Amendment_0005.pdf

PDF 794 KB Posted

Attached to
Floating Plant Electrical and Electronic System Support IDIQ Federal contract opportunity
Solicitation number
W912BU19R0002
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to Floating Plant Electrical and Electronic System Support IDIQ, newest first.
File Type Posted
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006_-_Specification_Section_Revisions.pdf PDF
Amendment_0006.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Dredge_JADWIN_Hoist_Winch_Arrangement.pdf PDF
Amendment_0002.pdf PDF
361-M150-A001_-_Jadwin_-_Machinery_Arrangement_-_Pump_and_Winch_Rooms.pdf PDF
Dredge_JADWIN_Hauling_Winch.pdf PDF
C1026 - MDC # 2101 - Jadwin - Pneumatic Brake & Clutch Control - Hull# 361.tif TIF image
Dredge Jadwin Arc Flash Hazard Analysis.pdf PDF
Dredge JADWIN Monitoring System Retrofit.pdf PDF
361-G255-02 - DREDGE_CONSOLE ARRT.pdf PDF
Dredge JADWIN Hauling Winch Manual.pdf PDF
Amendment_0001.pdf PDF
Dredge JADWIN Ladder Hoist Winch Rigging Block System.pdf PDF
361-M700-C002 - Electrical Cable Schedule.pdf PDF
361-M710-C001 - Machinery Space Electrical Power Deck Plans.pdf PDF
361-M700-C001 - Electrical One-Line Diagram.pdf PDF
Hauling Winch DV 300 Retrofit Dredge JADWIN.pdf PDF
Dredge JADWIN Pilothouse Upgrade Electrical.pdf PDF
703-B725-01 REV-2 AC VOLTAGE DROP & CABLE SCHEDULE.xlsx XLSX spreadsheet
361-H240-C006 - Hoist and Hauling Winch Fdn.pdf PDF
Hoisting Winch Retrofit Dredge JADWIN Prints.pdf PDF
Dredge JADWIN IO Points List.pdf PDF
W912BU19R0002.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Revised section B part 2 - Pricing and table 1 through table 5.

2. Revised section L Tab II - Price Schedule

3. Answer questions from offerors. Questions that may be of general interest of all Bidders/Government will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s). Questions and answers are issued to the Offerors for information purposes only.

All other terms and conditions shall remain unchanaged.

Oferors must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended). FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR PROPOSAL

1. CONTRACT ID CODE PAGE OF PAGES

J 1 18

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Feb-2019

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X

W912BU19R0002

X 9B. DATED (SEE ITEM 11)

16-Jan-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Feb-2019

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W912BU19R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTION AND ANSWERS AMEND 05

Question No. 1 - Does the MDC have versions of the existing drawings, including the winches' electrical and mechanical drawings in electronic format such as AutoCAD? If so, what electronic format and what version?

Answer No. 1 – The Government does not have any additional drawings for the winches.

Questions No. 2 - We would like the USACE to consider alternative means for testing the winch in the factory. The current requirement is to perform a load test to demonstrate the rated capacity at the rated line speed at all layers. This test would end up being dangerous and/or costly. When on the dredge the wire passes through two blocks with multiple parts, thus "slowing down" the actual movement of the load and allowing it to be controlled.

In order to do the same in the factory, we would have to design and install our own blocks and then increase the weights for the test by the number of parts to achieve a full load and provide the test as described. This would be extremely expensive if not impossible in our facilities. We request that the USACE consider breaking this test into 2 separate tests, a no load test at the rated line speed, and a rated capacity test at an unspecified speed at the outermost layer of wire rope. Please confirm this is acceptable.

Answer No. 2 – Solicitation Section C001A.B.13.b. requires that the Contractor perform testing to demonstrate the winch rated capacity (line pull) at rated line speed at all layers. Rated line speed refers to the line speed at the actual winch, not through the multi-block system that is installed on the dredge. The testing shall prove the winches ability to operate at rated capacity at rated line speed at all layers. Dividing this into two separate tests to demonstrate line speed and capacity (line pull) separately would not demonstrate rated capacity at rated line speed and therefore is not acceptable.

Question No. 3 - In the solicitation there is a block for "hourly rates" with different markup columns. This is not something that is "traditional" in this type of work and seems more in line with basic "trade" type construction rather than professional/technical supplies and services. Can we provide fully burdened published rates that have been acceptable in all of our other numerous government projects. We want to be compliant with your request, but cannot develop a new accounting system to try to respond in the manner you are requesting.

Answer No. 3 – Sections B and L have been revised (and included in Amendment 0005) to require only the Fully

Burdened Rate.

Question No. 4 – Should the new hoist winch motor clutch be capable of engaging/disengaging while moving and/or under load? Should the motor clutch be spring engaged or spring released?

Answer No. 4 – The new hoist winch motor clutch shall not be capable of engaging or disengaging while moving or under load. The motor clutch shall be spring engaged.

Question No. 5 – Should the line tension measurement system be capable of load sensing when moving or when on the brake (drum or motor)? Does the line tension measurement system require to measure the actual line tension, or can it be estimated from the motor current?

Answer No. 5 – The line tension measurement system is not required to load sense when the winch is moving or when the brake (drum or motor) is on. Measuring the line tension by calculating it from the motor current is permissible.

Question No. 6 – At what rate is the 15 minutes of thermal capacity for the drum (disc) brake and motor brake required? Is the motor brake intended to be a parking brake or for stopping moving load?

Answer No. 6 – The thermal capacity of both the drum brake and motor brake shall be rated for a minimum of 15 minutes at full brake capacity as required by API 2C Section 7.3. The rated load and line pull referenced in API 2C Section 7.3 shall be assumed to be the rated line pull specified in the Solicitation Section C001A.B.3. Requirements for the drum and motor brakes as well as the braking system operational modes are identified in Solicitation Section C001A.B.5. To provide additional clarification on this subject, the information below is provided:

Under normal operating circumstances, the regenerative braking will serve as the dynamic brake. This is explained in "Power-in Power-Out Operation."

Under normal operating circumstances, the motor brake and the drum brake are both essentially parking brakes.

However, their function is explained further in:

"Over-speed or Snapped shaft" mode which requires the drum brake to set through the ramp function. In this case, the drum brake is setting while the winch drum is moving.

"Emergency Stop" mode which requires the drum brake to set through the ramp function, followed by the motor brake once winch rotation stops. In this case, the drum brake is setting while the winch drum is moving.

"Power Loss" mode which requires the motor brake and drum brake to set through a ramp function. In this case, the drum and motor brakes are both setting while the winch drum/motor are moving. Note - Power loss paragraph may require a cleanup in an amendment.

API 2C Section 7.3 includes requirements for sizing dynamic and parking brakes. As explained above, since the motor and drum brakes can operate either as a parking brake, or a dynamic brake under conditions where the drum/motor is moving, they should be designed to comply with both requirements as defined by API 2C Section 7.3.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

SUPPLIES OR SERVICES

SECTION B – SUPPLIES OR SERVICES & PRICES

1. Contract Definition

All Task Orders to be awarded under this MATOC will be competed in accordance with (IAW) FAR

16.505(b)(1), Fair Opportunity, and DFARS 216.505-70, Ordering Under Multiple Award Contracts, unless one of the exceptions to fair opportunity at FAR 16.505(b)(2)(i) applies. IAW FAR 16.505(b)(1) and DFARS

216.505-70 Task Order selection will be tailored to specific project requirements and awarded IAW pre-established evaluation criteria.

Evaluation criteria will be established IAW with the DOD and/or Army Source Selection Manual. For additional information on the task order evaluation process, see Contract Section L and M.

2. Pricing

The price for each firm-fixed price Task Order shall be based on the hourly rates for labor disciplines proposed by the offeror in the “Hourly Labor Rates” tables shown below., If a discipline is not listed in the Hourly Labor Rates table and is required for a specific Task Order, that labor rate will be determined before award of that Task Order.

Profit will be reflected in individual Task Orders issued.

The offeror shall complete Tables 1-5 in the pages that follow. If the offeror has a different job title or if the offeror is proposing to use subcontracted labor in which the subcontractor uses a different job title for any of the listed employees, the offeror is instructed to add that job title to the most appropriate or similar job title listed in the table

(i.e.: Clerical/Administrative Assistant). The proposed labor rates are to be fully burdened labor rates, with the exception of profit which will be reflected in individual Task Orders. The rates proposed in Tables 1-5 will be legally binding and will be the maximum rates that the offeror will use for all firm-fixed price Task Orders issued within the five year ordering period of the contract. The offeror shall provide proposed labor rates for each year. Lower rates may be offered at the Task Order level, if deemed appropriate by the offeror.

NOTE: If during the Contract Period of Performance, the Contractor’s original subcontracted personnel are no longer available to the Prime, the Prime shall find a subcontractor that has at a minimum, the same qualifications as the previous subcontracted personnel. The Prime shall be responsible for negotiating the labor rates for those personnel that have been provided in this RFP. Those rates provided are the maximum that will be paid by the

Government for any replacement personnel.

NOTE: During the Contract Period of Performance, the requirements of an individual task order may require specific technical capability beyond what was originally proposed by the Contractor for the MATOC Contract.

In this case, the Contractor is not restricted from utilizing additional subcontractors, however the qualifications and labor rates for the additional subcontractors are subject to review and approval by the Government.

In the Rates table below, offerors shall indicate the annual escalation percentages in the Hourly Labor Rates table, which will be used for evaluation of basic contract price.

Maximum rates shall be governed by the date of the Task Order requirement. Task Orders will use the prices for the 12-month period effective on the date the Task Order is issued. Modifications to Task Orders will reflect the rates of the "current 12-month" price schedule. For example, if the rate schedule changes over on 1 November of each year, and a Task Order is issued on 1 Sep 2017 for 12 months work, the maximum rates will be the rates that were effective on 1 Nov 2016. Under the same assumptions, if a modification to this Task Order is required in

December 2017, labor rates effective on 1 Nov 2017 will apply.

Table 1 - Hourly Labor Rates – Year 1

DISCIPLINE

Prime or

Subcontractor

Fully

Burdened

Hourly Rate

Year 1

Program Manager

Project Manager

Electrical/Electronic/Automation Design

Personnel

Programmer

Field Installation/Commissioning/Service

Administrative

Procurement Specialist

Offerors are to submit their labor rates for each of the ordering periods.

For each labor discipline, please annotate whether the discipline provided is Prime or Subcontractor.

Offerors are to provide only one table with one rate per discipline

In accordance with Solicitation Section L, If the offeror has a different job title or if the offeror is proposing to use subcontracted labor in which the subcontractor uses a different job title for any of the listed employees, the offeror is instructed to add that job title to the most appropriate or similar job title listed in the table (i.e.:

Clerical/Administrative Assistant). Different job titles can be inserted within the cell of the job titles that it is intended to replace (see example below). Additionally, for job titles not addressed but included in the Offeror's proposal, the Offeror is instructed to add that information to the "Other Job Title" blocks at the bottom of the rate schedule.

Example:

Field Commissioning Personnel

Other Job Title: Commissioning Engineer

Table 2 - Hourly Labor Rates – Year 2

Subcontractor

Fully

Burdened

Hourly

Rate

Year 2

Program Manager

Project Manager

Electrical/Electronic Design Personnel

Programmer

Field Installation/Service Personnel

(electronic technician?)

Table 3 - Hourly Labor Rates – Year 3

Subcontractor

Fully

Burdened

Hourly

Rate

Year 3

Program Manager

Project Manager

Table 4 - Hourly Labor Rates – Year 4

Subcontractor

Fully

Burdened

Hourly

Rate

Year 4

Program Manager

Project Manager

Table 5 - Hourly Labor Rates – Year 5

Subcontractor

Fully

Burdened

Hourly

Rate

Year 5

Program Manager

Project Manager

3. Travel

The Contractor shall perform all travel and attend all meetings necessary for completion of the work required by the

Task Orders. Pricing for travel shall be priced at the current Joint Travel Regulation (JTR) rates and limitations. Per

Diem (lodging and meals and incidental expenses) shall be priced at the current Government rates in accordance with the JTR per person per calendar day spent in travel status. Per Diem rate information may be obtained at http:www.defensetravel.dod.mil/.

4. Total Evaluated Price

The total evaluated price of an offeror shall consist of all labor, material, equipment, other direct charges, and indirect charges necessary to complete the seed task.

5. Seed Task Total Price

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 8,000,000 Task Electrical and Electronic System Support

FFP

This CLIN is designated for Firm Fixed Price work. The Contractor shall provide

Electrical and Electronic System Support for maintenance, upgrade, and retrofit of existing USACE floating plant. The ordering period is for a duration of five (5) years from the date of contract award.

FOB: Destination

MAX

NET AMT

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

http://www.defensetravel.dod.mil/ http://www.defensetravel.dod.mil/

$1,000.00 $8,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each

Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$1,000.00 $8,000,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

The following have been modified:

INSTRUCTION TO OFFERORS

SECTION L – Instructions, Conditions and Notices to Bidders

1. Introduction.

The offeror’s proposal shall be submitted in hard copy, with accompanying digital copies, as set forth below.

Failure to include digital copies shall result in an unresponsive proposal. The RFP will provide the Government’s address and receipt date for proposal submittal.

The offeror’s proposal shall consist of three (3) volumes. The Volumes are: Volume I – Technical/Risk, Volume II

Past Performance, and Volume III – Price. Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.

Offerors are cautioned that “parroting” of the Technical requirements or the PWS with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.

2. Proposal Submission Requirements

a. Each volume shall be submitted in a separate binder. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page.

The revised pages shall be dated. Each binder shall be clearly labeled with its Title and a copy number (e.g., copy 1 of 5).

b. The following volumes of material shall be submitted:

PRINTED DIGITAL MAXIMUM

VOLUME TITLE COPIES COPIES PAGES

I – Technical/Risk Original 1 70

II - Past Performance Original 1 N/A

III – Price Original 1 N/A

NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government. All pages will be counted except for Subcontract Letters of Commitment (Attachment A) and Past Performance

Questionnaires (Attachment B) submitted in Volume II.

3. Proposal Files

a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. Printing should be single spaced. Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape. A Table of Contents should be created using the Table of Content feature in Microsoft Word. Microsoft Word (doc) files shall use the following page setup parameters:

Page Size, Width – 8.5”

Page Size, Height – 11”

NOTE: 11”X17” folded pages are acceptable for tables/graphic representations; however, each 11”X17” page counts as two pages.

The following additional restrictions apply:

b. File Packaging. All electronic files shall be consolidated into one .pdf file per volume and submitted on one (1) Compact Disc (CD). Each disc shall be externally labeled with the solicitation number, date, and the offeror’s name. Each .pdf file shall be named as follows; “Volume #-VolumeTitle-ContractorsName-

DDMMMYY.pdf” (example VolumeI-Technical/Risk-Past Performance-XYZCompany-15JAN14.pdf).

Zip disks, thumb drives, or any storage media other than a CD, are not permitted. Files shall be in read-only format, using PDF files. **Please note – Self extracting exe files are not acceptable. ** If the hard-copy proposal differs from the electronic version, the hard copy will govern.

c. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of

Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked. The following shall be included in the Narrative discussion:

(A) VOLUME I – Factor 1 – Technical/Risk

The volume shall be organized into the following sections and shall be Tabbed as identified below with

Tab page markings:

NOTE: Price information shall NOT be included in this Volume. Price information shall only be submitted with the Price Proposal in Volume III and shall not be included anywhere else within the proposal, to allow for the review by the Government technical representatives to take place without the influence of price.

(1) Tab 1 – Subfactor 1-A – Organization

For Subfactor 1-A – Organizational Capability, the offeror’s proposal submission shall address each of the Elements identified below and shall include the following at a minimum:

(a) Element 1-A-1 – Management, Planning, and Staffing

The Offeror shall provide the following information:

name and type of company brief history of company principal ownership, subsidiaries, and corporate affiliations.

organizational chart bonding capability (bonding is not required, but considered in assessment of performance risk)

The Offeror shall provide resumes for all key management personnel expected to be used in this contract, to include professional qualifications, experience, and certifications. Resumes shall clearly identify the relevant experience of each person and how they were utilized in similar projects.

The Offeror shall provide a narrative explaining their proposed approach to planning, assembling, and managing teams including design resources, consultants, suppliers, and subcontractors to complete the work required by this solicitation. The narrative should also explain the Offeror’s experience with assembling and managing teams to accomplish projects similar in scope, size, and complexity to the work required by this solicitation.

The Offeror shall provide resumes, including qualifications, experience, and certifications for key personnel within their own organization (not subcontractors) to comprehend, plan, determine staffing requirements for a job, and manage marine electrical work as identified in the C-Section of the solicitation.

(b) Element 1-A-2 – Design Management

The Offeror shall provide a narrative explaining their approach to managing, reviewing, and assuring quality design work related to the type of work identified in Section C of the solicitation by the Offeror’s organization or by the offeror’s network of consultants, suppliers and subcontractors. Key resumes for the Offeror’s personnel within their own organization

(not subcontractors) that will be responsible for design management shall be provided.

Resumes shall identify qualifications, experience, and certifications related to the management of design efforts associated with marine electrical work.

(c) Element 1-A-3 – Consultants/Suppliers/Subcontractors

The Offeror shall provide a narrative explaining their history and experience working with their proposed network of Consultants, Suppliers, and Subcontractors. The narrative in this section should focus on the established business relationships with this network, the scope and scale of work previously performed together, and the number of jobs working as partners under any business arrangement. The narrative shall be supported with an inventory of historical jobs with specific consultants, suppliers, and subcontractors that briefly describe the scope of partnered work, with specific roles of each relevant party, and the dollar value of the actual participation of each party identified.

Details associated with the specific backgrounds and capabilities of individual consultants, suppliers, and subcontractors are not required in this section and are required later in the proposal. See Subfactors 1-B and 1-C.

The Offeror shall provide a signed letter of commitment from each Consultant, Supplier, or Subcontractor, stating that they agree to perform a similar function in the event of an award to the Offeror. For this purpose, the Contractor shall use Attachment A.

(2) Tab 2 – Subfactor 1-B – Specialized Technical Experience

For Subfactor 1-B – Specialized Technical Experience, the offeror shall provide a narrative for at least three (3), but no more than ten (10), electrical or electronic system integration projects performed on floating plant (marine vessels) over the past three (3) years that are similar in size and scope to the requirements in this Solicitation. The contractor shall identify breadth of experience related to the following technical areas (the experience of those consultants, suppliers, and subcontractors identified in Element 1-A-3 with which the offeror has a working historical relationship may be included so long as the experience identified also identifies which entity has that particular experience.)

Experience with design, acquisition of components, installation, programming, commissioning, testing, and delivery of electrical or electronic systems

Experience with electrical design software

Experience interpreting results of analyses and reports generated from electrical design software

Experience with Programming using software required for industrial applications (drives, PLC’s, etc.)

Experience in developing complete, accurate, and professionally prepared deliverables

(drawings, technical manuals, operational manuals) relevant to this solicitation

Experience with coordinating the submission and review of documentation with regulatory bodies (ABS and USCG)

The Offeror shall provide a signed letter of commitment from each Consultant, Supplier, or Subcontractor, as identified in Subfactor 1-A, Element 1-A-3.

(3) Tab 3 – Subfactor 1-C – Technical Capability and Resources

For Subfactor 1-C – Technical Capability and Resources, the offeror shall identify the qualifications, experience, and certifications of in house staff and subcontractors that are being offered in response to this solicitation for use on this contract. Narratives and/or resumes are acceptable. The submittal shall include:

Professional qualifications, experience, and certifications of the offeror’s key personnel within his/her own organization pertaining to performing the type of marine electrical work required in the solicitation. Technical capability of the Offeror’s key personnel must include a subset of all the technical skills required by the solicitation. Technical roles shall be identified.

Professional qualifications and experience of the key personnel within the Offeror’s proposed network of consultants, suppliers, and subcontractors pertaining to the type of marine electrical work required in the solicitation. Technical roles shall be identified.

Ability of the Offeror and his/her network to adjust resources to suit the scope of specific task orders. A narrative explaining the ability to customize staffing to a specific task order shall be provided to demonstrate organizational flexibility.

The Offeror shall provide a signed letter of commitment from each Consultant, Supplier, or

Subcontractor, as identified in Subfactor 1-A, Element 1-A-3

(4) Tab 4 – Response to Seed Task

The submittals included in Tab 4 of the Offeror’s proposal will be used by the Government to evaluate the proposal submission for Award of the MATOC Contract(s) as well as Award of the

Seed Task Order. Tab 4 is intended to address the Offeror’s proposal submission requirements for the following Factors, Subfactors, and Elements:

Factor 1, Subfactor 1-D – Response to Seed Task (Evaluation for the MATOC Award).

o Element 1-D-1 – Product o Element 1-D-2 – Technical Approach

Factor 1 – Technical/Risk (Evaluation for the Seed Task Order Award) o Subfactor 1-A – Product

Element 1-A-1 – Hoist Winch, Motor, and Drive

Element 1-A-2 – Hauling Winch Motors and Drives o Subfactor 1-B – Technical Approach

Only offerors receiving a MATOC award will be eligible for the award of the Seed Task Order.

(a) Tab 4a – Product

For Tab 4a, the Offeror’s proposal submission shall include the following:

A list of all significant components to be supplied

Cut sheets and performance data sheets for all proposed major components including typical or standard construction details that are included as part of this Offer.

A narrative which addresses the following:

o Describes how the new components will be integrated into the existing system, fit in the space available, and ensure that the upgraded system will function as originally intended.

o Describes how the new components will be compatible with the dredge’s existing electrical power generation and distribution system and local and remote winch controls.

o Describes how the proposed components comply with the list of requirements included in Solicitation Section M, Factor 1 – Technical/Risk (Evaluation for the

Seed Task Order Award), Subfactor 1-A, Elements 1-A-1 and 1-A-2.

(b) Tab 4b – Technical Approach

For Tab 4b, the Offeror’s proposal submission shall include the following:

A narrative identifying the labor resources planned to accomplish the work and their source (Offeror’s organization or part of the Offeror’s proposed network of

Consultants, Suppliers, and Subcontractors).

A basic schedule identifying a reasonable logic with reasonable activity durations. An output from scheduling software such Microsoft project or Primavera is preferred. Schedule must have enough detail to allow an assessment of the Offeror’s understanding of the work.

A list of documentation that will be provided.

Approach to commissioning and testing - The Offeror shall provide a narrative description of their plan to complete system commissioning and testing to ensure that the system is installed correctly and functions as intended. The Offeror shall provide an abridged sample of a testing plan and Operations & Maintenance Manual provided for a similar project.

The Offeror shall explain their approach to Warranty

(B) VOLUME II - Factor 2 – Past Performance

The volume shall be organized into the following sections and shall be Tabbed as identified below with Tab page markings:

NOTE: Price information shall NOT be included in this Volume. Price information shall only be submitted with the Price Proposal in Volume III and shall not be included anywhere else within the proposal, to allow for the review by the Government technical representatives to take place without the influence of price.

(1) Tab 1 - Past Performance.

The Proposal must include no more than ten (10) projects completed using the attached Past

Performance Questionnaire (PPQ) forms (Attachment B) (do not include the Adjective Ratings and

Definitions page), representing the Offeror’s relevant Past Performance. In lieu of submitting Past

Performance questionnaires, offerors may provide completed questionnaires from the Contractor

Performance Assessment Reporting System (CPARS) on a “one for one” basis. In other words, one

(1) completed CPARS questionnaire shall satisfy the requirement for one (1) PPQ.

Past performance pertains to how well an Offeror has performed relevant past work that is an indicator of future performance. Past performance information is not the same as experience information. Experience information pertains to what types of work an Offeror has performed.

Past performance pertains to how well an Offeror performs project work.

The Past Performance Questionnaire (PPQ) included in the solicitation is provided for the Offeror to submit to the client for each project the Offeror includes in its proposal for Factor 2 (Past

Performance). The Offeror shall ensure that correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires shall be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the

Government's point of contact, via email at marvin.a.nunez@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

mailto:marvin.a.nunez@usace.army.mil

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all

CAGE/DUNS numbers identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract

Reporting System (eSRS), and any other known sources not provided by the Offeror.

(B) VOLUME III – Factor 3 – Price.

This volume shall consist of the offerors proposed prices. Certified cost and pricing data are not currently required; however, the Government reserves the right to request other pricing information if required during negotiations. The information submitted in this volume shall comply with the requirements set forth below. There are no page limitations for this volume. The offerors proposal shall contain the following elements:

(1) Tab I – Cover Letter, SF33, Solicitation, Offer, and Award

(a) A cover letter containing:

(i) Solicitation Number

(ii) Name, address, email, telephone number, and fax number of the offeror

(iii) CAGE Code

(iv) DUNS Number

(v) Names, Title, email, telephone number, and fax number of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP.

(vi) Name, title, and signature of the person authorized to sign the proposal

(vii) Name, phone number, and email address of all individuals the firm would like to be notified of all subsequent Task Orders issued under this MATOC.

(viii) A statement specifying agreement with all terms, conditions, and provisions included in this RFP.

(b) The SF 33 duly executed with an original signature by an official authorized to bind the company. Include the Offeror’s CAGE and DUNS number in Block 15.

(c) Offeror must acknowledge all amendments by the date specified in the solicitation (or as amended) by one of the following methods: in the space provided on the SF 33, or by signing the block 15 of the SF30 and including as part of their proposal.

(d) All offerors shall be registered in the System for Award Management (SAM) database prior to award of the contract in accordance with DFARS 252.204-7004, if an offeror is not registered prior to the closing date of this solicitation they shall provide all information required by FAR 52.204-8(c)(1)(i) as a tab in this volume.

(2) Tab II – Price Schedule

(a) The offeror shall complete Section B in its entirety. If the offeror has a different job title for any of the listed employees, the offeror is instructed to add that job title to the most appropriate or similar job title listed in the table (i.e.: Clerical/Administrative Assistant).

The proposed labor rates are to be fully burdened labor rates, with the exception of profit which will be reflected in individual Task Orders. The rates proposed in Section B will be legally binding and will be the maximum rates that the offeror will use for all firm-fixed price Task Orders issued within the five year ordering period of the contract. The offeror shall provide proposed labor rates for each year. Lower rates may be offered at the Task

Order level, if deemed appropriate by the offeror.

(b) ****Removed****

(c) The Offeror shall review the Seed Task Scope of Work included in Section C and provide a price to perform this work on the price schedule in Section B, paragraph 5. The Offeror shall also provide a price proposal to include a detailed breakdown of all costs by category. At a minimum, information provided shall include but not be limited to the following:

Labor: Individual labor category or person, with associated labor hours and the fully burdened labor rates proposed in Section B.

Equipment and Material

Profit

Travel: Destination, number of trips, number of days per trip, departure and arrival destinations, number of people, etc.

Subcontractor and Consultants: All subcontractor costs and consultant costs must be detailed at the same level as prime contractor costs in regards to labor, travel, equipment, etc. Provide detailed substantiation of subcontractor costs in your cost proposal. Provide consultant agreement or other document that verifies the proposed daily/hourly rate.

Other Direct Costs (ODCs): ODCs shall be itemized.

Pricing for the seed task shall be based on the assumption that the work will be performed during the base year of the Contract.

(d) The Government reserves the right to award a contract without conducting discussions. Therefore, offerors are encouraged to propose their very best offer.

(e) The total evaluated price of an offeror shall consist of all labor, material, equipment, other direct charges, and indirect charges necessary to complete the seed project.

(End of Summary of Changes)