Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Provide questions and answ ers as of 22 Jan 19.
2. Amend solicitation Section C, paragraph C001A.B.13.b. FACTORY ACCEPTANCE TESTING.
3. Provide reference draw ing "DREDGE JADWIN HAULING WINCH" that w as inadvertently omitted from the solicitation.
4. Amend solicitation Section J, paragraph J01 REFERENCE DRAWINGS, to add (2) additional draw ings.
All other terms and conditions shall remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 51
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU19R0002
X 9B. DATED (SEE ITEM 11)
16-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jan-2019
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU19R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
Questions and Answers
Q1. Can we have an arrangement drawing of the existing hoisting winch?
A1. Yes. The drawing is provided with amendment 2.
Q2. Can we have the winch room arrangement and/or a machinery arrangement drawing?
A2. Yes. The drawing is added to Section J in amendment 2.
Q3. Paragraph C001A.B.13.b. FACTORY ACCEPTANCE TESTING requires: “The Contractor shall create a no load test system to demonstrate the winches rated capacity at rated line speed at all layers, and a brake test to demonstrate the operation of the braking system at rated capacity.”
Please describe how you envisioned testing the capacity of the winch with no load?
A3. Section C, Paragraph C001A.B.13.b. has been amended to change this verbiage.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SPECIFICATIONS
Section C – Descriptions and Specifications
C000 GENERAL
C001 CONTRACT OVERVIEW
The Marine Design Center of the U.S. Army Corps of Engineers (USACE) has issued this solicitation for an
Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC). The MATOC contract resulting from this solicitation will support work assigned to the Philadelphia District (NAP) and Marine
Design Center (MDC), U.S. Army Corps of Engineers (USACE), for Electrical and Electronic System Support of existing USACE floating plant nationwide.
C002 DESCRIPTION OF WORK
The USACE currently owns and operates a significant amount of floating plant consisting of approximately 2,500 different vessels. The age of the vessels varies widely, however the majority of all floating plant is at least 15 years old and still operating with the equipment that was installed during original construction. As a result of the age of the vessels, the onboard power, control, monitoring and alarm systems and equipment require replacement several times over the life of the floating platform. In some cases, vessels have undergone planned upgrades to newer systems and components which increases reliability, however it also increases system complexity in operation and maintenance. In other cases, where the condition of the hull and other systems is also in need of significant repair, many vessels have been replaced with newer vessels operating newer electronic systems.
In all cases, equipment operating life, component support, and unpredictable reliability becomes more of an issue with age of the system. Additionally, the complexity of the electronics systems installed in new vessels and retrofitted in existing vessels and their effect on the overall safe operation of those vessels necessitates installation or oversight of installation by recognized system integration experts.
The MATOC contracts will provide Electrical and Electronic System Support for maintenance, upgrade, alteration, and retrofit of existing USACE floating plant. This contract will provide complete turn-key system integration services, including but not limited to the following disciplines:
Program Manager
Project Manager
Electrical/Electronic Design Personnel
Automation Design Personnel
PLC/HMI programmer
Field Installation/Service Personnel (Electronic technician)
Field Commissioning Personnel
Marine Electricians
Supporting Trades (welder, pipefitter, mechanic)
Arc Flash Software Personnel
CADD/Solidworks Technician
Support Staff (administrative, procurement, etc.)
Utilizing the disciplines identified above, the work to be performed under this Contract will included, but not be limited to, the following:
Furnishing, installing, commissioning, and troubleshooting marine variable frequency drive systems including motors
Furnishing, installing, commissioning, and troubleshooting AC power systems including low & medium voltage switchboards, distribution panels, circuit breakers, motor controllers, and transformers;
Furnishing, installing, commissioning, and troubleshooting marine control, monitoring and alarm systems;
Pulling, terminating, tracing, ringing-out, labeling, and documenting shipboard power and control wiring, including fiber optic;
Marine electronic system integration and commissioning services;
Marine project management and integration services as related to technical work identified herein;
PLC programming and troubleshooting services;
DC power systems including SCR drives and large battery banks;
Troubleshooting and resolution of marine equipotential bonding systems, ground faults, and stray current;
Integration of navigation and communication networks, equipment, and systems;
Marine arc flash hazard, short circuit, circuit breaker coordination analyses including other ancillary engineering to support the work performed under this contract
Programming using specialized PLC and HMI programs from manufacturers such as SIEMENS, GE, Allen-Bradley, ABB, etc.
Use of EasyPower software or similar for arc flash analysis
Use of 3D CAD software for design development.
Application of current marine and electrical standards (ABS, USCG, IEEE-45, NEC, etc.), regulations, guidelines, and procedures
Marine electrical and electronic system integration and project planning. This includes a systematic, comprehensive approach incorporating multiple disciplines, procurements, and services for the purpose of retrofitting floating plant and meeting schedule and budget objectives.
This contract will address a wide range of potential tasks similar, but not limited to, the following:
Replacement of a dredge pump or propulsion system and auxiliary power and control components. This type of task would require demolition of the aged existing system and components to be replaced; design of the replacing system, including regulatory body approval, if necessary; procurement or manufacture of the new drive and control components; integration of those components to function efficiently together and with existing components; testing of the new systems to include builder’s trials, dock trials, and sea trials
(if necessary); and submittal of as-built drawings, test documentation, and operation and maintenance manuals of the new system.
Replacement of monitoring, alarm, and control systems. This type of task would require demolition of the aged existing monitoring, alarm, and control system to be replaced; design of the replacing system, including regulatory body approval, if necessary; procurement of new control components including all lights, pushbuttons, switches, terminal boards, control components, displays, and consoles; integration of those components to function ergonomically; testing of the new systems to include builder’s trials, dock trials, and sea trials (if necessary); and submittal of as-built drawings, test documentation, and operation and maintenance manuals of the new system.
Troubleshooting and resolving: 1) Faulty electrical power, control and fiber optic wiring; 2) Faulty PLC programming code; 3) Ground faults, stray current, and bonding system problems; and 4) Communication and Navigation network issues.
Furnishing and installing new or replacement marine AC and DC switchboards including the engineering analyses for short circuit, arc flash hazard, and coordination studies associated with the replacement.
C003 DESIGN AND INSTALLATION STANDARDS
All work performed under this Contract shall be in accordance with the latest edition and interpretations of the rules, regulations, and requirements and standards of the legislation, regulatory agencies, and technical organizations listed as follows or as stipulated in the respective specification clause:
American Boat and Yacht Council (ABYC) – Standards and Technical Information Reports for Small Craft
– Section E – Electrical Division – Rules as applicable based on vessel particulars
American Bureau of Shipping (ABS) - Rules below as applicable based on vessel particulars -o Rules for Building and Classing Steel Vessels o Rules for Building and Classing Steel Vessels Under 90 Meters (295 Feet) in Length o Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways o Rules for Building and Classing Steel Barges
46 CFR - Subchapters below as applicable based on vessel particulars -o Subchapter C – Uninspected Vessels o Subchapter D – Tank Vessels o Subchapter H – Passenger Vessels o Subchapter I – Cargo and Miscellaneous Vessels o Subchapter K – Small Passenger Vessels Carrying More than 150 Passengers or with Overnight
Accommodations for more than 49 Passengers o Subchapter M – Towing Vessels o Subchapter T – Small Passenger Vessels (Under 100 Gross Tons)
46 CFR Subchapter J – Electrical Engineering
U.S. Army Corps of Engineers, Publication No. EM 385-1-1, “Safety and Health Requirements Manual.”
(http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf)
U.S. Army Corps of Engineers, Publication No. ER 385-1-100, “Safety and Occupational Health: Arc Flash
Hazard Program”
(http://www.publications.usace.army.mil/Portals/76/Publications/EngineerRegulations/ER_385-1-
100.pdf?ver=2014-11-20-123724-203)
Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE-45 – Recommended
Practice for Electrical Installations on Shipboard.
Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE-519 "Recommended
Practices and Requirements for Harmonic Control in Electrical Power Systems"
Illuminating Engineering Society, “Recommended Practice for Marine Lighting”
National Electric Code (NEC)
C004 CLASSIFICATION & CERTIFICATION
A. REVIEW AND CLASSIFICATION BY REGULATORY BODIES
The Contractor shall be responsible obtaining necessary regulatory body reviews and approvals, obtaining necessary inspections and onsite surveys, and for the certification and classing of the work performed under this Contract.
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
Specific requirements for regulatory body reviews and approvals will be identified in each task order. Typically, the task order will require that the design be reviewed and approved by the regulatory bodies governing the vessel. In some cases, that will require involvement by USCG to maintain the vessel’s Certificate of Inspection, ABS to maintain the vessel’s class, etc. In other cases, ABS may be able to review on behalf of other regulatory bodies and act as a third party reviewer.
The recommended ABS point of contact is Rich Delpizzo, who can be reached by phone, email or mail, at: (703)
519-9233, Rdelpizzo@eagle.org, or 1525 Wilson Blvd, Suite 600, Alexandria, VA 22209.
For coordination with regulatory bodies, the vessel owner contact information will be provided in each task order.
B. ABS ENGINEERING MANAGER ACCESS & DISCLOSURE
The Marine Design Center (CEMDC) will be the “Owner’s Representative” for all work performed under this
Contract and all correspondence with ABS shall be made available to the COR. In order to facilitate the communication process and reduce the paperwork burden on all parties, the contractor, and all sub-contractors, shall utilize the ABS Eagle Construct Engineering Manager Portal (02E) for all drawing submittals and correspondence.
The contractor and all sub-contractors shall make the necessary arrangements with ABS to ensure that the Marine
Design Center is granted the following Oversight Permissions for this contract:
View project and drawing status
View comments
View transmittals
Download approved drawings and review letters
E-mail notification of approval
E-mail notification of transmittal
Status
Disclaimer
The Marine Design Center’s ID/WCN number is 615255 and the point of contact with respect to the ABS
Coordination/Engineering Manager Portal (02E) is Mr. Tim Keyser, Timothy.J.Keyser@usace.army.mil, phone:
(215) 656-6171.
The Contractor shall ensure that, as a part of its contract with ABS, the contractor authorizes ABS to disclose to and discuss with the Army Corps of Engineers any Rule or certification criteria issues, design assumptions and their impact on classification and certification, and any other technical considerations on which classification is to be based or which may affect future classification or certification of the vessel.
The Contractor shall authorize ABS to provide the Army Corps of Engineers at its request with a copy of all correspondence related to classification, statutory certification or other compliance verification for which ABS is responsible as it is promulgated and initially distributed. This is to include drawings and other engineering work requiring ABS approval as well as correspondence generated which relates to such approvals, including all such correspondence dealing with vendors.
In addition, the contractor shall copy the Army Corps of Engineers with correspondence regarding classification, statutory certification and other compliance verification for which ABS is responsible. The contractor shall also authorize ABS to establish and maintain contact with other certification, verification and compliance agents involved on the vessel.
Upon request by the COR, the Contractor shall request ABS to furnish the Government with the project comment list. The list shall include open and closed technical and surveyor comments. The surveyor comments shall not only include comments generated during the drawing review process, but also comments generated by the ABS Surveyor during onsite inspections. The comment list shall be sent directly from ABS to the COR via email as a .pdf file.
mailto:Rdelpizzo@eagle.org mailto:Timothy.J.Keyser@usace.army.mil
At the completion of the ABS review process, the contractor shall download all ABS “Eagle Stamped” drawings and provide them on a CD or DVD to the Government in .pdf format.
C005 CONTRACT AND REFERENCE DRAWINGS
During the placement of individual task orders under this Contract, the statement of work will often include Contract and/or Reference Drawings.
Contract Drawings are provided with specifications for bid purposes and are intended to represent a final design, or provide the contractual basis for the Contractor to develop the final design. All features of the Contract Drawings must be complied with.
Reference drawings are intended to provide useful information that may have application to the procurement. The exact details presented in the reference drawings may not reflect the specific needs of the vessel, but present the contractor with a methodology to develop a specific system or design feature as identified in the specification. The
Contractor shall not build from any reference drawings.
Although the Contractor’s design responsibility will be specific to each task order, it is typically the responsibility of the Contractor to use the written specifications and the contract and reference drawings to properly develop the final design and engineering drawings in order to complete the work.
C010 DEFINITIONS
The following definitions are applicable to phrases and acronyms used throughout this contract.
ABS – American Bureau of Shipping
COR - Contracting Officer’s Representative is a member of the contract management and quality assurance team authorized by the Contracting Officer to perform certain administrative and managerial duties. A copy of the COR’s authority letter is furnished to the Contractor.
GFE - Government Furnished Equipment - Equipment or components furnished by the Government to the
Contractor for installation aboard the vessel by the Contractor.
K.O. - The Contracting Officer.
MDC – Marine Design Center of the USACE
QC - Quality Control - Quality Control is a function of the contractor. Refer to clause E03. Quality
Assurance (QA) is a function of the Government.
USACE - Acronym for United States Army Corps of Engineers.
USCG - Acronym for United States Coast Guard.
Detail Design – includes the development of detailed working (production level) plans that will serve as the installation and construction instructions to the installers (welders, machinery vendors, electricians, electronic technicians, etc). Upon completion of the Detail Design, the plans are no longer to be interpreted, adjusted, or corrected by any other engineer. The plans must unequivocally define the desired end result and be producible and operable.
Depending on the scope of work of each Task Order, the contractor may be required to perform engineering for the development of cable routings, breaker sizing/settings, heat transfer, arc flash, design of foundations to suit selected equipment, system arrangements, material lists, purchase specifications, detailed design drawings (refer to SNAME definition), shop drawings, construction details, submittals to regulatory bodies, "as built" drawings, and other technical development necessary to support production practices.
C025 CONTRACTOR QUALITY STANDARDS
A. GENERAL
The contractor shall be responsible for the installation, commissioning, and troubleshooting of complete and functioning systems and equipment onboard each vessel.
Inspection by the Marine Design Center is for the purpose of verifying the proper function of the contractor’s quality control measures and is not to be used as a substitute for control of quality by the contractor.
Every effort shall be made during production planning to modify the vessel in an efficient sequence minimizing re-work and repair. Care shall be taken to assure the latest revisions of the Final Design plans are being used.
B. STRUCTURAL MATERIALS
Unless otherwise specified or noted on the contract drawings, all structural hull material shall be in accordance with the following specifications:
American Bureau of Shipping (ABS), “Rules for Building and Classing Steel Vessels” and “Rules for
Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways”.
Welding Materials - ABS “Approved Welding Electrodes, Wire-Flux and Wire Gas Combination”.
Bolts, nuts and screws – ASTM A307-82, Specification for Carbon Steel Externally and Internally
Threaded Standard Fasteners.
C. STANDARD PARTS AND MATERIALS
All articles, fittings, equipment, machinery, supplies, and materials used in the construction and outfitting of the vessel shall be new, free from defects and imperfections, and be the standard product of reputable manufacturers, to the maximum extent practicable. All items shall be suitable for workboat application and meet the latest requirements of standard specifications published by National Agencies. No salvaged materials shall be used in the works. Spare parts and service shall be readily obtainable.
D. WORKMANSHIP
All labor shall be especially skilled for each kind of work and under competent direction.
Where work of one trade joins, passes through, or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damage of previously acceptable construction shall be cause for rejection. All parts of the vessel intended to join or bear upon other parts shall have complete and solid contact and shall fit together without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit.
All holes for machinery mounting bolts shall be drilled or punched; burning is not acceptable. Holes in members having sharp curvature shall be avoided.
E. WELDERS
Note – The requirements in this paragraph (paragraph E.) apply only to welding on significant structural components such as equipment foundations, installation of steel plate or angle, etc. The requirements do not apply to minor welding for installation of electrical brackets, wireways, etc.
All welding under this contract shall be done only by welders who have successfully passed qualification tests accepted by the American Bureau of Shipping or other regulatory agency acceptable to ABS. The contractor shall bear the expense of conducting these tests and shall certify, by name to the Contracting Officer, welders who have successfully passed the prescribed tests and hold current, valid certifications.
The contractor shall require any welder to repeat these tests when in the opinion of the Contracting Officer’s
Representative, the work of the welder indicates a reasonable doubt of his proficiency. In such cases the welder shall be re-certified as above if he successfully passed the retest; otherwise, he shall be disqualified until he has successfully passed the retest.
The contractor shall maintain records of the individual welder’s certification during the course of the contract. The records are to be available for examination upon request of the Contracting Officer or his representative.
F. WELDING
All welding shall be in accordance with the current rules of the American Bureau of Shipping, except where stated otherwise. All welding equipment used on the work shall be of a modern type subject to close control. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld, and be approved by
ABS.
The contractor shall employ appropriate welding procedures and grounding connections to preclude the possibility of damaging electrical and electronics equipment onboard the vessel.
A detailed description of all welding procedures being employed in the construction shall be available to the
Contracting Officer or his authorized representative.
G. INSTALLATION
Materials and equipment shall be installed in accordance with the approved recommendations of the manufacturer, and in compliance of this specification and the contract documents. The installation shall be accomplished by workmen especially skilled for each kind of work and under competent direction.
H. CONSTRUCTION STANDARDS
All material, machinery and equipment shall be new, of current manufacture and suitable for the marine service intended. Spare parts and service shall be readily obtainable.
All material, unless otherwise specified in these specifications or in the drawings, shall be of commercial quality to
ASTM, ANSI, or SAE specifications.
During construction and before delivery, the contractor shall be responsible for protection of all material, equipment, etc., intended for the vessel.
All materials shall be free of imperfections due to manufacturing processes and from defects which adversely affect appearance or serviceability.
C030 PROJECT PERSONNEL
The requirements for personnel will differ for each Task Order and shall be specifically identified in the statement of work negotiated for the Task Order. However, the following list of qualifications generally reflect the personnel requirements associated with these types of activities. The Contractor shall not replace key personnel proposed and accepted by the Contracting Officer for the specific Task Order without the prior approval of the Contracting
Officer.
Program Manager
Project Manager
Electrical/Electronic Design Personnel
Automation Design Personnel
PLC/HMI programmer
Field Installation/Service Personnel (Electronic technician)
Field Commissioning Personnel
Marine Electricians
Supporting Trades (welder, pipefitter, mechanic)
Arc Flash Software Personnel
CADD/Solidworks Technician
Support Staff (administrative, procurement, etc.)
C600 MACHINERY
C601 GENERAL REQUIREMENTS
All machinery and piping systems related to electrical installations shall be in accordance with the regulatory bodies and design and installation standards referenced in contract Clauses C003 and C004, and shall also comply with additional regulatory bodies where specified. References made to specific sections of codes, rules and standards in these specifications are intended to emphasize specific salient items.
All equipment shall be suitable for marine service and the intended application.
Machinery guards shall be provided over all rotating and hazardous machinery. The guarding shall be consistent with that required by the U.S. Army Corps of Engineers, “Safety and Health Requirements Manual.”
Manufacturers’ recommendations, concerning fabrication and installation, shall be followed in addition to these specifications.
The piping requirements in this section are included since piping may be required for auxiliary support of electrical equipment (i.e. cooling).
B. PRESSURE & TEMPERATURE GAUGES
Pressure and temperature gauges shall be provided for system operability.
All pressure gauges shall give readings in psig and all temperature gauges shall give readings in degrees Fahrenheit.
The gauges shall be selected so the operating point is in the middle of the gauge range. All gauges shall be fitted with gauge isolation valves.
Temperature gauges shall be provided on all piping that transfers a medium in excess of ambient temperature.
C. PIPING – GENERAL REQUIREMENTS
The use of the designation “line” in this specification is defined as all pipe, fittings, and valves in a piping run between the points indicated.
A sufficient number of unions and/or flanges shall be installed in all pipe lines to permit dismantling of the lines and equipment. Valves shall be installed in sufficient quantity to isolate any piece of equipment in the systems.
Sufficient drains shall be provided to permit draining of all lines within the vessel in an even trim condition. The drains shall be provided at low spots in the piping, located so that they will be readily accessible. Drains ½ inch minimum, shall be provided at the lowest points in each water system, consisting of a nipple and valve with a threaded brass plug. The water piping runs shall be arranged to facilitate complete draining (no loops or water traps), and suitably located hose connections (with plugs) shall be installed for blow-down with compressed air.
All fluid fill points shall be located in areas that are easily accessible and potential fluid spills shall be collected in containment coamings that shall be easy to drain and clean. All fluid fill/transfer/pump-out containments shall have a drain that is connected to the waste oil collection system.
Pipes passing through watertight or oil tight bulkheads shall be made of extra heavy pipe in that section, in way of the penetration and the bulkhead or deck shall maintain its integrity. Where pipes pass through watertight bulkheads or decks, the penetrations shall be watertight. All such penetrations and deck openings shall be suitably designed and reinforced in accordance with NSRP 0490 (referenced in contract Clause C003).
Heat sensitive materials shall not be used in piping systems that penetrate watertight subdivisions where deterioration of such systems would, in the event of a fire, impair the watertight integrity of such bulkheads. Copper tubing that penetrates watertight bulkheads and decks shall use a suitable stuffing tube. Spool pieces with flanges shall be provided for all galvanized pipe penetrations to prevent the destruction of galvanizing due to welding.
All piping exposed in unheated spaces or to the weather and carrying fluids that can freeze shall be insulated and electrically heat traced, except that the raw water piping may operate as a dry system when not pressurized. Freeze protection shall be provided by installing drain connections with ball valves at all low points in all piping systems carrying fluids that can freeze.
All piping shall be coated and colored to match surroundings in accordance with the space that it is routed through.
All piping, machinery and equipment shall be marked as stated in contract Clause C460 and paragraph C601 (H).
D. PIPING – SPECIFIC REQUIREMENTS
All piping shall be schedule 40, ASTM A-53, Type S or E except where otherwise indicated on drawings or in these specifications.
All piping between the side shell and the first inboard valve shall be a minimum of schedule 80. Fasteners for valves at the hull connections and sea chests shall be stainless steel. All tank penetrations shall be through schedule
80 welded couplings unless specified elsewhere.
Manually operated valves shall be readily operable by one person, directly or through mechanical advantage type operators.
No cast iron valves or wafer valves shall be used at shell connections.
Remotely operated valves shall also be operable locally. All valves must be outside stem and yoke (OS&Y) and rising stem type or fitted with open/close indicators. They shall be clockwise closing.
Check valves shall be of a type best suited for the service condition, especially the flow velocity to ensure that the valve will fully open. A check valve shall be installed where a reversal of flow is possible and would be detrimental to proper functioning of the system, or might be injurious to equipment.
Gate valves are intended to be fully open or fully closed and shall not be used for throttling the flow.
All lines leading to the overboard discharges shall be angled downward sloping 45 degrees or better toward the water line.
At the written request of the Contractor, the Government will consider the use of grooved mechanical pipe joining systems and valves for the cooling systems, potable water system, sewage system, vents and sounds, and drainage system. The pipe joining system must be ABS approved and specific system drawings shall be updated to reflect the pipe joining system components, and resubmitted to ABS for review and approval. COR has final authority on the use and implementation of grooved mechanical pipe joining systems. When grooved mechanical pipe couplings are used on roll grooved, the grooving tool shall be of the same manufacturer as the pipe couplings, and a spare grooving tool provided with the vessel.
At the written request of the Contractor, the Government will consider the use of mechanical press pipe joining systems for the potable water system. The pipe joining system must be ABS approved and specific system drawings shall be updated to reflect the pipe joining system components, and resubmitted to ABS for review and approval.
The COR has final authority on the use and implementation of mechanical press pipe joining systems. When mechanical press pipe couplings are used, the press tool shall be of the same manufacturer, and a spare press tool with the appropriate size clamps provided with the vessel.
E. PIPING ROUTING
The contractor shall be responsible for routing all piping as directly as practicable; shall not interfere with machinery access or handling gear; and shall be sufficiently flexible and supported to account for thermal expansion, shock, vibration and the working of the vessel. Wherever practicable, piping shall be run below the grating or sole level.
No piping runs shall be made through access openings. Where piping penetrates structure, the strength of the structure shall be restored (refer to NSRP 0490 for specific details on penetrations).
The contractor shall make every attempt with regard to field routing of piping to preserve headroom and access in the spaces.
Piping shall not be run over or in the vicinity of switchboards, distribution panels, or other electrical equipment unless unavoidable, in which case flanged joints, valves, etc. shall not be installed in the vicinity.
Piping conveying flammable materials shall not be routed adjacent to or over hot surfaces unless unavoidable, in which case adequate shields shall be provided.
F. PIPE HANGERS
Rigid hangers shall be designed and located in accordance with ASTM Standard Practice for the Design and
Installation of Rigid Pipe Hangers, F708-92 (2014). The hangers shall safely support the weight of the piping, its operating or test fluid (whichever is heavier), and its insulation and lagging (where installed).
The number of supports installed, the type selected and their location shall prevent excessive vibration of piping under all system operating conditions, but they shall not constrain the piping to such an extent as to cause excessive transfer of load from support to piping or from support to support.
The locations and type of supports selected shall be to prevent excessive stress from being transmitted by the piping to machinery, equipment, or ship structure.
Hangers for copper pipe or tubing shall be lined with plastic. Non-ferrous metal pipes shall be insulated from direct contact with any steel structure.
G. PIPE CLEANING
All piping, piping appurtenances and applicable equipment shall be thoroughly cleaned after fabrication and prior to installation in the vessel. After complete installation, each system shall be thoroughly cleaned and flushed of all foreign matter with the applicable system’s medium, or an approved substitute.
System flushing shall be conducted at the applicable system’s maximum operating pressure and temperature, and above normal line velocity. However, prior to flushing operations, such units as heat exchangers, and control valves, having in-line mechanisms capable of trapping or being affected by the carryover of foreign matter, shall either be removed or blanked-off and bypassed.
H. PIPE MARKING
The contractor shall mark all piping in the vessel to indicate its service and usage in accordance with the contract drawing. The pipes shall be marked at each termination and at each watertight bulkhead penetration to indicate service and flow direction. Piping shall also be marked at the midpoint of long compartment runs.
Standard markers, color bands and flow arrows, similar to those available from Graphic Products DuraLabel system, may be used.
Label plates shall be attached to all valves and pumps to indicate the system and function of the equipment.
For valves, the label plates shall be installed over the stem of the hand wheel, where possible, and shall indicate the direction of opening (or closing). The nameplate shall be 14 gauge (or heavier) brass with ¼ inch high engraved letters filled with black paint.
C700 ELECTRICAL
C701 GENERAL REQUIREMENTS
The design, construction and installation of all system components shall be suitable for marine service and the intended application. All system components shall be furnished new and unused.
All machinery, equipment, materials, designs, and installation shall be in accordance with the regulatory bodies and design and installation standards referenced in contract Clauses C003 and C004, and shall also comply with additional regulatory bodies where specified. All of the equipment furnished shall bear the approval of the
Underwriters Laboratories, where applicable. Contract references to specific sections of codes, rules and standards in these specifications are intended to emphasize specific salient items.
The design ambient temperature for all electrical equipment in machinery spaces shall be 50 degrees C and all current carrying conductors shall be copper.
All controllers and equipment indicators shall be installed in weathertight enclosures, unless otherwise required in the specification.
Equipment shall be located and oriented as conveniently as practicable for operation and maintenance. All equipment shall be accessible for removal, servicing and adjustment without dismounting or removal of other equipment.
Equipment shall be treated to provide protection against corrosion, moisture, mold, and other destructive agents to which the equipment may be exposed.
All panels, switchgear, relays, contactors, circuit breakers, motor starters, receptacles, etc., shall be similar to those manufactured by Square D.
The contractor shall provide a grounding conductor for all installed electrical equipment which shall be grounded to an isolation ground bus at each panel. Switchboard frames shall be grounded to the vessel structure.
The conductivity of connections shall not be less than the conductivity of the connected cable. All bolts, screws, nuts, and washers shall be made of corrosion-resistant metal of adequate size for their functions. Lock washers or equivalent shall be used to prevent loosening of bolted connections throughout the electrical system.
C702 ELECTRICAL EQUIPMENT & CABLING MARKING
A. DESIGNATION SYSTEM
All designation of circuits, panelboards, nameplates, etc. shall be in accordance with Annex B of IEEE Standard 45.
B. EQUIPMENT MARKING REQUIREMENTS
All electrical equipment shall be provided with standard label plates indicating manufacturer, model number, and electrical characteristics (operating voltage, phase, amperage, etc.). The nameplates, serial number plates, identification tags, etc. that are installed on the equipment shall remain in place on the equipment as furnished by suppliers. The contractor shall use caution during construction to not damage or paint over nameplates or tags.
Damaged nameplates or tags shall be replaced prior to Final Acceptance.
The contractor shall install identification labels for all equipment. All nameplates and notices shall be stamped or engraved on brass or plastic plates. All weather exposed nameplates, notices, and markings shall be of brass. See contract Clause C460.
All distribution panels shall be labeled with designation plates. All breakers in the distribution panels shall be numbered and the panel identification cards filled out to identify the breaker’s service. The panels and their breakers shall be marked in accordance with USCG, 46 CFR, subchapter J, paragraph 111.40-11.
All receptacles shall be labeled with the supplying panel designator and circuit breaker number (example: L1-14).
All other controls, gauges, switches, etc., shall be labeled with phenolic label plates to permit operation of the vessel.
C. CABLE MARKING REQUIREMENTS
All interconnecting cables and wiring shall be marked at each termination and at each watertight bulkhead or deck with circuit or system identification. Power distribution wiring shall be marked to indicate phase and polarity. All cables shall be suitably identified throughout their length with cable tags identifying the circuit designation.
The tags shall be fabricated from strip aluminum or bronze with raised lettering and shall be securely fastened to the cable by banding with metal bands.
D. IDENTIFICATION OF MOTOR CONTROLLERS
Each motor controller and motor control center shall be marked in accordance with USCG, 46 CFR, subchapter J, paragraph 111.70-3(d).
E. SHORE POWER IDENTIFICATION
Shore power receptacles shall be provided with an identification plate in accordance with the ABS River Rules (Part
4, Chapter 5, Section 2, paragraph 7.7.5).
C705 AC ELECTRICAL SYSTEMS
When required by the task order, the contractor shall provide and install AC electrical systems for the vessel.
Depending on the requirements of the task order, the contractor may be required to develop a detailed AC electrical system design.
In most cases, the AC electrical system will consist of a primary power system rated as a 600 or 480 volt AC, 3-phase, 3-wire, 60-Hz ungrounded system. Power to this system will typically be supplied by the generator sets or through shore power.
The generator sets for the primary power system may be set up for parallel and/or split bus operation.
The AC electrical system may also include a secondary power system rated as a 208Y/120 volt AC, 3-phase, 4-wire, 60-Hz, grounded system. Power to this system is typically supplied from the main switchboard through a transformer.
C706 DC ELECTRICAL SYSTEMS
A. DESCRIPTION OF WORK
When required by the task order, the contractor shall provide and install DC electrical systems for the vessel, consisting of 12 volt DC and/or 24 volt DC electrical systems.
The 12 volt DC systems are typically installed to provide power for the communication equipment, navigation equipment, and other equipment that requires 12-volt DC power
The 24 volt DC systems are typically installed to provide power for the emergency lighting system and for starting the diesel generator sets.
B. DC SYSTEM PANELBOARD
A DC distribution panel shall be provided and installed for each 12 volt DC system and the 24 volt DC systems similar to those manufactured by Paneltronics. Each DC panel shall include, but not be limited to the following basic components and features:
Power available light with dimmer switch
Line voltage meter
Load current meter
Ground fault detection
C. BATTERIES & BATTERY CHARGERS
1. Battery Requirements
All batteries provided shall be suitable for marine use. All batteries, with the exception of the diesel generator starting batteries, shall be the valve-regulated lead-acid battery (VRLA), absorbed glass mat (AGM) type. The diesel generator starting batteries shall be VRLA “gel cell” type.
The size of the DC battery banks shall be based on the DC load analysis which may be developed by the
Government or the contractor depending on the specifics of the task order. The batteries shall be sized in accordance with the specific system manufacturer’s recommendations.
Each battery or set of batteries shall be placed in vented, high-density, polyethylene boxes with lockable covers.
Two padlocks shall be provided for each battery box.
2. Battery Chargers
Battery chargers that are supplied shall be ABS listed and certified as well as USCG listed for marine service and built to carry continuous loads. The battery chargers for the DC systems shall be sized to meet the power requirements for the respective system’s batteries. The battery shall be located with the respective battery banks and be suitable for operation in 50-degrees C.
The input voltage for all chargers shall be 120 volt AC, 60-Hz and all chargers shall be supplied with ammeters.
All battery charger installations shall have a monitoring and alarm system in compliance with ABS River Rules (4-
5-4/7.19.4(e)).
3. Overload & Reverse Current Protection
Overload and reverse current protection for the battery conductors shall be in accordance with USCG, 46 CFR, subchapter J, paragraph 111.15-25.
C715 FAULT CURRENT ANALYSIS, PROTECTIVE DEVICE COORDINATION STUDY, ARC
FLASH HAZARD ANALYSIS & ELECTRICAL EQUIPMENT HAZARDOUS AREA PLAN
A. DESCRIPTION OF WORK
When required by the task order, the contractor shall prepare a fault current analysis, protective device coordination study, arc flash hazard analysis, electrical equipment arrangement, and/or an electrical equipment hazardous area plan. The drawings shall be numbered and titled as follows:
703-C715-01 FAULT CURRENT ANALYSIS
703-C715-02 PROTECTIVE DEVICE COORDINATION STUDY
703-C715-03 ARC FLASH HAZARD ANALYSIS
703-C715-04 ELECTRICAL EQUIPMENT ARRANGEMENT
703-C715-05 ELECTRICAL EQUIPMENT HAZARDOUS AREA PLAN
For the drawing names above, the “703” in the drawing numbers represents the vessel hull number. The vessel hull number shall be revised to reflect the specific vessel identified under the task order.
The contractor shall update the analyses throughout the completion of the task order to account for any design changes that may affect the results of the studies. The contractor shall submit final copies of the fault current analysis, protective device coordination study, and arc flash hazard analysis once the task order is complete.
B. FAULT CURRENT ANALYSIS
The fault current analysis shall demonstrate that all protective devices such as fuses and circuit breakers have sufficient short circuit breaking and making capacities. A listing of all protective devices, their locations, use, manufacturer, model, and interrupting rating shall be submitted with the fault current analysis.
The fault current analysis shall compare circuit breaker interrupting ratings and available fault current to verify that equipment is rated to safely handle short circuit currents without creating hazardous conditions. An equipment duty report shall be included with the fault current analysis in addition to a one-line diagram computer output showing the short circuit results for each location in the electrical system.
C. PROTECTIVE DEVICE COORDINATION STUDY
The protective device coordination study shall compare upstream and downstream protective devices to ensure proper electrical system reliability and that USCG coordination requirements are met. Protective device coordination and selectivity shall be provided so that, for a fault on any part of the system, the fault is cleared by the protective device that is closest to the point of fault without tripping upstream breakers in accordance with USCG, 46 CFR, subchapter J, subpart 111.51.
Time-current plots shall be included in the study showing the time-current curves (TCC) of all protective devices for each major path in the electrical system. This includes individual plots for all protective devices between the generator and each vital load fed directly from the main switchboard, and for all protective devices between the generator and one branch circuit load in each of the distribution panelboards.
Electronic trip circuit breakers shall be provided where required for proper coordination.
As a minimum, each TCC plot shall include a one-line diagram for the given plot in addition to the following breaker information:
Device ID
Manufacturer
Trip element type/model
Frame size
Trip rating (thermal magnetic trip units)
All other breaker settings (electronic trip units)
For breakers with electronic trip units, the contractor shall verify the settings of the installed breakers are consistent with the settings of the final coordination study upon completion of the task order.
D. ARC FLASH HAZARD ANALYSIS
Detailed incident energy arc flash hazard analyses for the entire vessel electrical installation shall be in accordance with ER 385-1-100. The analyses shall be completed for all electrical equipment and locations where the potential for an AFH exists as defined by ER 385-1-100. The detailed incident energy analyses shall be conducted using
EasyPower and the IEEE 1584 method of calculation.
The arc flash hazard analysis shall be provided with a report to summarize the results and provide recommendations for mitigating hazards where alternative designs cannot bring the risk to an acceptable level. As a minimum, the report shall contain the following sections:
1. Executive Summary
The executive summary shall include an overview of the current system, a listing of the number of devices in each hazard/risk category, and a summary of the results of the analysis.
2. Detailed Information
The detailed portion of the report shall contain the following:
A matrix and explanation of all operating scenarios evaluated.
A list and explanation of assumptions made.
3. Results Summary
A discussion of the results of the analysis.
4. Recommendations
For equipment and locations with high incident energies, mitigation solutions shall be provided to reduce the…