D_Mech9.pdf
PDF 9 MB Posted
- Solicitation number
- W912BU-18-R-0026
About this file
This document provides details of a federal contract opportunity for construction services for an aircraft maintenance hangar at Dover Air Force Base in Delaware. The U.S. Army Corps of Engineers, Philadelphia District intends to award a firm-fixed price contract between $25 million and $100 million for design-build construction services. The project involves construction of an 84,176 square foot single bay, fully enclosed, fuel cell capable C-5 and C-17 aircraft maintenance hangar with office spaces, tool rooms, break room, toilet facilities and support spaces. The contract duration is anticipated at approximately 610 calendar days. There is no set-aside designated and the procurement will be full and open. The tradeoff source selection process will be used and price and technical proposals are due by April 5, 2019.
Drawings - 8
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18R0026_Specs-AM2.pdf | ||
| 18R0026_Dwgs-AM2.pdf | ||
| 18-R-0026_DAFB_AMH_Pre-proposal_Site_Visit_Attendance_Roster.pdf | ||
| 18R0026_Specs-AM1R1.pdf | ||
| D_Elec10.pdf | ||
| D_Civ2.pdf | ||
| D_Structural4.pdf | ||
| RFI_Format.pdf | ||
| D_Civ3.pdf | ||
| D_Int6.pdf | ||
| D_Fire7.pdf | ||
| D_Arch5.pdf | ||
| D_Tel11.pdf | ||
| 18R0026-SpecsVol1-RTA.pdf | ||
| D_Plum8.pdf | ||
| D_Gen1.pdf | ||
| 18R0026-SpecsVol3-RTA.pdf | ||
| 18R0026-SpecsVol2-RTA.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONDENSER WATER RETURNCWR
CWS CONDENSER WATER SUPPLY
HWR HEATING HOT WATER RETURN
SYMBOL ABBREV DESCRIPTION
HVAC PIPE LEGEND
HWS HEATING HOT WATER SUPPLY
DOMESTIC COLD WATERCW
CONDENSATE DRAINCDCD
CWR
CWS
HWR
HWS
RS/RL
REFRIGERANT SUCTION /
REFRIGERANT LIQUID *
RS/RL
* RS/RL LINES TYPICALLY TO BE SIZED PER EQUIPMENT MANUFACTURER'S
RECOMMENDATIONS UNLESS NOTED OTHERWISE.
DOMESTIC HOT WATERHW
GLYCOL WATER RETURNGWR
GWS GLYCOL WATER SUPPLY
GWR
GWS
CHILLED WATER RETURNCHWR
CHWS CHILLED WATER SUPPLY
CHWR
CHWS
TAG
CFM
AV
AxB
S
T
MECHANICAL SYMBOLS LEGEND
NOTE
T
DDCP
AFS
DESCRIPTIONSYMBOL
AIR DEVICE
ACCESS PANEL
DUCTWORK - AIRFLOW
MEASUREMENT STATION
AIR VENT (AUTOMATIC)
PIPING - BALL VALVE
DUCTWORK - BACKDRAFT
DAMPER
CONNECT TO EXISTING
DIRECT DIGITAL CONTROL PANEL
PIPING - DIRECTION OF WATER
FLOW
DUCTWORK - DIRECTION OF
AIRFLOW - RETURN
DUCTWORK - DIRECTION OF
AIRFLOW - SUPPLY
DUCTWORK - DIFFERENTIAL
PRESSURE
DUCTWORK - DUCT ELEVATION
DROP
DUCTWORK - DIMENSIONS (SIDE
SHOWN x SIDE NOT SHOWN)
DN
DSD
DUCTWORK - DUCT SMOKE
DETECTOR
DUCTWORK - FIRE DAMPER
FD
DUCTWORK - FLEXIBLE DUCT
DUCTWORK - FLEXIBLE
CONNECTION
DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL
DUCTWORK - MOTOR OPERATED
DAMPER
DUCTWORK - EXHAUST OR
RETURN DUCT UP (SLASH MAY
BE FLIPPED)
DUCTWORK - EXHAUST OR
RETURN DUCT DOWN (SLASH
MAY BE FLIPPED)
DUCTWORK - DUCT ELEVATION
RISE
UP
DUCTWORK - SUPPLY DUCT UP
DUCTWORK - SUPPLY DUCT
DOWN
DUCTWORK - MANUAL VOLUME
DAMPER
EXHAUST FAN
HUMIDISTATH
ATFP SHUTDOWN SWITCHATFP
CARBON DIOXIDE SENSORCO2
CO CARBON MONOXIDE SENSOR
PHOTOIONIZATION DETECTOR
PIPING - ELBOW 90° DOWN
PIPING - ELBOW 90° UP
PIPING - FLEXIBLE CONNECTION
PIPING - UNION
PIPING - FLOWMETER - VENTURI
PIPING - FLOWMETER - ORIFICE
PIPING - CAP
PIPING - TEE DOWN
PIPING - TEE UP
PIPING - CHECK VALVE (SWING
GATE)
PIPING - CHECK VALVE (SPRING)
PIPING - ANGLE GLOBE VALVE
PIPING - CALIBRATED BALANCE
VALVE
PIPING - THERMOMETER
PIPING - CONTROL VALVE
(2-WAY)
PIPING - CONTROL VALVE
(3-WAY)
PIPING - PRESSURE GAUGE WITH
GAUGE COCK
PIPING - PT (PRESSURE &
TEMPERATURE) TEST PORT
PIPING - PUMP (ARROW IS
DIRECTION OF FLOW)
P-#
DESCRIPTIONSYMBOL
RETURN OR EXHAUST AIR
DEVICE (SLASH MAY BE FLIPPED)
REMOVE EXISTING TO
STARTER (EQUIPMENT SERVED)
SWITCH
SQUARE SUPPLY AIR DIFFUSER
THERMOSTAT (DASHED LINE
RUNS TO CONTROLLED DEVICE)
PIPING - TEMPERATURE SENSOR
NOX
H2 HYDROGEN SENSOR
NITROGEN OXIDE SENSOR
MV
FS
DESCRIPTIONSYMBOL
PIPING - BUTTERFLY VALVE
PIPING - AIR VENT (MANUAL)
PIPING - PLUG VALVE
PIPING - EXPANSION JOINT
PIPING - GATE VALVE
PIPING - GLOBE VALVE
PIPING - FLOW SWITCH
PIPING - STRAINER WITH VALVED
AND CAPPED BLOW DOWN
PIPING - REDUCER
DUCTWORK - TRANSITION -
RECTANGULAR
DUCTWORK - TRANSITION -
RECTANGULAR TO ROUND /
FLAT OVAL
AxB AxB
AxB
(AØ)
(AxBFO)
PIPING - SOLENOID VALVE
PIPING - PIPE GUIDE
PIPING - PIPE ANCHOR
PIPING - PRESSURE RELIEF
VALVE
PIPING - PRESSURE REDUCING
VALVE
DP
AØ
DUCTWORK - DIMENSIONS -
ROUND
AxBFO
DUCTWORK - DIMENSIONS - FLAT
OVAL (SIDE SHOWN x SIDE NOT
SHOWN)
DUCTWORK - COMBINATION FIRE
/ SMOKE DAMPER
FS
DSD
DUCTWORK - SMOKE DAMPER
SD
DSD
LOUVER
BDD
DOOR LOUVER
DOOR UNDERCUT
L
UC
S
T
PIPING - ELBOW 45°
PIPING - ELBOW 90°
DUCTWORK - ELBOW 90° UP
DUCTWORK - ELBOW 90° DOWN
DUCTWORK - DUCT ELEVATION
RISE (ROUND OR FLAT OVAL)
UP
DUCTWORK - DUCT ELEVATION
DROP (ROUND OR FLAT OVAL)
DN
KEYNOTE#
REVISION#
PID
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
1 2 3 4 5
/1
/2
:1
:5
P M
M-001
M E
C H
A N
IC
A
L S
Y M
B O
L S
A N
D A
B B
R E
V
IA
T
IO
N S
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
NOTE: LEGEND AND ABBREVIATIONS ARE ALL
INCLUSIVE, SOME SYMBOLS OR ABBREVIATIONS
SHOWN MAY NOT BE INCLUDED IN THIS PROJECT
ABBREV DESCRIPTION
SA SUPPLY AIR
SAR SUPPLY AIR REGISTER
SOV SHUT-OFF VALVE
SPECS SPECIFICATIONS
SQ SQUARE
STRUC STRUCTURAL
TA TRANSFER AIR
TEMP TEMPERATURE
TXV THERMAL EXPANSION VALVE
TYP TYPICAL
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
VEF VEHICLE EXHAUST FAN
VEL VELOCITY
VENT VENTILATION, VENTILATOR
VER VEHICLE EXHAUST REEL
VERT VERTICAL
VOL VOLUME
VSD VARIABLE SPEED DRIVE
W/ WITH
W/O WITHOUT
WB WET BULB
WG WATER GAUGE
XFER TRANSFER
ABBREV DESCRIPTION
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MBH 1,000 BTUH
MECH MECHANICAL
MFR / MFGR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MUA MAKE-UP AIR
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
OED OPEN END DUCT
P PUMP
PID PHOTOIONIZATION DETECTOR
PLBG PLUMBING
POC POINT OF CONNECTION
PRESS PRESSURE
PRV PRESSURE RELIEVING VALVE
PSI POUNDS PER SQUARE INCH
PSIG PSI GAUGE
PTAC PACKAGED TERMINAL AIR CONDITIONER
QTY QUANTITY
RA RETURN AIR
REQ'D REQUIRED
RF RETURN FAN
RH RELATIVE HUMIDITY
RM ROOM
RPM REVOLUTIONS PER MINUTE
RTU ROOFTOP AIR HANDLING UNIT
ABBREV DESCRIPTION
FDB DEGREES FAHRENHEIT DRY BULB
FIN FLR FINISHED FLOOR
FLEX FLEXIBLE
FPM FEET PER MINUTE
FT FOOT, FEET
FWB DEGREES FAHRENHEIT WET BULB
GA GAUGE
GC GENERAL CONTRACTOR
GMU GLYCOL MAKEUP UNIT
GPM GALLONS PER MINUTE
GV GRAVITY VENTILATOR
GWR GLYCOL WATER RETURN
GWS GLYCOL WATER SUPPLY
HC HEATING COIL
HOA HAND-OFF-AUTOMATIC
HP HORSE POWER
HPU HEAT PUMP UNIT
HTG HEATING
HTR HEATER
HVAC HEATING VENTILATION / AIR CONDITIONING
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
ID INSIDE DIAMETER
IN INCH(ES)
INSUL INSULATE(D), INSULATION
KW KILOWATTS
L LOUVER
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LWT LEAVING WATER TEMPERATURE
MAG MAGNETIC
MAINT MAINTENANCE
ABBREV DESCRIPTION
CWBT CHILLED WATER BUFFER TANK
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DB DRY BULB
DDC DIRECT DIGITAL CONTROL
DEG DEGREE(S)
DIA DIAMETER
DIFF DIFFUSER
DISC DISCONNECT
DOAS DEDICATED OUTDOOR AIR SYSTEM
DWG DRAWING
DWH DOMESTIC WATER HEATER
EA EXHAUST AIR
EAG EXHAUST AIR GRILLE
EAR EXHAUST AIR REGISTER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
ELEC ELECTRIC(AL)
ERU ENERGY RECOVERY UNIT
ERV ENERGY RECOVERY VENTILATOR
ERW ENERGY RECOVERY WHEEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETR EXISTING TO REMAIN
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
(F) FUTURE
F FAHRENHEIT
FAI FRESH AIR INTAKE
FCU FAN COIL UNIT
ABBREV DESCRIPTION
AC AIR CONDITIONER, AIR CURTAIN
ACCU AIR COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
APD AIR PRESSURE DROP
APPROX APPROXIMATE(LY)
ARCH ARCHITECT OR ARCHITECTURAL
AS AIR SEPARATOR
B BOILER
BCU BLOWER COIL UNIT
BHP BRAKE HORSEPOWER
BI BINARY INPUT
BLDG BUILDING
BOT BOTTOM
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CAP CAPACITY
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CLG CEILING, COOLING
CON CONNECTION
CONC CONCRETE
CONT CONTINUOUS, CONTINUATION
CONTR CONTRACTOR
CONV CONVECTOR
CU CONDENSING UNIT
CU FT CUBIC FEET
CUH CABINET UNIT HEATER
MECHANICAL ABBREVIATIONS
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
12 December 2o18
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
1 2 3 4 5
/1
/2
:1
:0
P M
M-002
M E
C H
A N
IC
A
L G
E N
E R
A L
N O
T E
S
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
7.0 EQUIPMENT
7.1 INSTALL ALL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE
BUILDING, STATE, AND LOCAL CODES, ENERGY CODES, ASHRAE AND NFPA
STANDARDS, AND INSURANCE UNDERWRITER REQUIREMENTS.
7.2 MECHANICAL DEVICES OR EQUIPMENT INSTALLED IN ACOUSTIC TILE CEILINGS
SHALL BE CENTERED IN THE TILE, IN BOTH DIRECTIONS.
8.0 CONTROLS
8.1 COORDINATE AUXILIARY CONTACT AND RELAY REQUIREMENTS WITH SEQUENCES
OF OPERATION.
8.2 COORDINATE MOTOR AND MOTOR CONTROL REQUIREMENTS WITH EQUIPMENT
SCHEDULES AND SEQUENCES OF OPERATION.
8.3 HARDWIRE ALL SAFETIES TO SHUTDOWN HVAC EQUIPMENT.
8.4 LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN
ACCESSIBLE LOCATIONS WITH A STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM
AND DOWNSTREAM, AS RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.
8.5 ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC
CODE, DIVISION 26 OF THE SPECIFICATIONS, AND ALL LOCAL CODES.
8.6 UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS 48" (CENTER LINE)
ABOVE FINISHED FLOOR IN ACCORDANCE WITH ADA REQUIREMENTS. NOTIFY THE
QUALITY CONTROL MANAGER OF ANY ROOMS WHERE THE ABOVE LOCATION
CANNOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION.
8.7 COORDINATE POINT NOMENCLATURE WITH DOVER AIR FORCE BASE STANDARDS.
8.8 ALL CONTROL WIRING SHALL BE HARDWIRED; WIRELESS IS PROHIBITED.
8.9 CENTRAL BUILDING AUTOMATION SYSTEM (BAS) IS LOCATED IN BUILDING 615. THIS
PROJECT SHALL BE CONNECTED TO CENTRAL BAS FOR MONITORING AND
CONTROL.
9.0 TEST AND INSPECTION
9.1 TESTING ADJUSTING AND BALANCING (TAB) AGENCY SHALL BE A MEMBER OF THE
ASSOCIATED AIR BALANCING COUNCIL (AABC), THE NATIONAL ENVIRONMENTAL
BALANCING BUREAU (NEBB), OR THE TESTING, ADJUSTING AND BALANCING
BUREAU (TABB). THE TAB FIRM SHALL BE A SUBCONTRACTOR HIRED DIRECTLY BY
THE GENERAL CONTRACTOR. TAB FIRM SHALL HAVE A MINIMUM OF 5 YEARS
EXPERIENCE ON SIMILAR PROJECTS. PERFORM TAB IN ACCORDANCE WITH THE
REQUIREMENTS OF THE TAB PROCEDURAL STANDARD RECOMMENDED BY THE TAB
TRADE ASSOCIATION THAT APPROVED THE TAB FIRM'S QUALIFICATIONS. COMPLY
WITH REQUIREMENTS OF AABC MN-1, NEBB PROCEDURAL STANDARDS, OR SMACNA
HVAC TAB(TABB) AS SUPPLEMENTED AND MODIFIED BY SPECIFICATION SECTIOS.
11.0 CUTTING AND PATCHING
11.1 PERFORM CUTTING, ROUGH AND FINAL PATCHING, AND MASONRY TO MATCH
EXISTING.
11.2 WORK INDICATED ON THESE DRAWINGS SHALL INCLUDE THE REMOVAL,
REPLACEMENT, DEMOLITION, CUTTING, PLASTERING AND PAINTING OF EXISTING
SURFACES ABOVE, BELOW AND ADJACENT TO THE ROOMS SHOWN.
11.3 RESTORE ALL SURFACES AND FLOORS TO THE CONDITION PRIOR TO
CONSTRUCTION.
11.4 THE CONTRACTOR SHALL ENSURE THAT THE PATCHING AND REPAIR WILL
COORDINATE WITH THE WORK OF THE GENERAL CONTRACTORS FINAL FINISHES.
11.5 WHERE NEW SURFACES ABUT EXISTING SURFACES, FINISHED SURFACES SHALL BE
IN THE SAME PLANE.
11.6 TEMPORARILY SUPPORT WALL OR CEILING PENETRATIONS.
11.7 FIRE STOP ALL FLOOR/CEILING PENETRATIONS AND ALL PENETRATIONS THROUGH
RATED PARTITIONS/WALLS.
3.0 WORK AREA
3.1 PROVIDE CONSTRUCTION AND DUST BARRICADES AS INDICATED AND AS DIRECTED
BY THE OWNER TO ISOLATE WORK AREAS FROM OTHER PARTS OF THE BUILDING.
3.2 BARRICADES SHALL HAVE LOCKABLE DOOR TO PREVENT UNAUTHORIZED ENTRY.
PROVIDE "WIPE OFF" MATS TO MINIMIZE TRACKING DUST AND DEBRIS.
3.3 DEVELOP, POST, AND IMPLEMENT NEW, SAFE PATHS OF EGRESS IF BARRICADES
BLOCK NORMAL PATHS OF EGRESS.
3.4 PROVIDE TEMPORARY EXIT SIGNS.
3.5 DUST-PROOF PARTITIONS SHALL HAVE LOCKABLE PRE-HUNG DOOR 3'-0" X 7'-0" TO
PREVENT UNAUTHORIZED ENTRY, FIRE PROOF OR METAL STUDS AND PLYWOOD.
"WIPE OFF" MATS TO MINIMIZE TRACKING DUST AND DEBRIS TO ADJOINING SPACES,
AND TEMPORARY EXIT SIGNS IF PARTITIONS INTERFERE WITH PATHS OF EGRESS.
3.6 IF DUST-PROOF PARTITIONS BLOCKS NORMAL PATHS OF EGRESS, THE PRIME
CONTRACTOR SHALL DEVELOP, POST, AND IMPLEMENT NEW, SAFE PATHS OF
EGRESS.
3.7 PROVIDE CONSTRUCTION AND DUST BARRICADES, AS REQUIRED, AND DIRECTED
BY THE OWNER, TO ISOLATE WORK AREAS, AND MAINTAIN REQUIRED EGRESS
PATHWAYS. PROVIDE TEMPORARY EXIT SIGNAGE, WALK-OFF MATS AND DOORS.
3.8 RETURN ADJACENT AREAS DISTURBED BY THIS PROJECT’S CONSTRUCTION TO THE
CONDITION PRIOR TO CONSTRUCTION.
4.0 HVAC WORK
4.1 THE CONTRACTOR SHALL COORDINATE THE LOCATIONS OF GRILLES, REGISTERS
AND DIFFUSER WITH THE CEILING GRID, LIGHTING AND SPRINKLER HEAD LAYOUTS.
4.2 ALL HEATING DEVICES AND SURFACES WITH ELEVATED TEMPERATURES WHICH
CAN BE ACCESSED OR COME IN CONTACT WITH OWNER PERSONNEL SHALL BE
PROTECTED, INSULATED, OR CONTROLLED TO REMAIN BELOW 120°F.
4.3 ALL PIPING AND DUCTWORK SHALL CLEAR DOORS, WINDOWS, EQUIPMENT
CLEARANCES, MAINTENANCE REQUIREMENTS, CODE SETBACKS, ETC. TO ASSURE
PROPER OPERATION, INSPECTION, AND MAINTENANCE.
4.4 WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED. ATTACHMENTS
SHALL BE MADE USING CLAMPS MEETING MSS STANDARDS AS SPECIFIED.
4.5 MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED
FROM ROOF OR DECK ASSEMBLY. SUPPORTS SHALL ATTACH TO STRUCTURAL
MEMBERS.
4.6 PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT
VIBRATION TRANSMISSION TO BUILDING STRUCTURE.
4.7 OFFSET DUCTWORK AS REQUIRED, COORDINATE WITH CEILING HEIGHTS.
4.8 PROVIDE ACCESS DOORS AT EVERY LOCATION THAT A VOLUME DAMPER, FIRE
DAMPER, VALVE OR OTHER CONTROL/BALANCING ITEM WILL BE INSTALLED ABOVE
AN INACCESSIBLE CEILING.
5.0 DUCTWORK
5.1 PROVIDE ALL 90 DEGREE SQUARE DUCT ELBOWS WITH TURNING VANES UNLESS
OTHERWISE INDICATED OR SPECIFIED. PROVIDE ACCESS DOORS UPSTREAM OF
ALL ELBOWS CONTAINING TURNING VANES.
5.2 ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE
COPPER GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED OR
SOLDERED TO BOTH THE EQUIPMENT AND THE DUCT.
5.3 COORDINATE DUCT ROUTING AND ELEVATION WITH LIGHTING, CEILING GRID,
PIPING, CABLE TRAYS, CONDUIT, AND ALL OTHER ITEMS REQUIRED FOR THE
COMPLETION OF THIS PROJECT.
5.4 FOR VAV SYSTEMS, DUCTWORK SHALL BE ROUND OR EQUIVALENT FLAT OVAL OF
SIZES INDICATED. DUCTWORK BETWEEN AHU AND VAV BOXES SHALL BE SIZED TO
0.2 INCHES STATIC PRESSURE LOSS PER 100 FEET OF DUCT RUN. DUCTWORK
DOWNSTREAM OF VAV BOXES, RETURN, EXHAUST AND TRANSFER AIR DUCTS
SHALL BE SIZED TO 0.08 INCHES PER 100 FOOT OF DUCT RUN. ALL REVISIONS MUST
BE COORDINATED WITH ALL OTHER TRADES AND ILLUSTRATED IN DUCTWORK
SHOP DRAWINGS FOR APPROVAL.
6.0 PIPING
6.1 INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND
OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
6.2 ALL ISOLATION VALVES SHALL BE IN A LOCATION AND ELEVATION WHICH ALLOWS
FOR EQUIPMENT AND BRANCH PIPING REMOVAL, WHILE MAINTAINING SERVICE
UPSTREAM OF THE ISOLATION VALVE.
6.3 ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
6.4 ALL BALANCING VALVES AND ISOLATION VALVES USED TO ADJUST FLOW RATES
SHALL BE PROVIDED WITH POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOPS (MEMORY STOPS).
6.5 ALL ISOLATION VALVES (EXCEPT CONTROL VALVES) AND PIPING SPECIALTIES AND
STRAINERS SHALL BE FULL LINE SIZE BEFORE REDUCING SIZE TO MAKE
CONNECTIONS TO EQUIPMENT AND CONTROLS.
6.6 MECHANICAL JOINTS SUCH AS UNIONS, FLANGES, OR THREADED FITTINGS SHALL
BE INSTALLED AT EACH EQUIPMENT CONNECTION, IN BYPASSES, AT FLOOR
PENETRATIONS, AT CONTROL DEVICES, AND IN LONG PIPE RUNS (100 FEET OR
MORE) TO PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS.
6.7 MEASURE, CUT, AND INSTALL PIPE LENGTH ACCURATELY TO MINIMIZE
MISALIGNMENT. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.
1.0 GENERAL
1.1 DO NOT SCALE DRAWINGS. CONDITIONS ARE DIAGRAMMATICALLY INDICATED.
1.2 PROVIDE ALL WORK INDICATED OR IMPLIED ON THE DRAWINGS UNLESS
SPECIFICALLY NOTED OTHERWISE.
1.3 PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE
DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.
1.4 ALL WORK SHOWN ON THE DRAWINGS IS TO BE BY THE CONTRACTOR UNLESS
SPECIFICALLY NOTED OTHERWISE.
1.5 EQUIPMENT SUBMITTALS AND SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS
SHALL BE APPROVED BY ENGINEER PRIOR TO PURCHASE, FABRICATION, AND
INSTALLATION.
1.6 WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED,
THE PRODUCTS OF A SINGLE MANUFACTURER SHALL BE USED.
1.7 VERIFY EXISTING CONDITIONS AT THE SITE AND REPORT DISCREPANCIES TO THE
OWNER’S REPRESENTATIVE BEFORE PROCEEDING WITH WORK.
1.8 LIMITS OF WORK ARE SHOWN FOR GENERAL REFERENCE AND DO NOT ESTABLISH
PRECISE BOUNDARIES OF WORK FOR ANY TRADE THAT MAY BE REQUIRED TO
COMPLETE THE PROJECT.
1.9 THE VERBIAGE ON THE DRAWING INDICATING TYPES OF MATERIALS IS INTENDED
TO AID THE CONTRACTOR IN UNDERSTANDING THE VARIOUS CONDITIONS LIKELY
TO BE ENCOUNTERED.
1.10 THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING QUANTITIES OF MATERIALS
REQUIRED TO COMPLETE THE PROJECT.
1.11 REFER TO DETAILS FOR ADDITIONAL REQUIREMENTS REGARDING SIZES AND
ARRANGEMENTS.
1.12 PAINT COLORS AND OTHER FINISHES ARE SUBJECT TO CHANGE FROM THOSE
LISTED IN THE CONTRACT DOCUMENTS WITHOUT NOTICE. CONTRACTOR TO
SUBMIT SAMPLES OF PROPOSED COLORS AND FINISHES TO OWNER FOR REVIEW
AND APPROVAL BEFORE THE INSTALLATION/FINISHING OF SURFACES.
1.13 IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE AND TO MAINTAIN THE
BUILDING'S STRUCTURAL INTEGRITY DURING ALL PHASES OF DEMOLITION AND
NEW WORK. PROVIDE ALL REQUIRED SUPPORT, SHORING, PINNING, ETC. TO
ASSURE THIS REQUIREMENT.
1.14 MAINTAIN BUILDING IN WEATHERPROOF AND WATERTIGHT CONDITIONS
THROUGHOUT THE DURATION OF CONSTRUCTION.
1.15 FIRE STOP ALL FLOOR/CEILING PENETRATIONS AND ALL PENETRATIONS THROUGH
RATED PARTITIONS/WALLS.
1.16 THE CONTRACTOR SHALL LEGALLY DISPOSE OF ALL THEIR DEMOLISHED
MATERIALS OFF-SITE PER REGULATIONS OF AUTHORITIES HAVING JURISDICTION
OVER THIS PROJECT.
1.17 WORK SHOWN ON DRAWINGS INVOLVES THE REMOVAL, REPLACEMENT,
DEMOLITION, CUTTING, PATCHING AND PLASTERING OF EXISTING SURFACES IN
ROOMS ABOVE AND BELOW THE CONSTRUCTION AREA. ALL OF THIS WORK IS BY
THE CONTRACTOR. THE CONTRACTOR SHALL RESTORE ALL SURFACES AND
FLOORS THAT ARE AFFECTED BY THEIR WORK. THE CONTRACTOR SHALL
COORDINATE THE PATCHING AND REPAIR OF THEIR WORK WITH THE WORK OF THE
GENERAL CONTRACTOR’S FINAL FINISHES.
1.18 CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC
AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
CONTRACTOR SHALL BE RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS
AND ACCOMMODATE ACTUAL SITE CONDITIONS AS PART OF SCOPE OF WORK AT
NO ADDITIONAL COST TO GOVERNMENT.
1.19 MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS,
CONDUITS, SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS
ROUTES IN MECHANICAL ROOMS.
1.20 COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH MANUFACTURERS'
CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING
TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED
EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCTWORK AND PIPING
DIMENSIONS BEFORE FABRICATION.
1.21 ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND
SUPPORT OF MECHANICAL WORK AS SHOWN IN DETAILS FOR PIPING, DUCTWORK
AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND
INSTALLED BY THE MECHANICAL CONTRACTOR AT NO ADDITIONAL COST.
1.22 ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED,
SPECIFIED AND AS REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.
1.23 PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS CONNECTED TO
FANS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION. FLEXIBLE
CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE
EQUIPMENT UNLESS OTHERWISE INDICATED.
2.0 COORDINATION
2.1 REFER TO AND INCORPORATE THE ARCHITECTURAL, PLUMBING, ELECTRICAL AND
FIRE PROTECTION DRAWINGS FOR COORDINATION REQUIREMENTS OF NEW WORK.
2.2 COORDINATE WITH THE ELECTRICAL CONTRACTOR:
2.2.1 LOCATION AND POWER REQUIREMENTS OF EQUIPMENT, CONTROL PANELS AND
DEVICES.
2.2.2 MECHANICAL CONTRACTOR SHALL FURNISH MOTOR CONTROL DEVICES TO
ELECTRICAL CONTRACTOR FOR INSTALLATION. MOTOR CONTROL DEVICES
INCLUDE BUT ARE NOT LIMITED TO FUSED DISCONNECTS, DISCONNECTS, MOTOR
STARTING SWITCHES, PUSH BUTTON STATIONS, FRACTIONAL HORSEPOWER
MANUAL MOTOR STARTERS WITH THERMAL OVERLOADS, 3 PHASE MOTOR
CONTACTORS, COMBINATION MOTOR STARTERS, VARIABLE FREQUENCY DRIVES,
SINGLE PHASE MOTOR SPEED ADJUSTMENT DEVICES.
2.2.3 COORDINATE ALL ELECTRICAL REQUIREMENTS AND LOCATIONS OF ALL EQUIPMENT
WITH THE ELECTRICAL CONTRACTOR PRIOR TO ORDERING AND INSTALLATION.
2.2.4 LOCATIONS AND SIZES OF ALL FLOOR, WALL AND ROOF OPENINGS SHALL BE
COORDINATED WITH ALL OTHER TRADES INVOLVED.
MECHANICAL - HVAC REQUIRED CODES, STANDARDS, & REFERENCES
• INTERNATIONAL BUILDING CODE 2012
• INTERNATIONAL MECHANICAL CODE 2012
• INTERNATIONAL ENERGY CONSERVATION CODE 2012
• INTERNATIONAL FUEL GAS CODE 2012
• ASHRAE 62.1-2013, VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
• ASHRAE 90.1 ENERGY EFFICIENT DESIGN OF NEW LOW-RISE RESIDENTIAL BUILDINGS
• ASHRAE HANDBOOKS: 2013 FUNDAMENTALS, 2014 REFRIGERATION, 2015 HVAC APPLICATIONS, 2012 HVAC SYSTEMS
AND EQUIPMENT
• ALL OTHER APPLICABLE ASHRAE HANDBOOKS AND GUIDELINES.
• EPACT 2005
• ALL OTHER APPLICABLE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES AND STANDARDS
• SMACNA HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE
• SMACNA, HVAC SYSTEMS – TESTING, ADJUSTING, AND BALANCING
• UFC 1-200-01, GENERAL BUILDING REQUIREMENTS
• UFC 1-200-01, HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS
• UFC 3-401-01, MECHANICAL ENGINEERING
• UFC 3-410-01, HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS
• UFC 4-010-01, DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS
• UFC 3-400-02, DESIGN: ENGINEERING WEATHER DATA
• UFC 4-211-01, AIRCRAFT MAINTENANCE HANGARS
• UFC 4-211-02, AIRCRAFT CORROSION CONTROL AND PAINT FACILITIES
GENERAL NOTES
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
MH111 MH112
MH113 MH114
MH113 MH114
MH115
MH114
MH115
A
B
C
D
E
F
G
H
J
K
L
M
N
0.0 1 2 3
4 5 6 7 8 9 10 11 12 13
MH111
MH113
MH112
MH114
MH110 M-402
BREAKROOM
OFFICE
VESTIBULE
V001
RESTROOM
G002
J.C.
G001
TER
HALLWAY
C001
RESTROOM WOMEN'S
G003
MENS LOCKER RM
G006
MECHANICAL ROOM
ELEC
FUEL CELL TOOL
ROOM
TOOL CRIB
MECH
HANGAR
M-301M-301
M-301M-301
MH110 M-401
MH110 M-401
M-302M-301
M-302M-301
OFFICE
WOMENS LOCKER RM
G005
CORRIDOR
C002
RESTROOM MEN'S
G004
OPEN OFFICE
TR
ELECTRICAL ROOM
FIRE PUMP AND FOAM
TANK ROOM
M-505MH110
M-505MH110
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:2
:2
P M
MH110
H V
A C
S T
F L
O O
R P
L A
N
C O
M P
R E
H E
N S
IV
E
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
SCALE: 1/16" = 1'-0"
HVAC - 1ST FLOOR PLAN - COMPREHENSIVE
KEYNOTES
SCALE: 1/16" = 1'-0"
0 8'-0" 16'-0" 32'-0"
GENERAL NOTES - HVAC
1 SEE SHEETS M-001 AND M-002 FOR LEGENDS,
ABBREVIATIONS, AND GENERAL NOTES.
2 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE
AND DO NOT ILLUSTRATE ALL SPECIFIC DUCT
TAKE-OFF CONFIGURATIONS, TAPS, ETC. REFER TO
PROJECT SPECIFICATIONS AND DUCTWORK
DETAILS FOR SPECIFIC REQUIREMENTS.
3 ALL EQUIPMENT SHALL BE INSTALLED WITH
MANUFACTURER’S REQUIRED ACCESS SPACE
BETWEEN UNIT AND FULL HEIGHT WALLS AND
OTHER OBSTRUCTIONS.
4 PROVIDE MANUAL VOLUME DAMPERS IN ALL
RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS
FROM MAIN SUPPLY DUCTS, AND ALL OTHER
LOCATIONS AS REQUIRED TO PROVIDE PROPER
SYSTEM AIRFLOW BALANCING. BALANCING
DAMPERS ARE NOT REQUIRED BETWEEN SUPPLY
FAN AND VAV BOXES.
5 ALL SUPPLY AIR DUCT RUN-OUTS TO DIFFUSERS
AND VAV BOXES SHALL BE SIZED TO MATCH THE
NECK SIZE OF THE DEVICE AS INDICATED ON THE
DIFFUSER, REGISTER AND GRILLE SCHEDULE
UNLESS OTHERWISE NOTED.
SCALE: 1/16" = 1'-0"
0 8'-0" 16'-0" 32'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
MH113
MH113
MH110MH110
MH110
MH110
MH113 MH113
HVLS-A
ACU-01
HALLWAY
C001
BREAKROOM
OFFICE
VESTIBULE
V001
TER
J.C.
G001
RESTROOM
G002
EF-01
MH112
MH113 MH114
A
B
C
D
E
0.0 1 2 3 4 5 6 7
MH113
HANGAR
M-301M-301
M-301M-301
HVLS-A
D
TYP 2
OFFICE
Ø S A
B
B
5Ø SA
Ø S A
12Ø SA
8Ø SA
C
C
DN
A
Ø S A
C
B 2508Ø
S A
DN A
I I
G
G x1 R A x2 R A
I
6Ø E A
S
H
E 508x8 EA
E
F
M x1 E A
M
N
TYP 2
x2 T A
M
N x2 T A
ACCU-01
IRH-B IRH-B IRH-B
4Ø O A
4Ø O A
4Ø O A
M-302M-301
M-302M-301
WOMENS LOCKER RM
G005
RESTROOM MEN'S
G004
VAV-02
VAV-04
VAV-05
OPEN OFFICE
LOBBY
L001 x1
14x1414x14
RESTROOM WOMEN'S
G003
HEATING CONTROL
PANEL #1
L
D
TYP 2
8Ø SA
6Ø SA
5Ø SA
10Ø SA
14Ø SA
Ø S A
VAV-03
Ø S A
10Ø SA
VAV-06
Ø S A
14Ø SA
18000
1 1 1 1
4Ø OA 4Ø OA 4Ø OA4Ø OA
IRH-B IRH-B IRH-B IRH-B
4Ø O A
4Ø O A
4Ø OA 4Ø OA
4Ø OA 4Ø OA
IRH-A IRH-A IRH-A IRH-A
4Ø OA 4Ø OA 4Ø OA 4Ø OA
6Ø O A
6Ø O A
4Ø E A
4Ø E A
4Ø E A
4Ø E A
IRH-A IRH-A IRH-A IRH-A
6Ø EA
U P
U P
U P
U P
VP-A
8Ø EA
8Ø EA
6Ø OA6Ø OA
VP-A
6Ø OA5
6Ø OA
D N
Ø S A
16x16 TA
Ø S A x1
14x14 TA
108x72 OA
108x20 OA
108x20 OA
108x72 OA
DN
P
TYP 4
P
TYP 4
VP-B
VP-B
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:2
:3
P M
MH111
H V
A C
S T
F L
O O
R P
L A
N
A R
E A
A
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
SCALE: 1/8" = 1'-0"M-301 MH111
1 HVAC - 1ST FLOOR PLAN - AREA A
KEYNOTES
1 INSTALL INFRARED RADIANT HEATER AT
UNDERSIDE OF STRUCTURAL BEAM. PROVIDE
FLEXIBLE DUCT CONNNECTIONS.
2 MAINTAIN 8 FT VERTICAL CLEARANCE FROM
BOTTOM OF ROOF DECK AND 2 FT HORIZONTAL
CLEARANCE FROM STRUCTURAL BEAMS ON HVLS
FANS.
3 PROVIDE DUCTWORK CONSTRUCTED OF
STAINLESS STEEL OR ALUMINUM (TYP OF
BATHROOM EXHAUST).
4 PROVIDE EXHAUST FAN MANUFACTURER’S
STANDARD WALL CAP DISCHARGE ACCESSORY
COMPLETE WITH BACKDRAFT DAMPER AND INSECT
SCREEN.
5 DUCT PENETRATION TO BUILDING EXTERIOR.
PROVIDE BACKDRAFT DAMPER AND VENT CAP.
REFER TO 4/M-503.
6 MANUAL ON/OFF SWITCH FOR OCCUPANT
CONTROL.
7 REFER TO HANGAR OUTDOOR AIR REGISTER
DETAIL.
8 PROVIDE BIRD SPIKES ON ALL HORIZONTAL
PORTIONS OF MECHANICAL EQUIPMENT BELOW
BIRD NETTING TO INCLUDE BUT NOT LIMITED TO:
DUCTWORK, PUMPS, AND PANELS; TO PREVENT
NEXTING.
9 PROVIDE RECESSED INFRARED HEATING CONTROL
PANEL. MAINTAIN WALL FIRE RATING.
GENERAL NOTES - HVAC
1 SEE SHEETS M-001 AND M-002 FOR LEGENDS,
ABBREVIATIONS, AND GENERAL NOTES.
2 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE
AND DO NOT ILLUSTRATE ALL SPECIFIC DUCT
TAKE-OFF CONFIGURATIONS, TAPS, ETC. REFER TO
PROJECT SPECIFICATIONS AND DUCTWORK
DETAILS FOR SPECIFIC REQUIREMENTS.
3 ALL EQUIPMENT SHALL BE INSTALLED WITH
MANUFACTURER’S REQUIRED ACCESS SPACE
BETWEEN UNIT AND FULL HEIGHT WALLS AND
OTHER OBSTRUCTIONS.
4 PROVIDE MANUAL VOLUME DAMPERS IN ALL
RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS
FROM MAIN SUPPLY DUCTS, AND ALL OTHER
LOCATIONS AS REQUIRED TO PROVIDE PROPER
SYSTEM AIRFLOW BALANCING. BALANCING
DAMPERS ARE NOT REQUIRED BETWEEN SUPPLY
FAN AND VAV BOXES.
5 ALL SUPPLY AIR DUCT RUN-OUTS TO DIFFUSERS
AND VAV BOXES SHALL BE SIZED TO MATCH THE
NECK SIZE OF THE DEVICE AS INDICATED ON THE
DIFFUSER, REGISTER AND GRILLE SCHEDULE
UNLESS OTHERWISE NOTED.
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
MH110
MH110
MH110
MH110 MH110
MH111
MH113 MH114
A
B
C
D
E
7 8 9 10 11 12 13
MH114
HVLS-A
VP-A
VP-A
4Ø OA4Ø OA
Ø O A
4Ø OA4Ø OA 4Ø OA4Ø OA
4Ø OA4Ø OA
Ø O A
IRH-AIRH-A
IRH-AIRH-A
IRH-BIRH-B
IRH-AIRH-A
IRH-AIRH-A
IRH-BIRH-B
IRH-B IRH-B IRH-B
Ø O A
Ø O A
Ø O A
4Ø OA4Ø OA4Ø OA4Ø OA
3L
HEATING CONTROL
PANEL #2
HANGAR
VP-B
18000
Ø O A
Ø O A
Ø E A
Ø E A
Ø E A
Ø E A
8Ø EA
8Ø EA
U P
U P
U P
U P
VP-B
6Ø OA
6Ø OA
VP-A
VP-B
6Ø OA
108x72 OA
108x20 OA
108x72 OA
108x20 OA
P
TYP 4
P
TYP 4
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:2
:4
P M
MH112
H V
A C
S T
F L
O O
R P
L A
N
A R
E A
B
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
SCALE: 1/8" = 1'-0"M-301 MH112
1 HVAC - 1ST FLOOR PLAN - AREA B
KEYNOTES
1 INSTALL INFRARED RADIANT HEATER AT
UNDERSIDE OF STRUCTURAL BEAM. PROVIDE
FLEXIBLE DUCT CONNNECTIONS.
2 MAINTAIN 8 FT VERTICAL CLEARANCE FROM
BOTTOM OF ROOF DECK AND 2 FT HORIZONTAL
CLEARANCE FROM STRUCTURAL BEAMS ON HVLS
FANS.
3 DUCT PENETRATION TO BUILDING EXTERIOR.
PROVIDE BACKDRAFT DAMPER AND VENT CAP.
REFER TO 4/M-503.
4 REFER TO HANGAR OUTDOOR AIR REGISTER
DETAIL.
5 PROVIDE BIRD SPIKES ON ALL HORIZONTAL
PORTIONS OF MECHANICAL EQUIPMENT BELOW
BIRD NETTING TO INCLUDE BUT NOT LIMITED TO:
DUCTWORK, PUMPS, AND PANELS; TO PREVENT
NEXTING.
6 PROVIDE RECESSED INFRARED HEATING CONTROL
PANEL. MAINTAIN WALL FIRE RATING.
GENERAL NOTES - HVAC
1 SEE SHEETS M-001 AND M-002 FOR LEGENDS,
ABBREVIATIONS, AND GENERAL NOTES.
2 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE
AND DO NOT ILLUSTRATE ALL SPECIFIC DUCT
TAKE-OFF CONFIGURATIONS, TAPS, ETC. REFER TO
PROJECT SPECIFICATIONS AND DUCTWORK
DETAILS FOR SPECIFIC REQUIREMENTS.
3 ALL EQUIPMENT SHALL BE INSTALLED WITH
MANUFACTURER’S REQUIRED ACCESS SPACE
BETWEEN UNIT AND FULL HEIGHT WALLS AND
OTHER OBSTRUCTIONS.
4 PROVIDE MANUAL VOLUME DAMPERS IN ALL
RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS
FROM MAIN SUPPLY DUCTS, AND ALL OTHER
LOCATIONS AS REQUIRED TO PROVIDE PROPER
SYSTEM AIRFLOW BALANCING. BALANCING
DAMPERS ARE NOT REQUIRED BETWEEN SUPPLY
FAN AND VAV BOXES.
5 ALL SUPPLY AIR DUCT RUN-OUTS TO DIFFUSERS
AND VAV BOXES SHALL BE SIZED TO MATCH THE
NECK SIZE OF THE DEVICE AS INDICATED ON THE
DIFFUSER, REGISTER AND GRILLE SCHEDULE
UNLESS OTHERWISE NOTED.
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
MH110
TOOL CRIB
FUEL CELL TOOL
ROOM
MECHANICAL ROOM
ELEC
HANGAR
MH111 MH112
MH114
MH114
MH115
F
G
H
J
K
0.0 1 2 3 4 5 6 7
MH111
M-301M-301
M-301M-301
M-301MH113
M-301MH113
HVLS-A
Ø S A
C
C
B
8Ø S A
12Ø SA
I
EUH-01
K
EF-04
N
TYP 3
16x16 EA
EF-02
H
F
14x14 EA x1 E A
E
N x2 T A
IRH-B IRH-B IRH-B
IRH-A IRH-A IRH-B
6Ø OA
4Ø EA
4Ø EA
4Ø OA
4Ø O A
4Ø O A
4Ø O A
4Ø O A
4Ø O A
4Ø O A
6Ø E A
8Ø EA
VP-B
6Ø E A
IRH-B
IRH-B IRH-B
IRH-BIRH-AIRH-A
VP-A
6Ø OA
4Ø O A
4Ø OA
4Ø O A
4Ø O A
4Ø EA6Ø OA
4Ø EA
4Ø O A
4Ø O A
M-302M-301
M-302M-301
MENS LOCKER RM
G006
L-07
L-08
L-09
L-10
L-11
MH110 M-401
MH110 M-401
RESTROOM MEN'S
G004
18x18 SA
18x18 EA
EF-08
L-21
EEF-01
VAV-01
VAV-02
8Ø SA
CORRIDOR
C002
14x14
RESTROOM WOMEN'S
G003
CH-01
EF-07
22x22 EA
L-29
8Ø SA14Ø SA
16x16 SA
M-505MH110
M-505MH110
L-12
VP-A
VP-B
8Ø E A
6Ø OA
8Ø EA
UP
UP
UP
UP
44x40 SA x4 S A 5
20x20 EA
20x20 EA 36x36 EA
D N
6Ø O A x2 R A
14Ø SA
14x14 TA
16x16 SA
TYP 3 7
16x16 SA
(TYP)
TYP 3
FCU-01
36x24 OA
36x24 OA
FCU-02
6Ø EA
60x30 SA
ECCENTRIC TRANSITION
FITTINGS TO OFFSET BELOW
STRUCTURE, COORDINATE WITH
STRUCTURAL DRAWINGS
UP
6Ø EA
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:2
:5
P M
MH113
H V
A C
S T
F L
O O
R P
L A
N
A R
E A
C
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
SCALE: 1/8" = 1'-0"M-301 MH113
1 HVAC - 1ST FLOOR PLAN - AREA C
KEYNOTES
1 INSTALL INFRARED RADIANT HEATER AT
UNDERSIDE OF STRUCTURAL BEAM. PROVIDE
FLEXIBLE DUCT CONNNECTIONS.
2 MAINTAIN 8 FT VERTICAL CLEARANCE FROM
BOTTOM OF ROOF DECK AND 2 FT HORIZONTAL
CLEARANCE FROM STRUCTURAL BEAMS ON HVLS
FANS.
3 DUCT PENETRATION TO BUILDING EXTERIOR.
PROVIDE BACKDRAFT DAMPER AND VENT CAP.
REFER TO 4/M-503.
4 PROVIDE DUCTWORK CONSTRUCTED OF
STAINLESS STEEL OR ALUMINUM (TYP OF
BATHROOM EXHAUST).
5 12"Ø OWAHU SUPPLY AIR DUCT DOWN.
6 12"Ø OWAHU EXHAUST AIR DUCT DOWN.
7 OPEN ENDED DUCT. PROVIDE WIRE MESH GUARD.
8 PROVIDE BIRD SPIKES ON ALL HORIZONTAL
PORTIONS OF MECHANICAL EQUIPMENT BELOW
BIRD NETTING TO INCLUDE BUT NOT LIMITED TO:
DUCTWORK, PUMPS, AND PANELS; TO PREVENT
NEXTING.
GENERAL NOTES - HVAC
1 SEE SHEETS M-001 AND M-002 FOR LEGENDS,
ABBREVIATIONS, AND GENERAL NOTES.
2 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE
AND DO NOT ILLUSTRATE ALL SPECIFIC DUCT
TAKE-OFF CONFIGURATIONS, TAPS, ETC. REFER TO
PROJECT SPECIFICATIONS AND DUCTWORK
DETAILS FOR SPECIFIC REQUIREMENTS.
3 ALL EQUIPMENT SHALL BE INSTALLED WITH
MANUFACTURER’S REQUIRED ACCESS SPACE
BETWEEN UNIT AND FULL HEIGHT WALLS AND
OTHER OBSTRUCTIONS.
4 PROVIDE MANUAL VOLUME DAMPERS IN ALL
RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS
FROM MAIN SUPPLY DUCTS, AND ALL OTHER
LOCATIONS AS REQUIRED TO PROVIDE PROPER
SYSTEM AIRFLOW BALANCING. BALANCING
DAMPERS ARE NOT REQUIRED BETWEEN SUPPLY
FAN AND VAV BOXES.
5 ALL SUPPLY AIR DUCT RUN-OUTS TO DIFFUSERS
AND VAV BOXES SHALL BE SIZED TO MATCH THE
NECK SIZE OF THE DEVICE AS INDICATED ON THE
DIFFUSER, REGISTER AND GRILLE SCHEDULE
UNLESS OTHERWISE NOTED.
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
MH110
MH113
MH113
MH110 MH110
MH110
MH110
EF-06
MH111 MH112
MH113
MH113
MH115 MH115
F
G
H
J
K
7 8 9 10 11 12 13
MH112
HANGAR
M-301MH113
M-301MH113
EUH-02
ACU-02
IRH-B IRH-B IRH-B
IRH-B IRH-A IRH-A
4Ø O A
4Ø O A
4Ø OA
4Ø O A
4Ø O A
4Ø EA
6Ø OA
4Ø EA
4Ø O A
4Ø O A
IRH-BIRH-BIRH-B
IRH-B IRH-A IRH-A
6Ø OA
6Ø O A
4Ø EA
4Ø EA
6Ø OA4Ø OA
4Ø O A
4Ø O A
4Ø O A
4Ø O A
4Ø O A
HVLS-A
4 4 L-15
18x
SA
18x
EA
EF-11
L-24
EEF-03
M-303MH114
M-303MH114
HEATING CONTROL
PANEL #4
MH110 M-402
TR
VP-B
VP-A
UP
UP
x4 S A
44x40 SA
UP
UP 8Ø EA
6Ø E A
VP-A
D N
6Ø E A
VP-B
38Ø E A
Sim
M-505MH110
Sim
M-505MH110
EF-12
18X18 EA UP
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:2
:0
P M
MH114
H V
A C
S T
F L
O O
R P
L A
N
A R
E A
D
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
SCALE: 1/8" = 1'-0"M-301 MH114
1 HVAC - 1ST FLOOR PLAN - AREA D
KEYNOTES
1 INSTALL INFRARED RADIANT HEATER AT
UNDERSIDE OF STRUCTURAL BEAM. PROVIDE
FLEXIBLE DUCT CONNNECTIONS.
2 MAINTAIN 8 FT VERTICAL CLEARANCE FROM
BOTTOM OF ROOF DECK AND 2 FT HORIZONTAL
CLEARANCE FROM STRUCTURAL BEAMS ON HVLS
FANS.
3 DUCT PENETRATION TO BUILDING EXTERIOR.
PROVIDE BACKDRAFT DAMPER AND VENT CAP.
REFER TO 4/M-503.
4 THERE SHALL NOT BE ANY EQUIPMENT (PIPING,
DUCTWORK, MACHINERY, ETC.) THAT DOES NOT
SERVE THIS SPACE INSTALLED ABOVE OR WITHIN
THIS SPACE, NOR SHALL EQUIPMENT THAT DOES
NOT SERVE THIS SPACE PASS THROUGH OR ENTER
THIS SPACE.
5 12"Ø OWAHU SUPPLY AIR DUCT DOWN.
6 12"Ø OWAHU EXHAUST AIR DUCT DOWN.
7 PROVIDE BIRD SPIKES ON ALL HORIZONTAL
PORTIONS OF MECHANICAL EQUIPMENT BELOW
BIRD NETTING TO INCLUDE BUT NOT LIMITED TO:
DUCTWORK, PUMPS, AND PANELS; TO PREVENT
NEXTING.
8 PROVIDE RECESSED INFRARED HEATING CONTROL
PANEL. MAINTAIN WALL FIRE RATING.
GENERAL NOTES - HVAC
1 SEE SHEETS M-001 AND M-002 FOR LEGENDS,
ABBREVIATIONS, AND GENERAL NOTES.
2 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE
AND DO NOT ILLUSTRATE ALL SPECIFIC DUCT
TAKE-OFF CONFIGURATIONS, TAPS, ETC. REFER TO
PROJECT SPECIFICATIONS AND DUCTWORK
DETAILS FOR SPECIFIC REQUIREMENTS.
3 ALL EQUIPMENT SHALL BE INSTALLED WITH
MANUFACTURER’S REQUIRED ACCESS SPACE
BETWEEN UNIT AND FULL HEIGHT WALLS AND
OTHER OBSTRUCTIONS.
4 PROVIDE MANUAL VOLUME DAMPERS IN ALL
RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS
FROM MAIN SUPPLY DUCTS, AND ALL OTHER
LOCATIONS AS REQUIRED TO PROVIDE PROPER
SYSTEM AIRFLOW BALANCING. BALANCING
DAMPERS ARE NOT REQUIRED BETWEEN SUPPLY
FAN AND VAV BOXES.
5 ALL SUPPLY AIR DUCT RUN-OUTS TO DIFFUSERS
AND VAV BOXES SHALL BE SIZED TO MATCH THE
NECK SIZE OF THE DEVICE AS INDICATED ON THE
DIFFUSER, REGISTER AND GRILLE SCHEDULE
UNLESS OTHERWISE NOTED.
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
MECH
EF-06
MH113 MH114 MH114
K
L
M
N
5 6 7 8 9 10 11 12 13
MH110 M-402
HANGAR
UH-02
EUH-02
ACCU-02
ACU-02
EF-05
K
IRH-A
4Ø O A
4Ø O A
4Ø OA
IRH-A
6Ø OA
IRH-A
IRH-A
4Ø O A
4Ø O A
4Ø EA
6Ø OA
4Ø EA
VP-A
VP-B
8Ø E A
6Ø E A
6Ø O A
3 3
2 2
L-15
L-17
L-14
J
8x8 OA
L-16
EF-09 EF-10
L-22 L-23
EEF-02
HEATING
CONTROL
PANEL #5
ELECTRICAL ROOM
TR
FIRE PUMP AND FOAM
TANK ROOM
L-30
48x36 OA
VP-A
44x40 SA44x40 SA
D N
Sim
M-505MH110
Sim
M-505MH110
x3 E A
UP
UP
60x30 SA
ECCENTRIC TRANSITION
FITTINGS TO OFFSET BELOW
STRUCTURE, COORDINATE WITH
STRUCTURAL DRAWINGS
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:2
:1
P M
MH115
H V
A C
S T
F L
O O
R P
L A
N
A R
E A
E
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
SCALE: 1/8" = 1'-0"M-301 MH115
1 HVAC - 1ST FLOOR PLAN - AREA E
KEYNOTES
1 INSTALL INFRARED RADIANT HEATER AT
UNDERSIDE OF STRUCTURAL BEAM. PROVIDE
FLEXIBLE DUCT CONNNECTIONS.
2 DUCT PENETRATION TO BUILDING EXTERIOR.
PROVIDE BACKDRAFT DAMPER AND VENT CAP.
REFER TO 4/M-503.
3 THERE SHALL NOT BE ANY EQUIPMENT (PIPING,
DUCTWORK, MACHINERY, ETC.) THAT DOES NOT
SERVE THIS SPACE INSTALLED ABOVE OR WITHIN
THIS SPACE, NOR SHALL EQUIPMENT THAT DOES
NOT SERVE THIS SPACE PASS THROUGH OR ENTER
THIS SPACE.
4 PROVIDE BIRD SPIKES ON ALL HORIZONTAL
PORTIONS OF MECHANICAL EQUIPMENT BELOW
BIRD NETTING TO INCLUDE BUT NOT LIMITED TO:
DUCTWORK, PUMPS, AND PANELS; TO PREVENT
NEXTING.
5 PROVIDE RECESSED INFRARED HEATING CONTROL
PANEL. MAINTAIN WALL FIRE RATING.
GENERAL NOTES - HVAC
1 SEE SHEETS M-001 AND M-002 FOR LEGENDS,
ABBREVIATIONS, AND GENERAL NOTES.
2 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE
AND DO NOT ILLUSTRATE ALL SPECIFIC DUCT
TAKE-OFF CONFIGURATIONS, TAPS, ETC. REFER TO
PROJECT SPECIFICATIONS AND DUCTWORK
DETAILS FOR SPECIFIC REQUIREMENTS.
3 ALL EQUIPMENT SHALL BE INSTALLED WITH
MANUFACTURER’S REQUIRED ACCESS SPACE
BETWEEN UNIT AND FULL HEIGHT WALLS AND
OTHER OBSTRUCTIONS.
4 PROVIDE MANUAL VOLUME DAMPERS IN ALL
RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS
FROM MAIN SUPPLY DUCTS, AND ALL OTHER
LOCATIONS AS REQUIRED TO PROVIDE PROPER
SYSTEM AIRFLOW BALANCING. BALANCING
DAMPERS ARE NOT REQUIRED BETWEEN SUPPLY
FAN AND VAV BOXES.
5 ALL SUPPLY AIR DUCT RUN-OUTS TO DIFFUSERS
AND VAV BOXES SHALL BE SIZED TO MATCH THE
NECK SIZE OF THE DEVICE AS INDICATED ON THE
DIFFUSER, REGISTER AND GRILLE SCHEDULE
UNLESS OTHERWISE NOTED.
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
MP111 MP112
MP113 MP114
MP113 MP114
MP115
MP114
MP115
A
B
C
D
E
F
G
H
J
K
L
M
N
0.0 1 2 3 4 5 6 7 8 9 10 11 12 13
MH110 M-402
MP111
MP113
MP112
MP114
MECH
HANGAR
TOOL CRIB
FUEL CELL TOOL
ROOM
ELEC
MECHANICAL ROOM
CORRIDOR
C002
MENS LOCKER RM
G006
RESTROOM WOMEN'S
G003
HALLWAY
C001
RESTROOM
G002 J.C.
G001TER
VESTIBULE
V001
BREAKROOM
M-301M-301
M-301M-301
M-302M-301
M-302M-301
RESTROOM MEN'S
G004
MH110 M-401
MH110 M-401
OPEN OFFICE
OFFICE
OFFICE
FIRE PUMP AND FOAM
TANK ROOM
ELECTRICAL ROOM
TR
M-505MH110
M-505MH110
MH113
MH113
MH110
MH110
MH110
MH110
MH113 MH113
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:2
:3
P M
MP110
P
IP
IN
G
S T
F L
O O
R P
L A
N
C O
M P
R E
H E
N S
IV
E
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
GENERAL NOTES - PIPING
1 SEE SHEETS M-001 AND M-002 FOR LEGENDS,
ABBREVIATIONS, AND GENERAL NOTES.
2 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE
AND DO NOT ILLUSTRATE ALL SPECIFIC PIPE
CONFIGURATIONS, CONNECTIONS, ETC. REFER TO
PROJECT SPECIFICATIONS AND DETAILS FOR
SPECIFIC REQUIREMENTS.
3 ALL EQUIPMENT SHALL BE INSTALLED WITH
MANUFACTURER’S REQUIRED ACCESS SPACE
BETWEEN UNIT AND FULL HEIGHT WALLS AND
OTHER OBSTRUCTIONS.
4 ALL FINAL RUN-OUTS TO EQUIPMENT SHALL BE 3/4
INCHES UNLESS OTHERWISE NOTED.
5 PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH
DROP IN THE SYSTEM, ALL PIPING SHALL GRADE TO
LOW POINTS; PROVIDE HOSE END DRAIN VALVES AT
THE BOTTOM OF ALL RISERS AND LOW POINTS.
6 INSTALL PIPING SO THAT ALL VALVES, STRAINERS,
UNIORS, TRAPS, FLANGES AND OTHER
APPURTENANCES REQUIRING ACCESS ARE EASILY
ACCESSIBLE.
7 ALL VALVES FOR SHUT OFF/ISOLATION SERVICE,
STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER
PIPING APPURTENANCES SHALL BE FULL SIZE OF
PIPE BEFORE REDUCING TO MAKE CONNECTIONS
TO EQUIPMENT AND CONTROLS. CONTROL VALVES
AND BALANCING VALVES SHALL BE SIZED FOR
PROPER OPERATION AT THE FLOW RATE OF THE
DEVICES.
8 ALL VALVES SHALL BE INSTALLED SO THAT THE
VALVE REMAINS IN SERVICE WHEN EQUIPMENT OR
PIPING ON EQUIPMENT SIDE OF VALVE IS
REMOVED.
9 UNIONS AND/OR FLANGES SHALL BE INSTALLED AT
EACH PIECE OF EQUIPMENT, IN BYPASSES AND IN
LONG PIPE RUNS (100 FEET OR MORE) TO PERMIT
DISASSEMBLY FOR ALTERATIONS AND REPAIRS.
10 INSTALL ALL PIPING WITHOUT FORCING OR
SPRINGING.
11 ALL CONDENSATE DRAIN PIPING SHALL BE SLOPED
AT A MINIMUM OF 1/8 INCH PER FOOT TOWARDS
THE POINT OF TERMINATION INDICATED. ALL
CONDENSATE PIPING SHALL BE SIZED AT 3/4
INCHES PIPE SIZE UNLESS OTHERWISE NOTED.
12 PROVIDE PRESSURE AND TEMPERATURE PLUGS ON
ALL HYDRONIC COILS.
KEYNOTES
SCALE: 1/16" = 1'-0"
PIPING - 1ST FLOOR PLAN - COMPREHENSIVE
SCALE: 1/16" = 1'-0"
0 8'-0" 16'-0" 32'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
ATFP
T F P
A T F P
MP112
MP113 MP114
A
B
C
D
E
0.0 1 2 3 4 5 6 7
MP113
RESTROOM WOMEN'S
G003
HANGAR
HALLWAY
C001
BREAKROOM
OFFICE
VESTIBULE
V001
TER
J.C.
G001
RESTROOM
G002
HVLS-A
EF-01
M-301M-301
M-301M-301
ACU-01
ACCU-01
T
T
T
T
T
T
RS/RL
IRH-B IRH-B IRH-B
M-302M-301
M-302M-301
HVLS-A
WOMENS LOCKER RM
G005
1" HWR
HEATING CONTROL
PANEL #1
2 2 2
OFFICE
OPEN OFFICE
LOBBY
L001
VAV-05
VAV-04
VAV-02
3/4" HWR 1" HWS
1" HWS1" HWR
3/4" HWS
1" HWR
3/4" HWR
1" HWR
VAV-06
VAV-03
IRH-B IRH-B
IRH-A IRH-A
IRH-AIRH-A IRH-A IRH-A
IRH-A IRH-A
IRH-B IRH-B
P
ID
VP-A
VP-A
VP-B
VP-B
4 4
4 4
4 4
4 45
3/4" CD
3/4" CD
3/4" CD
3/4" CD
3/4" CD
CO2
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:2
:4
P M
MP111
P
IP
IN
G
S T
F L
O O
R P
L A
N
A R
E A
A
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
GENERAL NOTES - PIPING
1 SEE SHEETS M-001 AND M-002 FOR LEGENDS,
ABBREVIATIONS, AND GENERAL NOTES.
2 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE
AND DO NOT ILLUSTRATE ALL SPECIFIC PIPE
CONFIGURATIONS, CONNECTIONS, ETC. REFER TO
PROJECT SPECIFICATIONS AND DETAILS FOR
SPECIFIC REQUIREMENTS.
3 ALL EQUIPMENT SHALL BE INSTALLED WITH
MANUFACTURER’S REQUIRED ACCESS SPACE
BETWEEN UNIT AND FULL HEIGHT WALLS AND
OTHER OBSTRUCTIONS.
4 ALL FINAL RUN-OUTS TO EQUIPMENT SHALL BE 3/4
INCHES UNLESS OTHERWISE NOTED.
5 PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH
DROP IN THE SYSTEM, ALL PIPING SHALL GRADE TO
LOW POINTS; PROVIDE HOSE END DRAIN VALVES AT
THE BOTTOM OF ALL RISERS AND LOW POINTS.
6 INSTALL PIPING SO THAT ALL VALVES, STRAINERS,
UNIORS, TRAPS, FLANGES AND OTHER
APPURTENANCES REQUIRING ACCESS ARE EASILY
ACCESSIBLE.
7 ALL VALVES FOR SHUT OFF/ISOLATION SERVICE,
STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER
PIPING APPURTENANCES SHALL BE FULL SIZE OF
PIPE BEFORE REDUCING TO MAKE CONNECTIONS
TO EQUIPMENT AND CONTROLS. CONTROL VALVES
AND BALANCING VALVES SHALL BE SIZED FOR
PROPER OPERATION AT THE FLOW RATE OF THE
DEVICES.
8 ALL VALVES SHALL BE INSTALLED SO THAT THE
VALVE REMAINS IN SERVICE WHEN EQUIPMENT OR
PIPING ON EQUIPMENT SIDE OF VALVE IS
REMOVED.
9 UNIONS AND/OR FLANGES SHALL BE INSTALLED AT
EACH PIECE OF EQUIPMENT, IN BYPASSES AND IN
LONG PIPE RUNS (100 FEET OR MORE) TO PERMIT
DISASSEMBLY FOR ALTERATIONS AND REPAIRS.
10 INSTALL ALL PIPING WITHOUT FORCING OR
SPRINGING.
11 ALL CONDENSATE DRAIN PIPING SHALL BE SLOPED
AT A MINIMUM OF 1/8 INCH PER FOOT TOWARDS
THE POINT OF TERMINATION INDICATED. ALL
CONDENSATE PIPING SHALL BE SIZED AT 3/4
INCHES PIPE SIZE UNLESS OTHERWISE NOTED.
12 PROVIDE PRESSURE AND TEMPERATURE PLUGS ON
ALL HYDRONIC COILS.
KEYNOTES
1 IRH CONTROL PANEL. REFER TO ELECTRICAL
DRAWINGS FOR POWER WIRING TO PANEL AND TO
IRH VACUUM PUMPS.
2 PROVIDE CONTROL WIRING TO HEATING CONTROL
PANEL #3.
3 ATFP SHUTDOWN SWITCH.
4 PROVIDE CONTROL WIRING TO HEATING CONTROL
PANEL #1.
5 TERMINATE CONDENSATE DRAIN ABOVE MOP
RECEPTOR. MAITAIN MINIMUM SLOPE OF 1/8" PER
12" ON ALL HORIZONTAL PIPING.
6 ROUTE CONDENSATE DRAIN TO NEAREST FLOOR
DRAIN, REFER TO PLUMBING DRAWINGS FOR
FLOOR DRAIN LOCATIONS. MAITAIN MINIMUM
SLOPE OF 1/8" PER 12" ON ALL HORIZONTAL PIPING.
7 PROVIDE CO2 SENSOR TO MEET LEED
REQUIREMENT THAT WILL GENERATE AN ALARM
WHEN CARBON DIOXIDE LEVELS VARY BY 10% OR
MORE FROM THE DESIGN VALUES.
8 RED STROBE LIGHT AND AUDIBLE ALARM - REFER
TO M-800 FOR SEQUENCE OF OPERATIONS.
9 DIFFERENTIAL PRESSURE TRANSMITTER WITH
SHUTOFF VALVES.
SCALE: 1/8" = 1'-0"M-301 MP111
1 PIPING - 1ST FLOOR PLAN - AREA A
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
MP110
MH110 MH110
MH110 MH110
T
F P
MP111
MP113 MP114
A
B
C
D
E
7 8 9 10 11 12 13
MP114
HVLS-A
VP-A
VP-A
IRH-A
IRH-A
IRH-A
IRH-A
IRH-B IRH-B IRH-B IRH-B
IRH-AIRH-A
IRH-AIRH-A
IRH-B IRH-B IRH-B
HVLS-A
HEATING
CONTROL
PANEL #2
2 2
3 3
VP-B
P
ID
2 VP-B
3/4" CD
3/4" CD
3/4" CD
3/4" CD
3/4" CD
3/4" CD
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:2
:5
P M
MP112
P
IP
IN
G
S T
F L
O O
R P
L A
N
A R
E A
B
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
GENERAL NOTES - PIPING
1 SEE SHEETS M-001 AND M-002 FOR LEGENDS,
ABBREVIATIONS, AND GENERAL NOTES.
2 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE
AND DO NOT ILLUSTRATE ALL SPECIFIC PIPE
CONFIGURATIONS, CONNECTIONS, ETC. REFER TO
PROJECT SPECIFICATIONS AND DETAILS FOR
SPECIFIC REQUIREMENTS.
3 ALL EQUIPMENT SHALL BE INSTALLED WITH
MANUFACTURER’S REQUIRED ACCESS SPACE
BETWEEN UNIT AND FULL HEIGHT WALLS AND
OTHER OBSTRUCTIONS.
4 ALL FINAL RUN-OUTS TO EQUIPMENT SHALL BE 3/4
INCHES UNLESS OTHERWISE NOTED.
5 PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH
DROP IN THE SYSTEM, ALL PIPING SHALL GRADE TO
LOW POINTS; PROVIDE HOSE END DRAIN VALVES AT
THE BOTTOM OF ALL RISERS AND LOW POINTS.
6 INSTALL PIPING SO THAT ALL VALVES, STRAINERS,
UNIORS, TRAPS, FLANGES AND OTHER
APPURTENANCES REQUIRING ACCESS ARE EASILY
ACCESSIBLE.
7 ALL VALVES FOR SHUT OFF/ISOLATION SERVICE,
STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER
PIPING APPURTENANCES SHALL BE FULL SIZE OF
PIPE BEFORE REDUCING TO MAKE CONNECTIONS
TO EQUIPMENT AND CONTROLS. CONTROL VALVES
AND BALANCING VALVES SHALL BE SIZED FOR
PROPER OPERATION AT THE FLOW RATE OF THE
DEVICES.
8 ALL VALVES SHALL BE INSTALLED SO THAT THE
VALVE REMAINS IN SERVICE WHEN EQUIPMENT OR
PIPING ON EQUIPMENT SIDE OF VALVE IS
REMOVED.
9 UNIONS AND/OR FLANGES SHALL BE INSTALLED AT
EACH PIECE OF EQUIPMENT, IN BYPASSES AND IN
LONG PIPE RUNS (100 FEET OR MORE) TO PERMIT
DISASSEMBLY FOR ALTERATIONS AND REPAIRS.
10 INSTALL ALL PIPING WITHOUT FORCING OR
SPRINGING.
11 ALL CONDENSATE DRAIN PIPING SHALL BE SLOPED
AT A MINIMUM OF 1/8 INCH PER FOOT TOWARDS
THE POINT OF TERMINATION INDICATED. ALL
CONDENSATE PIPING SHALL BE SIZED AT 3/4
INCHES PIPE SIZE UNLESS OTHERWISE NOTED.
12 PROVIDE PRESSURE AND TEMPERATURE PLUGS ON
ALL HYDRONIC COILS.
KEYNOTES
1 IRH CONTROL PANEL. REFER TO ELECTRICAL
DRAWINGS FOR POWER WIRING TO PANEL AND TO
IRH VACUUM PUMPS.
2 PROVIDE CONTROL WIRING TO HEATING CONTROL
PANEL #2.
3 PROVIDE CONTROL WIRING TO HEATING CONTROL
PANEL #4.
4 ATFP SHUTDOWN SWITCH.
5 ROUTE CONDENSATE DRAIN TO NEAREST FLOOR
DRAIN, REFER TO PLUMBING DRAWINGS FOR
FLOOR DRAIN LOCATIONS. MAITAIN MINIMUM
SLOPE OF 1/8" PER 12" ON ALL HORIZONTAL PIPING.
6 RED STROBE LIGHT AND AUDIBLE ALARM - REFER
TO M-800 FOR SEQUENCE OF OPERATIONS.
SCALE: 1/8" = 1'-0"M-301 MP112
1 PIPING - 1ST FLOOR PLAN - AREA B
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
MP110
ATFP
T F P
A T F P
ATFP
MP111 MP112
MP114
MP114
MP115
F
G
H
J
K
0.0 1 2 3 4 5 6 7
MP111
MENS LOCKER RM
G006
TOOL CRIB
FUEL CELL TOOL
ROOM
MECHANICAL ROOM
ELEC
HANGAR
HVLS-A
M-301M-301
M-301M-301
M-301MH113
M-301MH113
EF-04
EUH-01
IRH-B IRH-B IRH-B
VP-B
VP-A
IRH-B
IRH-A IRH-A
IRH-B
IRH-B
IRH-B
IRH-A IRH-A IRH-B
M-302M-301
M-302M-301
HVLS-A
EF-02 RESTROOM MEN'S
G004
1" HWR
L-10
L-09
L-08
L-07
1" HWS
MH110 M-401
MH110 M-401
L-11
HEATING CONTROL
PANEL #3
2 2 2
2 2 2
RESTROOM WOMEN'S
G003
HALLWAY
C001
VAV-02
VAV-01
1" HWR
3/4" HWR
1 1/2" HWR
1 1/2" HWS
T
1 1/2" HWR
EF-08 EEF-01
L-21
EF-07
L-29
M-505MH110
M-505MH110
RACK PIPING VERTICALLY
ALONG COLUMN FACE
P
ID
VP-B
VP-A
CH-01
FCU-01
FCU-02
L-12
3/4" CD
3/4" CD
3/4" CD
3/4" CD
3/4" CD
3/4" CD
3/4" CD
2 1/2" CHWS
2 1/2" CHWR
2" HWS
2" HWR
T
T
T
1" HWR
1" HWS
1" HWR
1" HWS
1 1/2" HWS
1 1/2" HWR
1 1/2" HWS
PNN
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
A B
C D
E
KEY PLAN
1 2 3 4 5
/1
/2
:2
:0
P M
MP113
P
IP
IN
G
S T
F L
O O
R P
L A
N
A R
E A
C
D W
H B
D M
B D
M
R T
A
D
E C
D
E C
GENERAL NOTES - PIPING
1 SEE SHEETS M-001 AND M-002 FOR LEGENDS,
ABBREVIATIONS, AND GENERAL NOTES.
2 PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE
AND DO NOT ILLUSTRATE ALL SPECIFIC PIPE
CONFIGURATIONS, CONNECTIONS, ETC. REFER TO
PROJECT SPECIFICATIONS AND DETAILS FOR
SPECIFIC REQUIREMENTS.
3 ALL EQUIPMENT SHALL BE INSTALLED WITH
MANUFACTURER’S REQUIRED ACCESS SPACE
BETWEEN UNIT AND FULL HEIGHT WALLS AND
OTHER OBSTRUCTIONS.
4 ALL FINAL RUN-OUTS TO EQUIPMENT SHALL BE 3/4
INCHES UNLESS OTHERWISE NOTED.
5 PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH
DROP IN THE SYSTEM, ALL PIPING SHALL GRADE TO
LOW POINTS; PROVIDE HOSE END DRAIN VALVES AT
THE BOTTOM OF ALL RISERS AND LOW POINTS.
6 INSTALL PIPING SO THAT ALL VALVES, STRAINERS,
UNIORS, TRAPS, FLANGES AND OTHER
APPURTENANCES REQUIRING ACCESS ARE EASILY
ACCESSIBLE.
7 ALL VALVES FOR SHUT OFF/ISOLATION SERVICE,
STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER
PIPING APPURTENANCES SHALL BE FULL SIZE OF
PIPE BEFORE REDUCING TO MAKE CONNECTIONS
TO EQUIPMENT AND CONTROLS. CONTROL VALVES
AND BALANCING VALVES SHALL BE SIZED FOR
PROPER OPERATION AT THE FLOW RATE OF THE
DEVICES.
8 ALL VALVES SHALL BE INSTALLED SO THAT THE
VALVE REMAINS IN SERVICE WHEN EQUIPMENT OR
PIPING ON EQUIPMENT SIDE OF VALVE IS
REMOVED.
9 UNIONS AND/OR FLANGES SHALL BE INSTALLED AT
EACH PIECE OF EQUIPMENT, IN BYPASSES AND IN
LONG PIPE RUNS (100 FEET OR MORE) TO PERMIT
DISASSEMBLY FOR ALTERATIONS AND REPAIRS.
10 INSTALL ALL PIPING WITHOUT FORCING OR
SPRINGING.
11 ALL CONDENSATE DRAIN PIPING SHALL BE SLOPED
AT A MINIMUM OF 1/8 INCH PER FOOT TOWARDS
THE POINT OF TERMINATION INDICATED. ALL
CONDENSATE PIPING SHALL BE SIZED AT 3/4
INCHES PIPE SIZE UNLESS OTHERWISE NOTED.
12 PROVIDE PRESSURE AND TEMPERATURE PLUGS ON
ALL HYDRONIC COILS.
KEYNOTES
1 IRH CONTROL PANEL. REFER TO ELECTRICAL
DRAWINGS FOR POWER WIRING TO PANEL AND TO
IRH VACUUM PUMPS.
2 PROVIDE CONTROL WIRING TO HEATING CONTROL
PANEL #3.
3 ATFP SHUTDOWN SWITCH.
SCALE: 1/8" = 1'-0"M-301 MP113
1 PIPING - 1ST FLOOR PLAN - AREA C
SCALE: 1/8" = 1'-0"
0 4'-0" 8'-0" 16'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
MP110
MH113MH113
MH110 MH110
MH110
MH110
MH113
MH113
F P
A T
F P
MP111 MP112
MP113
MP113
MP115 MP115
F
G
H
J
K
7 8 9 10 11 12 13
MP112
HANGAR
HVLS-A
EF-06
M-301MH113
M-301MH113
ACU-02
IRH-B IRH-B IRH-B
IRH-B IRH-A IRH-A
IRH-AIRH-AIRH-B
IRH-B IRH-B IRH-B
EUH-02
HVLS-A
L-15
HEATING CONTROL
PANEL #4
3 3
3 3 3
M-303MH114
M-303MH114
EEF-03
EF-11
TR
110 ELECTRICAL ROOM
VP-B
MP111 M-403
P
ID
VP-A
L-24
3/4" CD
3/4" CD
3/4" CD
3/4" CD
3/4" CD
3/4" CD
T
EF-12
PNN
1 2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .