Amendment_0006.pdf
PDF 369 KB Posted
- Attached to
- Floating Plant Electrical and Electronic System Support IDIQ Federal contract opportunity
- Solicitation number
- W912BU19R0002
About this file
Amendment 0006
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Extend the proposal due date to 13 March 2019 in lieu of 6 March 2019.
2. Revised section C and section L spec sections.
3. Answ er questions from offerors. Questions that may be of general interest of all Bidders/Government w ill appear below . These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify thequestion(s). Questions and answ ers are issued to the Offerors for information purposes only.
All other terms and conditions shall remain unchanaged.
Oferors must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended). FAILURE TO ACKNOWLEDGE
AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR PROPOSAL
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Feb-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU19R0002
X 9B. DATED (SEE ITEM 11)
16-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Feb-2019
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
e5ct9man Typewritten Text e5ct9man Typewritten Text e5ct9man Typewritten Text e5ct9man Typewritten Text e5ct9man Typewritten Text
W912BU19R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTION AND ANSWERS
Question No 1.
On page 36 of the attachment in "Section 10. Hoisting Winch Controls And Monitoring" it states the pilothouse hoist winch control panel will be replaced and the local hoist winch controls and indication lights shall be retained.
Based on inspection from vessel visit, it appeared that there are new controls in the Pilot House and that the local controls were old and really part of the original winch installation. Should the intent be that the Pilot House controls would be retained and that the local would be replaced? Can you please confirm intent?
Answer No 1.
The intent for the Hoisting Winch Controls shall be kept as specified in the Solicitation.
Question No 2.
What is the reasoning behind the 15 min thermal capacity for the drum brakes? This requirement greatly increases the size and cost of the braking system. The hoist has regenerative braking through the VFD, so if the regenerative braking was not functioning, the VFD would most likely also not be functioning, if the VFD is not functioning, the motor cannot lift the load, which means the drum brake would only have to safely lower the load one time. The regenerative braking will also be much safer and easier for the operator to control, since the operator could not accidentally cause a runaway situation when using regenerative braking, but lowering the load by partial release of the brakes could cause a runaway situation especially if the operator allows the line speed to exceed the limits of the hoist.
Answer No 2.
The requirement for the 15 minute thermal capacity for the drum brake will remain as specified in the Solicitation.
Question No 3.
The specification states " the new winch shall be rated for 22,374 lb. line pull at a line speed of 400 fpm across all layers." If the hoist was sized to meet the 400 fpm and 22,374 lb line pull on all layers, a 500 hp motor would need to be used. We suggest using a 300 HP motor, which would give the following ratings: (8th layer 22,374 lb line pull @ 400 fpm) and (1st layer 22,374 lb line pull @ 245 fpm). The first layer line pull would be electronically limited by the VFD to achieve these ratings.
Answer No 3.
The requirement for line pull of 22,374 lbs is based on worst case conditions calculated for the ladder on the dredge. Using this line pull requirement, and accounting for inefficiencies in the motor and gearbox assemblies, the Government has determined that approximately 320 horsepower will be the actual power consumption requirement from the new system. However, the government recognizes that the requirement for constant line speed and line pull across all layers, requires an oversized motor in order to meet the torque requirements when the wire rope is on the outer layer of the winch. Even with the larger motor however, the actual power consumed will remain less than the 320 horsepower determined above. As a result, the requirement shall remain as stated in the Solicitation.
Question No 4.
For the factory acceptance test, we request that the USACE considers allowing the hoist to be tested on a single layer instead of all layers. The test could be performed on the 1st layer, outermost layer, or any layer in between.
This would still adequately prove that the hoist can meet the duties requested by lifting the rated load at the RPM required to meet the specified 400 fpm line speed.
Answer No 4.
As part of Amendment 0006, specification Section C001A.B.13.b-Factory Acceptance Testing, has been revised to only require testing at the outer most layer of the winch.
Question No 5.
Request for clarification on brake testing. Will the brake test need to prove that the drum brake can handle the full 15 minutes of braking or just that the brakes can handle the required loads?
Answer No 5.
Demonstration of the 15 minute brake thermal capacity is not required.
Question No 6.
Given our only recent ability to visit the dredge and the large technical questions that are still open on these custom winches, we request an extension of two weeks for the final proposal.
Answer No 6.
The Government has extended the proposal due date to 13 March 2019 in lieu of 6 March 2019.
Question No 7.
Does USACE have technical manuals for both the hauling and hoist winches?
Answer No 7.
The manual for the hauling winches was provided as “Dredge JADWIN Hauling Winch Manual.pdf” in Amendment 0001 of this Solicitation. A hoist winch manual is not available.
Question No 8.
After confirming that there is not a current hydraulic power unit for the brake and clutch systems, is an HPU required for the Seed Task Order, or can we keep the system pneumatically controlled?
Answer No 8.
The hauling winch brake and clutch systems shall retain the existing systems pneumatic control.
Question No 9.
If the Class H+ insulation motor is unavailable for purchase, is the Class H acceptable?
Answer No 9.
Class H insulation is acceptable. As part of Amendment 0006, specification sections C001A.B.4 – AC Electric Motor and C001A.C.4 – AC Electric Motor have been revised to require class H insulation with class F temperature rise rating based on a 50 degree C ambient temperature.
Question No 10.
With regards to the 70 pages for Volume I, is this single pages or double sided (as in, 70 pages total with front and back content of 140 page number count with 70 physical sheets)?
Answer No 10.
Both sides of a sheet of paper count toward the 70 page total if printed double sided, i.e. 1 sheet of paper totals 2 pages.
Question No 11.
Are the USACE drawing revisions that will be provided upon contract award available in Autocad, PDF or a scanned
PDF?
Answer No 11.
All drawings will be provided in Autocad except for the Dredge JADWIN Monitoring System Retrofit drawing.
Question No 12.
Can Volume I, Tab 4b Test Plans be included as an Attachment instead of inside this tab to not count against the page count? The Test Plans are extensive and lengthy and would prefer to reserve page count for the explanatory information vice the sample Test Plans we provide.
Answer No 12.
The abridged sample of a testing plan and Operations & Maintenance Manual provided for a similar project which is required in Volume I, Tab 4b, does not count towards the maximum page limit. This will be revised in Amendment 0006.
Question No 13.
Can resumes be included as an Attachment, not to be counted in the overall page count?
Answer No 13.
Resumes counted toward the total overall page count for Volume I.
Question No 14.
Can the O&M manual be included as an attachment and not inside Volume I, Tab 4b to not count inside the maximum page limit?
Answer No 14.
The abridged sample of a testing plan and Operations & Maintenance Manual provided for a similar project which is required in Volume I, Tab 4b, does not count towards the maximum page limit. This will be revised in
Amendment 0006.