Hazardous Materials Survey Welch Elementary/Dover Middle School Replacement
Dover Air Force Base Dover, Delaware November 1, 2016
Terracon Project No. J116P090
Prepared for:
Zyscovich Architects
Miami, Florida
Prepared by:
Terracon Consultants, Inc.
Manchester, NH mmcguinn Typewritten Text
APPENDIX A-4
mmcguinn Typewritten Text
HAZARDOUS MATERIALS SURVEY
mmcguinn Typewritten Text
RFP W912BU-17-R-0032
Responsive ■ Resourceful ■ Reliable i
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Project Objective
1.2 Reliance
2.0 BUILDING DESCRIPTION
3.0 FIELD ACTIVITIES
3.1 Asbestos Survey
3.1.1 Visual Assessment
3.1.2 Physical Assessment
3.1.3 Sample Collection
3.1.4 Sample Analysis
3.2 Lead Paint Sampling
3.2.1 Visual Assessment
3.2.2 Sample Collection
3.2.3 Sample Analysis
3.3 Hazardous Materials Assessment
3.3.1 Visual Assessment
4.0 REGULATORY OVERVIEW
4.1 Asbestos
4.2 Lead
4.3 Hazardous Materials
5.0 FINDINGS and recommendations
5.1 Asbestos
5.2 Lead Sampling Summary
5.3 Hazardous Materials
6.0 LIMITATIONS/GENERAL COMMENTS
APPENDIX A ASBESTOS ANALYTICAL LABORATORY DATA
APPENDIX B LEAD ANALYTICAL LABORATORY DATA
APPENDIX C LICENSES AND CERTIFICATIONS
Responsive ■ Resourceful ■ Reliable 1
HAZARDOUS MATERIALS SURVEY
Welch Elementary/Dover Middle School Replacement Dover Air Force Base, Dover, Delaware
Terracon Project No. J116P090 November 1, 2016
1.0 INTRODUCTION
Terracon Consultants, Inc. (Terracon) conducted a pre-demolition Hazardous Materials Survey of Welch Elementary/Dover Middle School located at Dover Air Force Base, Dover, Delaware.
The survey was conducted on July 5 - 8 and October 12, 2016, by representatives from Terracon in general accordance with Terracon proposal J6155030, dated February 15, 2016. The interior and exterior building components were surveyed, and homogeneous areas of suspect asbestos-containing materials (ACM) were visually identified and documented. Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids, or in other concealed areas. Suspect ACM samples were collected in general accordance with the sampling protocols outlined in United States Environmental Protection Agency (USEPA) 40 Code of Federal Regulations (CFR) Part 763, Subpart E, known as the Asbestos Hazard Emergency Response Act (AHERA). Samples were delivered to an accredited laboratory for analysis by Polarized Light Microscopy (PLM).
1.1 Project Objective
We understand this Hazardous Materials Survey was requested due to the planned demolition of the on-site buildings to satisfy requirements of the USEPA 40 CFR Part 61, Subpart M, and National Emission Standards for Hazardous Air Pollutants (NESHAP).
1.2 Reliance
This report is for the exclusive use of Zyscovich Architects for the project being discussed.
Reliance by any other party on this report is prohibited without written authorization of Terracon and Zyscovich Architects. Reliance on this report by Zyscovich Architects and all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal, this report, and Terracon’s Agreement for Services. The limitations of liability defined in Terracon’s Agreement for Services is the aggregate limit of Terracon’s liability to Zyscovich Architects.
Welch Elementary and Dover Middle School ■ Dover, DE November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 2
2.0 BUILDING DESCRIPTION
The building is two stories with a glass and brick exterior, concrete block interior, and a metal roof used as an elementary and middle school. The structure is approximately 127,000 square feet.
3.0 FIELD ACTIVITIES
The survey was conducted by Terracon a Certified Asbestos Professional Services Firm. John Lynch, Leonard Giambrocco, and Vincent Giambrocco, AHERA accredited asbestos inspectors, conducted the survey. A copy of the licenses are attached as Appendix C. The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763, Subpart E, Section 763.86, AHERA. A summary of survey activities is provided below.
3.1 Asbestos Survey
The survey was conducted July 4 - 8, and October 12, 2016, by AHERA accredited asbestos inspectors. The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763 Subpart E 763.86, AHERA. A summary of survey activities is provided below.
3.1.1 Visual Assessment
Survey activities were initiated with visual observation of the interior and exterior of the building to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application. Interior assessment was conducted in visually accessible areas of the building proposed for renovation.
3.1.2 Physical Assessment
A physical assessment of each HA of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.
3.1.3 Sample Collection
Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Bulk samples were
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 3 collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.
The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.
Terracon collected two-hundred fifty-nine (259) samples from eighty-two (82) homogeneous areas of suspect ACM. A summary of suspect ACM samples collected during the survey is included as Appendix B.
3.1.4 Sample Analysis
Bulk samples were submitted under chain of custody to EMSL in Woburn, MA for analysis by polarized light microscopy with dispersion staining techniques per EPA 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. Lab Name is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP) Accreditation No. 101147-0.
3.2 Lead Paint Sampling
3.2.1 Visual Assessment
Terracon visually assessed the interior and exterior of the existing building and perform Lead Paint (LP) sampling that consisted of collecting paint chip samples from various painted building components. Representative building components sampled included, walls, exterior façade, and exterior doors.
3.2.2 Sample Collection
The LP sampling began with the Terracon walking the building, observing painted surfaces, and selecting sample locations. After the sampling strategy was determined, Terracon collected thirty-three paint chip samples from select areas within building.
3.2.3 Sample Analysis
Paint chip samples were submitted under a chain of custody to EMSL Analytical, Inc. (EMSL) of Woburn, Massachusetts. Paint chip samples were analyzed by Flame Atomic Absorption method SW846-3050B/7000B. EMSL is an American Industrial Hygiene Association (AIHA) accredited laboratory (ELLAP, Lab Code 100194), to perform Flame Atomic Absorption analysis. The lead paint chip laboratory analytical report is provided in Appendix B.
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 4
3.3 Hazardous Materials Assessment
3.3.1 Visual Assessment
Terracon visually assessed the interior and exterior of the existing building for common hazardous materials including but not limited to Mercury-containing items and Polychlorinated-biphenyl (PCB) containing items.
4.0 REGULATORY OVERVIEW
4.1 Asbestos
The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. It also requires the identification and classification of existing building materials prior to demolition or renovation activities. Under NESHAP, asbestos-containing building materials are classified as either friable, Category I non-friable or Category II non-friable ACM. Friable materials are those that, when dry, may be crumbled, pulverized or reduced to powder by hand pressure. Category I non-friable ACM includes packings, gaskets, resilient floor coverings and asphalt roofing products containing more than 1% asbestos. Category II non-friable ACM are any materials other than Category I materials that contain more than 1% asbestos.
Friable ACM, Category I and Category II non-friable ACM which is in poor condition and has become friable or which will be subjected to drilling, sanding, grinding, cutting or abrading and which could be crushed or pulverized during anticipated renovation or demolition activities are considered regulated ACM (RACM).
In the state of Delaware, asbestos activities are regulated by the Delaware Office of Management and Budget, Division of Facilities Management, 16 Delaware Code, Chapter 78 (16 Del.C. Ch.78).
Delaware requires that any asbestos-related activity conducted be performed by an Certified Asbestos Professional Services Firm.
Asbestos abatement must be conducted by a Certified Asbestos Abatement Contractor Class “A” under the direct supervision of a Delaware Certified Asbestos Abatement Supervisor Class “A”. An asbestos abatement design must be prepared by a person accredited by the EPA under AHERA, 40 CFR 763. Third-party air monitoring must be conducted by a Delaware Certified Project Monitor employed by a Certified Asbestos Professional Services Firm.
The Occupational Safety and Health Administration (OSHA) Asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The OSHA standard requires that employee exposure to airborne asbestos fibers be maintained below 0.1 asbestos fibers per cubic centimeter of air (0.1 f/cc). The OSHA standard classifies construction and maintenance activities, November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 5 which could disturb ACM, and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.
4.2 Lead
EPA and the State of Delaware has defined LBP as coatings that contain 1.0 milligram of lead per square centimeter (mg/cm2) or 0.5% by weight. LBP waste from renovation or demolition activities, such as debris, paint chips, dust, and sludges, that exhibit the toxicity characteristic must be managed and disposed as hazardous waste under the Resource Conservation and Recovery Act (RCRA), with the exception of whole-building demolition debris. Whole-building demolition debris is considered a non-hazardous waste with regard to lead. Therefore, no sampling/analysis of painted components for lead is required for disposal as non-hazardous waste. If it is not a whole-building demolition debris, a composite, representative sample of the demolition debris must be tested to determine if it is regulated as hazardous waste under 40 CFR 261 Identification and Listing of Hazardous Waste.
The OSHA Lead standard for construction (29 CFR 1926.62) requires that employee exposure to airborne lead must be maintained below the permissible exposure limit (PEL) of 50 micrograms of contaminant per cubic meter of air (mg/m3). OSHA does not define LCP; the requirements of the standard apply if any amount of lead is present in building materials. At a minimum, the contractor is required to provide respiratory protection appropriate to the task and conduct initial, representative exposure monitoring.
4.3 Hazardous Materials
Delaware solid waste regulations prohibit the disposal of PCB-containing ballasts in regular or solid waste landfills. These ballasts must be disposed of at an incineration/recycling facility.
Approximately 25% percent of ballasts manufactured after 1979 contain DEHP, a regulated substance under the USEPA Superfund regulations. DEHP-contaminated ballasts must be disposed of in the same manner as PCB-contaminated ballasts. Fluorescent light tubes, which contain mercury, are prohibited from disposal at in-state landfills due to their mercury content.
The preferred option is for the removal and recycling of the bulbs and ballasts at an approved recycling facility.
The USEPA has issued a number of fact sheets indicating that PCBs may be present in electrical equipment and building materials (e.g., caulk and other sealant materials) used in buildings constructed/renovated in the period from 1950 through approximately 1980. PCBs were a common additive to oils in electrical equipment, and caulk materials because of their water and chemical resistance, durability, and elasticity. PCBs were added as a plasticizer in caulking used to seal joints between masonry units and around windows. More specifically, PCBs were used in building materials such as paints, caulks, adhesives, mastics, sealants, and specialty coatings.
PCBs are known to leach into existing building substrate materials (existing brick and concrete)
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 6 adjacent to suspect PCB materials sampled. If suspect building materials sampled are less than 1 part per million (ppm), substrate sampling is not necessary. Disposal of substrate materials and electrical equipment containing PCBs at concentrations of 1 to 50 ppm will require disposal at an approved solid waste landfill; concentrations above 50 ppm will require disposal at a USEPA TSCA-approved landfill. Terracon recommends testing the building materials for PCBs prior to building demolition.
5.0 FINDINGS AND RECOMMENDATIONS
5.1 Asbestos
Asbestos containing materials were identified in the samples collected and analyzed.
ACM Summary – Welch Elementary School Sample
ID
Sample
Location Sample
Description Classification Asbestos
Quantities
04-MA-10
and 24-MA-
Girls and Boys Bathrooms, Custodial Closets, and bathrooms in Rooms 118, 119, 120, 121, 122, 123, 124, 208, 210, 211, 212, 213, 214, and 215
Ceramic Tile and Grout
Category II Non Friable
2% Chrysotile
3,000 SF
07-PI-19 Hallways Thermal System Pipe Insulation
RACM 3%
Chrysotile
1,500 LF
40-CA-121 Southeast Entrance Door
Door Caulk Category II Non Friable
3% Chrysotile
50 LF
40-CA-121 Door by Room 125 Door Caulk Category II Non Friable
3% Chrysotile
20 LF
N/A Boiler Room Flue Insulation* Category II Non Friable
Assumed Positive
150 SF
N/A Boiler Room Thermal System Pipe Insulation*
RACM Assumed Positive
165 LF
N/A Boiler Room Thermal System Pipe Insulation Fittings*
RACM Assumed Positive
N/A Boiler Room Boiler and Flue Gaskets*
RACM Assumed Positive
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 7
Sample
ID
Sample Location
Sample Description
Classification Asbestos
Quantities
N/A Boiler Room Pipe Flange Gaskets*
Category I Non Friable
Assumed Positive
N/A Throughout the School behind walls
Thermal System Pipe Insulation and Fittings*
RACM Assumed Positive
2,500 LF
*Materials unable to be sampled
Sample
ID
Sample Location
Sample Description
Classification Asbestos
Quantities
11M-MS-31 Room 179, 225, and
Transite Countertop
Category II Non Friable
15% Chrysotile
600 SF
04-MA-10
and 24-MA-
Large Bathrooms (4), Small Bathrooms (2), and Janitors Closets (3)
Ceramic Tile and Grout
Category II Non Friable
2% Chrysotile
3,000 SF
N/A Boiler Room Boiler Gaskets* Category I Non Friable
Assumed Positive
20 Each
N/A Boiler Room Pipe Flange Gaskets*
Category I Non Friable
Assumed Positive
N/A Cafeteria/Stage/Kitche n
Thermal System Pipe Insulation and Fittings*
RACM Assumed Positive
360 LF
N/A Cafeteria/Stage Stage Lighting Wire*
Category II Non Friable
Assumed Positive
80 LF
N/A Gymnasium Vibration Dampening Cloth*
Category II Non Friable
Assumed Positive
N/A Hallways Thermal System Pipe Insulation and Fittings*
RACM Assumed Positive
1,550 LF
N/A Gymnasium, Stage, Storage Rooms, Locker Rooms, Offices, and Locker Rooms
Thermal System Pipe Insulation and Fittings*
RACM Assumed
1,250 LF
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 8
*Materials unable to be sampled
ACM Summary – Welch Elementary/Dover Middle School
Based on the results of our visual survey and the results of the ACM testing, Terracon provides the following conclusions and recommendations:
n A licensed Asbestos Project Designer should prepare asbestos and hazardous materials abatement technical specifications for obtaining competitive bids for the removal of identified asbestos-containing materials that will be impacted by the proposed demolition activities.
n Prior to conducting demolition activities that will impact confirmed or assumed ACM at the Site, a Delaware-licensed asbestos abatement contractor must be retained to remove the ACM anticipated to be impacted by such activities.
5.2 Lead Sampling Summary
Welch Elementary School
Sample Location Description Method Lead Concentration
1 Exterior Blue Trim AAS 0.25 % 2 Exterior Blue Trim AAS 0.12 % 3 Exterior Blue Trim AAS 0.64 % 4 Interior Beige AAS 0.044 % 5 Interior Beige AAS 0.049 % 6 Interior Beige AAS 0.044 % 7 Interior Green AAS 0.21 % 8 Interior Green AAS 0.21 % 9 Interior Green AAS 0.13 % 10 Interior White AAS <0.019 % 11 Interior White AAS <0.010 %
N/A Room 128, Technology Lab and Hallway
Thermal System Pipe Insulation and Fittings*
RACM Assumed Positive
250 LF
N/A Room 128, Technology Lab and Hallway
Vibration Dampening Cloth*
Category II Non Friable
Assumed Positive
N/A Throughout the School
Chalkboard Mastic* Category II Non Friable
Assumed
3,700 SF
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 9
Sample Location Description Method Lead Concentration
12 Interior White AAS <0.018 % 13 Interior Green Trim AAS 0.030 % 14 Interior Green Trim AAS 0.030 % 15 Interior Green Trim AAS 0.042 % 16 Interior Red Door AAS 0.33 % 17 Interior Red Door AAS 0.41 % 18 Interior Red Door AAS 0.39 %
Dover Middle School
Sample Location Description Method Lead Concentration
A Interior Yellow AAS <0.014 % B Interior Yellow AAS <0.012 % C Interior Yellow AAS <0.015 % D Interior Blue AAS 0.25 % E Interior Blue AAS 0.25 % F Interior Blue AAS 0.26 % G Interior White AAS 0.040 % H Interior White AAS 0.031 % I Interior White AAS 0.039 % J Interior Light Blue AAS 0.081 % K Interior Light Blue AAS 0.074 % L Interior Light Blue AAS 0.046 % M Interior Light Purple AAS <0.019 % N Interior Light Purple AAS 0.021 % O Interior Light Purple AAS 0.014 %
Lead (ranging from <0.010-.64% of weight) was identified in representative paint collected for this project.
Based on the results of the lead paint sampling, Terracon provides the following conclusions and recommendations:
n Any disturbance of lead-containing paint would be subject to the OSHA Lead in Construction Standard, 29 CFR 1926.62. For proper disposal, it is the responsibility of FIRST’s contractor to perform the TCLP testing to appropriately determine the waste stream characterization.
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 10
Hazardous Materials
Terracon made visual observations for universal wastes within the building at the time of the survey. This allowed Terracon to obtain information on the potential presence of hazardous materials that require removal and disposal prior to demolition/demolition. Hazardous materials observed during the survey include miscellaneous equipment oils/lubricants, various solvent containers, mercury switches, emergency exit sign/ light batteries (lead-acid batteries), fluorescent tubes/ballasts, high intensity discharge lights, fire extinguishers, wall and ceiling-mounted heater units, air conditioning units, refrigeration units which may contain CFCs, and various containerized wastes. HVAC units were also observed at the Site. An area-by-area quantification estimate of hazardous materials is provided below for a listing of the locations and estimated quantities of the suspect universal wastes.
Welch Elementary School
Area Light Tubes Ballasts Exit
Signs Thermo stats
AC
Units Other
Roof 0 0 0 0 0 Two HVAC Units, 30
Pounds of R-22 Refrigerant each
Main Offices 14 0 0 0 0 2 Emergency Lights Principal’s
Office 6 0 0 0 0 N/A
Assistant Principals
Office 6 0 0 0 0 N/A
Records Room 6 0 0 0 0 N/A
Girls Bathroom
6 0 0 0 0 N/A
Janitors Closets –
Supply Room 2 0 0 0 0 Miscellaneous Cleaning
Chemicals
Boys Bathroom
6 0 0 0 0 N/A
Library – Room 113 60 0 0 2 2 2 Emergency Lights
Teachers’ Lounge – Room 112
45 0 0 1 1 2 Emergency Lights
Room 114 45 0 0 1 1 2 Emergency Lights Room 115 45 0 0 1 1 2 Emergency Lights
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 11
Area Light Tubes Ballasts Exit
Signs Thermo stats
AC
Units Other
Room 117 45 0 0 1 1 2 Emergency Lights Room 116 45 0 0 1 1 2 Emergency Lights
Hallway from Office to
Room 117 36 0 2 0 0 2 Emergency Lights
Stairwell 8 4 0 0 0 N/A Nurses Office –
Room 118 48 0 0 1 1 N/A
Room 119 50 0 0 1 1 2 Emergency Lights Room 121 50 0 0 1 1 2 Emergency Lights Room 120 50 0 0 1 1 2 Emergency Lights Room 122 50 0 0 1 1 2 Emergency Lights Room 123 50 0 0 1 1 2 Emergency Lights Storage Room 6 0 0 0 0 N/A
Room 124 50 0 0 1 1 2 Emergency Lights Stairwell 8 4 0 0 0 N/A
Hallway from 117 to 124 32 0 2 1 1 2 Emergency Lights
Hallway to Gymnasium 22 0 2 0 0 N/A
Gymnasium offices and storage rooms
13 0 0 0 0 N/A
Gym Storage 32 0 0 0 0 N/A Boys Room in Gymnasium
11 6 0 0 0 N/A
Stage 8 0 0 0 0 1 Fire Extinguisher Girls Room in Gymnasium
11 6 0 0 0 N/A
Gymnasium 160 0 6 1 0 N/A Short Hall to Room 126
11 0 2 0 0 2 Emergency Lights
Stairwell 8 4 0 0 0 N/A
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 12
Area Light Tubes Ballasts Exit
Signs Thermo stats
AC
Units Other
Hallway from 126 to 132
42 0 2 0 0 2 Emergency Lights
Room 126 45 0 0 1 1 2 Emergency Lights Room 128 45 0 0 1 1 2 Emergency Lights Room 125 45 0 0 1 1 2 Emergency Lights Room 127 45 0 0 1 1 2 Emergency Lights Room 130 45 0 0 1 1 2 Emergency Lights Room 132 45 0 0 1 1 2 Emergency Lights Room 129 45 0 0 1 1 2 Emergency Lights Room 131 45 0 0 1 1 2 Emergency Lights
Lounge 9 0 0 1 0 N/A Boys
Bathroom 8 4 0 1 0 N/A
Janitors Closet
2 1 0 0 0 N/A
Girls Bathroom 8 4 0 1 0 N/A
Small Boiler Room 10 0 0 0 0
1 Water Cooler Compressor, 1 Dryer, 2 Quarts of Oil, 6 Cans
Solvent, 1 Fire Extinguisher, and 1 Wall
Transformer
Storage by Boiler Room 4 0 0 0 1
6 Cans of Spray Paint, 2 Quarts of Oil, and Ten
Gallons of Paint Book Room 36 0 0 1 0 N/A Room 122 45 0 0 1 1 2 Emergency Lights Room 124 45 0 0 1 1 2 Emergency Lights Elevator
Hallway – 2nd
Floor 47 0 2 0 0 2 Emergency Lights
Hallway 201 to 209 38 0 2 0 0 2 Emergency Lights
Room 206 45 0 0 1 1 2 Emergency Lights Room 209 45 0 0 1 1 2 Emergency Lights Room 207 45 0 0 1 1 2 Emergency Lights
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 13
Area Light Tubes Ballasts Exit
Signs Thermo stats
AC
Units Other
Room 204 45 0 0 1 1 2 Emergency Lights Room 202 45 0 0 1 1 2 Emergency Lights Room 205 45 0 0 1 1 2 Emergency Lights Room 203 45 0 0 1 1 2 Emergency Lights
Boys Bathroom
8 0 0 0 0 N/A
Custodial Closet
2 0 0 0 0 N/A
Girls Bathroom 8 0 0 0 0 N/A
Room 201 18 0 0 1 1 2 Emergency Lights Room 200 9 0 0 1 1 2 Emergency Lights
Hallway from 208 to 214 30 0 2 0 0 2 Emergency Lights
Room 208 50 0 0 1 1 2 Emergency Lights Room 211 50 0 0 1 1 2 Emergency Lights Room 213 50 0 0 1 1 2 Emergency Lights Room 210 50 0 0 1 1 2 Emergency Lights Room 212 50 0 0 1 1 2 Emergency Lights Room 215 50 0 0 1 1 2 Emergency Lights Room 214 50 0 0 1 1 2 Emergency Lights
Total 2,420 24 14 46 43 N/A
Dover Middle School
Area Light Tubes Ballasts Exit
Signs Thermo stats
AC
Units Other
Hallway from 123 to
Student Services
40 0 0 0 0 2 Emergency Lights
Room 123 40 0 0 1 1 2 Emergency Lights Library –
Room 127 99 4 0 3 3 2 Emergency Lights and
1 Refrigerator Computer
Lab – Room
45 0 0 1 1 2 Emergency Lights
Stairwell 6 0 0 1 0 0
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 14
Area Light Tubes Ballasts Exit
Signs Thermo stats
AC
Units Other
Hallway – Exits to
Room 128 24 0 2 1 0 2 Emergency Lights
Room 128 72 0 0 2 3 2 Emergency Lights Stairwell 6 0 0 1 0 0
Hallway from Room 130 to
Cafeteria Storage
24 0 2 0 0 2 Emergency Lights and 1 Fire Extinguisher
Room 130 36 0 0 1 1 2 Emergency Lights Room 131 36 0 0 1 1 2 Emergency Lights Room 132 36 0 0 1 1 2 Emergency Lights Room 133 36 0 0 1 1 2 Emergency Lights Room 134 36 0 0 1 1 2 Emergency Lights Room 135 36 0 0 1 1 2 Emergency Lights
Hallway from Room 135 to
Stage 33 0 0 1 0 2 Emergency Lights and
1 Fire Extinguisher
Stairwell 6 0 0 1 0 0 Boys
Bathroom 8 0 0 0 0 0
Girls Bathroom
8 0 0 1 0 0
Custodial Closet 2 0 0 0 0 0
Boiler Room 6 0 0 0 0
1 Compressor, 1 Condenser, 1 Switchgear, 2 Water Hot Water Tanks, 3 Oil Lines, and 1
Fire Extinguisher
Kitchen 48 48 0 1 2
2 Walk In Coolers, 4 Double Freezers, 1 Single Freezer, 2
Refrigerators, 4 Ovens, and 2 Fire Extinguishers
Cafeteria 216 0 0 2 0 0
Stage 4 1 0 0 0 1 Transformer and 96 Incandescent Lights
Room 177 60 0 0 1 1 2 Emergency Lights
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 15
Area Light Tubes Ballasts Exit
Signs Thermo stats
AC
Units Other
Room 166 9 0 0 0 0 2 Emergency Lights
Room 179 64 2 0 2 1 2 Emergency Lights and 1 Refrigerator
Room 180 45 0 0 1 1 2 Emergency Lights
Room 180A 18 0 0 1 1 2 Emergency Lights and 1 Refrigerator
Room 181A 27 0 0 1 2 2 Emergency Lights Home
Economics – Room 181
50 5 0 1 1 2 Emergency Lights, 1 Refrigerator, 5 Ovens, One Dryer, and 1 Washer Storage 6 0 0 0 0 0
Small Hall with closet and sink
6 0 0 0 0 2 Emergency Lights and 1 Refrigerator
Teachers’ Lounge 15 0 0 1 1 1 Soda Machine
Conference Room
12 0 0 1 1 0
Principal’s Office
9 0 0 1 0 0
School Store 3 0 0 0 0 0 Assistant Principals
Office 6 0 0 1 1 0
Main Office 18 0 0 1 0 0 Hallway by Gymnasium
42 0 0 1 0 2 Emergency Lights
Stairwell 6 0 0 1 0 0
Gymnasium 0 0 0 0 0 32 Halogen Lights and 1
Water Fountain Boys Locker
Room 12 6 0 1 0 Miscellaneous Cleaning
Chemicals Girls Locker
Room 12 6 0 1 0 0
Stage 12 0 0 1 0 0 Electrical
Closet 12 0 0 1 0 Switchgear
Room 237 27 0 0 1 1 2 Emergency Lights
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 16
Area Light Tubes Ballasts Exit
Signs Thermo stats
AC
Units Other
Janitors Closet
2 0 0 0 0 0 Miscellaneous Cleaning Chemicals
237A Storage
4 2 0 1 0 2 Emergency Lights
Girls Bathroom –
2nd Floor 8 0 0 1 0 0
Boys Bathroom –
2nd Floor 8 0 0 1 0 0
Hallway 6 0 0 0 0 2 Emergency Lights and 1 Water Fountain
Room 231 36 0 0 2 1 2 Emergency Lights Room 232 36 0 0 1 1 2 Emergency Lights
Rear Hallway 24 0 0 0 0 2 Emergency Lights Room 229 36 0 0 1 1 2 Emergency Lights Room 230 36 0 0 1 1 2 Emergency Lights Room 227 36 0 0 1 1 2 Emergency Lights Room 228 36 0 0 1 1 2 Emergency Lights Room 225 36 0 0 1 1 2 Emergency Lights
Interior Office 12 0 0 0 0 0 Room 226 48 0 0 1 1 2 Emergency Lights Hallway 24 0 0 1 0 2 Emergency Lights Total 1,690 62 4 54 36 N/A
Based on the results of our visual survey of the OHMs, Terracon provides the following conclusions and recommendations:
n Prior to conducting demolition activities that will impact the identified materials above at the Site, a Delaware-licensed contractor must be retained to remove the identified electrical and mechanical equipment materials above anticipated to be impacted by such activities.
No other environmental sampling was conducted during this survey.
November 1, 2016, 2016 ■ Terracon Project J116P090
Responsive ■ Resourceful ■ Reliable 17
6.0 LIMITATIONS/GENERAL COMMENTS
Terracon did not perform sampling requiring demolition or destructive activities such as knocking holes in walls, dismantling of equipment, or removal of protective coverings. Reasonable efforts to access suspect materials within known areas of restricted access (e.g., crawl spaces) were made; however, confined spaces or areas which may pose a health or safety risk to Terracon personnel were not sampled. Sampling did not include suspect materials which could not be safely reached with available ladders/man-lifts. Additionally, roofing materials were not sampled during this survey.
This asbestos survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions, and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed, and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by Zyscovich Architects for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories, or other third parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.
APPENDIX A
ASBESTOS ANALYTICAL LABORATORY DATA
EMSL Analytical, Inc.
7 Constitution Way, Suite 107 Woburn, MA 01801
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
131603165EMSL Order:
Customer ID: JAWO50
Customer PO: J6167045
Project ID:
Attention: Phone:John Lynch (603) 647-9700
Fax:Terracon Consultants, Inc. (603) 647-4432
Received Date:77 Sundial Avenue 07/13/2016 9:20 AM
Analysis Date:Suite 401-W 07/19/2016 - 07/20/2016
Collected Date:Manchester, NH 03103
Project: J6167045
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
01-FC-01
131603165-0001
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Main Office Hall -
Floor Tile 1x1
01-FC-02
131603165-0002
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Main Office Hall -
Floor Tile 1x1
01-FC-03
131603165-0003
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Main Office Hall -
Floor Tile 1x1
02-FC-04
131603165-0004
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Main Office Hall -
Floor Mastic
02-FC-05
131603165-0005
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Main Office Hall -
Floor Mastic
02-FC-06
131603165-0006
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Main Office Hall -
Floor Mastic
03-MG-07
131603165-0007
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Main Office Hall -
Cove Base Mastic
03-MG-08
131603165-0008
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Main Office Hall -
Cove Base Mastic
03-MG-09
131603165-0009
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Main Office Hall -
Cove Base Mastic
04-MA-10
131603165-0010
2% ChrysotileNon-fibrous (Other)98%Gray
Non-Fibrous
Homogeneous
Girls Lav - Ceramic
Tile Grout
04-MA-11
131603165-0011
Positive Stop (Not Analyzed)Girls Lav - Ceramic
Tile Grout
04-MA-12
131603165-0012
Positive Stop (Not Analyzed)Girls Lav - Ceramic
Tile Grout
05-MA-13
131603165-0013
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Girls Lav - Caulk
Around Door
05-MA-14
131603165-0014
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Girls Lav - Caulk
Around Door
05-MA-15
131603165-0015
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Girls Lav - Caulk
Around Door
06-PI-16
131603165-0016
None DetectedNon-fibrous (Other)85%Glass15%White
Fibrous
Homogeneous
Main Hall Classrooms
Throughout - Pipe
Insulation
Initial Report From: 07/20/2016 13:48:32
Page 1 of 9ASB_PLM_0008 - 1.71 Printed: 7/20/2016 1:48 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
131603165EMSL Order:
Customer ID: JAWO50
Customer PO: J6167045
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
06-PI-17
131603165-0017
None DetectedNon-fibrous (Other)85%Glass15%White
Fibrous
Homogeneous
Main Hall Classrooms
Throughout - Pipe
Insulation
06-PI-18
131603165-0018
None DetectedNon-fibrous (Other)85%Glass15%White
Fibrous
Homogeneous
Main Hall Classrooms
Throughout - Pipe
Insulation
07-PI-19
131603165-0019
3% ChrysotileNon-fibrous (Other)87%Min. Wool10%White
Fibrous
Homogeneous
Main Hall Classrooms
- Pipe Insulation
07-PI-20
131603165-0020
Positive Stop (Not Analyzed)Main Hall Classrooms
- Pipe Insulation
07-PI-21
131603165-0021
Positive Stop (Not Analyzed)Main Hall Classrooms
- Pipe Insulation
08-MA-22
131603165-0022
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Girls Lav/Boys - Tile
Grout - Floor
08-MA-23
131603165-0023
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Girls Lav/Boys - Tile
Grout - Floor
08-MA-24
131603165-0024
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Girls Lav/Boys - Tile
Grout - Floor
09-PL-25
131603165-0025
None DetectedNon-fibrous (Other)98%Hair2%Gray/White
Non-Fibrous
Homogeneous
Lav Main Hall -
Plaster Ceiling
09-PL-26
131603165-0026
None DetectedNon-fibrous (Other)98%Hair2%Gray/White
Non-Fibrous
Homogeneous
Lav Main Hall -
Plaster Ceiling
09-PL-27
131603165-0027
None DetectedNon-fibrous (Other)98%Hair2%Gray/White
Non-Fibrous
Homogeneous
Lav Main Hall -
Plaster Ceiling
10-MA-28
131603165-0028
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Main Office - Cove
Base Mastic
10-MA-29
131603165-0029
None DetectedNon-fibrous (Other)100%Brown/Beige
Non-Fibrous
Homogeneous
Main Office - Cove
Base Mastic
10-MA-30
131603165-0030
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Main Office - Cove
Base Mastic
11-MA-31
131603165-0031
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Main Office - Carpet
Glue
11-MA-32
131603165-0032
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Main Office - Carpet
Glue
11-MA-33
131603165-0033
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Main Office - Carpet
Glue
12-CA-34
131603165-0034
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Library - Around A/C -
Window Caulk
12-CA-35
131603165-0035
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Library - Around A/C -
Window Caulk
Page 2 of 9ASB_PLM_0008 - 1.71 Printed: 7/20/2016 1:48 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
131603165EMSL Order:
Customer ID: JAWO50
Customer PO: J6167045
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
12-CA-36
131603165-0036
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Library - Around A/C -
Window Caulk
13-MA-37
131603165-0037
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Library - Carpet Glue
13-MA-38
131603165-0038
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Library - Carpet Glue
13-MA-39
131603165-0039
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Library - Carpet Glue
14-CT-40
131603165-0040
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Library - Ceiling Tile
2x4
14-CT-41
131603165-0041
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Library - Ceiling Tile
2x4
14-CT-42
131603165-0042
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Library - Ceiling Tile
2x4
15-CT-43
131603165-0043
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray
Fibrous
Homogeneous
Library - Ceiling Tile
1x1
15-CT-44
131603165-0044
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray
Fibrous
Homogeneous
Library - Ceiling Tile
1x1
15-CT-45
131603165-0045
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Library - Ceiling Tile
1x1
16-SI-46
131603165-0046
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Teachers Lounge -
Sink Coating
16-SI-47
131603165-0047
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Teachers Lounge -
Sink Coating
16-SI-48
131603165-0048
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Teachers Lounge -
Sink Coating
17-FT-49-Floor Tile
131603165-0049
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Rm 114 - 1x1 Floor
Tile and Mastic
17-FT-49-Mastic
131603165-0049A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Rm 114 - 1x1 Floor
Tile and Mastic
17-FT-50-Floor Tile
131603165-0050
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Rm 114 - 1x1 Floor
Tile and Mastic
17-FT-50-Mastic
131603165-0050A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Rm 114 - 1x1 Floor
Tile and Mastic
17-FT-51-Floor Tile
131603165-0051
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Rm 114 - 1x1 Floor
Tile and Mastic
17-FT-51-Mastic
131603165-0051A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Rm 114 - 1x1 Floor
Tile and Mastic
Page 3 of 9ASB_PLM_0008 - 1.71 Printed: 7/20/2016 1:48 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
131603165EMSL Order:
Customer ID: JAWO50
Customer PO: J6167045
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
18-MA-52
131603165-0052
None DetectedNon-fibrous (Other)100%Brown/Black
Non-Fibrous
Homogeneous
Rm 114 - Cove Base
18-MA-53
131603165-0053
None DetectedNon-fibrous (Other)100%Brown/Black
Non-Fibrous
Homogeneous
Rm 114 - Cove Base
18-MA-54
131603165-0054
None DetectedNon-fibrous (Other)100%Brown/Black
Non-Fibrous
Homogeneous
Rm 114 - Cove Base
19-SI-55
131603165-0055
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Rm 114 - Sink
Undercoat
19-SI-56
131603165-0056
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Rm 114 - Sink
Undercoat
19-SI-57
131603165-0057
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Rm 114 - Sink
Undercoat
20-MA-58
131603165-0058
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Stair Tread Glue
20-MA-59
131603165-0059
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Stair Tread Glue
20-MA-60
131603165-0060
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Stair Tread Glue
21-FT-61
131603165-0061
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Hall Between 117-119
- Floor - 1st Layer
21-FT-62
131603165-0062
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Hall Between 117-119
- Floor - 1st Layer
21-FT-63
131603165-0063
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Hall Between 117-119
- Floor - 1st Layer
22-FT-64
131603165-0064
None DetectedNon-fibrous (Other)85%Cellulose15%Gray
Fibrous
Homogeneous
Between 117-119 -
Floor - 2nd Layer
22-FT-65
131603165-0065
None DetectedNon-fibrous (Other)85%Cellulose15%Gray
Fibrous
Homogeneous
Between 117-119 -
Floor - 2nd Layer
22-FT-66
131603165-0066
None DetectedNon-fibrous (Other)85%Cellulose15%Gray
Fibrous
Homogeneous
Between 117-119 -
Floor - 2nd Layer
23-FT-67
131603165-0067
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Between 117-119 -
Floor - 2nd Layer
23-FT-68
131603165-0068
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Between 117-119 -
Floor - 2nd Layer
23-FT-69
131603165-0069
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Between 117-119 -
Floor - 2nd Layer
24-MA-70
131603165-0070
2% ChrysotileNon-fibrous (Other)98%Gray
Non-Fibrous
Homogeneous
From Rm 118 Lav -
Mortar - Ceramic Tile
Page 4 of 9ASB_PLM_0008 - 1.71 Printed: 7/20/2016 1:48 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
131603165EMSL Order:
Customer ID: JAWO50
Customer PO: J6167045
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
24-MA-71
131603165-0071
Positive Stop (Not Analyzed)From Rm 118 Lav -
Mortar - Ceramic Tile
24-MA-72
131603165-0072
Positive Stop (Not Analyzed)From Rm 118 Lav -
Mortar - Ceramic Tile
25-MA-73
131603165-0073
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Gym Lav - Tile Grout
25-MA-74
131603165-0074
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Gym Lav - Tile Grout
25-MA-75
131603165-0075
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Gym Lav - Tile Grout
25-FT-76-Floor Tile
131603165-0076
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Rm 214 - Vinyl Floor
& Mastic
25-FT-76-Mastic
131603165-0076A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Rm 214 - Vinyl Floor
& Mastic
25-FT-77-Floor Tile
131603165-0077
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Rm 214 - Vinyl Floor
& Mastic
25-FT-77-Mastic
131603165-0077A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Rm 214 - Vinyl Floor
& Mastic
25-FT-78-Floor Tile
131603165-0078
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Rm 214 - Vinyl Floor
& Mastic
25-FT-78-Mastic
131603165-0078A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Rm 214 - Vinyl Floor
& Mastic
26-FT-79-Floor Tile
131603165-0079
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
1st Floor Hall Next to
Elevator - Floor Tile &
Mastic
26-FT-79-Mastic
131603165-0079A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
1st Floor Hall Next to
Elevator - Floor Tile &
Mastic
26-FT-80-Floor Tile
131603165-0080
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
1st Floor Hall Next to
Elevator - Floor Tile &
Mastic
26-FT-80-Mastic
131603165-0080A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
1st Floor Hall Next to
Elevator - Floor Tile &
Mastic
26-FT-81-Floor Tile
131603165-0081
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
1st Floor Hall Next to
Elevator - Floor Tile &
Mastic
26-FT-81-Mastic
131603165-0081A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
1st Floor Hall Next to
Elevator - Floor Tile &
Mastic
27-BI-82
131603165-0082
None DetectedNon-fibrous (Other)55%Cellulose
Min. Wool
Glass
10%
25%
10%
Gray
Fibrous
Homogeneous
Boiler Insulation
Breach
27-BI-83
131603165-0083
None DetectedNon-fibrous (Other)55%Cellulose
Min. Wool
Glass
10%
25%
10%
Gray
Fibrous
Homogeneous
Boiler Insulation
Breach
Page 5 of 9ASB_PLM_0008 - 1.71 Printed: 7/20/2016 1:48 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
131603165EMSL Order:
Customer ID: JAWO50
Customer PO: J6167045
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
27-BI-84
131603165-0084
None DetectedNon-fibrous (Other)65%Cellulose
Min. Wool
10%
25%
Gray
Fibrous
Homogeneous
Boiler Insulation
Breach
28-HP-85
131603165-0085
None DetectedNon-fibrous (Other)100%Gray/White
Non-Fibrous
Homogeneous
Boiler Room - Ceiling
Plaster
28-HP-86
131603165-0086
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Boiler Room - Ceiling
Plaster
28-HP-87
131603165-0087
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Boiler Room - Ceiling
Plaster
29-CA-88
131603165-0088
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Boiler Room at
Corner of Building
Southeast Side -
Window Glaze
29-CA-89
131603165-0089
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Boiler Room at
Corner of Building
Southeast Side -
Window Glaze
29-CA-90
131603165-0090
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Boiler Room at
Corner of Building
Southeast Side -
Window Glaze
30-CA-91
131603165-0091
None DetectedNon-fibrous (Other)100%Blue
Non-Fibrous
Homogeneous
Southeast Side -
Window Glaze - Teal
30-CA-92
131603165-0092
None DetectedNon-fibrous (Other)100%Blue
Non-Fibrous
Homogeneous
Southeast Side -
Window Glaze - Teal
30-CA-93
131603165-0093
None DetectedNon-fibrous (Other)100%Blue
Non-Fibrous
Homogeneous
Southeast Side -
Window Glaze - Teal
31-CA-94
131603165-0094
None DetectedNon-fibrous (Other)92%Cellulose8%Black
Non-Fibrous
Homogeneous
Southeast Side -
Black Foundation
Caulk
31-CA-95
131603165-0095
None DetectedNon-fibrous (Other)92%Cellulose8%Black
Non-Fibrous
Homogeneous
Southeast Side -
Black Foundation
Caulk
31-CA-96
131603165-0096
None DetectedNon-fibrous (Other)92%Cellulose8%Black
Non-Fibrous
Homogeneous
Southeast Side -
Black Foundation
Caulk
32-CA-97
131603165-0097
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Southeast Side -
White Caulk
32-CA-98
131603165-0098
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Southeast Side -
White Caulk
32-CA-99
131603165-0099
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Southeast Side -
White Caulk
33-RF-100
131603165-0100
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Rubber
33-RF-101
131603165-0101
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Rubber
Page 6 of 9ASB_PLM_0008 - 1.71 Printed: 7/20/2016 1:48 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
131603165EMSL Order:
Customer ID: JAWO50
Customer PO: J6167045
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
33-RF-102
131603165-0102
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Rubber
34-RF-103
131603165-0103
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Black Pitch Under
Foam
34-RF-104
131603165-0104
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Black Pitch Under
Foam
34-RF-105
131603165-0105
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Black Pitch Under
Foam
35-RF-106
131603165-0106
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
White Material
35-RF-107
131603165-0107
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
White Material
35-RF-108
131603165-0108
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
White Material
36-RF-109
131603165-0109
None DetectedNon-fibrous (Other)100%Clear
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Mastic/Caulk
36-RF-110
131603165-0110
None DetectedNon-fibrous (Other)100%Clear
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Mastic/Caulk
36-RF-111
131603165-0111
None DetectedNon-fibrous (Other)100%Clear
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Mastic/Caulk
37-RF-112
131603165-0112
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Black Window Caulk
37-RF-113
131603165-0113
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Black Window Caulk
37-RF-114
131603165-0114
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Roof Over Rm 126 -
Black Window Caulk
38-RF-115
131603165-0115
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Over Rm 126 - Grey
Window Caulk -
Outside
38-RF-116
131603165-0116
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Over Rm 126 - Grey
Window Caulk -
Outside
38-RF-117
131603165-0117
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Over Rm 126 - Grey
Window Caulk -
Outside
39-CA-118
131603165-0118
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Southeast Entrance -
Door Caulk
39-CA-119
131603165-0119
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Southeast Entrance -
Door Caulk
39-CA-120
131603165-0120
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Southeast Entrance -
Door Caulk
Page 7 of 9ASB_PLM_0008 - 1.71 Printed: 7/20/2016 1:48 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
131603165EMSL Order:
Customer ID: JAWO50
Customer PO: J6167045
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
40-CA-121
131603165-0121
3% ChrysotileNon-fibrous (Other)97%Gray
Non-Fibrous
Homogeneous
Southeast Entrance -
Door Caulk
40-CA-122
131603165-0122
Positive Stop (Not Analyzed)Southeast Entrance -
Door Caulk
40-CA-123
131603165-0123
Positive Stop (Not Analyzed)Southeast Entrance -
Door Caulk
40-MS-124
131603165-0124
None DetectedNon-fibrous (Other)2%Cellulose98%Brown
Fibrous
Homogeneous
Library - Door Core
40-MS-125
131603165-0125
None DetectedNon-fibrous (Other)2%Cellulose98%Brown
Fibrous
Homogeneous
Library - Door Core
40-MS-126
131603165-0126
None DetectedNon-fibrous (Other)2%Cellulose98%Brown
Non-Fibrous
Homogeneous
Library - Door Core
41-CA-127
131603165-0127
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Outside Windows
Inside Courtyard -
Window Caulk
41-CA-128
131603165-0128
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Outside Windows
Inside Courtyard -
Window Caulk
41-CA-129
131603165-0129
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Outside Windows
Inside Courtyard -
Window Caulk
42-CA-130
131603165-0130
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Front Entrance -
Caulk Door
42-CA-131
131603165-0131
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Front Entrance -
Caulk Door
42-CA-132
131603165-0132
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Front Entrance -
Caulk Door
43-CA-133
131603165-0133
None DetectedNon-fibrous (Other)100%Gray/White
Non-Fibrous
Homogeneous
Between Window &
Brick Front Side -
Caulk
43-CA-134
131603165-0134
None DetectedNon-fibrous (Other)100%Gray/White
Non-Fibrous
Homogeneous
Between Window &
Brick Front Side -
Caulk
43-CA-135
131603165-0135
None DetectedNon-fibrous (Other)100%Gray/White
Non-Fibrous
Homogeneous
Between Window &
Brick Front Side -
Caulk
Page 8 of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.