have been collected. Additional trips into the park may be necessary to physically post reserved sites.
k. To insure all fees are collected, additional surveillance may be required, especially during holiday periods, weekends or other heavy usage periods.
l. Report disturbances such as vandalism, harassment of visitors, rowdiness, speeding, or violation of quiet hours to Park Rangers, or if unable to contact them, to local law enforcement officers. All accidents will be promptly reported to the Park Rangers.
m. Keep a written log of complaints and criticism of park facilities, and provide this information to Park Rangers.
n. Other specific duties and procedures will be defined in written information and through the pre-work training provided by the Government.
o. Open and close gates to PUAs as specified in the SS SOW or as instructed by the COR.
May be required to open and/or close the gate in case of emergencies, at times other than their regular work shift coverage.
p. Open and close gates in nearby parks (contractor must furnish their own transportation as stated in the SS SOW).
q. Assist Park Rangers in maintaining quiet hours from 10 p.m. - 6 a.m. Advise campers who are already camped in the park or who are returning to the park that quiet hours are in effect. Advise Park Rangers of violations.
r. Direct late arrivals to overflow areas, other Corps of Engineers parks, or nearby commercial campgrounds.
s. Lock and secure the gatehouse after duty hours or at any time it is left unattended.
2. Amounts collected must balance to user permits issued or contractor will be required to reimburse the Government for any shortages or questionable loss of funds. Any loss is to be reported immediately to the Government "Recreation Fee Cashier". When checks are used for payment, the attendant will ensure that the check is completed in accordance with instructions from the NRRS service (or as instructed by the POC).
3. Gate attendants may utilize user fee monies to make change; however, personal cash may be needed to make change in some instances, especially at the beginning of a shift. Contractors are required to keep a change fund of their own money of at least $100 at all times, this requirement will be subject to unannounced audit.
4. The contractor will not make refunds or credits, but will accept such requests and refer them to the Lake Manager. A form will be provided to the customer to request a refund be mailed to them at a later date. Completed forms will be given to a Park Ranger.
5. Transmittal of Fees. Transmit fees in accordance with instructions from the NRRS or the POC. This function includes, but is not limited to, the following items:
a. Prepare transmittal forms.
b. Tabulate fees collected.
c. Convert cash collections into cashier’s checks for transmittal (at contractor’s expense) (or as otherwise specified in the SS SOWs)...
d. Mail or transport transmittal forms, cahiers checks, and personal checks to the proper location as instructed by the POC. If mailing directly to NRRS, shall be mailed during normal business hours (Monday-Friday) from inside the US Post Office facility or from Project Office.
e. Provide a copy of the computer generated deposit summary report (DSR) for each fee transmittal, and provide it, with a copy of the corresponding cashier's check and a copy of all personal checks to the Lake Office for verification and audit purposes each week or at the end of their shift.
f. Use fee collections will be transmitted as soon as possible when the total reaches $5,000, but no later than the morning of the next business day financial institutions are open (in the case of weekends and holidays). This will normally require submittals on Monday and Friday mornings.
g. Funds shall never exceed $5,000 before being remitted.
h. Funds shall not be held longer than one week, even if the total is less than $5,000.
i. On-hand funds and fee collection records will be subject to unannounced audits as deemed necessary by the Lake Manager.
6. Separate payment will not be made to the contractor for postage, time spent banking, cost of cashier's checks, transportation expenses associated with fee transmittal. Compensation for these items must be included as part of the contractor's quotation. (see SS SOW).
7. The contractor may be required to perform duties at times other than their normal shift. This may include, but not limited to, opening gates for emergencies or for persons already camped in the park, directing late arrivals to overflow areas, and closing/opening gates at specified times, which may include other nearby park areas. (See SS SOW)
8. May be required to accomplish some light duty tasks including, but not limited to, emergency shut-off of park utilities, reading traffic counters, and delivering messages to campers or other contractors.
9. May be required to mow the area in the immediate vicinity of the gate complex and trailer/camper site. (See SS SOW)
10. May be required to maintain existing landscape plantings in the PSA, to include planting, weeding, and watering. (Government furnished plant materials). (See SS SOW).
F. OTHER REQUIREMENTS:
1. While patrolling the campground or performing any duties under this contract, the contractor is required to wear either the vest provided or an approved clean red polo shirt (supplied by the contractor) with a specified patch or logo (provided by the Government) as a means of identification. Only caps provided by the Corps of Engineers may be worn while on duty. The wearing of this cap is recommended, but optional. The contractor may also be required to display vehicle identification while on duty (provided by the Government).
2. Possession of firearms in the gatehouse or in the park is prohibited, and will be grounds for immediate termination of the contract.
3. When reporting for or while on duty, being under the influence of/or consuming alcoholic beverages is strictly prohibited and will be grounds for immediate termination of the contract.
4. Illegal use of drugs, or possession of controlled substances, is grounds for immediate termination, whether or not it is during duty hours.
6. All work shall be conducted in accordance with the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. Copies are available at all lake offices, or on the Tulsa District website.
7. Smoking is not allowed inside, or within 50 feet, of the gatehouse.
8. Keep the gatehouse clean and sanitary at all times. Cleaning supplies shall be furnished by the contractor (unless otherwise specified in the SS SOW). Gatehouse cleaning includes sweeping, dusting, cleaning windows, doors and fixtures, and proper disposal of trash.
a. Trash shall be emptied daily.
b. Floor shall be swept and mopped daily.
b. All surfaces dusted at least once during each shift.
c. Windows will be cleaned monthly, at minimum.
d. Keep entrance & exit lane road free of unsightly debris, trash, litter, etc. This may be accomplished by broom, leaf blower or other method approved in advance by the POC (a hose & water will not be used unless instructed by the POC).
e. Keep exterior of gate house free of cobwebs or other debris. Stinging insect nests on the exterior of the gatehouse will be reported to the POC, Park Ranger, or lake office.
9. Radio and telephone equipment is for official business only, in accordance with FCC regulations and Corps of Engineers instructions. The public is not allowed to use the telephone, except in the case of an emergency (collect calls only).
10. Selling of personal items for monetary gain within the PSA is strictly prohibited. Such activity may be cause for termination of the contract.
SITE SPECIFIC FORT GIBSON
SITE SPECIFIC SCOPE OF WORK
2016 GATE ATTENDANTS
VARIOUS PUBLIC SITE AREAS (PSAs)
TULSA DISTRICT, US ARMY CORPS OF ENGINEERS
FORT GIBSON AREA
SOLICITATION NO.
05 November 2015
Locations:
OKLAHOMA
Fort Gibson Lake:
Blue Bill – Shift B
Flat Rock – Shift B
Rocky Point – Shift B
Tenkiller Lake:
Cookson Bend – Shift A
Cookson Bend – Shift B
Snake Creek – Shift A
Snake Creek – Shift B
Strayhorn Landing – Shift A
Strayhorn Landing – Shift B
FORT GIBSON LAKE
BLUE BILL – SHIFT B
GATE ATTENDANT SERVICES
POC for this location is Jim Montgomery, 918-682-4314.
In addition to the requirements stated in the GENERAL SCOPE OF WORK, the following work will be performed at this location.
1. Period of Performance is 1 April through 30 September.
a. Start work date is 5 April.
b. Work 5 days on/5 days off throughout the performance period.
c. Regular work hours are:
Sunday - Saturday Noon - 10 p.m.
2. PUA has 43 campsites, 1 group picnic shelter and 2 boat ramps.
a. Perform specific duties to implement the reservation program and submit paperwork and fees collected to NRRS. Contractor responsible for converting all cash funds collected to cashier’s check. Cost for cashier’s check will not be reimbursed. Contractor must maintain at a minimum $100 personal cash fund.
b. Copies of paperwork related to fee collection must be turned in weekly to the recreation fee cashier at the Lake Office.
c. Post reservation information daily (or as needed) at each individual campsite and group picnic shelter (a Phillips screwdriver will be needed for changing reservation markers).
d. Patrol park a minimum of 3 times during each shift. Additional patrols may be required to insure all fees have been collected, verify that reservation markers have not been changed by visitors and general security.
e. Gate house shall be kept clean at all times. No cleaning supplies will be furnished by the Government.
f. Weed and water flower beds at the gate house as needed. Contractor will supply all hand tools required for flower bed maintenance.
g. Government furnished office supplies will be limited to printer paper and toner, as well as, other supplies associated with the computer equipment. Additional office supplies required will be contractor furnished.
h. Contractor is required to open park entrance gate at 6 am and close and lock gate at 10
pm. Contractor may also be required to close gate from 9 pm to 10 pm to limit access to registered campers and visitors prior to locking gate at 10pm.
i. Remain onsite overnight during duty days to provide for security and emergency access.
3. Security bond will be $5,000 (as stated in “General Requirements”).
PRICING SCHEDULE
FORT GIBSON
BLUE BILL – SHIFT B
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, TERMS AND
CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
Unit Total Description Quantity Unit Price Amount
BASE ITEMS:
0001 2015 - 2016 Contract Period 90 DAYS $__________ $__________
Option 1:
1001 2016 – 2017 Contract Period 90 DAYS $__________ $__________
Option 2:
2001 2017 – 2018 Contract Period 90 DAYS $__________ $__________
TOTAL (CLINs 0001 through 2001) $__________
Contractor Name (printed) Signature
FLAT ROCK – SHIFT B
POC for this location is Jim Montgomery, 918-682-4314.
In addition to the requirements stated in the GENERAL SCOPE OF WORK, the following work will be performed at this location.
1. Period of Performance is 1 April through 30 September.
a. Start work date is 5 April.
b. Work 5 days on/5 days off throughout the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .