18R0026_Dwgs-AM2.pdf
PDF 594 KB Posted
- Solicitation number
- W912BU-18-R-0026
About this file
This document is a solicitation for construction services for an aircraft maintenance hangar. The U.S. Army Corps of Engineers, Philadelphia District intends to award a firm-fixed price contract between $25 million and $100 million to construct a single bay, fully enclosed fuel cell capable C-17 and C-5 aircraft maintenance hangar at Dover Air Force Base, Delaware. The new 84,176 square foot facility will include office spaces, tool rooms, break rooms, and support spaces such as mechanical, electrical, fire pump, and telecommunications rooms. The project requires blast resistant windows and doors, a fire suppression system including low expansion foam, and infrastructure like roads and utilities. The construction site is adjacent to an active airfield so coordination is needed. The contract duration is approximately 610 calendar days. The submission basis is a tradeoff process and proposals are due April 5, 2019.
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18R0026_Specs-AM2.pdf | ||
| 18-R-0026_DAFB_AMH_Pre-proposal_Site_Visit_Attendance_Roster.pdf | ||
| 18R0026_Specs-AM1R1.pdf | ||
| D_Elec10.pdf | ||
| D_Civ2.pdf | ||
| D_Structural4.pdf | ||
| RFI_Format.pdf | ||
| D_Civ3.pdf | ||
| D_Int6.pdf | ||
| D_Fire7.pdf | ||
| D_Arch5.pdf | ||
| D_Tel11.pdf | ||
| 18R0026-SpecsVol1-RTA.pdf | ||
| D_Plum8.pdf | ||
| D_Gen1.pdf | ||
| D_Mech9.pdf | ||
| 18R0026-SpecsVol3-RTA.pdf | ||
| 18R0026-SpecsVol2-RTA.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FS
FIRE PROTECTION ABBREVIATIONS AND LEGEND
BALL VALVE
BELOW
CAP
CHECK VALVE
DUCTILE IRON
SYMBOL ABBREV DESCRIPTION SYMBOL ABBREV DESCRIPTION
BLW
DI
BRANCH - BOTTOM CONNECTION
BRANCH - TOP CONNECTION
DOWN
FIRE PROTECTION
CONTRACTOR
FLOW SWITCH
HYDRAULIC
DN
FPC
FS
HYD
MIN
TS
TYP
MINIMUM
SPRINKLER HEAD
STRAINER
TAMPER SWITCH
TYPICAL
INSPECTOR'S TEST
CONNECTION
ITC
BUTTERFLY VALVE
TS
RISER
OHG ORDINARY HAZARD GROUP
UNDERGROUND
WATER SUPPLY
OH
GATE VALVE - OS&Y
HIGH EXPANSION FOAMHEF
CHECK VALVE
BUTTERFLY VALVE
TEST HEADER
BALL VALVE
DRY PIPE VALVE WITH QUICK
OPENING DEVICE
FIRE PROTECTION GENERAL NOTES
1. PROVIDE A SUPERVISED AUTOMATIC DRY PIPE FIRE SPRINKLER SYSTEM THROUGHOUT
THE HANGAR BAY AREA. PROVIDE A SUPERVISED AUTOMATIC WET PIPE FIRE SPRINKLER
SYSTEM THROUGHOUT ALL OTHER AREAS OF THE BUILDING. THE SPRINKLER SYSTEMS
DESIGN SHALL BE IN ACCORDANCE WITH UFC 3-600-01, UFC 4-211-01, AND NFPA 13.
2. PROVIDE A HIGH EXPANSION FOAM SYSTEM THROUGHOUT THE HANGAR BAY. THE FOAM
SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH UFC 4-211-01. SEE FOAM SYSTEM
SPECIFIC NOTES.
3. THE FIRE PROTECTION SYSTEM SHALL BE SUPPLIED BY TWO DEDICATED WATER STORAGE
TANKS. THE FIRE PUMPS ARE LOCATED IN THE FIRE PUMP AND FOAM TANK ROOM.
4. PROVIDE SEPARATE SPRINKLER RISERS WITHIN THE FIRE PUMP AND FOAM TANK ROOM
FOR THE FOLLOWING SEPARATE SYSTEMS: TWO (2) DRY PIPE SYSTEM RISERS TO SUPPLY
THE HANGAR BAY, ONE (1) WET PIPE SYSTEM RISER TO SUPPLY THE SUPPORT AREAS.
5. A FIVE INCH STORZ FIRE DEPARTMENT CONNECTION (FDC) WILL BE PROVIDED FOR THE
BUILDING. FDC IS NOT TO BE CONNECTED TO THE FOAM SYSTEM RISER.
6. POST INDICATOR VALVES WILL BE PROVIDED SUCH THAT EACH FIRE WATER STORAGE
TANK IS ABLE TO BE ISOLATED.
7. ALL FIRE PROTECTION MATERIALS ARE TO BE UL LISTED AND / OR FM APPROVED.
8. DRAFT CURTAINS SHALL BE PROVIDED IN ACCORDANCE WITH UFC 4-211-01, SUCH THAT A
SINGLE DRAFT CURTAIN AREA DOES NOT EXCEED 15,000 SQ FT AND SHALL EXTEND FROM WALL
TO WALL AND BE SUPPORTED BY THE BUILDING STRUCTURE.
9. IT IS THE INTENT OF THESE DOCUMENTS TO PROVIDE DESIGN, MATERIALS AND EQUIPMENT
FOR A TOTALLY FUNCTIONING AND OPERATING FIRE PROTECTION SYSTEM, INCLUDING THE
PROPER INTERFACING AND COORDINATION WITH ALL OTHER BUILDING SYSTEMS.
10. PIPING LAYOUTS, WHERE SHOWN, SHOW PIPE DIAGRAMMATICALLY AND DOES NOT SHOW ALL
OFFSETS, DROPS, AND RISERS. FINAL ROUTING SHALL BE PROVIDED ON SHOP DRAWINGS.
11. THE GENERAL CHARACTER AND SCOPE OF THE WORK IS ILLUSTRATED IN THE SPECIFICATIONS
AND DRAWINGS. THE SPECIFICATIONS AND DRAWINGS ARE DIVIDED INTO SEVERAL SECTIONS
FOR CONVENIENCE ONLY AND ALL OF THE CONTRACT DOCUMENTS MUST BE CONSIDERED
AS A WHOLE.
12. THE SPRINKLER SYSTEM DESIGNER SHALL BE RESPONSIBLE FOR AVOIDING ALL CONFLICTS BETWEEN FIRE PROTECTION SYSTEMS AND LIGHTING FIXTURES, DIFFUSERS, GRILLES, DUCTS, EQUIPMENT FIXTURES, STRUCTURAL MEMBERS, PIPES, CONDUITS, AND OTHER OBSTRUCTIONS
ENCOUNTERED.
13. INSTALLING CONTRACTOR SHALL PROVIDE THE FINAL SPRINKLER SYSTEM LAYOUT INCLUDING
HYDRAULIC CALCULATIONS.
14. ALL SPRINKLER PIPING SHALL BE INSTALLED SO THAT ALL PORTIONS OF THE SYSTEM CAN BE
DRAINED BACK THROUGH THE MAIN DRAIN VALVES. WHERE TRAPPED SECTIONS OF PIPING
CANNOT BE AVOIDED, AUXILIARY DRAINS SHALL BE PROVIDED. PROVIDE TEST AND DRAIN
CONNECTIONS IN ACCORDANCE WITH SPECIFICATIONS AND NFPA 13.
15. LOCATE CONTROL VALVES, TEST VALVES, AND LOW POINT DRAIN VALVES IN READILY ACCESSIBLE
AREAS WITHIN 8 FEET OF THE FLOOR. TEST VALVES AND DRAINS MUST DISCHARGE TO THE
OUTSIDE OF THE BUILDING TO A SPLASHBLOCK.
16. THE INSTALLING CONTRACTOR SHALL OBTAIN APPROVAL OF THE AUTHORITY HAVING JURISDICTION.
17. THE SPRINKLER SYSTEMS SHALL BE DESIGNED HYDRAULICALLY FOR UNIFORM DISCHARGE
DENSITIES ON THE FOLLOWING BASIS:
A. SPRINKLER SYSTEM DISCHARGE DENSITIES SHALL BE BASED ON UFC 3-600-01, UFC 4-211-01, AND AS FOLLOWS:
CEILING HEIGHT UP TO 30 FEET (WET PIPE)
1. LIGHT HAZARD: 0.10 GPM / SQ FT OVER THE HYDRAULICALLY MOST REMOTE 1,500 SQ FT
2. ORDINARY HAZARD: 0.20 GPM / SQ FT OVER THE HYDRAULICALLY MOST REMOTE 2,500
SQ FT CEILING HEIGHT BETWEEN 30 - 45 FEET
CEILING HEIGHTS OF 30 - 45 FEET (WET PIPE)
1. LIGHT HAZARD: 0.20 GPM / SQ FT OVER THE HYDRAULICALLY MOST REMOTE 2,500 SQ FT
2. ORDINARY HAZARD: 0.20 GPM / SQ FT OVER THE HYDRAULICALLY MOST REMOTE 2,500
SQ FT HANGAR BAY (DRY PIPE)
HANGAR BAY (DRY PIPE)
1. 0.20 GPM/ SQ FT OVER THE HYDRAULICALLY MOST REMOTE 6,500 SQ FT
B. WHERE ROOF / CEILING SLOPE EXCEEDS 2 IN 12, THE SYSTEM AREA OF OPERATION SHALL
BE INCREASED BY 30 PERCENT IN ACCORDANCE WITH NFPA 13.
C. MAXIMUM SPRINKLER SPACING SHALL BE 225 SQ FT PER HEAD FOR LIGHT HAZARD AREAS,
130 SQ FT PER HEAD FOR ORDINARY HAZARD AREAS, AND 100 SQ FT PER HEAD FOR EXTRA
HAZARD AREAS. THE HANGAR BAY SPRINKLER SPACING SHALL BE LIMITED TO 130 SQ FT AND
THE MAXIMUM SPACING BETWEEN HEADS SHALL BE 12 FEET.
D. HOSE DEMANDS FOR THE SPRINKLER SYSTEMS WILL BE BASED ON THE FOLLOWING VALUES
FOR COMBINED INSIDE AND OUTSIDE HOSE DEMANDS. HOSE DEMAND IS SUPPLIED FROM A
SEPARATE LINE THAN THE FIRE PROTECTION SUPPLY.
1. LIGHT HAZARD – 250 GPM
2. ORDINARY HAZARD – 250 GPM
3. HANGAR BAY – 500 GPM
18. PROVIDE ONE HYDRAULIC CALCULATION FOR THE MOST DEMANDING AND/OR MOST REMOTE AREA
FOR EACH SPRINKLER RISER.
19. PROVIDE A MINIMUM OF ONE 45 GALLON CAPACITY COMMON SURGE ARRESTOR FOR THE DRY PIPE
SPRINKLER RISER AND FOAM SYSTEM RISER THAT PROTECTS THE HANGAR BAY.
20. PROVIDE A SPRINKLER SYSTEM SIMULATION TEST HEADER CAPABLE OF SIMULATING THE HANGAR
SPRINKLER SYSTEM DEMAND DURING THE FOAM SYSTEM DISCHARGE TEST.
21. PROVIDE CAGES ON SPRINKLERS IN AREAS SUBJECT TO MECHANICAL DAMAGE, SUCH AS MECHANICAL
ROOMS AND ELECTRICAL ROOMS.
22. PROVIDE INTERMEDIATE AND HIGH TEMPERATURE SPRINKLERS BASED ON DISTANCE FROM HEAT SOURCES SUCH AS DIFFUSERS AND UNIT HEATERS IN ACCORDANCE WITH NFPA 13 SECTION 8.3.2.5
23. ALL SPRINKLER PIPING SHALL BE BLACK STEEL AND WILL BE SCHEDULE 40 FOR SIZES 6 INCH AND LESS IN THE HANGAR AND 2 INCHES OR LESS IN THE OFFICE SPACE. THE USE OF SCHEDULE 10 PIPING MAY BE USED FOR PIPE LARGER THAN 2 INCHES FOR THE OFFICE SPACE AND GREATER THAN 6 INCHES IN THE MAINTENANCE HANGAR AFTER A WATER QUALITY TEST, INCLUDING A TEST FOR MIC, HAS BEEN
PERFORMED AND CONFIRMS THE WATER IS ACCEPTABLE FOR THIN WALL PIPE.
24. NO PIPING SHALL BE LOCATED IN ELECTRICAL ROOMS, ELECTRICAL CLOSETS, OR OTHER RELATED
AREAS EXCEPT PIPING SERVING SPRINKLERS IN THE ROOM.
25. ALL PIPING IS TO BE INSTALLED TO MAINTAIN CEILING HEIGHTS OR CLEARANCES IN ACCORDANCE WITH
NFPA 13, NFPA 101 AND THE CONTRACT DOCUMENTS.
26. THE SPRINKLER AND FOAM SYSTEM PIPING SHALL BE PROTECTED AGAINST DAMAGE FROM
EARTHQUAKES. PROTECTION SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 13.
27. NO STRUCTURAL MEMBERS SHALL BE CUT, DRILLED, OR BURNED UNLESS PREVIOUSLY APPROVED
BY THE PROJECTS STRUCTURAL ENGINEER AND CONTRACTING OFFICER.
28. ALL VALVES WHICH CONTROL ALARM FUNCTIONS OR THE FLOW OF WATER, FOAM, FOAM
CONCENTRATE, OR THAT WHEN CLOSED WILL DISRUPT THE PROPER OPERATION OR ALARMING OF A SYSTEM SHALL BE ELECTRONICALLY SUPERVISED VIA TAMPER SWITCHES CONNECTED TO THE FIRE
ALARM CONTROL PANEL.
29. PROVIDE AUTOMATIC AIR VENTS AT ALL HIGH POINTS IN THE DRY PIPE SPRINKLER SYSTEMS.
30. ALL SPRINKLER SYSTEM FITTINGS SHALL BE HIGH PRESSURE RATED TO ACCOUNT FOR FIRE PUMP
PRESSURE CAPABILITIES.
31. A QUICK OPENING DEVICE SHALL BE PROVIDED FOR THE DRY PIPE SPRINKLER SYSTEM IN ACCORDANCE
WITH NFPA 13.
32. PROVIDE SUPERVISED HEAT TRACING SYSTEM ON THE WET PIPE SPRINKLER MAIN LOACTED IN THE HANGAR
BAY TO PROTECT THE PIP AGAINST FREEZING IN ACCORDANCE WITH NFPA 13.
FIRE PUMP GENERAL NOTES
1. TWO (2) FIRE PUMPS WILL BE PROVIDED FOR THE HANGAR. THE FIRE PUMPS SHALL BE SIZED TO
MEET THE MAXIMUM REQUIRED FIRE SYSTEM DEMAND.
2. THE FIRE PUMPS SHALL BE ELECTRIC DRIVEN HORIZANTAL SPLIT CASE TYPE AND INSTALLED IN
ACCORDANCE WITH NFPA 20.
3. THE FIRE PUMPS ARE ANTICIPATED TO BE SIZED AT 1,500 GPM AT 260 PSI. THIS IS BASED ON
THE MAXIMUM FIRE WATER DEMAND FOR THESPRINKLER AND HIGH EXPANSION FOAM SYSTEM
DEMAND IN THE HANGAR BAY AREA OF 3,549.8 GPM. SEE PRELIMINARY FIRE PROTECTION
CALCULATIONS.
4. THE FIRE PUMPS WILL BE STARTED BASED ON A PRESSURE DROP IN THE SYSTEM OR BY A
TRANSMITTED SIGNAL FROM THE FOAM SYSTEM IN THE HANGAR BAY.
5. A JOCKEY PUMP SHALL BE PROVIDED FOR MAINTAINING SYSTEM PRESSURE.
6. PITCH FLOORS FOR ADEQUATE DRAINAGE OF ESCAPING WATER AWAY FROM CRITICAL EQUIPMENT
SUCH AS THE PUMPS, DRIVERS, CONTROLLERS, ETC.
7. DO NOT INSTALL A SHUTOFF VALVE IN THE FIRE OR JOCKEY PUMP CONTROLLER PRESSURE-SENSING
LINE.
8. PROVIDE SUITABLE PIPE STANDS AND PIPE SUPPORT FOR ALL PUMP ROOM PIPING IN ACCORDANCE
WITH NFPA 13 AND NFPA 20.
9. ENSURE ALL WALL PENETRATIONS ARE SEALED WATERTIGHT. ENSURE ALL INTERIOR WALL
PENETRATIONS ARE FIRE STOPPED.
10. ALL FIRE PUMP EQUIPMENT MUST BE ABLE TO BE DELIVERED THROUGH THE DOORWAY TO THE PUMP
ROOM PROVIDED.
11. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL APPROPRIATE ASSOCIATED PIPING, VALVES, AND
OTHER APPURTENANCES ASSOCIATED WITH THE FIRE PUMP DESIGN IN ACCORDANCE WITH NFPA 20.
THIS INCLUDES BUT IS NOT LIMITED TO ; AUTOMATIC RELIEF VALVES, GUAGES, CONTROLLER PIPING, AND AIR RELIEF VALVES.
FOAM SYSTEM SPECIFIC NOTES
1. THE HIGH EXPANSION FOAM (HEF) SYSTEM SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE
WITH UFC 4-211-01 AND THESE DRAWINGS.
2. NO CONTAINMENT IS REQUIRED FOR THE FOAM SYSTEM DISCHARGE.
3. PROVIDE A FLOW CONTROL VALVE FOR THE FOAM SYSTEM. THE VALVE SHALL HAVE FACTORY
CONFIGURED AND INSTALLED TRIM PIPING. THE VALVE SHALL BE CAPABLE OF CLOSING (AND OPENING) AT ANY POINT IN THE FOAM SYSTEM DISCHARGE BASED ON THE FOAM STOP STATION ACTIVATION.
4. PROVIDE A FOAM CONCENTRATE STORAGE TANK FOR THE HIGH EXPANSION FOAM SYSTEM FOAM CONCENTRATE. THE TANK SHALL BE VERTICAL, DOUBLE WALLED, HIGH DENSITY CROSS-LINKED
POLYETHYLENE COMPATIBLE WITH THE REQUIRED CONCENTRATE.
5. THE FOAM TANK CAPACITY SHALL BE SIZED FOR NOT LESS THAN 15 MINUTE DISCHARGE AT THE
HYDRAULICALLY CALCULATED WATER FLOW RATE AND 130% OF THE NOMINAL CONCENTRATE
INJECTION RATE.
6. PROVIDE A SINGLE FOAM INDUCTOR FOR THE FOAM WATER RISER. INDUCTOR SHALL BE INSTALLED IN
THE HORIZANTAL POSITION ABOVE THE FOAM CONCENTRATE TANK.
7. PROVIDE A 2 INCH CONCRETE HOUSEKEEPING PAD UNDER THE FOAM SYSTEM TANK.
8. FOAM SOLUTION SHALL NOT BE PREPRIMED. ALL SOLUTION PIPING SHALL BE SLOPED TO BE SELF
DRAINING BACK TO THE RISER.
9. PROVIDE A FOAM SYSTEM TEST HEADER WITHIN THE HANGAR BAY. LOCATE THE TEST HEADERS NEAR AN
OUTSIDE DOOR.
10. THE FOAM SYSTEM SHALL BE DESIGNED TO COVER 90 PERCENT OF THE AIRCRAFT SILHOUETTE IN ONE
MINUTE OR LESS AND TO A DEPTH OF 3.2 FEET IN 4 MINUTES OR LESS, UPON ACTIVATION OF THE
FOAM SYSTEM.
11. FOAM CONCENTRATE PIPING SHALL BE STAINLESS STEEL FLANGED OR WELDED.
12. PROVIDE BASKET TYPE STRAINERS UPSTREAM OF THE FOAM SYSTEM RISERS.
13. ALL FOAM SYSTEM FITTINGS SHALL BE HIGH PRESSURE RATED TO ACCOUNT FOR FIRE PUMP
PRESSURE CAPABILITIES.
PRELIMINARY FIRE PROTECTION CALCULATIONS
SPRINKLER AND HIGH EXPANSION FOAM CALCULATIONS
SPRINKLER SYSTEM CALCULATIONS
HANGAR SPRINKLER SYSTEM
HANGAR SPRINKLER SYSTEM DISCHARGE (0.20 GPM/SQ FT X 6,500 SQ FT) = 1,300 GPM
HYDRAULIC IMBALANCE (20%) = 260 GPM
TOTAL HANGAR SPRINKLER DISCHARGE = 1,560 GPM
HYDRANT DEMAND = 500 GPM
- NOT SUPPORTED BY
FIRE PUMPS AND FIRE
WATER TANKS
HEF SYSTEM CALCULATIONS
HANGAR BAY (71,811 SQ FT)
FOAM RATE OF DISCHARGE [UFC 4-211-01]:
R = ([V/T] + RS) X CN X CL
R = RATE OF DISCHARGE [CFM]
V = SUBMERGENCE VOLUME [CUBIC FT]
V = A X D
WHERE;
A = AREA OF AIRCRAFT HANGAR FLOOR AREA = 71,811 SQ FT
D = DEPTH = 3.2 FEET
V = 71,811 SQ FT X 3.2 FT = 229,795 CU FT
T = SUBMERGENCE TIME [MIN] = 4 MIN (PER UFC 4-211-01)
RS = RATE OF FOAM BREAKDOWN BY SPRINKLERS [CFM]
RS = S X Q
WHERE;
S = FOAM BREAKDOWN FROM SPRINKLER DISCHARGE [CFM/GPM] = 10 CFM/GPM
Q = ESTIMATED TOTAL SPRINKLER DISCHARGE [GPM] = 1560 GPM
CN = COMPENSATION FOR NORMAL FOAM SHRINKAGE = 1.15
CL = COMPENSATION FOR LOSS OF FOAM THROUGH OPENINGS = 3.0
R = ([229,795 CU. FT. / 4 MIN] + 15,600) X 1.15 X 3.0
R = 252,018 CFM
NUMBER OF GENERATORS
ANSUL JET-X 27 UL WITH JET-X 2%
GENERATOR PRESSURE (PSI) OUTPUT (CFM) NUMBER OF GENERATORS FOR 252,018 CFM
42 PSI 21,100 CFM 12
DUE TO AREA COVERAGE OF THE HANGAR, 12 GENERATORS WILL BE USED.
FOAM SYSTEM SOLUTION FLOW RATE:
GENERATOR SOLUTION FLOW RATE AT 21,100 CFM FOAM (42 PSI) = 186 GPM X 12 = 2,232 GPM
TOTAL GENERATOR FLOW = 2,232 GPM
OVERAGE AND IMBALANCE (20%) = 446 GPM
TOTAL SOLUTION FLOW RATE FOR FOAM GENERATORS = 2,678 GPM
TOTAL SOLUTION CALCULATED USING HASS = 2,440 GPM
TOTAL SOLUTION CALCULATED USING HASS (NO SPRINKLER DEMAND CONSIDERED) = 2,437 GPM
FOAM CONCENTRATE BLADDER TANK SIZING:
FOAM CONCENTRATION = 2%
*CONCENTRATE STORAGE TANK SHALL BE SIZED TO SUPPORT THE HYDRAULICALLY CALCULATED
WATER FLOW RATE AT 130% OF THE NOMINAL CONCENTRATE INJECTION RATE.
TOTAL FOAM CONCENTRATE FLOW RATE = 2,437 X 0.02 X 1.3 = 63.4 GPM
FOAM CONCENTRATE STORAGE SHALL BE BASED ON 15 MINUTE DISCHARGE AT THE
HYDRAULICALLY CALCULATED WATER FLOW RATE AND 130% OF THE NOMINAL
CONCENTRATE INJECTION RATE
DURATION = 15 MIN
TOTAL FOAM CONCENTRATE = 951 GALLONS
BASED ON THE CALCULATIONS, IT IS ESTIMATED THAT A 1000 GALLON USABLE CAPACITY
FOAM CONCENTRATE TANK WILL BE REQUIRED. THE TANK SHALL BE SIZED TO ACCOUNT FOR
THE UNUSABLE FOAM CONCENTRATE AT THE BOTTOM OF THE TANK AND EXPANSION AREA AT
THE TOP OF THE TANK.
TOTAL HANGAR WATER DEMAND:
SPRINKLER SYSTEM DISCHARGE= 1,560 GPM
FOAM SYSTEM DISCHARGE = 2,440 GPM
TOTAL FOAM SYSTEM DEMAND = 4,000 GPM
PRESSURE CALCULATIONS
AVAILABLE PRESSURE IS BASED ON THE FIRE PUMP CURVES FROM THE FIRE PUMP TESTS.
THE NET PSI REQUIRED FROM THE TWO FIRE PUMPS AT THE HANGAR SYSTEM DEMAND OF 4,000
GPM IS 240 PSI.
PUMP PRESSURE AT DEMAND 240 PSI BASED ON FIRE PUMP CURVE #1
FLOW CONTROL VALVE -10 PSI CUTSHEET
INDUCTOR INLET PRESSURE 230 PSI
INDUCTOR OUTLET PRESSURE
(65% OF INLET PRESSURE) 150 PSI CUTSHEET REQUIREMENT OF 65%
ELEVATION LOSS (85 FT) -36.8 PSI HANGAR TRUSS HEIGHT IS 85 FEET
FOAM GENERATOR END HEAD
PRESSURE -42 PSI CUTSHEET
PRESSURE AVAILABLE FOR
INTERIOR PIPE LOSSES 71.2 PSI
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P L
O T
D A
T E
P
L O
T S
C A
L E
S U
B M
IT
T
E D
B Y
D W
N B
Y
D E
S
IG
N E
D B
Y
C K
D B
Y
D A
T E
S
IZ
E E
F
IL
E N
A M
E
"X
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
V E
R A
IR
F
O R
C E
B A
S E
A
IR
C R
A F
T M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
A S
N O
T E
D
-0
-0
W
B U
- 1 -R
-0
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S
1 2 3 4 5
/2
/2
:5
:0
A M
FX001
F
IR
E P
R O
T E
C T
IO
N
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
S
Y M
B O
L S
K B
S D
A M
M C
Z
R T
A
D
E C
D
E C
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R a R
E S
P O
N S
E T
O R
F I
M
A R a
VERT REINF. & TIES
RE: SCHED ON S-601
PROVIDE CONTROL JOINT
EACH SIDE OF PIER TYP
RE: 15/S-501
1' - 4" 8"
BCDE
GROUT POCKET FOR SHEAR LUG
9"LX9"WX6" DEEP
OMIT LINK(S) IN POCKET
ANCHOR BOLTS
RE: SCHED ON S-602
TENSION REINFORCEMENT
(4) #8 U-BARS
28" 29"+ (Tftg -5")
16"
2' - 0" 2' - 0"
10" 10"
VERT REINF.
RE: SCHED ON S-601
TIE REINF.
RE: SCHED ON S-601
0.9
2' - 0"
2'
- 0
2'
- 0
1'
- 0
1'
- 0
GROUT POCKET FOR SHEAR LUG
11"LX11"WX9" DEEP
OMIT LINK(S) IN POCKET
ANCHOR BOLTS
RE: SCHED ON S-602
FGHJ
ANCHOR BOLTS
RE: SCHED ON S-602
CMU WALL
RE: PLAN
1' - 0" 8" 2' - 0"
TENSION REINFORCEMENT
(8) #8 U-BARS 28"
29"+ (Tftg -5")
1'
- 0
5"
5" 1'
- 0
5"5"
16"
TENSION REINFORCEMENT
(2) #8 Z-BARS
16"
29"+ (Tftg -5")
16"
REINF PER
PIER P16 RE:
SCHED ON S-601
2' - 0"
2'
- 0
1 1 /2"
C
LR
, T
YP
VERT REINF. & TIES
RE: SCHED ON S-601
A
2'
- 0
PROVIDE CONTROL JOINT
EACH SIDE OF PIER TYP
RE: 15/S-501
1' - 4" 8"
GROUT POCKET FOR SHEAR LUG
9"LX9"WX6" DEEP
OMIT LINK(S) IN POCKET
ANCHOR BOLTS
RE: SCHED ON S-602
8" 1'
- 4
WALL CORNER REINF.
RE: 16/S-501
2' - 0"
10" 10"
TENSION REINFORCEMENT
(4) #8 U-BARS 28"
29"+ (Tftg -5")
16"
2' - 0"
2'
- 0
1 1 /2"
C
LR
, T
YP
VERT REINF. & TIES
RE: SCHED ON S-601
2'
- 0
2' - 0"
PROVIDE CONTROL JOINT
EACH SIDE OF PIER TYP
RE: 15/S-501
1' - 4" 8"
FGHJ
GROUT POCKET FOR SHEAR LUG
11"LX11"WX9" DEEP
OMIT LINK(S) IN POCKET
ANCHOR BOLTS
RE: SCHED ON S-602
TENSION REINFORCEMENT
(8) #8 U-BARS
28" 29"+ (Tftg -5")
16"
1'
- 0
5"
5" 5"
5" 1'
- 0
TENSION REINFORCEMENT
(2) #8 Z-BARS
16"
29"+ (Tftg -5")
16"
2' - 0"
2'
- 0
VERT REINF. & TIES
RE: SCHED ON S-601
2'
- 0
2' - 0"
PROVIDE CONTROL JOINT
EACH SIDE OF PIER TYP
RE: 15/S-501
K
GROUT POCKET FOR SHEAR LUG
10"LX10"WX9" DEEP
OMIT LINK(S) IN POCKET
ANCHOR BOLTS
RE: SCHED ON S-602
8" 1'
- 4
1' - 4" 8"
WALL CORNER REINF.
RE: 16/S-501
1'
- 0
1'
- 0
TENSION REINFORCEMENT
(8) #8 U-BARS
28" 29"+ (Tftg -5")
16"
5" 5"
5" 5"
K
2'
- 0
2' - 0" VERT REINF. & TIES
RE: SCHED ON S-601
2' - 0"
2'
- 0
PROVIDE CONTROL JOINT
EACH SIDE OF PIER TYP
RE: 15/S-501
1'
- 4
8"
GROUT POCKET FOR SHEAR LUG
10"LX10"WX9" DEEP
OMIT LINK(S) IN POCKET
ANCHOR BOLTS
RE: SCHED ON S-602
N
6.2
7.8
1' - 0" 5"5" 1' - 0"
TENSION REINFORCEMENT
(8) #8 U-BARS
28" 29"+ (Tftg -5")
16"
5" 5"
TENSION REINFORCEMENT
(2) #8 Z-BARS
16"
29"+ (Tftg -5")
16"
K
2'
- 0
2' - 0" VERT REINF. & TIES
RE: SCHED ON S-601
2' - 0"
2'
- 0
PROVIDE CONTROL JOINT
EACH SIDE OF PIER TYP
RE: 15/S-501
GROUT POCKET FOR SHEAR LUG
10"LX10"WX9" DEEP
OMIT LINK(S) IN POCKET
ANCHOR BOLTS
RE: SCHED ON S-602
10" 8" 6"
1'
- 4
8"
WALL CORNER REINF.
RE: 16/S-501
CMU WALL
RE: PLAN
TENSION REINFORCEMENT
(8) #8 U-BARS
28" 29"+ (Tftg -5")
1'
- 0
5"
5"
1'
- 0
5" 5"
OPP
HAND
K
2'
- 0
2' - 0"
1 1/2" CLR, TYP
VERT REINF. & TIES
RE: SCHED ON S-601
2' - 0"
CMU WALL
RE: PLAN
GROUT POCKET FOR SHEAR LUG
11"LX11"WX9" DEEP
OMIT LINK(S) IN POCKET
ANCHOR BOLTS
RE: SCHED ON S-602
2'
- 0
TENSION REINFORCEMENT
(8) #8 U-BARS
28" 29"+ (Tftg -5")
16"
K
2'
- 0
2' - 0" VERT REINF. & TIES
RE: SCHED ON S-601
2' - 0"
PROVIDE CONTROL JOINT
EACH SIDE OF PIER TYP
RE: 15/S-501
5.2
GROUT POCKET FOR SHEAR LUG
11"LX11"WX9" DEEP
OMIT LINK(S) IN POCKET
ANCHOR BOLTS
RE: SCHED ON S-602
8" 1' - 4" 2' - 0"
WALL CORNER REINF.
RE: 16/S-501
2'
- 0
"1'
- 4
8"
TENSION REINFORCEMENT
(8) #8 U-BARS 28"
29"+ (Tftg -5") 1'
- 0
5"
5" 1'
- 0
5" 5"
8.8
2' - 0"
VERT REINF. & TIES
RE: SCHED ON S-601
2'
- 0
ML
ANCHOR BOLTS
RE: SCHED ON S-602
2' - 0"
CMU WALL
RE: PLAN
TENSION REINFORCEMENT
(8) #8 U-BARS
28" 29"+ (Tftg -5")
1'
- 0
5"
5" 1'
- 0
5" 5"
5.2
2'
- 0
VERT REINF. & TIES
RE: SCHED ON S-601
2'
- 0
PROVIDE CONTROL JOINT
EACH SIDE OF PIER TYP
RE: 15/S-501
ML
ANCHOR BOLTS
RE: SCHED ON S-602
2' - 0" 2' - 0"
8" 1' - 4"
TENSION REINFORCEMENT
(8) #8 U-BARS
28" 29"+ (Tftg -5")
1'
- 0
5"
5" 1'
- 0
5" 5"
2'
- 0
2' - 0"
VERT REINF. & TIES
RE: SCHED ON S-601
2' - 0"
2'
- 0
PROVIDE CONTROL JOINT
EACH SIDE OF PIER TYP
RE: 15/S-501
5.2
8.8
GROUT POCKET FOR SHEAR LUG
8"LX8"WX9" DEEP
OMIT LINK(S) IN POCKET
ANCHOR BOLTS
RE: SCHED ON S-602
N
OPP HAND
WALL CORNER REINF.
RE: 16/S-501
8" 1' - 4"
8" 1'
- 4
1' - 0" 5"5" 1' - 0"
TENSION REINFORCEMENT
(8) #8 U-BARS
28" 29"+ (Tftg -5")
16"
5" 5"
TENSION REINFORCEMENT
(2) #8 Z-BARS
16"
29"+ (Tftg -5")
16"
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P
LO
T D
AT
E:
P
LO
T S
C
AL
E:
S U
BM
IT
TE
D
B Y:
D W
N B
Y:
D
ES
I G N
ED
B
Y :
C
KD
B Y:
D
AT
E :
S
IZ
E :
E
FI
LE
N A
M E:
"X
S O
LI
C
IT
AT
IO
N
N O
C O
N
TR
AC
T
N O
C
AT
E G O
R Y
C O
D E:
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
VE
R
A
IR
F O
R C
E
BA
SE
AI
R C
R
AF
T M
A I N
TE
N
A N C
E
FA
C
IL
IT
Y
A S
N O
TE
D
0-
0 0 -0
W
2 B U
-1 8-
R
- 0
U .S
. A R
M Y
E N G
IN
EE
R D
IS
TR
IC
T
C O
R
PS
O F
EN
G
IN
EE
R S
1 2 3 4 5
3/
/2
9:
:5
AM
S-502
FO
UN
DA
TI
ON
T
YP
IC
AL
D
ET
AI
LS
JJ
S
W C
A
W C
A
125 RT
A
SU
BM
IS
SI
ON
- 1
2 D
EC
D
EC
SCALE: 3/4" = 1'-0"S-502
1 PIER 1
SCALE: 3/4" = 1'-0"S-502
18 PIER 12
SCALE: 3/4" = 1'-0"S-502
2 PIER 2
SCALE: 3/4" = 1'-0"S-502
3 PIER 3
SCALE: 3/4" = 1'-0"S-502
4 PIER 4
SCALE: 3/4" = 1'-0"S-502
5 PIER 5
SCALE: 3/4" = 1'-0"S-502
6 PIER 6
SCALE: 3/4" = 1'-0"S-502
7 PIER 7
SCALE: 3/4" = 1'-0"S-502
8 PIER 8
SCALE: 3/4" = 1'-0"S-502
9 PIER 9
SCALE: 3/4" = 1'-0"S-502
10 PIER 10
SCALE: 3/4" = 1'-0"S-502
11 PIER 11
SCALE:
1' - 0" 2' - 0" 4' - 0"
3/4"= 1' - 0"
S-502 S-502 S-502 S-502
S-502 S-502 S-502 S-502
S-502 S-502 S-502 S-502
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
A
PP
R a P
IE
R
R
EI
N F
IN
FO
U P
D
AT
ED
M
AR
a
VERT REINF. & TIES
RE: SCHED ON S-601
0.9
2' - 0"
2'
- 0
2'
- 0
1'
- 0
1'
- 0
GROUT POCKET FOR SHEAR LUG
11"LX11"WX9" DEEP
OMIT LINK(S) IN POCKET
ANCHOR BOLTS
RE: SCHED ON S-602
K
ANCHOR BOLTS
RE: SCHED ON S-602
CMU WALL
RE: PLAN
1' - 0" 8" 2' - 0"
8" 1'
- 4
8" 4"
A
OPP
HAND
TENSION REINFORCEMENT
(8) #8 U-BARS 28"
29"+ (Tftg -5") 1'
- 0
5" 5"
1'
- 0
5"5"
REINF PER
PIER P16 RE:
SCHED ON S-601
VERT REINF. & TIES
RE: SCHED ON S-601
TIE REINF.
RE: SCHED ON S-601
0.9
2' - 0"
2'
- 0
2'
- 0
1'
- 0
1'
- 0
ANCHOR BOLTS
RE: SCHED ON S-602
EDC
ANCHOR BOLTS
RE: SCHED ON S-602
CMU WALL
RE: PLAN
1' - 0" 8" 2' - 0"
GROUT POCKET FOR SHEAR LUG
9"LX9"WX6" DEEP
OMIT LINK(S) IN POCKET
TENSION REINFORCEMENT
(4) #8 U-BARS 28"
29"+ (Tftg -5")
10" 10"
REINF PER
PIER P16 RE:
SCHED ON S-601
VERT REINF. & TIES
RE: SCHED ON S-601
TIE REINF.
RE: SCHED ON S-601
2' - 0"
2'
- 0
2'
- 0
B
CMU WALL
RE: PLAN
GROUT POCKET FOR SHEAR LUG
9"LX9"WX6" DEEP
OMIT LINK(S) IN POCKET
2' - 0"
ANCHOR BOLTS
RE: SCHED ON S-602
TENSION REINFORCEMENT
(4) #8 U-BARS
28" 29"+ (Tftg -5")
10" 10"
" VERT REINF.
RE: SCHED ON S-601
0.2 1' - 0"
1'
- 0
1'
- 0
CL
1' - 0"
1 1 /2"
C
LR
, T
YP
ANCHOR BOLTS
RE: SCHED ON S-602
VERT REINF.
RE: SCHED ON S-601
0.2 1' - 0" 1' - 0"
1 1 /2"
C
LR
, T
YP
ANCHOR BOLTS
RE: SCHED ON S-602
ANCHOR BOLTS
RE: SCHED ON S-602
1'
- 0
1'
- 1 0"
1'
- 0
F.7
F.8
VERT REINF. & TIES
RE: SCHED ON S-601
0.1
8"
8" 8"
D.1
8"
1 1 /2"
C
LR
, T
YP
D.6
ANCHOR BOLTS
RE: SCHED ON S-602
M
1 1/2" CLR, TYP
VERT REINF.
RE: SCHED ON S-601
ANCHOR BOLTS
RE: SCHED ON S-602
M.1
8" 4"
2'
- 4
1'
- 0
1'
- 4 " 1' - 0" 1' - 0"
M
VERT REINF. & TIES
RE: SCHED ON S-601
ANCHOR BOLTS
RE: SCHED ON S-602
M.1
8" 4"
2'
- 4
1'
- 0
1'
- 4
1' - 0" 10" 8"
WALL CORNER REINF.
RE: 16/S-501
VERT REINF. & TIES
RE: SCHED ON S-601
1'
- 0
1'
- 0
L
ANCHOR BOLTS
RE: SCHED ON S-602
1' - 0" 10" 8"
1 1 /2"
C
LR
, T
YP
VERT REINF. & TIES
RE: SCHED ON S-601
0.5
1'
- 0
1'
- 0
A
ANCHOR BOLTS
RE: SCHED ON S-602
1' - 0"
1 1/2" CLR, TYP
1' - 0"
K
1 2 3 4 5
A
B
C
D
PLATE REFERENCE
NUMBER
SHEET OF
P
LO
T D
AT
E:
P
LO
T S
C
AL
E:
S U
BM
IT
TE
D
B Y:
D W
N B
Y:
D
ES
I G N
ED
B
Y :
C
KD
B Y:
D
AT
E :
S
IZ
E :
E
FI
LE
N A
M E:
"X
S O
LI
C
IT
AT
IO
N
N O
C O
N
TR
AC
T
N O
C
AT
E G O
R Y
C O
D E:
US ARMY CORPS
OF ENGINEERS
PHILADELPHIA
DISTRICT
D O
VE
R
A
IR
F O
R C
E
BA
SE
AI
R C
R
AF
T M
A I N
TE
N
A N C
E
FA
C
IL
IT
Y
A S
N O
TE
D
0-
0 0 -0
W
2 B U
-1 8-
R
- 0
U .S
. A R
M Y
E N G
IN
EE
R D
IS
TR
IC
T
C O
R
PS
O F
EN
G
IN
EE
R S
1 2 3 4 5
3/
/2
9:
:5
AM
S-503
FO
UN
DA
TI
ON
T
YP
IC
AL
D
ET
AI
LS
JJ
S
W C
A
W C
A
126 RT
A
SU
BM
IS
SI
ON
- 1
2 D
EC
D
EC
SCALE: 3/4" = 1'-0"S-503
1 PIER 13
SCALE: 3/4" = 1'-0"S-503
2 PIER 14
SCALE: 3/4" = 1'-0"S-503
3 PIER 15
SCALE: 3/4" = 1'-0"S-503
4 PIER 16, 16A
SCALE: 3/4" = 1'-0"S-503
8 PIER 20
SCALE: 3/4" = 1'-0"S-503
5 PIER 17
SCALE: 3/4" = 1'-0"S-503
6 PIER 18
SCALE: 3/4" = 1'-0"S-503
7 PIER 19
SCALE:
1' - 0" 2' - 0" 4' - 0"
3/4"= 1' - 0"
SCALE: 3/4" = 1'-0"S-503
9 PIER 21
S-503 S-503 S-503 S-503
S-503 S-503 S-503 S-503 S-503
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
A
PP
R a P
IE
R
R
EI
N F
IN
FO
U P
D
AT
ED
M
AR
a a
| 156254-FX001 - FIRE PROTECTION GENERAL NOTES, ABBREVIATIONS, & SYMBOLS |
| Sheets |
| FX001 - FIRE PROTECTION GENERAL NOTES, ABBREVIATIONS, & SYMBOLS |
| 156254-S-502 - FOUNDATION TYPICAL DETAILS |
| Sheets |
| S-502 - FOUNDATION TYPICAL DETAILS |
| 156254-S-503 - FOUNDATION TYPICAL DETAILS |
| Sheets |
| S-503 - FOUNDATION TYPICAL DETAILS |
File details come from the government source that posted it. Updated .