EHQ10940_REV_-_APPROVED_FLT_III_PCM_INSTALLATION_(FULL_SIZE).pdf
PDF 499 KB Posted
- Solicitation number
- W912BU-17-R-0010
About this file
EHQ10940
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFERENCES
No. TITLE DRAWING No.
1 DDG 51 LAND BASED ENGINEERING SITE
FLIGHT III EQUIPMENT ARRANGEMENT EHQ10517
THIS IS A CAD MAINTAINED DRAWING DEVELOPED
IN AUTOCAD R2013 SOFTWARE. CHANGES SHALL BE
INCORPORATED BY THE DESIGN AUTHORITY
UNDER 12" ±1/8"
12" TO 6'-0" ±1/4"
OVER 6'-0" ±1/2"
DISTRIBUTION STATEMENT D
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE AND U.S. DoD CONTRACTORS ONLY;
CRITICAL TECHNOLOGY, 2/23/2011. OTHER U.S.
REQUESTS SHALL BE REFERRED TO COMMANDER,
NAVAL SEA SYSTEMS COMMAND.
PLAN VIEW 5A
DDG 51 FLIGHT III
BUILDING KEY PLAN
SCALE: NONE
REVISION STATUS
REV SH DESCRIPTION
- 1 TITLE SHEET, BUILDING KEY PLAN, REFERENCES, NOTES
- 2 KEY PLAN & ISOMETRIC
- 3 PLAN VIEW PCM ARRANGEMENT
- 4 PCM INSTALLATION DETAILS AND LIST OF MATERIAL
DDG 51 LAND BASED TEST SITE, BUILDING 77H
FLIGHT III PCM 1 AND 2
INSTALLATION
DWG NO.CAGE CODESIZE REV
SCALE : AS NOTED SHEET 1 OF 4
89256D EHQ10940 -
CONTRACT No.
N00178-04-D-4089
OFFICIAL SIGNATURE DATE
PREPARED D. Merlino 8/09/16
CHECKED
QA
PROJ MGR
APPROVED NSWCPD
TECH REVIEW
PROG MGR
DIMENSIONAL TOLERANCES
UNLESS OTHERWISE SPECIFIED
DIMENSIONS IN FEET & INCHES
DECIMAL DIMENSIONS IN INCHES
TOLERANCE ON ANGLES ±.50°
1 PL ±.2, 2 PL ±.06, 3 PL ±.005
INTERPRET DIMENSIONS AND TOLERANCES
PER ASME Y14.5 - 1994
REVISION HISTORY
DESCRIPTIONREVZONE DATE APPROVED
D
C
B
A
D
C
B
A
12345678
12345678
AC
AD
F
IL
E
NA
ME
: A
CA
D
EH
P0 1/
AC
AD
N
SW
CP
D/
DD
G M
OD
IF
IC
AT
IO
NS
/E
HQ
R-
.D W G
NORTH
2 PCM OUTLINE DRAWING DRS TECHNOLOGIES
RMC-037076
SEE PLAN VIEW 14A
NAVAL SURFACE WARFARE CENTER, PHILADELPHIA DIVISION
PHILADELPHIA, PA 19112-5083FLT III POWER CONVERSION SITE
NOTES:
1. DEVIATIONS FROM THIS DRAWING ARE NOT PERMITTED WITHOUT APPROVAL
FROM THE NSWCPD CONSTRUCTION MANAGER (CODE 212).
2. DIMENSIONS REFERRING TO THIS NOTE SHALL BE FIELD VERIFIED PRIOR TO
BEGINNING ANY WORK. MINOR DEVIATIONS MAY BE PERMITTED WITH THE
APPROVAL OF THE NSWCPD CONSTRUCTION MANAGER (CODE 212).
3. VERIFY INSTALLATION OF PCM FOUNDATIONS PER REFERENCE 3 HAS BEEN
COMPLETED PRIOR TO INSTALLATION OF THE PCM'S ON THE FOUNDATIONS
PER THIS DRAWING.
4. LIFTING AND HANDLING OF EQUIPMENT SHALL BE IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS.
POWER CONVERSION SITE
CONTROL ROOM
272625242322212019
B
R. Chranowski
N/A
M. Lamberto
DDG 51 LAND BASED ENGINEERING SITE
FLIGHT III PCM 1 & 2 AND MPDU 1 FDN ARR & DETAILS EHQ10874
8/11/16
8/12/16
L. Skarbek 12/1/2016
A. Cairns 1/11/2017
KEY PLAN & ISOMETRIC
DWG NO.CAGE CODESIZE REV
SCALE : AS NOTED SHEET 2
89256D EHQ10940 -
D
C
B
A
D
C
B
A
910111213141516
910111213141516
ISOMETRIC VIEW 10B
LOOKING NORTHWEST
DDG 51 FLIGHT III EQUIPMENT INSTALLATION
SCALE: NONE
PLAN VIEW 14A
DDG 51 FLIGHT III EQUIPMENT INSTALLATION
POWER CONVERSION SITE
SCALE: NONE
PCM 1
PCM 2
20'20'20'
POWER CONVERSION
CONTROL ROOM
POWER CABLE TRAY
10'-1" ABV TEE BLOCK
FLOOR PAD
POWER CONVERSION SITE
TEE BLOCK SLOTTED FLOOR PAD
8-1/2" ABV CONCRETE PAD
POWER CONVERSION
UPPER LEVEL
10'-4" ABV CONCRETE PAD
NORTH
24 252322
B
POWER CONVERSION
UPPER LEVEL
10'-4" ABV CONCRETE PAD
POWER CONVERSION
CONTROL ROOM
CABLE TRAY
SUPPORT STRUCTURE
10'-1" ABV TEE BLOCK
SLOTTED FLOOR PADPCM 1
PCM 2
PLAN VIEW
PCM ARRANGEMENT
DWG NO.CAGE CODESIZE REV
SCALE : AS NOTED SHEET 3
89256D EHQ10940 -
D
C
B
A
D
C
B
A
1718192021222324
1718192021222324
PLAN VIEW 21A
FLIGHT III EQUIPMENT
POWER CONVERSION SITE EQUIPMENT ARRANGEMENT
SCALE: 1/2"=1'-0"
NORTH
20'
REF
GRAPHIC SCALE 1/2"=1'-0"
0 6" 2' 3' 4' 5' 10'1'
TEE BLOCK
SLOTTED FLOOR PAD
EXISTING
EDGE OF TEE BLOCK
SLOTTED FLOOR
B
CABLE TRAY
SUPPORT STRUCTURE
10'-1" ABV TEE BLOCK
EXISTING
FRONT
PCM 1
PCM 2
FRONT
DWG NO.CAGE CODESIZE REV
SCALE : AS NOTED SHEET 4
89256D EHQ10940 -
D
C
B
A
D
C
B
A
PCM INSTALLATION DETAILS
AND LIST OF MATERIAL
PLAN VIEW 29A
EQUIPMENT INSTALLATION FOR PCM 1 &2
2 PCM'S REQUIRED
SCALE: 1-1/2"=1'-0"
DETAIL 26D
TYPICAL EQUIPMENT ATTACHMENT TO FOUNDATION
SCALE: 3"=1'-0"
3/4" HEX NUT
WELDED ON REF 3
RESILIENT MOUNT ASSY
ITEM 2
FOUNDATION
REF 3
ITEM 3, ∅3/4" BOLT
GRAPHIC SCALE 1 1/2"=1'-0"
0 1" 2" 3" 6" 9" 12" 18" 24"
0 3" 6" 9" 2' 3' 4'1'
ITEM 2
RESILIENT MOUNT
EXISTING
TEE BLOCK FLOOR
GRAPHIC SCALE 3"=1'-0"
ITEM 3
∅3/4" BOLT
FRONT
(ITEM 2), BUSHING
(ITEM 2), WASHER
2526272829303132
2526272829303132
LIST OF MATERIAL
ITEM QTY DESCRIPTION MATERIAL SPECIFICATION REMARKS
1 2 PCM ENCLOSURE VARIOUS MILITARY SEE REF 2 / GFM
2 33 RESILIENT MOUNT ASSY, W/ BUSHING, WASHER &
ATTACHING BOLT VARIOUS TYPE X, 450 KG CAPARO DYNAMICS, PN 14/907U
QUANTITY FOR 1 PCM ENCLOSURE / GFM
3 33 BOLT, HEX HD, 3/4-10UNC-2A, 3" L CARBON STEEL SAE
GRADE 5
QUANTITY FOR 1 PCM ENCLOSURE
GFM
ITEM 1, PCM
PCM FOUNDATION
REF 3
PCM, ITEM 1
PCM TO SHOCK MOUNT
ATTACHING BOLT, (ITEM 2)
| EHQ10940-01 |
| EHQ10940-02 |
| EHQ10940-03 |
| EHQ10940-04 |
File details come from the government source that posted it. Updated .