PDF 18 MB Posted
- Solicitation number
- W912BU-18-R-0026
About this file
This document summarizes a solicitation for construction services for an aircraft maintenance hangar. The U.S. Army Corps of Engineers, Philadelphia District intends to award a firm-fixed price contract between $25-100 million to construct a single bay, fully enclosed C-5 and C-17 capable hangar at Dover Air Force Base. The 84,176 square foot facility includes office, tool, and support spaces along with a dual function fuel cell/maintenance hangar bay accessible via vertical lift fabric doors. The project requires safety and security features including blast resistant windows and a fire suppression system. It also includes related site work and utilities with an option for parking areas. The contractor must coordinate construction to avoid interrupting airfield operations over the anticipated 610-day period. Proposals are due on April 5, 2019 following a March 1st site visit. The basis for award is tradeoff between technical and price factors.
Drawings - 9
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18R0026_Specs-AM2.pdf | ||
| 18R0026_Dwgs-AM2.pdf | ||
| 18-R-0026_DAFB_AMH_Pre-proposal_Site_Visit_Attendance_Roster.pdf | ||
| 18R0026_Specs-AM1R1.pdf | ||
| D_Elec10.pdf | ||
| D_Civ2.pdf | ||
| D_Structural4.pdf | ||
| RFI_Format.pdf | ||
| D_Civ3.pdf | ||
| D_Int6.pdf | ||
| D_Fire7.pdf | ||
| D_Arch5.pdf | ||
| D_Tel11.pdf | ||
| 18R0026-SpecsVol1-RTA.pdf | ||
| D_Gen1.pdf | ||
| D_Mech9.pdf | ||
| 18R0026-SpecsVol3-RTA.pdf | ||
| 18R0026-SpecsVol2-RTA.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
CO
CO
CO
"A"
ANGLE GATE - ELEV.
ANGLE GATE - PLAN
BALL VALVE
BUTTERFLY VALVE
CAP
CHECK VALVE
CLEAN-OUT IN VERTICAL
CLEAN-OUT
ELBOW DOWN
ELBOW UP
FLOOR DRAIN W/ P-TRAP
GATE VALVE
HOSE BIBB
METER
PLUG VALVE
REDUCER
STRAINER
TEE OUTLET UP
TEE OUTLET DOWN
TRAP - ELEVATION
TRAP - PLAN
UNION
VENT THROUGH ROOF
VALVE IN RISE
DIRECTION OF FLOW
WALL HYDRANTWH
FD
FS
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
PLUMBING SYMBOLS LEGEND
ACCESS PANEL
BACKFLOW PREVENTER
BRANCH - BOTTOM CONNECTION
BRANCH - TOP CONNECTION
CLEAN-OUT IN HORIZONTAL
FLOOR SINK W/ P-TRAP
FLEXIBLE PIPING CONNECTION
PRESSURE GAGE W/PET COCK
PRESSURE REDUCING VALVE
WATER HAMMER ARRESTOR
THERMOMETER
GLOBE VALVE
BALANCING VALVE
COMPRESSED AIR OUTLET
FILTER
FILTER/REGULATOR/LUBRICATOR
GAS REGULATOR
RECIRCULATING PUMP
F/R/L
F/R
ROOF DRAIN
RD
FLOOR CLEANOUT
FCO
DRAIN VALVE
FILTER/REGULATOR
HOSE BIBB & QUICK COUPLERS
LUBRICATOR
MIXING VALVE
POINT OF DISCONNECTION
POINT OF CONNECTION
PRESSURE REGULATOR
RELIEF VALVE (TEMPERATURE &
PRESSURE)
T & P
QUICK DISCONNECT
\\\ RELIEF VALVE (TEMPERATURE)
\\\ RELIEF VALVE (PRESSURE)
P
T
EO ENGINE OIL
ENGINE COOLANTEC
CHASSIS GREASECG
OIL-LADEN WASTEOW
CW DOMESTIC COLD WATER
G
HW DOMESTIC HOT WATER
GEAR OILGO
SAN
HW140
HWS140
ST
V SANITARY VENT
SANITARY SEWER
STORM SEWER
NATURAL GAS
TEMPERED WATERTW
DOMESTIC HOT WATER (140°F)
DOMESTIC HOT WATER RETURN (140°F)
EO
SYMBOL ABBREV DESCRIPTION
PLUMBING PIPE LEGEND
CG
EC
G
GO
OW
SAN
ST
TW
HWR DOMESTIC HOT WATER RETURN
BREATHING COMPRESSED AIRBABA
V
WEC WASTE ENGINE COOLANTWEC
WEO WASTE ENGINE OILWEO
TOOL COMPRESSED AIRTATA
NOTE: THIS LEGEND IS ALL INCLUSIVE AND SOME OF THE PIPING SYSTEMS INDICATED
MAY NOT BE PART OF THIS PROJECT.
ACID RESISTANT WASTEAWAW
ACID RESISTANT VENTAVAV
GREASE-LADEN WASTEGWGW
PUMP DISCHARGEPDPD
FP FIRE PROTECTIONFP
(140°)
(140°)
ABOVEABV
AFF ABOVE FINISHED FLOOR
ABOVE FINISHED GRADEAFG
BLW BELOW
BREATHING AIR HOSE REELBHR
DFU DRAINAGE FIXTURE UNIT
DOWNDN
DRAWINGDWG
ELECTRICAL CONTRACTOREC
ELECTRIC WATER COOLEREWC
ELECTRIC WATER HEATEREWH
ELEVATIONELEV
EXPANSION LOOPEL
EMERGENCY EYE WASHEW
FINISHED FLOOR ELEVATIONFFE
FLOORFLR
FOOT OR FEETFT
GAS WATER HEATERGWH
GENERAL CONTRACTORGC
LAVATORYL
INVERT ELEVATIONIE
MECHANICAL CONTRACTORMC
MINIMUMMIN
NOT IN CONTRACTNIC
PLUMBING CONTRACTORPC
PRESSURE & TEMPERATUREP&T
RAIN WATER LEADERRWL
SINKS
SUPPLY FIXTURE UNITSFU
SQUARE FEETSF
SUMP PUMPSP
TRAP PRIMER VALVETP
TYPICALTYP
URINALU
UNLESS NOTED OTHERWISEUNO
WASH FOUNTAINWF
WASTEW
WALL CLEAN OUTWCO
WATER HEATERWH
WITHW/
WITHOUTW/O
DESCRIPTIONABBREV
PLUMBING ABBREVIATIONS
TOP ELEVATIONTE
RAIN WATER CONDUCTORRWC
TOOL AIR HOSE REELTHR
MOP RECEPTORMR
AIR COMPRESSORAC
ABOVE FINISHED ROOFAFR
AIR HANDLING UNITAHU
ABOVE GROUND STORAGE TANKAST
BTU BRITISH THERMAL UNIT
CATCH BASINCB
CUBIC FEET PER HOURCFH
CONCRETECONC
CONNECTIONCONN
CONDENSATIONCOND
CONTINUATIONCONT
DF DRINKING FOUNTAIN
EMERGENCY SHOWER & EYE
WASH
ESEW
EXPANSION TANKET
EXISTINGEX
FLOOR CLEANOUTFCO
FOOTINGFTG
FINISHEDFIN
GARBAGE DISPOSALGD
HIGH POINTHP
DESCRIPTIONABBREV
INFRARED RADIANT HEATERIRH
KITCHEN SINKKS
MAXIMUMMAX
1,000 BTUHMBH
NORMALLY CLOSEDNC
NORMALLY OPENNO
OUTLET BOXOB
PLUMBING & DRAINAGE INSTITUTEPDI
PETROLEUM / OIL / LUBRICANTPOL
POUNDS PER SQUARE INCHPSI
SHOWERSH
SAFE WASTE CONNECTIONSWC
TRENCH DRAINTD
TOP OF PIPETOP
WATER COLUMNWC
WASHER BOXWB
AIR DRYERAD
SERVICE SINKSS
KILOWATT(S)KW
FLOOR DRAINFD
WATER CLOSETWC
DISHWASHERDW
GENERAL NOTES:
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED, TO INSTALL COMPLETE FOR AN OPERABLE PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE. ALL MATERIAL SHALL BE NEW AND OF GOOD QUALITY. ALL WORK SHALL BE
INSTALLED IN A NEAT AND WORKMAN LIKE MANNER.
2. CONTRACT DOCUMENT DRAWINGS FOR PLUMBING WORK ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITIVELY FIXED BY DRAWING DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATION NECESSARY TO ACHIEVE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS. DO NOT SCALE DRAWINGS. CERTAIN ITEMS SUCH AS RISES AND DROPS IN PIPING, ACCESS DOORS, ETC., ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY NOT FOR A SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OF THE REQUIREMENTS FOR THESE TYPES OF ITEMS.
3. INSTALL ALL PLUMBING EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS. COORDINATE
ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND
PROVIDE ALL TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT.
FIELD VERIFY AND COORDINATE ALL PIPING DIMENSIONS BEFORE FABRICATION. LOCATE ALL PLUMBING
EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, VALVING, ETC.
4. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, SOILS, MECHANICAL, ELECTRICAL WORK, ETC., AS SHOWN IN OTHER CONTRACT DOCUMENTS. PROPERLY CONSTRUCTED OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST. LOCATIONS AND SIZES OF ALL FLOOR, WALL AND ROOF OPENINGS SHALL BE COORDINATED WITH
ALL OTHER TRADES INVOLVED.
5. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, SUSPENDED
EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.
6. ALL TESTS SHALL BE COMPLETED BEFORE ANY EQUIPMENT OR PIPING INSULATION IS APPLIED, OR
CONCEALED.
7. LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH A STRAIGHT SECTION OF PIPE UPSTREAM AND DOWNSTREAM, AS RECOMMENDED BY THE DEVICE MANUFACTURER FOR ACCURACY. INSTALL THERMOMETER IN A VERTICAL AND TILTED POSITION TO
ALLOW READING BY OBSERVER STANDING ON FLOOR.
8. WHERE TWO OR MORE PRODUCTS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE
PRODUCTS OF A SINGLE MANUFACTURER SHALL BE USED.
9. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHERE REQUIRED, TO SERVICE VALVES AND OTHER CONCEALED PLUMBING EQUIPMENT, DEVICES, ETC. ACCESS PANELS SHALL
BE TURNED OVER TO THE GENERAL CONTRACTOR FOR INSTALLATION.
10. ALL OPENINGS IN FIRE RESISTANCE RATED WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM E 814 & UL 1479. SIMILARLY, SEAL/FIRESTOP AS REQUIRED AT SMOKE RATED SURFACES AS WELL.
11. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING CONNECTED TO AIR COMPRESSOR AND OTHER EQUIPMENT WHICH REQUIRES VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT
THE POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.
12. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER APPURTENANCES REQUIRING ACCESS ARE EASILY ACCESSIBLE. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE OF VALVE IS REMOVED. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDED WITH POSITION INDICATORS AND MAXIMUM ADJUSTABLE STOPS (AKA MEMORY STOPS). ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL SIZE OF PIPE BEFORE REDUCING SIZE TO MAKE CONNECTIONS
TO EQUIPMENT AND CONTROLS.
13. DRAIN PIPING IN MECHANICAL ROOMS SHALL BE ROUTED SO AS NOT TO CREATE TRIPPING HAZARDS.
14. PIPING SHALL BE ROUTED TO MAINTAIN A MINIMUM HEIGHT OF 35'-0" ACROSS THE HANGER BAY, WITH A MINIMUM OF 10'-0" OF PIPING OR EQUIPMENT ABOVE ANY PORTION OF THE C-5 AIRCRAFT. COORDINATE
MOUNTING HEIGHTS WITH OTHER TRADES.
15. PROVIDE HIGH POINT VENTS AND LOW POINT DRAINS. PROVIDE DIELECTRIC CONNECTIONS BETWEEN
DISSIMILAR MATERIALS.
16. VENT FROM NATURAL GAS EQUIPMENT PRV'S TO BUILDING EXTERIOR. PIPE SHALL BE SAME SIZE AS VENT OPENING ON PRV'S. PROVIDE GOOSENECK WITH INSECT SCREEN AT EXTERIOR VENT TERMINATION.
17. REFER TO ARCHITECTURAL DRAWINGS FOR PENETRATIONS.
18. PROPERLY SEAL ALL PLUMBING SYSTEMS PIPING AND COMPONENT'S PENETRATIONS OF BUILDING AIR
BARRIER.
19. SHUT-OFF VALVES SHALL BE INTEGRATED INTO THE PLUMBING DISTRIBUTION SYSTEMS TO PERMIT
THE ISOLATION OF A FIXTURE OR EQUIPMENT TO PERMIT REPAIR OR MAINTENANCE, WITHOUT
DISRUPTION OF OTHER FIXTURES OR EQUIPMENT.
20. WATER HAMMER ARRESTORS SHALL BE INSTALLED AT FLUSH VALVE-OPERATED FIXTURES, SOLENOID VALVES, AND ANY OTHER QUICK CLOSING VALVES TO MINIMIZE NOISE IN ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE AND PDI STANDARD WH201. ARRESTORS SHALL BE INSTALLED WITH
PROPER ACCESS PANELS. AIR CHAMBERS SHALL NOT BE PERMITTED.
21. ALL FLOOR DRAINS AND FLOOR SINKS SHALL BE PROVIDED WITH A TRAP PRIMER CONNECTION SUPPLIED FROM A TRAP PRIMER VALVE, CONFORMING TO ASSE 1018 OR ASSE 1044, WITH APPROPRIATE
DISTRIBUTION UNIT, TO REDUCE TRAP SEAL EVAPORATION.
22. THE LISTED MANUFACTURERS AS A BASIS OF DESIGN ARE FOR THE LEVEL OF QUALITY. THE CONTRACTOR MAY USE OTHER MANUFATURERS SO LONG AS THE LEVEL OF QUALITY IS MAINTAINED.
23. SYSTEM COMPONENTS (EQUIPMENT, PIPING, DUCTWORK, MACHINERY, ETC.) THAT DOES NOT SERVE A EF,TER OR TR(S) SHALLNOT BE INSTALLED ABOVE, BELOW (I.E. BELOW OR UNDER SLAB) THROUGH OR
WITHIN THESE AREAS.
NOTE: THIS LEGEND IS ALL INCLUSIVE AND SOME OF THE ABBREVIATIONS INDICATED
MAY NOT BE PART OF THIS PROJECT.
NOTE: THIS LEGEND IS ALL INCLUSIVE AND SOME OF THE SYMBOLS INDICATED
MAY NOT BE PART OF THIS PROJECT.
DESIGNATES ELECTRICAL OR TELECOM ROOMS. DO NOT INSTALL
PLUMBING PIPING THROUGH, WITHIN, ABOVE OR BELOW THESE
AREAS.
COMPRESSED AIR
FILTER/REGULATOR/LUBRICATORF/R/L
HEATING AND VENTILATIONHV
PIPING SYSTEM TESTING
1. NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK (5 WORKING DAYS) BEFORE INSPECTIONS MUST BE MADE. PERFORM TESTS SPECIFIED BELOW IN THE PRESENCE OF AUTHORITIES HAVING JURISDICTION.
2. THE FOLLOWING ARE THE TESTING PARAMETERS FOR THE PLUMBING SYSTEMS PIPING:
a. SANITARY SEWER AND VENT: CLOSE OPENINGS IN PIPING SYSTEM AND FILL WITH WATER TO A POINT OF OVERFLOW, BUT NOT LESS THAN 10 FEET OF WATER. FROM 15 MINUTES BEFORE INSPECTION STARTS TO
COMPLETION OF THE INSPECTION, WATER LEVEL MUST NOT DROP.
b. DOMESTIC WATER: CAP AND SUBJECT PIPING TO STATIC WATER PRESSURE OF 50 PSIG ABOVETHE OPERATING PRESSURE, WITHOUT EXCEEDING PRESSURE RATING OF PIPING SYSTEM MATERIALS. ISOLATE TEST SOURCE AND ALLOW TO STAND FOR FOUR (4) HOURS. LEAKS OR LOSS IN THE TEST PRESSURE SHALL CONSTITUTE DEFECTS THAT MUST BE REPAIRED.
c. COMPRESSED AIR: CAP AND FILL PIPING WITH OIL-FREE DRY AIR OR GASEOUS NITROGEN, TO PRESSURE OF 50 PSIG ABOVE THE OPERATING PRESSURE, BUT NOT LESS THAN 150 PSIG. ISOLATE TEST SOURCE AND ALLOW TO STAND FOR FOUR (4) HOURS. REFILL SYSTEM, IF REQUIRED, TO TEST PRESSURE; HOLD FOR TWO (2) HOURS WITH NO DROP IN PRESSURE.
d. NATURAL GAS: TESTING SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-54, THE LOCAL GAS UTILITY COMPANY, OR THE FOLLOWING, WHICHEVER IS GREATER. THE TEST PRESSURE SHALL BE NO LESS THAN 1 ½ TIMES THE PROPOSED MAXIMUM WORKING PRESSURE, BUT NOT LESS THAN 3 PSIG. TEST DURATION SHAL NOT BE LESS THAN ½ HOUR FOR EACH 500 CUBIC FEET OF PIPE VOLUME OR FRACTION THEREOF. THE TEST MEDIUM SHALL BE OIL-FREE DRY AIR, NITROGEN, CARBON DIOXIDE, OR AN INERT GAS. OXYGEN SHALL NOT BE USED.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL NECESSARY PIPING CAPS/PLUGS, WATER, COMPRESSED AIR, ELECTRICITY, ETC. AS REQUIRED TO PERFORM THE REQUIRED TESTS.
4. TESTING SHALL BE PERFORMED BEFORE PIPING IS COVERED OR CONCEALED.
5. REPAIR LEAKS AND DEFECTS WITH NEW MATERIAL AND RETEST PIPING, OR PORTIONS THEREOF, UNTIL SATISFACTORY RESULTS ARE OBTAINED.
6. PREPARE TEST AND INSPECTION REPORTS.
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
1 2 3 4 5
/1
/2
:3
:4
P M
P-001
P L
U M
B
IN
G G
E N
E R
A L
N O
T E
S , A
B B
R E
V
IA
T
IO
N S
S
Y M
B O
L S
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
12 December 2o18
0.0 0.2 0.9
5 5.2 6.2 7 7.8 8.8 9 11 13
A
B
C
D
E
F
G
H
J
K
L
M
PU101
PU103
PU102
PU104
PU103 PU104
PU105
PU101
PU103
PU102
PU104
P U
P U
PU104
PU105
PU100 P-405
4" SAN
S A N
S A N
S A N
3" CW
2" G
PU100 P-401 PU101
4 10
PU100 P-405
OWS-2
OWS-1
4" SAN
S A N
DESIGNATES ELECTRICAL, TELECOM AND/OR
EF/TER ROOM. DO NOT INSTALL PLUMBING
PIPING THROUGH, WITHIN, ABOVE OR BELOW
THESE AREAS.
LEGEND
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:2
P M
PU100
P L
U M
B
IN
G
U N
D E
R G
R O
U N
D P
L A
N
C O
M P
R E
H E
N S
IV
E
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/16" = 1'-0"
0 8'-0" 16'-0" 32'-0"
KEYNOTES
GENERAL NOTES - UNDERGROUND
1 REFER TO STRUCTURAL DRAWINGS FOR THE
EXACT SIZE, LOCATION, AND ELEVATION OF
FOUNDATIONS, FOOTERS AND GRADE BEAMS.
2 REFER TO STRUCTURAL DRAWINGS FOR DETAILS
OF PIPE CROSSINGS UNDER OR THROUGH THE
STRUCTURAL FOUNDATIONS, FOOTERS AND
GRADE BEAMS.
3 ALL UNDERFLOOR SANITARY SEWERS SHALL BE
INSTALLED AT A MINIMUM SLOPE OF 1%, UNLESS
NOTED OTHERWISE.
4 PROVIDE TRAP PRIMER CONNECTIONS ON ALL
FLOOR DRAINS AND FLOOR SINKS, UNLESS
OTHERWISE NOTED.
5 UNDERFLOOR SANITARY SEWER PIPING SHALL BE
A MINIMUM OF 4" UNLESS NOTED OTHERWISE.
6 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
SCALE: 1/16" = 1'-0"
PLUMBING - UNDERGROUND PLAN - COMPREHENSIVE
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
5 5.2 6.2
A
B
C
D
E
4" SAN
4" S A N
4" S A N
FCO
I.E. -1.25'
PU103
PU102
PU104
P U
H.P.
I.E. -0.32'
I.E. 0.74'
I.E. -1.59'
(60 LF) (60 LF)
REFER TO DRAWING 1/P-702
FOR SANITARY SEWER
RISER
REFER TO DRAWING 1/P-703
FOR OIL-LADEN WASTE RISER
PU100 P-405
TD-1
CB-1 TD-1
MULLION PIT. REFER
TO STRUCTURAL
DRAWINGS
MULLION PIT. REFER
TO STRUCTURAL
DRAWINGS
FD-5
4" OW
CB-1
TD-1
(100 LF)
I.E. -1.86'
PU100 P-401
DESIGNATES ELECTRICAL, TELECOM AND/OR
EF/TER ROOM. DO NOT INSTALL PLUMBING
PIPING THROUGH, WITHIN, ABOVE OR BELOW
THESE AREAS.
LEGEND
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:3
P M
PU101
P L
U M
B
IN
G
U N
D E
R G
R O
U N
D P
L A
N
A R
E A
A
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/8" = 1'-0"PU101
1 PLUMBING - UNDERGROUND PLAN - AREA A
PU100
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
KEYNOTES
1 PROVIDE FOUL AIR TRAP AT CATCH BASIN OUTLET.
REFER TO DETAIL 2/P-503.
2 4" SAN FROM ABOVE.
GENERAL NOTES - UNDERGROUND
1 REFER TO STRUCTURAL DRAWINGS FOR THE
EXACT SIZE, LOCATION, AND ELEVATION OF
FOUNDATIONS, FOOTERS AND GRADE BEAMS.
2 REFER TO STRUCTURAL DRAWINGS FOR DETAILS
OF PIPE CROSSINGS UNDER OR THROUGH THE
STRUCTURAL FOUNDATIONS, FOOTERS AND
GRADE BEAMS.
3 ALL UNDERFLOOR SANITARY SEWERS SHALL BE
INSTALLED AT A MINIMUM SLOPE OF 1%, UNLESS
NOTED OTHERWISE.
4 PROVIDE TRAP PRIMER CONNECTIONS ON ALL
FLOOR DRAINS AND FLOOR SINKS, UNLESS
OTHERWISE NOTED.
5 UNDERFLOOR SANITARY SEWER PIPING SHALL BE
A MINIMUM OF 4" UNLESS NOTED OTHERWISE.
6 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
7 7.8 8.8 9 11 13
A
B
C
D
E
PU101
PU103 PU104
PU104
P U
CO. TO GRADE
H.P.
I.E. -0.32'
I.E. -0.74'
I.E. -2.23'
(60 LF) (60 LF)
REFER TO DRAWING 1/P-703
FOR OIL-LADEN WASTE RISER
CO. TO GRADE
CB-1 TD-1
I.E. -0.74'
TD-1 CB-1
I.E. -0.74'
I.E. -1.59'
I.E. -1.59'
FCO
4" OW
MULLION PIT. REFER
TO STRUCTURAL
DRAWINGS
MULLION PIT. REFER
TO STRUCTURAL
DRAWINGS
FD-5 FD-5
4" OW
TD-1
(100 LF)
CB-1
I.E. -1.86'
6" OW
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:4
P M
PU102
P L
U M
B
IN
G
U N
D E
R G
R O
U N
D P
L A
N
A R
E A
B
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
KEYNOTES
1 SLEEVE AND SEAL FOUNDATION
PENETRATION/CROSSING. REFER TO DETAILS ON
STRUCTURAL DRAWINGS.
2 PROVIDE FOUL AIR TRAP AT CATCH BASIN OUTLET.
REFER TO DETAIL 2/P-503.
3 CONNECT VENT AT 45 DEGREES ABOVE OIL LADEN
WASTE PIPING CENTERLINE.
4 2" VENT TO ABOVE.
GENERAL NOTES - UNDERGROUND
1 REFER TO STRUCTURAL DRAWINGS FOR THE
EXACT SIZE, LOCATION, AND ELEVATION OF
FOUNDATIONS, FOOTERS AND GRADE BEAMS.
2 REFER TO STRUCTURAL DRAWINGS FOR DETAILS
OF PIPE CROSSINGS UNDER OR THROUGH THE
STRUCTURAL FOUNDATIONS, FOOTERS AND
GRADE BEAMS.
3 ALL UNDERFLOOR SANITARY SEWERS SHALL BE
INSTALLED AT A MINIMUM SLOPE OF 1%, UNLESS
NOTED OTHERWISE.
4 PROVIDE TRAP PRIMER CONNECTIONS ON ALL
FLOOR DRAINS AND FLOOR SINKS, UNLESS
OTHERWISE NOTED.
5 UNDERFLOOR SANITARY SEWER PIPING SHALL BE
A MINIMUM OF 4" UNLESS NOTED OTHERWISE.
6 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
SCALE: 1/8" = 1'-0"PU102
1 PLUMBING - UNDERGROUND PLAN - AREA B
PU100
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
0.0 0.2 0.9 31 5 5.2 6.2
F
G
H
J
K
4" S A N
4" S A N
FCO
FCO
FCO2" G
3" CW
4" SAN
FCO
1/2" TP
PU101 PU102
PU104
PU104
PU105
PU101
FS-1
FD-2
FD-2
FD-2FD-2
FD-3
REFER TO DRAWING 2/P-702
FOR SANITARY SEWER
RISER
I.E. -1.37'
FD-2
I.E. -1.71'
I.E. -1.49'
I.E. -2.46'
FD-2
I.E. -1.86'
CB-1
TD-1
(100 LF)
H.P.
4" SAN
4" SAN
PU100 P-401
4" OW6" OW
I.E. -2.69'
I.E. -2.72'
I.E. -4.21'
9 8
I.E. -2.72'
I.E. -2.12'I.E. -2.05'
I.E. -4.53'
CLEANOUT TO GRADE
DESIGNATES ELECTRICAL, TELECOM AND/OR
EF/TER ROOM. DO NOT INSTALL PLUMBING
PIPING THROUGH, WITHIN, ABOVE OR BELOW
THESE AREAS.
LEGEND
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:5
P M
PU103
P L
U M
B
IN
G
U N
D E
R G
R O
U N
D P
L A
N
A R
E A
C
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
KEYNOTES
1 4" SAN FROM ABOVE.
2 4" SAN WITH P-TRAP FROM FLOOR DRAIN/FLOOR
SINK ABOVE. PROVIDE 1/2" TP PIPING CONNECTION.
3 SLEEVE AND SEAL FOUNDATION WALL
PENETRATION/CROSSING. REFER TO DETAILS ON
STRUCTURAL DRAWINGS.
4 2" GAS TO ABOVE BY GAS COMPANY.
5 3" DOMESTIC WATER TO ABOVE.
6 REFER TO CIVIL DRAWINGS FOR CONT.
7 EIGHT (8) 1/2" TP PIPING FROM ABOVE.
8 2" VENT TO ABOVE.
9 PROVIDE VENT CONNECTION AT 45º ABOVE
SANITARY SEWER CENTERLINE.
10 SLEEVE AND SEAL FOUNDATION WALL
PENETRATION/CROSSING. REFER TO DETAILS ON
STRUCTURAL DRAWINGS.
GENERAL NOTES - UNDERGROUND
1 REFER TO STRUCTURAL DRAWINGS FOR THE
EXACT SIZE, LOCATION, AND ELEVATION OF
FOUNDATIONS, FOOTERS AND GRADE BEAMS.
2 REFER TO STRUCTURAL DRAWINGS FOR DETAILS
OF PIPE CROSSINGS UNDER OR THROUGH THE
STRUCTURAL FOUNDATIONS, FOOTERS AND
GRADE BEAMS.
3 ALL UNDERFLOOR SANITARY SEWERS SHALL BE
INSTALLED AT A MINIMUM SLOPE OF 1%, UNLESS
NOTED OTHERWISE.
4 PROVIDE TRAP PRIMER CONNECTIONS ON ALL
FLOOR DRAINS AND FLOOR SINKS, UNLESS
OTHERWISE NOTED.
5 UNDERFLOOR SANITARY SEWER PIPING SHALL BE
A MINIMUM OF 4" UNLESS NOTED OTHERWISE.
6 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
SCALE: 1/8" = 1'-0"PU103
1 PLUMBING - UNDERGROUND PLAN - AREA C
PU100
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
7 7.8 8.8 9 11 13
G
H
J
K
PU101
PU103
PU102
PU103
PU102
H.P.
TD-1
CB-1
(100 LF)
I.E. -1.86'
4" O W
DESIGNATES ELECTRICAL, TELECOM AND/OR
EF/TER ROOM. DO NOT INSTALL PLUMBING
PIPING THROUGH, WITHIN, ABOVE OR BELOW
THESE AREAS.
LEGEND
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:1
P M
PU104
P L
U M
B
IN
G
U N
D E
R G
R O
U N
D P
L A
N
A R
E A
D
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
KEYNOTES
1 PROVIDE FOUL AIR TRAP AT CATCH BASIN OUTLET.
REFER TO DETAIL 2/P-503.
2 CONNECT VENT AT 45° ABOVE OIL LADEN WASTE
PIPING CENTERLINE.
3 2" VENT TO ABOVE.
GENERAL NOTES - UNDERGROUND
1 REFER TO STRUCTURAL DRAWINGS FOR THE
EXACT SIZE, LOCATION, AND ELEVATION OF
FOUNDATIONS, FOOTERS AND GRADE BEAMS.
2 REFER TO STRUCTURAL DRAWINGS FOR DETAILS
OF PIPE CROSSINGS UNDER OR THROUGH THE
STRUCTURAL FOUNDATIONS, FOOTERS AND
GRADE BEAMS.
3 ALL UNDERFLOOR SANITARY SEWERS SHALL BE
INSTALLED AT A MINIMUM SLOPE OF 1%, UNLESS
NOTED OTHERWISE.
4 PROVIDE TRAP PRIMER CONNECTIONS ON ALL
FLOOR DRAINS AND FLOOR SINKS, UNLESS
OTHERWISE NOTED.
5 UNDERFLOOR SANITARY SEWER PIPING SHALL BE
A MINIMUM OF 4" UNLESS NOTED OTHERWISE.
6 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
SCALE: 1/8" = 1'-0"PU104
1 PLUMBING - UNDERGROUND PLAN - AREA D
PU100
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
3 5 5.2 6.2 7 7.8 8.8 9 11 13
L
M
I.E. -1.27'
I.E. -1.88'
1/2" TP
4" SANITARY . REFER TO
CIVIL DRAWINGS FOR
CONT.
PU103 PU104 PU104
REFER TO DRAWING 3P-702
FOR SANITARY SEWER
RISER
10" FIRE PROTECTION MAIN. REFER
TO FIRE PROTECTION DRAWINGS
FD-2
FD-2
FCO
FD-2
4" SAN
4" S A N
4" SAN4" SAN
4" SAN
FCO
FCO
I.E. -1.44'
HOUSEKEEPING
PAD ABOVE
4 10
CB-1 TD-1
4" OW
I.E. -1.78'
(30 LF)
FCO
4" OW4" OW4" OW
4" O W
6" OW
FCO
4" OW
I.E. -2.69'
I.E. -2.72'
I.E. -4.21'
I.E. -2.72'
I.E. -2.12'
PU100 P-405
I.E.-4.81'
I.E. -5.03'
OWS-2
I.E. -2.05'
I.E. -4.53'
CLEANOUT TO GRADE
FCO
4" SAN
DESIGNATES ELECTRICAL, TELECOM AND/OR
EF/TER ROOM. DO NOT INSTALL PLUMBING
PIPING THROUGH, WITHIN, ABOVE OR BELOW
THESE AREAS.
LEGEND
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:1
P M
PU105
P L
U M
B
IN
G
U N
D E
R G
R O
U N
D P
L A
N
A R
E A
E
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/8" = 1'-0"PU105
1 PLUMBING - UNDERGROUND PLAN - AREA E
PU100
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
KEYNOTES
1 4" SAN WITH P-TRAP FROM FLOOR DRAIN ABOVE.
PROVIDE 1/2" TP PIPING CONNECTION.
2 PROVIDE VENT CONNECTION AT 45º ABOVE
SANITARY SEWER CENTERLINE.
3 FOUR(4) 1/2" TP PIPING FROM ABOVE.
4 TWO (2) 1/2" TP PIPING FROM ABOVE.
5 SLEEVE AND SEAL FOUNDATION WALL
PENETRATION/CROSSING. REFER TO DETAILS ON
STRUCTURAL DRAWINGS.
6 2" VENT TO ABOVE.
7 PROVIDE VENT CONNECTION AT 45° ABOVE OIL
LADEN WASTE PIPING CENTERLINE.
8 PROVIDE FOUL AIR TRAP AT CATCH BASIN OUTLET.
REFER TO DETAIL 2/P-503.
9 CONNECT VENT AT 45° ABOVE OIL LADEN WASTE
PIPING CENTERLINE.
GENERAL NOTES - UNDERGROUND
1 REFER TO STRUCTURAL DRAWINGS FOR THE
EXACT SIZE, LOCATION, AND ELEVATION OF
FOUNDATIONS, FOOTERS AND GRADE BEAMS.
2 REFER TO STRUCTURAL DRAWINGS FOR DETAILS
OF PIPE CROSSINGS UNDER OR THROUGH THE
STRUCTURAL FOUNDATIONS, FOOTERS AND
GRADE BEAMS.
3 ALL UNDERFLOOR SANITARY SEWERS SHALL BE
INSTALLED AT A MINIMUM SLOPE OF 1%, UNLESS
NOTED OTHERWISE.
4 PROVIDE TRAP PRIMER CONNECTIONS ON ALL
FLOOR DRAINS AND FLOOR SINKS, UNLESS
OTHERWISE NOTED.
5 UNDERFLOOR SANITARY SEWER PIPING SHALL BE
A MINIMUM OF 4" UNLESS NOTED OTHERWISE.
6 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
E
C
ATFP
A T
F P A T
F P
A T
F P
ATFP
A T
F P
A T
F P
ATFP
A T
F P
A T
F P
A T
F P
A T
F P
RESTROOM MEN'S
G004
MENS LOCKER RM-1
G006-1
MENS LOCKER RM-2
G006-2
TOOL CRIB
RESTROOM WOMEN'S
G003
ELECTRICAL ROOM
FIRE PUMP AND FOAM
TANK ROOM
TR
FUEL CELL TOOL
ROOM
ELEC
OPEN OFFICE
HANGAR
HALLWAY
C001
PP110 P-402
PP110 P-402
PP110 P-404
WH-1
0.0 0.2 0.9
5 5.2 6.2 7 7.8 8.8 9 11 13
A
B
C
D
E
F
G
H
J
K
L
M
PP110 P-401
PP111
PP113
PP112
PP114
PP113 PP114
PP115
PP111
PP113
PP112
PP114
P P
P P
PP114
PP115
P-502PP110
PP110 P-403
PP110 P-403
PP110 P-405
THR-1
WH-1
MV-3ES-1
3/4" CW
1 1/2" CW
1 1/2" CW
3/4" CW
PP113
4 10
DESIGNATES ELECTRICAL, TELECOM AND/OR
EF/TER ROOM. DO NOT INSTALL PLUMBING
PIPING THROUGH, WITHIN, ABOVE OR BELOW
THESE AREAS.
LEGEND
SCALE: 1/16" = 1'-0"
0 8'-0" 16'-0" 32'-0"
KEYNOTES
GENERAL NOTES - PLUMBING
1 ALL FLOOR DRAINS AND FLOOR SINKS SHALL BE
PROVIDED WITH TRAP PRIMER CONNECTIONS
SUPPLIED FROM A TRAP PRIMER VALVE.
2 SANITARY VENT ROOF PENETRATIONS SHALL BE
PAINTED TO MATCH ROOF COLOR, IN ACCORDANCE
WITH THE DOVER AIR FORCE BASE DESIGN GUIDE.
PROVIDE METAL PIPING WITHIN 12" OF ROOF.
3 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
4 EXTEND GAS REGULATOR VENTS TO BUILDING
EXTERIOR. PROVIDE GOOSENECK AND INSECT
SCREEN.
SCALE: 1/16" = 1'-0"
PLUMBING - 1ST FLOOR PLAN - COMPREHENSIVE
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:1
P M
PP110
P L
U M
B
IN
G
S
T F
L O
O R
P L
A N
C
O M
P R
E H
E N
S
IV
E
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
ATFP
A T F P
OPEN OFFICE
0.0 0.2 0.9
5 5.2 6.2 7
A
B
C
D
E
PP113 PP112
PP114PP113
P P
FCO
GD-1
KS-1
WH-1
3/4" CW
3/4" HW
3/4" CW
1 1/4" CW
1 1/2" HW
3/4" HWR
3/4" TA
2" G
GPR-4
GPR-4
1 1/2" G1 1/2" G
2" G
1" G 1" G
(60 LF)
H.P.
PP110 P-405
THR-1
THR-1
3/4" TA
1" TA
F/R/L
F/R/L
(5 PSI)
(5 PSI)
(5 PSI)
(14" W.C.)
(5 PSI)
OIL/WATER SEPARATOR
CONTROL PANEL (OWS-1)
REFER TO DRAWING 1/P-702
FOR SANITARY SEWER RISER.
REFER TO DRAWING 1/P-706
FOR WATER RISER
NOTE:
ONLY INFRARED HEATER
SECTIONS WITH NATURAL GAS
BURNER CONNECTIONS ARE
SHOWN FOR CLARITY. REFER TO
MECH. DRAWINGS FOR
COMPLETE INFRARED HEATER
LAYOUT.
1" G1" G
4 4 1" G
1" G
77 1" G1" G
7 7
2" G
1" G 1" G
77 1" G
1 1/2" G
1" G
1 1/4" G
1" G 1" G
1 1/4" G
1 1/2" G
2" G
(14" W.C.)
1 1/4" CW
1 1/4" CW
3/4" CW
TD-1
(60 LF)
TD-1
ES-1
MV-3
OB-1
OB-1
OB-1
OB-1
OWS-1
2" G
PP110 P-402
PP110 P-401
HB-1
DESIGNATES ELECTRICAL, TELECOM AND/OR
EF/TER ROOM. DO NOT INSTALL PLUMBING
PIPING THROUGH, WITHIN, ABOVE OR BELOW
THESE AREAS.
LEGEND
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:4
P M
PP111
P L
U M
B
IN
G
S
T F
L O
O R
P L
A N
A
R E
A A
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
KEYNOTES
1 PROVIDE 2" SAN TO KS-1. PROVIDE 2" X 4"
TRANSITION ABOVE FLOOR. 4" SAN TO BELOW
FLOOR. 1 1/2" VENT TO ABOVE CEILING.
2 4" VENT UP TO 4" VTR.
3 PROVIDE 1/2" CW & HW TO KS-1.
4 PROVIDE 1" GAS TO IRH BURNER SECTION, TYPE
B-120 (110 CFH). REFER TO MECH. DRAWINGS.
REFER TO DETAIL 5/P-502.
5 PROVIDE INTERMEDIATE PIPE SUPPORTS BETWEEN
COLUMNS, AS REQUIRED BY PIPING
REQUIREMENTS. REFER TO DETAILS ON
STRUCTURAL DRAWINGS.
6 PROVIDE MODESTY CURTAIN ASSEMBLY FOR ES-1.
REFER TO DETAIL 3/P-501.
7 PROVIDE 1" GAS TO IRH BURNER SECTION, TYPE
B-100 (100 CFH). REFER TO MECH. DRAWINGS.
REFER TO DETAIL 5/P-502.
8 PROVIDE MODESTY CURTAIN ASSEMBLY FOR ES-1.
REFER TO DETAIL 3/P-501.
GENERAL NOTES - PLUMBING
1 ALL FLOOR DRAINS AND FLOOR SINKS SHALL BE
PROVIDED WITH TRAP PRIMER CONNECTIONS
SUPPLIED FROM A TRAP PRIMER VALVE.
2 SANITARY VENT ROOF PENETRATIONS SHALL BE
PAINTED TO MATCH ROOF COLOR, IN ACCORDANCE
WITH THE DOVER AIR FORCE BASE DESIGN GUIDE.
PROVIDE METAL PIPING WITHIN 12" OF ROOF.
3 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
4 EXTEND GAS REGULATOR VENTS TO BUILDING
EXTERIOR. PROVIDE GOOSENECK AND INSECT
SCREEN.
SCALE: 1/8" = 1'-0"PP111
1 PLUMBING - 1ST FLOOR PLAN - AREA A
PP100
PROVIDE THREE (3) 2" VENTS
TO 12'-0" ABOVE GRADE MIN.
PROVIDE MUSHROOM VENTS
IN ACCORDANCE WITH NFPA-30
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
T
F P
7 7.8 8.8 9 11 13
A
B
C
D
E
ES-1
MV-3
WH-1
HB-1
PP111PP113
PP114 PP114
P P
1 1/2" CW
1 1/2" HW
3/4" HWR
3/4" TA
2" G
GPR-4 GPR-4
CLEANOUT
TO GRADE
(60 LF)
H.P.
(60 LF)
1 1/2" G
4 4
1" G
1" G1" G
THR-1
THR-1
1" TA
F/R/L
F/R/L
2" G
1 1/2" G 2" G
(5 PSI)
(14" W.C.)
(14" W.C.)
(5 PSI)
(5 PSI)
(5 PSI)
(5 PSI)
NOTE:
ONLY INFRARED HEATER
SECTIONS WITH NATURAL GAS
BURNER CONNECTIONS ARE
SHOWN FOR CLARITY. REFER
TO MECH. DRAWINGS FOR
COMPLETE INFRARED HEATER
LAYOUT.
4 4
6 6 6
1" G 1" G 1" G 1" G
1" G 1" G 1" G
1" G
1" G 1" G 1" G
1" G
2" G2" G
1 1/2" G
1 1/2" G
1 1/4" G 1 1/4" G
1 1/2" CW
1 1/2" CW
TD-1
TD-1
CB-1 FCO
2" V
CB-1
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:5
P M
PP112
P L
U M
B
IN
G
S
T F
L O
O R
P L
A N
A
R E
A B
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/8" = 1'-0"PP112
1 PLUMBING - 1ST FLOOR PLAN - AREA B
PP100
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
KEYNOTES
1 PROVIDE SHUTOFF VALVE 7'-0" AFF MINIMUM.
2 PROVIDE 1" CW & HW TO MV-3. PROVIDE 1 1/4" TW
FROM MV-3 TO ES-1. REFER TO DETAIL 3/P-501.
3 PROVIDE MODESTY CURTAIN ASSEMBLY FOR ES-1.
REFER TO DETAIL 3/P-501.
4 PROVIDE 1" GAS TO IRH BURNER SECTION, TYPE
B-120 (110 CFH). REFER TO MECH. DRAWINGS.
REFER TO DETAIL 5/P-502.
5 PROVIDE INTERMEDIATE PIPE SUPPORTS BETWEEN
COLUMNS, AS REQUIRED BY PIPING
REQUIREMENTS. REFER TO DETAILS ON
STRUCTURAL DRAWINGS.
6 PROVIDE 1" GAS TO IRH BURNER SECTION, TYPE
B-100 (100 CFH). REFER TO MECH. DRAWINGS.
REFER TO DETAIL 5/P-502.
7 2" VENT FROM BELOW.
GENERAL NOTES - PLUMBING
1 ALL FLOOR DRAINS AND FLOOR SINKS SHALL BE
PROVIDED WITH TRAP PRIMER CONNECTIONS
SUPPLIED FROM A TRAP PRIMER VALVE.
2 SANITARY VENT ROOF PENETRATIONS SHALL BE
PAINTED TO MATCH ROOF COLOR, IN ACCORDANCE
WITH THE DOVER AIR FORCE BASE DESIGN GUIDE.
PROVIDE METAL PIPING WITHIN 12" OF ROOF.
3 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
4 EXTEND GAS REGULATOR VENTS TO BUILDING
EXTERIOR. PROVIDE GOOSENECK AND INSECT
SCREEN.
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
ATFP
T
F P
A T
F P
ATFP
RESTROOM MEN'S
G004
TOOL CRIB
FUEL CELL TOOL
ROOM
MECHANICAL ROOM
ELEC
HANGAR
PP110 P-401
PP110 P-402
WH-1
WH-1
ES-1
ES-1
0.0 0.2 0.9 31 5 5.2 6.2
F
G
H
J
K
PP110 P-402
PP111PP112
PP114
PP114
PP115
PP111
HB-1
2" CW
2" HW
3/4" HWR
2" BA
2 1/2" TA
3" G
3/4" HWR
1 1/2" HW
2" CW
2" CW
1 1/2" HW
3/4" HWR
1" TA
2 1/2" G
2" CW
2" HW
3/4" HWR
2" BA
2 1/2" TA
3" G
FCO
MV-3
MV-3
FS-1
ES-1
MV-3
1 1/2" V
PP110 P-403
PP110 P-403
BV-1
BV-2
HANGAR
HANGAR
GPR-4
GPR-4
1" G 1" G
THR-1
THR-1
THR-1
F/R/L
3/4" TA
F/R/L
3/4" TA
1 1/4" G 1 1/2" G
1 1/2" G
2" BA
2 2
3 3 3
2" CW
2" HW
2 1/2" TA
2" BA
1" G
1 1/4" G1 1/2" G
2" G
1 1/2" G
2" G
(5 PSI)
(14" W.C.)
(5 PSI)
(5 PSI)
(5 PSI)
(14" W.C.)
PROVIDE 4' X 3'
EXPANSION LOOP ON
HW AND HWR
NOTE:
ONLY INFRARED HEATER SECTIONS
WITH NATURAL GAS BURNER
CONNECTIONS ARE SHOWN FOR
CLARITY. REFER TO MECH. DRAWINGS
FOR COMPLETE INFRARED HEATER
LAYOUT.
WF-1
2" CW
2" CW
3/4" CW
2" CW
BHR-1
BHR-1
BHR-1
BHR-1
BHR-1
BHR-1
1 1/4" BA
3/4" BA1 1/4" BA
1" BA
3/4" BA
1" BA
FCO
DESIGNATES ELECTRICAL, TELECOM AND/OR
EF/TER ROOM. DO NOT INSTALL PLUMBING
PIPING THROUGH, WITHIN, ABOVE OR BELOW
THESE AREAS.
LEGEND
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:1
P M
PP113
P L
U M
B
IN
G
S
T F
L O
O R
P L
A N
A
R E
A C
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/8" = 1'-0"PP113
1 PLUMBING - 1ST FLOOR PLAN - AREA C
PP100
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
KEYNOTES
1 PROVIDE SHUTOFF VALVE 7'-0" AFF MINIMUM.
2 PROVIDE 1" GAS TO IRH BURNER SECTION, TYPE
B-100 (100 CFH). REFER TO MECH. DRAWINGS.
REFER TO DETAIL 5/P-502.
3 PROVIDE 1" GAS TO IRH BURNER SECTION, TYPE
B-120 (110 CFH). REFER TO MECH. DRAWINGS.
REFER TO DETAIL 5/P-502.
4 PROVIDE MODESTY CURTAIN ASSEMBLY FOR ES-1.
REFER TO DETAIL 3/P-501.
5 PROVIDE INTERMEDIATE PIPE SUPPORTS BETWEEN
COLUMNS, AS REQUIRED BY PIPING
REQUIREMENTS. REFER TO DETAILS ON
STRUCTURAL DRAWINGS.
6 MOUNT HOSE REELS TO TUBULAR STEEL COLUMN.
REFER TO SUPPORT DETAILS ON STRUCTURAL
DRAWINGS. (MOUNTING HEIGHT = 42'-0").
GENERAL NOTES - PLUMBING
1 ALL FLOOR DRAINS AND FLOOR SINKS SHALL BE
PROVIDED WITH TRAP PRIMER CONNECTIONS
SUPPLIED FROM A TRAP PRIMER VALVE.
2 SANITARY VENT ROOF PENETRATIONS SHALL BE
PAINTED TO MATCH ROOF COLOR, IN ACCORDANCE
WITH THE DOVER AIR FORCE BASE DESIGN GUIDE.
PROVIDE METAL PIPING WITHIN 12" OF ROOF.
3 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
4 EXTEND GAS REGULATOR VENTS TO BUILDING
EXTERIOR. PROVIDE GOOSENECK AND INSECT
SCREEN.
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F P
A T F P
ELECTRICAL ROOM
ES-1
7 7.8 8.8 9 11
F
G
H
J
K
WH-1
MV-3
ES-1
HB-1
PP111PP113 PP112
PP113
PP115
PP112
PP115
1 1/2" CW
3/4" HWR
1 1/2" BA
1 1/4" TA
2 1/2" G
WH-1
HB-1
MV-3
ES-1
MV-3
PP113
GPR-4
GPR-4
1" G
1" G1" G
THR-1
THR-1
THR-1
F/R/L
1 1/4" G 1 1/2" G 2" G
1 1/2" G
3 2
F/R/L
3/4" TA
1" G
1 1/4" G 1 1/2" G
2" G 1 1/2" G
2" CW
2" CW
1 1/2" CW
1 1/2" HW
2" HW
2" HW
3/4" HWR
3/4" HWR
1" TA
1 1/2" TA1 1/2" TA
1 1/2" BA
1 1/2" BA
2 1/2" G
2 1/2" G
1 1/2" HW
(5 PSI)
(14" W.C.)
(5 PSI)
(5 PSI)
(5 PSI)(14" W.C.)
(5 PSI)
PROVIDE 4' X 3'
EXPANSION LOOP ON
HW AND HWR
NOTE:
ONLY INFRARED HEATER
SECTIONS WITH NATURAL GAS
BURNER CONNECTIONS ARE
SHOWN FOR CLARITY. REFER TO
MECH. DRAWINGS FOR
COMPLETE INFRARED HEATER
LAYOUT.
TR
1 1/4" BA
1 1/2" BA
1 1/4" BA
3/4" BA
1" BA
1 1/4" BA
BHR-1
BHR-1
BHR-1
1" BA3/4" BA
BHR-1
BHR-1
BHR-1
2" VENT
FROM BELOW
2" V
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:3
P M
PP114
P L
U M
B
IN
G
S
T F
L O
O R
P L
A N
A
R E
A D
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/8" = 1'-0"PP114
1 PLUMBING - 1ST FLOOR PLAN - AREA D
PP100
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
KEYNOTES
1 PROVIDE SHUTOFF VALVE 7'-0" AFF MINIMUM.
2 PROVIDE 1" GAS TO IRH BURNER SECTION, TYPE
B-100 (100 CFH). REFER TO MECH. DRAWINGS.
REFER TO DETAIL 5/P-502.
3 PROVIDE 1" GAS TO IRH BURNER SECTION, TYPE
B-120 (110 CFH). REFER TO MECH. DRAWINGS.
REFER TO DETAIL 5/P-502.
4 PROVIDE MODESTY CURTAIN ASSEMBLY FOR ES-1.
REFER TO DETAIL 3/P-501.
5 PROVIDE INTERMEDIATE PIPE SUPPORTS BETWEEN
COLUMNS, AS REQUIRED BY PIPING
REQUIREMENTS. REFER TO DETAILS ON
STRUCTURAL DRAWINGS.
6 MOUNT HOSE REELS TO TUBULAR STEEL COLUMN.
REFER TO SUPPORT DETAILS ON STRUCTURAL
DRAWINGS. (MOUNTING HEIGHT = 42'-0").
GENERAL NOTES - PLUMBING
1 ALL FLOOR DRAINS AND FLOOR SINKS SHALL BE
PROVIDED WITH TRAP PRIMER CONNECTIONS
SUPPLIED FROM A TRAP PRIMER VALVE.
2 SANITARY VENT ROOF PENETRATIONS SHALL BE
PAINTED TO MATCH ROOF COLOR, IN ACCORDANCE
WITH THE DOVER AIR FORCE BASE DESIGN GUIDE.
PROVIDE METAL PIPING WITHIN 12" OF ROOF.
3 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
4 EXTEND GAS REGULATOR VENTS TO BUILDING
EXTERIOR. PROVIDE GOOSENECK AND INSECT
SCREEN.
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
PA
T F P
ELECTRICAL ROOM
FIRE PUMP AND FOAM
TANK ROOM
MECH
WH-1
5 5.2 6.2 7 7.8 8.8 9 11 13
K
L
M
PP110 P-404
PP113 PP114 PP114
HANGAR
GPR-4
THR-1
THR-1
2" CW
2" HW
3/4" HWR
1 1/2" TA
1 1/2" BA
2 1/2" G
COORDINATE PIPING
INSTALLATION WITH
DOOR OPENING
1 1/2" G
2" G 1 1/2" G
2" CW
2" HW
3" G
2 1/2" TA
2" BA
3/4" TA
F/R/L
(5 PSI)
NOTE:
ONLY INFRARED HEATER
SECTIONS WITH NATURAL
GAS BURNER
CONNECTIONS ARE
SHOWN FOR CLARITY.
REFER TO MECH.
DRAWINGS FOR
COMPLETE INFRARED
HEATER LAYOUT.
2" CW 2" CW
TR
4 10
PP115 P-405
OIL/WATER SEPARATOR
CONTROL PANEL (OWS-2)
2" VENT
FROM BELOW
2" VENT UP
TO 3" VTR
OWS-2
DESIGNATES ELECTRICAL, TELECOM AND/OR
EF/TER ROOM. DO NOT INSTALL PLUMBING
PIPING THROUGH, WITHIN, ABOVE OR BELOW
THESE AREAS.
LEGEND
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:5
P M
PP115
P L
U M
B
IN
G
S
T F
L O
O R
P L
A N
A
R E
A E
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/8" = 1'-0"PP115
1 PLUMBING - 1ST FLOOR PLAN - AREA E
PP100
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
KEYNOTES
1 PROVIDE SHUTOFF VALVE 7'-0" AFF MINIMUM.
2 PROVIDE SHUTOFF VALVE 7'-0" AFF MINIMUM.
3 PROVIDE 1" GAS TO IRH BURNER SECTION, TYPE
B-100 (100 CFH). REFER TO MECH. DRAWINGS.
REFER TO DETAIL 5/P-502.
4 PROVIDE INTERMEDIATE PIPE SUPPORTS BETWEEN
COLUMN, AS REQUIRED BY PIPING REQUIREMENTS.
REFER TO DETAILS ON STRUCTURAL DRAWINGS.
GENERAL NOTES - PLUMBING
1 ALL FLOOR DRAINS AND FLOOR SINKS SHALL BE
PROVIDED WITH TRAP PRIMER CONNECTIONS
SUPPLIED FROM A TRAP PRIMER VALVE.
2 SANITARY VENT ROOF PENETRATIONS SHALL BE
PAINTED TO MATCH ROOF COLOR, IN ACCORDANCE
WITH THE DOVER AIR FORCE BASE DESIGN GUIDE.
PROVIDE METAL PIPING WITHIN 12" OF ROOF.
3 PROVIDE CONCRETE PAD FOR CLEANOUTS TO
GRADE. REFER TO DETAIL ON CIVIL DRAWINGS.
4 EXTEND GAS REGULATOR VENTS TO BUILDING
EXTERIOR. PROVIDE GOOSENECK AND INSECT
SCREEN.
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
5 5.2 6.2 7 7.8 8.8 9 11 13
A
B
C
D
E
F
G
H
J
K
L
M
END TERMINATION
JB
T
JUNCTION BOX
THERMOSTAT
PROVIDE FREEZE PROTECTION HEATING
TRACING ON DOMESTIC COLD WATER
PIPING IN HANGER BAY
PROVIDE FREEZE PROTECTION HEATING
TRACING ON DOMESTIC COLD WATER
PIPING IN HANGER BAY
JB
T
JUNCTION BOX
THERMOSTAT
PROVIDE FREEZE PROTECTION HEATING
TRACING ON DOMESTIC COLD WATER
PIPING IN HANGER BAY
PROVIDE FREEZE PROTECTION
HEATING TRACING ON DOMESTIC COLD
WATER PIPING IN HANGER BAY
4 10
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:0
P M
PP116
P L
U M
B
IN
G
H E
A T
T R
A C
IN
G
P L
A N
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/16" = 1'-0"
PLUMBING - HEAT TRACING PLAN
HEAT TRACING FOR PLUMBING PIPING
1. DESIGN CRITERIA:
A. PROVIDE FREEZE PROTECTION HEAT TRACING FOR DOMESTIC COLD WATER PIPING, WITH THE HANGER BAY, INCLUDING PIPING DROPS TO EMERGENCY SHOWER MIXING VALVES, WALL HYDRANTS AND HOSE BIBBS, TO THE LIMITS SHOWN ON THE
DRAWING.
B. LOWEST AMBIENT TEMPERATURE: 15 DEGREES F.
C. MAINTENANCE TEMPERATURE: 45 DEGREES F.
D. PIPE INSUALTION: MINIMUM 1 1/2" CELLUAR GLASS (PER SPECIFICATION)
E. PIPE CONTENT: DOMESTIC COLD WATER.
F. INSTALLATION SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE, APPROPRIATE LOCAL CODES, AND
AUTHORITIES HAVING JURISDICTION.
G. REFER TO DRAWINGS PP110 THRU PP115 AND P-705 FOR ROUTING OF DOMESTIC COLD WATER PIPING IN HANGER BAY.
2. COORDINATE INSTALLATION OF HEATING CABLE WITH ELECTRICAL CONTRACTOR.
3. MAINTAIN ENVIRONMENTAL CONDITIONS (I.E. TEMPERATURE, HUMIDITY, AND VENTILATION) WITHIN LIITS RECOMMENDED BY
MANUFACTRURER. DO NOT INSTALL PRODUCTS UNDER ENVIRONMENTAL CONDITIONS OUTSIDE MANUFACTURE'S LIMITS.
4. HEATING CABLE:
A. UL LISTED MINERAL-INSULATED, COPPER OR STAINLESS STEEL SHEATHED, SERIES RESISTANCE CABLE, DUAL CONDUCTOR CONFIGURATION, SIMILAR TO DELTA-THERM. CABLE SHALL CONSIST OF TWO 16 AWG, STRANDED, NICKEL PLATED COPPER BUS
WIRES BETWEEN WHICH A POSITIVE TEMPERATURE COEFFICIENT CONDUCTIVE POLYMER IS PLACED.
B. CABLE SHALL BE RATED FOR 208 VAC, WITH 4.3 WATT PER FOOT AT 50 DEGREES F.
C. INSULATOR SHALL BE MAGNESIUM OXIDE. FIBERGLASS INSULATOR IS NOT PERMITTED.
C. CABLE HEATER CONSTRUCTION SHALL CONSIST OF TERMINATION IN FACTORY AND SPLICED TO STRANDED LEADS. CABLE SHALL BE TERMINATED USING APPROVED MANUFACTURER'S POWER CONNECTION AND END TERMINATION KITS.
D. NO COMBUSTIBLE MATERIALS BETWEEN CONDUCTOR WIRE AND GROUND SHEATH.
5. CONTROLS:
A. THERMOSTAT SHALL BE A UL LISTED NEMA-4X LINE-SENSING RATED FOR 208 VAC, SIMILAR TO DELTA-THERM OTS-1A, AND SHALL INCLUDE A WATERTIGHT, DUST TIGHT AND CORROSION RESISTANT DIE CAST ENCLOSURE. SINGLE POLE, DOUBLE THROW, SNAP ACTION SWITCHING ACTION, +25 DEGREES TO +325 DEGREES F. OPERATING RANGE, AMBIENT RANGE OF ENCLOSURE SHALL BE -40
DEGREES TO +160 DEGREES F.
6. INSTALLATION:
A. CLEAN SURFACES PRIOR TO INSTALLATION, USING METHODS RECOMMENDED BY MANUFACTURER.
B. INSTALL HEATING CABLES IN ACCORDANCE WITH MANUFACTRURER'S LAYOUT DETAILS AND INSTALLATION INSTRUCTIONS.
C. LOCATE HEATING CABLE ON PIPING PER MANUFACTURER'S INSTRUCTIONS, SECURED TO PIPE WITH TAPE WRAPS
APPROXIMATELY EVERY 12 INCHES.
D. DO NOT PINCH OR MAKE SHARP BENDS IN CABLE.
E. AT POWER TERMINATION, MOUNT POWER CONNECTION STANDOFF AND JUNCTION BOX PER POWER TEMINATION KIT
INSTRUCTIONS.
F. INSTALL SPLICE CONNECTIONS AND MONITOR LIGHTS PER KIT INSTRUCTIONS
G. AT CONCLUSION OF INSTALLATION, TEST CONTINUITY OF HEATING CABLE. PERFOM INSTALLATION RESISTANCETEST ON EACH HEATING CABLE BEFORE DURING AND AFTER PIPING INSTALLATION. INSTALL RESISTANCE SHOULS BE GREATER THAN 10 MEGOHMS. MEASURE VOLTAGE AND CURRENT AT EACH UNIT AFTER PIPE INSTALLATION. ENTER TOTAL RESISTANCE AND
INSULATION RESISTANCE READING ON WARRANTY CARD.
H. ANNUALLY CHECK SYSTEM FOR LOOSE OR DAMAGED CABLES.
FIN.FLOOR ELEV.: 0.00' = 26.70
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
4" S A N
4" SAN
4" S A N
I.E. -3.42'
I.E. -2.75'
I.E. -2.29'
REFER TO DRAWING PP111
FOR CONT.
REFER TO DRAWING PP113
FOR CONT.
1/2" TP
2" SAN
FCO
4" SAN
1/2" TP
1/2" TP
1/2" TP
4 4
FCO
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN
4" SAN
I.E. -1.51'
4" SAN
REFER TO CIVIL
DRAWING FOR
CONT.
FCO
FD-4 FD-4
FD-4
FD-1
FD-1
FD-1
FD-1
FD-1
FD-4
FD-4
FD-1
FD-1
FD-1
FD-1
L-1 L-1 L-1 L-1
0.0 0.2 0.9
E
F
FD-1
WC-2
FD-1
FD-1
FD-1
L-1L-1
L-1
U-1U-1 U-1
FD-1
WC-1
WC-1
WC-1 WC-1
FD-1
SH-1 SH-2
1 1/2" V
1 1/2" V
1 1/2" V
2" V
2" V
1/ 2" V
2" V
2" V
TER
RESTROOM WOMEN'S
G003
RESTROOM MEN'S
G004
WOMENS LOCKER RM
G005
WC-2
WC-2
HALLWAY
C001
RESTROOM
G002
LOBBY
L001
VESTIBULE
V001
MENS LOCKER RM
G006
FCO
FD-1
FD-1
FD-1
2" V
L-2
2" V WCO
WCO
1 1/2" V
2" SAN
3" SAN
1 1/2" V
2" SAN
SH-1
1 1/2" V
2" V
FD-1
FD-1
MR-1
TP-1
TP-1
TP-1
SH-2
FCO
FD-4
FD-4
FD-4 FD-4
FD-4
SH-1
FCO
EWC-1
2" V
1 1/2" V
DESIGNATES ELECTRICAL, TELECOM AND/OR
EF/TER ROOM. DO NOT INSTALL PLUMBING
PIPING THROUGH, WITHIN, ABOVE OR BELOW
THESE AREAS.
LEGEND
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:0
P M
P-401
P L
U M
B
IN
G E
N L
A R
G E
D P
L A
N S
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/4" = 1'-0"
0 2'-0" 4'-0" 8'-0"
KEYNOTES
1 4" SAN WITH P-TRAP FROM FLOOR DRAIN/FLOOR
SINK ABOVE. PROVIDE 1/2" TP PIPING CONNECTION.
2 2" SAN WITH P-TRAP FROM SHOWER ABOVE.
3 3" SAN WITH P-TRAP FROM MR-1 ABOVE.
4 4" SAN FROM WATER CLOSET ABOVE. PROVIDE
CLOSET FLANGE AND WAX RING.
5 4" VENT TO ABOVE.
6 4" SAN FROM ABOVE.
7 PROVIDE VENT CONNECTION AT 45º ABOVE
SANITARY SEWER CENTERLINE.
8 SLEEVE AND SEAL FOUNDATION WALL
PENETRATION/CROSSING. REFER TO DETAILS ON
STRUCTURAL DRAINWGS.
9 1 1/2" VENT TO ABOVE.
10 1 1/2" VENT FROM BELOW TO ABOVE CEILING.
11 4" VENT FROM BELOW UP TO 4" VTR.
12 PROVIDE 2" SAN ROUGH-IN CONNECTION. 4" SAN
TO BELOW FLOOR, WITH 2" X 4" TRANSITION FITTING
ABOVE FLOOR. 2" VENT TO ABOVE CEILING.
13 3" SAN DOWN TO 4" SAN BELOW FLOOR, 3" X 4"
TRANISTION FITTING ABOVE FLOOR.
14 FOUR (4) 1/2" TP PIPING FROM ABOVE.
15 4" SAN TO BELOW FLOOR. PROVIDE 1 1/2" SAN
CONNECTION TO EWC-1. 1 1/2" VENT TO ABOVE
CEILING.
GENERAL NOTES - ENLARGED PLAN
1 REFER TO STRUCTURAL DRAWINGS FOR THE
EXACT SIZE, LOCATION, AND ELEVATION OF
FOUNDATIONS, FOOTERS AND GRADE BEAMS.
2 REFER TO STRUCTURAL DRAWINGS FOR DETAILS
OF PIPE CROSSINGS UNDER OR THROUGH THE
STRUCTURAL FOUNDATIONS, FOOTERS AND GRADE
BEAMS.
3 ALL UNDERFLOOR SANITARY SEWERS SHALL BE
INSTALLED AT A MINIMUM SLOPE OF 1%, UNLESS
NOTED OTHERWISE.
4 PROVIDE TRAP PRIMER CONNECTIONS ON ALL
FLOOR DRAINS AND FLOOR SINKS, UNLESS
OTHERWISE NOTED.
5 UNDERFLOOR SANITARY SEWER PIPING SHALL BE A
MINIMUM OF 4" UNLESS NOTED OTHERWISE.
6 SANITARY VENT ROOF PENETRATIONS SHALL BE
PAINTED TO MATCH ROOF COLOR, IN ACCORDANCE
WITH THE DOVER AIR FORCE BASE DESIGN GUIDE.
PROVIDE METAL PIPING WITH 12 INCHES OF ROOF.
SCALE: 1/4" = 1'-0"PU100 P-401
ENLARGED PLAN - TOILET ROOMS -
UNDERGROUND
SCALE: 1/4" = 1'-0"PP110 P-401
2 ENLARGED PLAN - TOILET ROOMS - SANITARY
NOTE:
REFER TO DRAWING 1/P-701 FOR SANITARY
RISER DIAGRAM
NOTE:
REFER TO DRAWING 1/P-701 FOR SANITARY
RISER DIAGRAM
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
RESTROOM MEN'S
G004
MENS LOCKER RM-1
G006-1
MENS LOCKER RM-2
G006-2
RESTROOM WOMEN'S
G003
HALLWAY
C001
L-2
WC-2
FD-1
FD-1
WC-1
WC-1
L-1 L-1 L-1
U-1U-1 U-1
WC-1WC-1
L-1
L-1 L-1 L-1
FD-1
SH-2
SH-1
MR-1
0.0 0.2 0.9
E
F
FD-1
DU
TP-1
WH-1
FD-1
FD-1 1 1/2" CW
3/4" HW
3/4" HWR
3/4" HW
3/4" CW
2" CW
1" HW
3/4" HWR
2" CW
3/4" HW
WHA-D
2" CW
3/4" HW
3/4" HWR
1 1/2" HW
2" CW
3/4" HW
3/4" CW
3/4" HWR
1 1/2" HW
2" CW
REFER TO DRAWING PP113 FOR CONT.
1/2" CW
3/4" CW
3/4" HW
3/4" CW
WHA-A
FCO
FD-1
FD-1
TP-1
TP-1
FD-1
FD-1FD-1
WC-2
WC-2
DU
DU
SH-1
3/4" CW
2" CW
1/2" HW
2" CW
FD-4
FD-4
SH-2
FCO
EWC-1
FD-2
FD-2
FD-2
FD-2
FS-1
0.0 0.2 0.9
G
(REFER TO MECH. DRAWINGS
FOR HVAC EQUIPMENT)
GWH-1
MECHANICAL ROOM
BOILER B-01
(399 CFH)
BOILER B-02
(399 CFH)
FCO
HWT-1
BV-3
P-503P-402
P-503P-402
RP-1
ET-1
MV-1
TP-1
DU
FD-3
BFP-2
3/4" CW MAKE-UP WATER.
REFER TO MECH.
DRAWINGS FOR CONT.
BFP-1
GPR-2
GPR-1
4 GAS VENT
4 AIR INTAKE
PROVIDE 4" HIGH
CONCRETE
HOUSEKEEPING PAD
TP-1
3/4" CW
2" G
2" G
3/4" CW
BV-5
BV-4
2" HW 140°
1" HWR
1" HWR
2" HW
2" CW
HB-1 FCO
FD-2
4" G 1" HWR 2" HW
2 1/2" CW
3/4" HWR
1 1/2" HW
2" CW
WATER HEATER
WALL TERMINAL
KIT
FD-2
WATER FILTRATION SYSTEM WFS-1:
• SIMILAR TO 3M TRS150.
• REVERSE OSMOSIS MEMBRANE TO REMOVE 96%
OF TDS.
• INTEGRATED PRE- AND POST- FILTRATION FOR
REDUCTION OF SEDIMENT, CHLORINE TASTE AND
ORDOR, AND TDS.
• FDA CFR-21 AND/OR NSF COMPLIANT MATERIALS
• BUILD-IN BY-PASS.
• CAPACITY: 6.25 GPH
• MAXIMUM INCOMING PRESSURE: 65 PSI
• MAXIMUM OPERATION TEMPERATURE: 100° F.
• WALL MOUNTED WITH STAINLESS STEEL BRACKET
DESIGN.
(REFER TO MECH. DRAWINGS
FOR HVAC EQUIPMENT)
(REFER TO MECH.
DRAWINGS FOR HVAC
EQUIPMENT)
3/4" SOFT CW MAKE-UP
WATER. REFER TO MECH.
DRAWINGS FOR CONT.
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:1
P M
P-402
P L
U M
B
IN
G E
N L
A R
G E
D P
L A
N S
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/4" = 1'-0"
0 2'-0" 4'-0" 8'-0"
KEYNOTES
1 PROVIDE REVERSE CORE SHOWER VALVE FOR
BACK-TO-BACK SHOWER INSTALLATION.
2 PROVIDED FOUR (4) 1/2" TP PIPING TO BELOW SLAB.
3 PROVIDE GAS METER IN ACCORDANCE WITH THE
REQUIREMENTS OF THE DOVER AIR FORCE BASE
DESIGN MANUAL. PROVIDE CONNECTION TO THE
BUILDING DDC SYSTEM.
4 PROVIDE WATER METER IN ACCORDANCE WITH THE
REQUIREMENTS OF THE DOVER AIR FORCE BASE
DESIGN MANUAL. PROVIDE CONNECTION TO THE
BUILDING DDC SYSTEM.
5 2" VENT FROM BELOW.
6 2" VENT UP TO 3" VTR.
7 PROVIDE THREE (3) 1/2" TP PIPING TO BELOW SLAB.
8 PRIME AND PAINT EXPOSED GAS PIPING.
9 EIGHT (8) 1/2" TP PIPING TO BELOW.
GENERAL NOTES - ENLARGED PLAN
1 REFER TO STRUCTURAL DRAWINGS FOR THE
EXACT SIZE, LOCATION, AND ELEVATION OF
FOUNDATIONS, FOOTERS AND GRADE BEAMS.
2 REFER TO STRUCTURAL DRAWINGS FOR DETAILS
OF PIPE CROSSINGS UNDER OR THROUGH THE
STRUCTURAL FOUNDATIONS, FOOTERS AND GRADE
BEAMS.
3 ALL UNDERFLOOR SANITARY SEWERS SHALL BE
INSTALLED AT A MINIMUM SLOPE OF 1%, UNLESS
NOTED OTHERWISE.
4 PROVIDE TRAP PRIMER CONNECTIONS ON ALL
FLOOR DRAINS AND FLOOR SINKS, UNLESS
OTHERWISE NOTED.
5 UNDERFLOOR SANITARY SEWER PIPING SHALL BE A
MINIMUM OF 4" UNLESS NOTED OTHERWISE.
6 SANITARY VENT ROOF PENETRATIONS SHALL BE
PAINTED TO MATCH ROOF COLOR, IN ACCORDANCE
WITH THE DOVER AIR FORCE BASE DESIGN GUIDE.
PROVIDE METAL PIPING WITH 12 INCHES OF ROOF.
SCALE: 1/4" = 1'-0"PP110 P-402
1 ENLARGED PLAN - TOILET ROOMS - WATER
SCALE: 1/4" = 1'-0"PP110 P-402
2 ENLARGED PLAN - MECHANICAL ROOM 106
NOTE:
REFER TO DRAWING 1/P-704
FOR WATER RISER
NOTE:
REFER TO DRAWING 1/P-710
FOR RISER DIAGRAM
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
0.0 0.2 0.9 1
J
K
FUEL CELL TOOL ROOM
TOOL CRIB
1/
2" V
4" V
EEW-1
SS-1
ES-1
EEW-1
SS-1
WF-1
1/
2" V
THR-1
F/R/L
0.0 0.2 0.9 1
J
K
TOOL CRIB
F/R/L COMBINATION UNIT WITH
1/2" QUICK DISCONNECT FITTING.
REFER TO DETAIL P-502. (TYP.)
1" TA
1 1/4" TA
1/
4" T
A
3/4" TA
1/ 2"
T A
3/4" TA 1" TA 1" TA
1/ 2"
T A
1/2" TA 3/4" TA 1" TA
1" T
A 1"
T A
1/2" TA
1/2" TA
1/2" TA
1/2" TA
1/2" TA
1/2" TA
3/4" TA
1/2" TA
1/2" TA
3/4" TA
1/2" TA
1/2" TA
1/2" TA
1/2" TA
1/2" TA
EEW-1
SS-1
MV-4
ES-1
MV-3
EEW-1
MV-4
SS-1
WH-1
SLEEVE AND SEAL
WALL PENETRATION SLEEVE AND SEAL
WALL PENETRATION
WF-1
1/2" CW
6 6
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:4
:3
P M
P-403
P L
U M
B
IN
G E
N L
A R
G E
D P
L A
N S
D W
H M
J M
M J M
R T
A
J
U N
E
J U
N E
SCALE: 1/4" = 1'-0"
0 2'-0" 4'-0" 8'-0"
KEYNOTES
1 PROVIDE 2" X 4" TRANSITION ABOVE FLOOR. 4" SAN
TO BELOW FLOOR. PROVIDE 2" SAN CONNECTION
FOR SS-1. PROVIDE 1 1/4" SAN CONNECTION FOR
EEW-1. 1 1/2" VENT TO ABOVE CEILING.
2 4" VENT UP TO 4" VTR.
3 PROVIDE 1/2" CW AND HW TO SS-1.
4 PROVIDE 1/2" CW AND HW TP MV-4. PROVIDE 1/2"
TW FROM MV-4 TO EEW-1. REFER TO DETAIL
4/P-501.
5 PROVIDE 1' CW AND HW TO MV-3. PROVIDE 1 1/4"
TW FROM MV-3 TO ES-1. REFER TO DETAIL 3/P-501.
6 PROVIDE 1/2" SHUTOFF VALVE AND DRAIN…