RFP_W912-BU-17-R-0032_Specs_Volume-1.pdf

PDF 8 MB Posted

Attached to
W912BU17R0032 WELCH SCHOOL DOVER AIRFORCE BASE ADDENDUM TO AMENDMENT 0001
Solicitation number
W912BU-17-R-0032
Issued by

About this file

RFP W912-BU-17-R-0032_Specs_Volume-1

View the file

Other files

File Type Posted
17R0032_Amendment_00007.pdf PDF
W912BU-17-R-0032_Specs-AM0005.pdf PDF
W912BU-17-R-0032_Dwgs-AM0005.pdf PDF
W912BU-17-R-0032_Specs-AM0004A.zip ZIP file
W912BU-17-R-0032_Specs-AM0004.zip ZIP file
W912BU-17-R-0032_Dwgs-AM0004.pdf PDF
17R0032_amendment3b.pdf PDF
W912BU-17-R-0032_Dwgs-AM0003.pdf PDF
W912BU-17-R-0032_Specs-AM0003.pdf PDF
Appendix_A-6_WelchDoverReferenceDwgPage25.pdf PDF
17-R-0032_Pre-Proposal_Site_Visit_Attendance_Roster.pdf PDF
W912BU-17-R-0032_Specs-AM0001.pdf PDF
RFI_Example.xls XLS spreadsheet
amendment_0001_SF30_(003).pdf PDF
RFP W912-BU-17-R-0032_Dwgs_Volume-3.pdf PDF
RFP W912-BU-17-R-0032_Dwgs_Volume-2.pdf PDF
RFP W912-BU-17-R-0032_Dwgs_Volume-1.pdf PDF
RFP_W912-BU-17-R-0032_Specs_Volume-2.pdf PDF
RFP_W912-BU-17-R-0032_Specs_Volume-3.pdf PDF
RFP_W912-BU-17-R-0032_Specs_Volume-4.pdf PDF
RFP_W912-BU-17-R-0032_Specs_Volume-5.pdf PDF
Appendix_A-5_price_breakout_schedule.pdf PDF
Appendix_A-6_WelchDoverReferenceDwgs.pdf PDF
Appendix_A-1_Geotech_Report.pdf PDF
Appendix_A-4_Dover_DE_Hazardous_Materials_Survey_Final.pdf PDF
Appendix_A-2_EPA_Technical_Guidance_for_Reducing_Lead_in_Drinking_Water_In_Schools.pdf PDF
Appendix_A-3_Soil_Gas_Assessment_Report.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP W912BU-17-R-0032

US Army Corps of Engineers Philadelphia District

Welch Elementary School / Dover Air Base Middle School Replacement

Dover Air Force Base Delaware

Drawings and Technical Specifications

Volume 1 of 5 (Divisions 00 – 01) JOB HAZARDS – Asbestos, Mercury, PCB’s, Lead Paint

3 January 2018

This page was intentionally left blank for duplex printing.

3 JANUARY 2018

INVITATION NO. RFP W912BU-17-R-0032

REQUEST FOR PROPOSALS

FOR

WELCH ELEMENTARY SCHOOL / DOVER MIDDLE SCHOOL REPLACEMENT

DOVER AIR FORCE BASE

DELAWARE

I. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL OPPORTUNITY CLAUSE

WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.

II. OFFERERS ARE REQUIRED TO COMPLETE THE REPRESENTATION AND CERTIFICATIONS

PORTION OF SECTION 00 45 00 OF THIS SOLICITATION AND SUBMIT THIS WITH THEIR

PROPOSAL.

RFP W912BU-17-R-0032

Main Table of Contents Page 1

MAIN TABLE OF CONTENTS

SOLICITATION PROVISIONS, CONTRACT CLAUSES AND SPECIFICATIONS FOR:

Welch Elementary School / Dover Air Base Middle School Replacement Dover Air Force Base, Dover, Delaware

Volume 1

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

Section Title

00 10 00 SF1442 SOLICITATION, OFFER, AND AWARD (PROPOSAL PRICE

BREAKOUT SCHEDULE FOUND IN APPENDIX A-5)

00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS

00 22 00 PROPOSAL SUBMSSION REQUIREMENTS, EVALUATION CRITERIA AND

BASIS OF AWARD

00 45 00 REPRESENTATIONS & CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

TECHNICAL SPECIFICATIONS

DIVISION 01 GENERAL REQUIREMENTS

Volume 2

DIVISION 02 - DIVISION 08

Volume 3

DIVISION 09 - DIVISION 14

Volume 4

DIVISION 15 - DIVISION 25

Volume 5

DIVISION 26 - DIVISION 33

APPENDICES

APPENDIX A-1 SUPPLEMENTAL GEOTECHNICAL REPORT (UNDER SEPARATE COVER)

APPENDIX A-2 3TS FOR REDUCING LEAD IN DRINKING WATER IN SCHOOLS: REVISED

TECHNICAL GUIDANCE (UNDER SEPARATE COVER)

APPENDIX A-3 SOIL GAS ASSESSMENT REPORT (UNDER SEPARATE COVER)

APPENDIX A-4 HAZARDOUS MATERIALS SURVEY (UNDER SEPARATE COVER)

APPENDIX A-5 PROPOSAL PRICE BREAKOUT SCHEDULE (UNDER SEPARATE COVER)

APPENDIX A-6 WELCH/DOVER REFERENCE DRAWINGS (UNDER SEPARATE COVER)

-- END OF MAIN TABLE OF CONTENTS --

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

11. The contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

W912BU-17-R-0032

US ARMY ENGINEER DISTRICT, PHILADELPHIA

WANAMAKER BUILDING, 100 PENN SQUARE EAST

PHILADELPHIA, PENNSYLVANIA 19107-3390

Request For Proposal: W912BU-17-R-0032 PROJECT TITLE: Welsh Elementary School / Dover Air Base Middle School Replacement, Dover Air Force Base,Delaware ISSUE DATE: 3 January 2018

THIS PROCUREMENT IS UNRESTRICTED

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: JAMAAL EDWARDS

WANAMAKER BUILDING, 100 PENN SQUARE EAST

PHILADELPHIA, PENNSYLVANIA 19107-3390

W25PHS71597713

W912BU

JAMAAL EDWARDS 215-656-3241 - Jamaal.a.Edwards@usace.army.mil

01/03/2018

03/05/2018

11:00 A.M.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 4-85) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

20b. SIGNATURE 20c. OFFER DATE

W912BU-17-R-0032 00 21 00 -1

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY REFERENCE

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction

FEB 1999

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

52.236-28 Preparation of Proposals--Construction OCT 1997 252.204-7006 Billing Instructions OCT 2005

W912BU-17-R-0032 00 21 00 -2

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

14.5% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

W912BU-17-R-0032 00 21 00 -3

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Dover AFB, DE

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from.

Mrs. Esther A. Edinborough U.S. Army Corps of Engineers Philadelphia District, 100 Penn Square East 13th & Market Philadelphia, PA 19107

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting: The scheduled date for a site visit is:

Date: Friday, January 19, 2018 Name: Barbara Moffatt, Barbara.F.Moffatt@usace.army.mil Address: 100 Square East, Philadelphia, PA 19107 Telephone: (215) 656-6693

Section 00 22 00 – Proposal submission Requirements

W912BU-17-R-0032 00 22 00 -1

SECTION II

SOLICITATION PROVISIONS

A. BASIS FOR AWARD

The award will be made based on the best overall (i.e., best value) proposal that is determined to be the most beneficial to the Government. Appropriate consideration will be given to three (3) non-price evaluation factors in addition to the price evaluation.

The non-price factors include: Past Performance, Management, and Small Business Participation. Offerors will be cautioned that the award may not necessarily be made to the lowest cost offered. NOTE: ALL NON-PRICED FACTORS COMBINED ARE MORE IMPORTANT than PRICE.

B. FACTORS AND SUB-FACTORS TO BE EVALUATED

The following evaluation factors and subfactors will be used to evaluate each proposal: Award will be made to the offeror whose proposal is most advantageous to the Government based upon compliance with the contract specifications and an integrated assessment of the evaluation factors and subfactors described below.

Factor 1: Past Performance: Each offeror’s past performance information will be reviewed to determine relevancy and confidence assessment.

Factor 2: Management: Each offeror’s management information will be reviewed to determine a clear understanding of the work and an ability to coordinate resources to ensure successful and safe pursuit of the work within the specified period of performance.

Factor 3. Small Business Participation: The extent of Small Business Participation will be evaluated for unrestricted acquisitions.

Factor 4: Price: The resulting award will be a firm-fixed price contract. Price reasonableness will be utilized in the evaluation of the Firm-Fixed Price effort.

Evaluation of the offeror’s proposal shall address each factor as it applies to the Plans and Specifications. A detailed explanation of the criteria for the evaluation is set forth in the “Evaluation Approach”, Paragraph C of this section. During evaluations of each proposal, the Government will assign each factor a rating and write a narrative evaluation reflecting the identified findings.

W912BU-17-R-0032 00 22 00 -2

C. EVALUATION APPROACH AND PROPOSAL SUBMISSION

All proposals shall be subject to evaluation by the Source Selection Team (SST).

1. Overview.

1.1 The intent of this solicitation is to select one contractor for Construction of a new combined Elementary School and Middle School at Dover Air Force Base, DE. The Government will evaluate the proposals in accordance with the criteria described herein, and award a firm fixed price contract to the responsible offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government, all factors considered.

1.2 The basis of award is the Tradeoff Process. The Contracting Officer will award a firm fixed price contract to the responsible offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.

2. Submittal of offers.

2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's past performance and management capabilities necessary for successful completion of the project. Requirements stated in this RFP are minimums. Innovative, creative, cost and time saving proposals that meet or exceed the requirements are encouraged and will be rated accordingly. Deviations from the requirements should be clearly noted and justified in the proposal.

2.2 Offerors shall submit their proposals to the US Army Corps of Engineers, Wanamaker Building, 100 Penn Square East, Philadelphia, PA 19107-3390 no later than the time and date specified in Block 13 of Standard Form 1442.

2.3 Offerors are required to submit a proposal made up of Past Performance, Management, Small Business Participation, and Price. All proposal materials shall be submitted in binders with a table of contents and tabbed section dividers. Refer to Paragraph C.4 for Volume I and Volume II contents.

Volume I shall be submitted in original plus two (2) paper copies and one electronic copy on

CD*.

Volume II shall be submitted in original plus two (2) paper copies and one electronic copy on

CD.* Volume II shall be placed in a separate envelope. DO NOT INCLUDE VOLUME II ON THE

SAME CD AS VOLUME I.

Failure to place the required submission information under the appropriate tab (factor or sub-factor) may result in a lower rating if the evaluators cannot readily find the appropriate information.

W912BU-17-R-0032 00 22 00 -3

*NOTE: The paper copy of the proposal will be used for evaluation and will control if there are any conflicts or discrepancies with the electronic version.

3. Proposal Evaluation Process.

3.1. A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the evaluation and rating of proposals will be conducted in strict confidence. Non-price factors will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone who is not involved in the evaluation and award process or to other offerors.

Proposals will be evaluated based on the factors described herein, and the basis of award is the Tradeoff Process.

3.2 The evaluation process consists of four parts: proposal compliance review and responsibility determination, non-price factor evaluation, price factor evaluation, and trade-off analysis.

3.2.1 Proposal Compliance Review: This is an initial review to ensure that all information required for both the non-price and price proposal were received.

3.2.2 Non-Price Evaluation: The SSEB will evaluate and rate the proposals against the RFP requirements.

Past Performance will be rated based on relevancy and confidence. Remaining factors will be rated using an adjectival-based system.

3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the non-price proposal evaluation. The SSEB will not have access to price information until completion of the non-price evaluation.

3.2.4 Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of non-price proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.

4. Proposal Information and Related Evaluation Factors.

4.1 Proposals will be evaluated in accordance with the factors and sub-factors below. Past Performance and Management are considered equally important as are the Management sub-factors. Past performance and Management are considered more important than the Small Business Participation Plan. The combined non-price factors are considered significantly more important than cost or price. Offerors are reminded to include their best terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interest of the Government.

4.2 Volume I – Factor I – Past Performance (Three-Ring Binder)

4.3 Volume I- Factor II – Management (Three-Ring Binder)

Subfactor A Management Plan

Subfactor B Safety

W912BU-17-R-0032 00 22 00 -4

Subfactor C Schedule

4.4 Volume I- Factor III- Small Business Participation Plan (Three-Ring Binder)

4.5 Volume II - Price and Pro Forma Information (Sealed Envelope)

Tab A Standard Form 1442 and Price Breakout Schedule Not Rated (See Appendix H)

Tab B Subcontracting Plan Not Rated

Tab C Joint Venture Agreements Not Rated

Tab D Evidence of Ability to Obtain Bonding and Not Rated

Proof of Financial Ability

Tab E Pre-Award Information Not Rated

4.6 Ratings

Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.

Past Performance Relevancy Ratings Rating Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Performance Confidence Assessments

Rating Definition Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that

W912BU-17-R-0032 00 22 00 -5

the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.

Unknown Confidence (Neutral) No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

Management Assessment Ratings Adjectival Rating Definition

Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.

Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.

Acceptable

Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.

Marginal Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths.

Risk of unsuccessful contract performance is high.

Unacceptable Proposal does not meet requirements and contains one or more deficiencies and is unawardable.

4.7 Definitions

1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

2. Strength. An aspect of an offerors’ proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

3. Significant Strength. An aspect of an offerors’ proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance.

See FAR 15.001.

W912BU-17-R-0032 00 22 00 -6

5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).

7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated.

8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating from sources where the information is from other than formal rating systems such as “PPIRS” or

“FAPPIS.”

5.0 Volume I – Factor I – Past Performance

5.1 Submission Requirements:

Provide descriptions of (3) three projects substantially complete or completed by the prime contractor as of the date of this solicitation or within the last 5 years which are similar to this project in size and scope. Projects considered similar to this project include new construction of elementary schools, middle schools and high schools of at least 80,000 SF. State whether the project included the following project elements: large, open spaces with clear spans in excess of 65 feet, structural steel frames, reinforced masonry and cast in place concrete, standing seam metal roofing, air-cooled chillers utilizing distributed pumping and boiler-fed hot water system, GBCI LEED certification for Schools (including Enhanced Commissioning), and operable wall partitions. The prime contractor must have self-performed at least 15% of the direct contract labor (including testing and layout personnel), exclusive of other general condition or field overhead personnel, material, equipment, or subcontractors to be considered similar. An IDIQ contract may be submitted only if a single task order could be considered similar to this project.

Task orders may not be combined in order for the contract to be considered similar. Formats for Project Details are included for your use. Use as many forms as necessary to meet the criteria. If you elect not to use the formats, all information identified on the formats is still required for evaluation of this item.

Provide two references for all of the experience identified in paragraph 5.1. Reference information should include project name, location, owner's name, point of contact, telephone number, and email address. Also include any ratings, letters, awards, etc. which support past performance on these projects. A sample Past Performance Questionnaire is attached for your convenience. If used, the Past Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency from the reference.

NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. If more than one contractor is listed in Block 14, then a signed joint venture must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the Joint Venture must submit their own DUNS number with the JV proposal. Projects performed by other contractors than the offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless

W912BU-17-R-0032 00 22 00 -7

those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture agreement.

5.2. Evaluation Criteria:

The SSEB will evaluate the relevancy of recent experience identified in the proposal.

Documentation of successful completion of projects similar in size and scope to this project will be considered relevant. Conversely, proposals that do not show documentation of successful completion of projects similar in size and scope will not be considered relevant.

Projects considered similar to this project include new construction of elementary schools, middle schools and high schools at least 80,000 SF in size. Additional consideration may be given for recent project experience that demonstrates experience with the following: (1) working with DoDEA or USACE on Military Bases/Installations, (2) large, open spaces with clear spans in excess of 65 feet, (3) structural steel frames, reinforced masonry, and cast in place concrete, (5) standing seam metal roofing, (6) air-cooled chillers utilizing distributed pumping and boiler-fed hot water system, (7) GBCI LEED certification for Schools (including Enhanced Commissioning), (8) construction projects in close proximity to an occupied, operating school, residential neighborhood or similar setting (9) and large operable wall partitions.

The SSEB will assign a confidence rating to each offeror based on the degree of successful performance of all recent and relevant projects identified in the proposal in response to paragraph 5.1. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The Government also reserves the right to not contact the provided references. The Government may also use other tools such as CPARS, CCASS, ACASS, FAPPIS, Dun & Bradstreet, etc. or any other relevant information to assist in its evaluation of an offeror’s past performance.

6.0 Volume I – Factor II – Management

6.1 Subfactor A Management Plan

6.1.1 Submission Requirements:

Provide a management plan for the project that describes how your labor, resources, subcontractors and material suppliers will be coordinated and used to ensure successful and safe completion of the project. Describe how you will manage, supervise and coordinate the subcontractors' work and who in the organization will be responsible for this management and coordination. Discuss how you will manage safe construction practices on an active school campus adjacent to a residential neighborhood. Discuss how the progress will be managed through the use of a detailed schedule. Discuss which resources are available but will not be present at the site. Provide an organizational chart for this project showing home office support, on-site management and the responsible chain of command. Joint venture offerors must show the respective areas of responsibility for each partner. Clearly delineate on-site from off-site personnel on the organizational chart. Project Manager, Site Superintendent, Contractor Quality Control Manager, Site Safety and Health Officer and other disciplines listed in Specification Section 01 45 00 Contractor Quality Control Experience Matrix shall be identified and their resumes provided to confirm compliance with education and experience requirements of the contract specifications. Describe Offeror’s proposed approach to managing construction of these facilities, including construction phasing, coordinating sub-

W912BU-17-R-0032 00 22 00 -8

contractors, constructing adjacent to existing occupied school and residential area, processes for requests for information, shop drawing and submittal reviews and approval, LEED documentation, progress meetings, turnover of operations and maintenance manuals and training requirements, as-built drawings, and contract completion and closeout. Generally describe the items the Offeror will self-perform to comply with the requirements for self-performed work. Describe in general terms the team’s quality control approach, corporate systems, and capabilities to maintain quality control of the construction.

6.1.2 Evaluation Criteria:

Comprehensive plans that demonstrate a clear understanding of the work and an ability to coordinate resources to ensure successful pursuit of the work will be considered to meet the RFP requirements. Plans that do not demonstrate a clear understanding of the work, that do not demonstrate a capability to coordinate resources, or that do not demonstrate appropriate excess capacity will be considered to not meet the RFP requirements. Plans will be evaluated based on the level of involvement the contractor will have in the management, oversight, control, and coordination of the work performed by subcontractors. The SSEB will evaluate the clarity, adequacy, capabilities and strengths of the offeror’s organizational chart or managing a successful project. An organizational chart that clearly depicts a highly qualified on-site team supported by appropriate resources off-site and that clearly defines responsibilities will be considered to meet the RFP requirements. Charts that are confusing, cluttered with duplicative entries, or that do not clearly define responsibilities will be considered to not meet the RFP requirements.

6.2 Subfactor B - Safety

6.2.1 Submission Requirements:

The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR and DART Rates shall not be submitted for subcontractors.)

(a) Experience Modification Rate (EMR):

For the three (3) previous complete calendar years (2014, 2015, & 2016), the Offeror shall submit its EMR (which compares your company’s annual losses in insurance claims against its policy premiums over a three (3) year period). If you have no EMR, the Offeror shall affirmatively state so and explain why. Any extenuating circumstances that affected the EMR and upward or downward trends shall be addressed as part of this element.

(b) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

For the three (3) previous complete calendar years (2014, 2015, & 2016), the Offeror shall submit its OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA DART Rate, the Offeror shall affirmatively state so, and explain why. Any extenuating circumstances that affected the OSHA DART Rate data and upward or downward trends shall be addressed as part of this element.

W912BU-17-R-0032 00 22 00 -9

(c) Approach for Safety:

The Offeror shall describe the plan that it will implement to evaluate safety performance of potential subcontractors as a part of the selection process for all levels of subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Approach for Safety shall be limited to two pages.

6.2.2 Evaluation Criteria:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Government will evaluate the Offeror’s overall safety record, the Offeror’s plan to select and monitor subcontractors, any and innovative safety methods that the Offeror plans to implement for this procurement. The Government’s sources of information for evaluating safety may include, but are not limited to, OSHA, NAVFAC’s Environmental and Safety Application Management System (ESAMS), and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The evaluation will collectively consider the following:

- Experience Modification Rate (EMR)

- OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate

- Offeror Technical Approach to Safety

- Other sources of information available to the Government

(a) Experience Modification Rate (EMR):

The Government will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rating. Lower EMRs will be given greater consideration in the evaluation.

(b) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

The Government will evaluate the OSHA DART Rate to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rates. Lower OSHA DART Rates will be given greater consideration in the evaluation.

(c) Technical Approach to Safety:

The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The Government will also evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement.

6.3 Subfactor C - Schedule

6.3.1 Submission Requirements:

W912BU-17-R-0032 00 22 00 -10

Provide a bar chart schedule utilizing days in lieu of dates, showing how the work will be performed and completed as specified in Section 00 70 00, Clause 52.211-10. The summary schedule shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. Offeror may use a critical path or other method of his choice; however, schedules shall be graphically represented. At a minimum identify preconstruction activities, mobilization, and all Phase 1 efforts indicated in the Proposal Price Breakout Schedule (Bidding Schedule). Procurement of long lead items shall be included in schedule Also identify Phase 2 hazardous materials abatement and building demolition. Include schedule for sitework, final cleanup and demobilization as applicable to Phase 1 and Phase 2.

6.3.2 Evaluation Criteria:

The SSEB will evaluate the schedule to assess the strength of understanding of events associated with the construction process and completion requirements. The SSEB will also evaluate the offeror’s capability to complete the schedule within the proposed contract duration and the realism of the schedule. Schedules offering Phase 1 duration less than that shown in 52.211-10 may receive a higher rating if the schedule is shown to be realistic and achievable.

Should the Government accept shorter duration(s) than that required by 52.211-10 the accepted schedule will take precedence over 52.211-10. NOTE: The SSEB will evaluate the offeror’s schedule using days, not dates. If an offeror includes dates in the schedule, the dates will be used to calculate days and the dates will not be considered to create binding dates.

7.0 Volume I – Factor III – Small Business Participation Plan

7.1 Submission Requirements

ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION

PROPOSAL. The Small Business Participation Proposal shall be based on the Minimum Quantitative Requirement (MQR) and/or the offeror’s best effort and be required to address each of the following areas individually:

• The extent in which the small business programs listed in FAR 19 (small business, small disadvantaged business, woman-owned small business, HUBZone, service-disabled veteran-owned small business, etc.) are specifically identified in the Small Business Participation Proposal;

• The extent of participation of such firms in terms of the value of the total acquisition in percentages; the extent of commitment to use such firms (for example, enforceable commitments, such as signed teaming agreements, are to be considered more heavily than non-enforceable ones);

• The complexity and variety of the work small firms are to perform on this acquisition;

• The realism of the Small Business Participation Proposal, i.e. aggressive goals.

The Small Business Participation Proposal shall be organized as follows:

(1) Prime Contractor type of business (check all that apply):

( ) Large Prime

W912BU-17-R-0032 00 22 00 -11

( ) Historically Black Colleges and Universities and Minority Institutions

(HBCU/MI)

Or

(2) Small Business Prime; also categorized as a ( ) Small Disadvantaged Business (SDB) ( ) Woman-Owned Small Business (WOSB) ( ) Historically Underutilized Business Zone (HUBZone) Small Business ( ) Veteran-Owned Small Business (VOSB) ( ) Service-Disabled, Veteran-Owned Small Business (SDVOSB)

(2) Total combined percentage of work (and the equivalent in dollars) to be performed by both large and small businesses (include work to be performed by both the Prime and Subcontractors)

Total Percentage planned for Large Business(es): ______________ % = $_________________

Total Percentage planned for Small Business(es): ______________ % = $_________________

100% (when combined, Large and Small Business totals must equal 100% and total contract value.)*

(3) Indicate the total percentage of participation to be performed by each type of subcategory of small business. The percentage of work to be performed by Small Businesses that qualify in multiple small business categories may be counted in each category.

% of Total Contract Value

Small Disadvantaged % Small Woman- Owned % Small HUBZone % Small Veteran-Owned % Small Service-Disabled Veteran Owned

Each percentage above shall be accompanied by detailed supporting documentation regarding individual commitments.

W912BU-17-R-0032 00 22 00 -12

(4) List principal supplies/services (be specific) to be performed by Small Businesses:

Name of Company

Type of Service/Supply

Small Small Disadvantaged Small Woman-Owned Small HUB Zone Small Veteran-Owned Small Service-Disabled Veteran Owned

(5) Prior Performance Information: Provide any information substantiating the Offeror’s track record of utilizing small business on past contracts, i.e., eSRS reports, SF294s and 295s, Past Performance Information Retrieval System (PPIRS) reports.

(6) For Large and Small Businesses provide descriptive information for all small business categories. Any information concerning long-term relationships with Small Business subcontractors, such as mentor-protégé relationships, should be provided.

(7) Extent of Commitment: Provide documentation describing the extent of commitment to use small businesses for this acquisition – either as small business prime, written contracts, teaming agreements, letters of intent, joint ventures, or as subcontractors as defined in FAR Part 19.

(8) Small Business Subcontracting Plan: Each other than Small Business Offeror shall provide a Small Business Subcontracting Plan that contains all of the elements required by FAR Clause 52.219-9 and DFARS 252.219-7003 (or DFARS 252.219- 7004 if the offeror has a comprehensive subcontracting plan). This Plan shall be submitted separately from the Small Business Participation Plan. The Subcontracting Plan is not a requirement for evaluation in source selection but, rather a requirement for award to a Large Business. The approved Small Business Subcontracting Plan will be incorporated into any resultant contract(s).

7.2. Evaluation Criteria:

ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS

PARTICIPATION PROPOSAL. The Small Business Participation Proposal will be evaluated on the Minimum Quantitative Requirement (MQR) and/or the Offeror’s best effort, the level of small business commitment that is being demonstrated for the proposed acquisition and the level of commitment that was demonstrated in utilizing small businesses in performance of prior contracts.

Pursuant to DFARS PGI 215.304(c) the following elements will be considered in evaluating an Offeror’s Participation Proposal:

W912BU-17-R-0032 00 22 00 -13

A. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals;

B. The extent of commitment to use such firms (enforceable commitments will be weighted more heavily than non-enforceable ones);

C. The complexity and variety of the work such firms are to perform;

D. The realism of the proposal;

E. Past performance of Offerors in complying with the requirements of FAR 52.219-8

“Utilization of Small Business” and maximizing opportunities for U. S. Small Business Subcontractors;

F. The extent to which the Offeror provides detailed explanations/documentation supporting the proposed participation percentages, or lack thereof. The Department of Defense (DOD) has established small business goals as an assistance to assure small business receives a fair proportion of DOD awards; and

G. The extent of participation of small business prime offerors and small business subcontractors in terms of the percentage of the total acquisition value (TAV). The government will evaluate the extent to which the offeror meets or exceeds the MQR. The MQR for this procurement is Small Business: (10%) of the TAV; Small and Disadvantaged Business: Best effort; Women- Owned Small Business: Best effort; Service-Disabled Veteran-Owned Small Business: Best effort; Veteran-Owned Small Business: Best effort; and Historically-Underutilized Business Zone small Business: Best effort.

8.0 Volume II - Price and Proforma Information (Submit in a separate envelope). PLEASE DO NOT

INCLUDE VOLUME II ON THE SAME CD AS VOLUME I.

8.1 Tab A - Standard Form 1442 and Proposal Price Breakout Schedule.

8.1.1 Submission Requirements:

The offeror shall complete and submit Standard Form 1442 and Appendix-5-Proposal Price Breakout Schedule. Standard Form 1442 is included in Section 00 10 00 of this solicitation and Proposal Price Breakout Schedule is located in APPENDIX-5.

8.1.2 Evaluation Criteria:

The price will be evaluated on the proposal in the detail required by Section 00 10 00. The price will be reviewed by the SSEB and Contracting Officer/SSA for fair and reasonableness through the use of a price analysis.

8.2 Tab B - Subcontracting Plan

8.2.1 Submission Requirements:

Large business offerors shall submit a Subcontracting Plan in accordance with FAR Clauses 52.219-8 and 52.219-9. To be acceptable, plans must adequately address the required statutory elements and provide sufficient information to enable the Contracting Officer to answer affirmatively questions A through H of Appendix DD, Part 2, AFARS 19.705. You may use the attached sample sub-contracting plan as a starting point. Percentage goals apply to the total amount being subcontracted. The current goals for the Philadelphia District are: 30.0% to Small Business, 5% to Small Disadvantaged Business. 5% to

W912BU-17-R-0032 00 22 00 -14

Women-Owned Small Business, 3% for HubZone Businesses, 3% to Service Disabled Veteran Owned Small Business, and 4% to Veteran Owned Small Business.

8.2 Tab B - Subcontracting Plan

8.2.2 Evaluation Criteria:

8.2.1 Submission Requirements:

Large business offerors shall submit a Subcontracting Plan in accordance with FAR Clauses 52.219-8 and 52.219-9. To be acceptable, plans must adequately address the required statutory elements and provide sufficient information to enable the Contracting Officer to answer affirmatively questions A through H of Appendix DD, Part 2, AFARS 19.705. You may use the attached sample sub-contracting plan as a starting point. Percentage goals apply to the total amount being subcontracted.

8.2.2 Evaluation Criteria:

Submitted information will be evaluated for acceptability in accordance with AFARS 19.705. To be acceptable, subcontracting plans must:

(a) Adequately address the required statutory elements.

(b) Provide sufficient information to enable the Contracting Officer to answer affirmatively questions A through H of Appendix DD (AFARS 19.705), a copy of which is attached.

(c) To be acceptable, subcontracting plans must be rated 71 percent of higher under the AFARS evaluation system. Any subcontracting plan that is rated 70 percent or less will not considered for acceptability. If discussions with offerors are necessary, those areas where the plan is deficient will be reviewed with each offeror with the goal of correcting deficiencies.

8.3 Tab C – Joint Venture and Mentor-Protégé Agreements

8.3.1 Submission Requirements:

Small business offerors (e.g., 8(a), HUBZone, SDVOSBC, etc) submitting a proposal as a Joint Venture or Mentor-Protégé Joint Venture shall submit evidence from the Offeror's SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business Opportunity Specialist. Joint Venture agreements and approved 8(a) Mentor-Protégé agreements must be submitted with the proposal.

8.3.2 Evaluation Criteria:

Joint Venture Agreements and Mentor-Protégé agreements must comply with the relevant regulations in Title 13 of the Code of Federal Regulations.

W912BU-17-R-0032 00 22 00 -15

8.4 Tab D- Evidence of Ability to Obtain Bonding and Proof of Financial Ability

8.4.1 Submission Requirements:

A. Financial Capability. Submit Proof of Financial Ability (Most recent financial statement covering assets and liabilities). Include the name, address and telephone number of firm's banking institution.

B. Bonding Capability. Submit information showing offeror's ability to be bonded for this project.

Include the name, address and telephone number of the firm's bonding company.

8.4.2 Evaluation Criteria:

This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.

8.5 Tab E - Pre-Award Information

8.5.1 Submission Requirements:

A. The offeror shall submit one completed copy of Section 00600, Representations and Certification.

B. The offeror shall submit the following information:

a) Number of years the firm has been in business

b) Name, address and telephone numbers of two credit/trade references

c) A list of present commitments, including the dollar value

W912BU-17-R-0032 00 45 00 -1

Section 00 45 00 - Representations and Certifications

52.204-7 System for Award Management OCT…