Appendix_A-5_price_breakout_schedule.pdf

PDF 91 KB Posted

Attached to
W912BU17R0032 WELCH SCHOOL DOVER AIRFORCE BASE ADDENDUM TO AMENDMENT 0001
Solicitation number
W912BU-17-R-0032
Issued by

About this file

Appendix A-5 price breakout schedule

View the file

Other files

File Type Posted
17R0032_Amendment_00007.pdf PDF
W912BU-17-R-0032_Specs-AM0005.pdf PDF
W912BU-17-R-0032_Dwgs-AM0005.pdf PDF
W912BU-17-R-0032_Specs-AM0004A.zip ZIP file
W912BU-17-R-0032_Specs-AM0004.zip ZIP file
W912BU-17-R-0032_Dwgs-AM0004.pdf PDF
17R0032_amendment3b.pdf PDF
W912BU-17-R-0032_Dwgs-AM0003.pdf PDF
W912BU-17-R-0032_Specs-AM0003.pdf PDF
Appendix_A-6_WelchDoverReferenceDwgPage25.pdf PDF
17-R-0032_Pre-Proposal_Site_Visit_Attendance_Roster.pdf PDF
W912BU-17-R-0032_Specs-AM0001.pdf PDF
RFI_Example.xls XLS spreadsheet
amendment_0001_SF30_(003).pdf PDF
RFP W912-BU-17-R-0032_Dwgs_Volume-3.pdf PDF
RFP W912-BU-17-R-0032_Dwgs_Volume-2.pdf PDF
RFP W912-BU-17-R-0032_Dwgs_Volume-1.pdf PDF
RFP_W912-BU-17-R-0032_Specs_Volume-2.pdf PDF
RFP_W912-BU-17-R-0032_Specs_Volume-1.pdf PDF
RFP_W912-BU-17-R-0032_Specs_Volume-3.pdf PDF
RFP_W912-BU-17-R-0032_Specs_Volume-4.pdf PDF
RFP_W912-BU-17-R-0032_Specs_Volume-5.pdf PDF
Appendix_A-6_WelchDoverReferenceDwgs.pdf PDF
Appendix_A-1_Geotech_Report.pdf PDF
Appendix_A-4_Dover_DE_Hazardous_Materials_Survey_Final.pdf PDF
Appendix_A-2_EPA_Technical_Guidance_for_Reducing_Lead_in_Drinking_Water_In_Schools.pdf PDF
Appendix_A-3_Soil_Gas_Assessment_Report.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A-5

PROPOSAL

PRICE BREAKOUT SCHEDULE

APPENDIX A-5 Page 1

Appendix A-5

PROPOSAL PRICE BREAKOUT SCHEDULE

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

BASE BID WORK – Phase 1

1. Substructure (A10 – A90) 1 JOB LS $____________

2. Shell (B10-B30) 1 Job LS $_____________

3. Interiors (C10 – C20) 1 JOB LS $____________

4. Conveying (D10) 1 JOB LS $____________

5. Plumbing (D20) 1 JOB LS $____________

6. HVAC (D30) 1 JOB LS $____________

7. Fire Protection (D40) 1 JOB LS $____________

8. Electrical (D50) 1 JOB LS $____________

9. Communications (D60) 1 JOB LS $____________

10. Electronic Safety and Security (D70) 1 JOB LS $____________

11. Integrated Automation (D80) 1 JOB LS $____________

12. Equipment and Furnishings (E10 – E20) 1 JOB LS $____________

13. Special Construction (F10) 1 JOB LS $____________

14. Sitework (G10-G50) 1 JOB LS $____________

BASE BID WORK – Phase 2

15. Asbestos Remediation (F20) 1 JOB LS $____________

16. Remediation of Other HazMats (F20) 1 JOB LS $____________

17. Special Construction (F10 and F30) 1 JOB LS $____________

18. Sitework (G10-G50) 1 JOB LS $____________

TOTAL BID $_________________

NOTES:

1. Offerors must bid on all items. Elements listed in parenthesis, ie (A10-

A90), refer to Level 2 of the 2010 version of Construction Specifications Institute UniFormat Classification of Construction Systems and Assemblies.

Bidders shall include the cost for all work required by the contract documents in the Total Bid under the Bid Item best matching the UniFormat designation.

Appendix A-5_
Appendix A-5 price breakout schedule

File details come from the government source that posted it.