EHQ10886_REV_B_APPROVED_IFTP_RECONFIG_FOR_FLT_III,_PHASE_3_(FULL_SIZE).pdf

PDF 923 KB Posted

Attached to
SATOC for Construction Industrial Support Services at the Naval Surface Warfare Center Land Based Test Sites, Philadelphia Division, Philadelphia, PA
Solicitation number
W912BU-17-R-0010
Issued by

About this file

EHQ10886

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REFERENCES

No. TITLE DRAWING No.

IFTP LBTS, BUILDING 77H 1.5MW 4160VAC-1000VDC

COMPACT PWR PHASE III INSTALLATION

EHQ10767

THIS IS A CAD MAINTAINED DRAWING DEVELOPED

IN AUTOCAD R2013 SOFTWARE. CHANGES SHALL BE

INCORPORATED BY THE DESIGN AUTHORITY

UNDER 12" ±1/8"

12" TO 6'-0" ±1/4"

OVER 6'-0" ±1/2"

DISTRIBUTION STATEMENT D

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT

OF DEFENSE AND U.S. DoD CONTRACTORS ONLY;

CRITICAL TECHNOLOGY, 2/23/2011. OTHER U.S.

REQUESTS SHALL BE REFERRED TO COMMANDER,

NAVAL SEA SYSTEMS COMMAND.

PLAN VIEW 3A

BUILDING 77H KEY PLAN

SCALE: NONE

REVISION STATUS

REV SH DESCRIPTION

B 1 TITLE SHEET, BUILDING KEY PLAN, REFERENCES, NOTES

B 2 PLAN VIEW & ISOMETRIC, PHASE 3

B 3

IFTP FLT III EQPT REMOVAL ARRANGEMENT PAD LEVEL,

PHASE 3

B 4

IFTP FLT III EQPT REMOVAL ARRANGEMENT 13'-6" LEVEL,

PHASE 3

B 5

IFTP FLT III 1000VDC ONE LINE RECONFIGURATION,

PHASE 3

B 6

IFTP FLT III 800VDC & 450VAC

ONE LINE RECONFIGURATION, PHASE 3

B 7

IFTP FLT III PHASE 3 COMPACT POWER REMOVAL

BLOCK DIAGRAM

B 8

IFTP FLT III PHASE 3 COMPACT POWER REMOVAL

ARRANGEMENT

B 9

IFTP FLT III CABLE REWORK & REMOVAL ARRANGEMENT,

PHASE 3

B 10

IFTP FLT III PHASE 3 COMPACT POWER AREA

FOUNDATION REMOVAL

B 11

IFTP FLT III EQUIPMENT / TRAY ARRANGEMENT AFTER

PHASE 3

B 12

IFTP FLT III LIST OF MATERIALS, PP2 ONE LINE

RECONFIGURATION

IFTP LBTS, BUILDING 77H

IFTP RECONFIGURATION FOR

FLT III, PHASE 3

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 1 OF 12

89256D EHQ10886 B

CONTRACT No.

N00178-04-D-4089

OFFICAL SIGNATURE DATE

PREPARED R.S. Fox 1/5/16

CHECKED R. Chranowski 1/5/16

QA N/A -

PROJ MGR M. Lamberto 1/5/16

APPROVED NSWCPD

DIMENSIONAL TOLERANCES

UNLESS OTHERWISE SPECIFIED

DIMENSIONS IN FEET & INCHES

DECIMAL DIMENSIONS IN INCHES

TOLERANCE ON ANGLES ±.50°

1 PL ±.2, 2 PL ±.06, 3 PL ±.005

INTERPRET DIMENSIONS AND TOLERANCES

PER ASME Y14.5 - 2009

REVISION HISTORY

DESCRIPTIONREVZONE DATE APPROVED

D

C

B

A

D

C

B

A

12345678

12345678 A C A D F

IL

E N

A M E A C A D E

H P 1/ A C A D N

S W C C D S S E S

IF

T P L

B T S E H Q .D W G

NORTH

DDG 1000 IPS LBTS, BUILDING 77H

LOW VOLTAGE ELECTRICAL ONE LINE DIAGRAM

8328894

IFTP TEST SITE

SEE PLAN VIEW 14A

3 IFTP TEST SITE ONE LINE DIAGRAM 7261555

4 IFTP RECONFIGURATION FOR FLT III, PHASE 1 EHQ10764

NOTES:

1. DEVIATIONS FROM THIS DRAWING ARE NOT PERMITTED WITHOUT APPROVAL

FROM THE NSWCPD CONSTRUCTION MANAGER (CODE 212).

2. SEE REFERENCE 2 AND 3 FOR ANY ADDITIONAL IFTP EQUIPMENT INFORMATION

REQUIRED THAT IS NOT FOUND IN THIS DRAWING.

3. VERIFY ALL CIRCUITS ARE TAGGED OUT PRIOR TO EQUIPMENT AND CABLE

REMOVAL.

4. ANY EQUIPMENT WHICH HAS CABLE REMOVED AND EQUIPMENT REMAINS

INSTALLED SHALL HAVE CABLE OPENINGS CLOSED WITH PLUGS OR SHEET

METAL COVERS. IT IS PREFERABLE TO USE STUFFING TUBE PLUGS

(ITEMS 5-6) WHERE POSSIBLE.

5. FOLLOW THE LATEST VERSION OF THE NATIONAL ELECTRICAL CODE (NEC) FOR

ANY INSTALLATION DETAILS NOT COVERED WITHIN THIS DRAWING.

6. FOR DC CIRCUITS, 2 CONDUCTORS ARE TO BE CONNECTED IN PARALLEL FOR THE

POSITIVE CONNECTION AND 2 CONDUCTORS ARE TO BE CONNECTED IN PARALLEL

FOR THE NEGATIVE CONNECTION:

PHYSICALLY OPPOSING CONDUCTORS SHALL BE UTILIZED FOR POSITIVE AND

ALSO NEGATIVE CIRCUITS AS SHOWN IN SKETCH. WHITE AND GREEN

CONDUCTORS SHALL BE ENTIRELY SLEEVED TO BREAKOUT BOOT WITH WHITE

SHRINK TUBE (ITEM 4) IN DCJB1 FOR NOTE 15 ALTERED CIRCUITS. BLACK AND

RED CONDUCTORS SHALL BE ENTIRELY SLEEVED TO BREAKOUT BOOT WITH

BLACK SHRINK TUBE (ITEM 3) IN DCJB1 FOR NOTE 15 ALTERED CIRCUITS.

7. POWER CABLES SHALL BE INSTALLED IN A SINGLE LAYER IN TRAY AND SHALL

BE SECURED TO TRAY RUNGS EVERY 36" USING BLACK NYLON TIE WRAPS

HAVING A MINIMUM TENSILE STRENGTH OF 120 LBS.

8. MISCELLANEOUS HARDWARE SUCH AS TIE WRAPS ARE NOT INCLUDED IN THE

MATERIAL LIST BUT MUST BE PROVIDED BY THE INSTALLER.

9. CIRCUIT NUMBERING IS AS FOLLOWS: 1BB1S-10P-2BB1S

POWER SOURCE

10P = 1000V

LOAD

10. UTILIZE SILICON BRONZE BOLTING HARDWARE (BOLT, NUT, 2 FLAT WASHERS, 1

LOCK WASHER) FOR POWER CIRCUIT/BUS BAR CONNECTIONS IF ANY HARDWARE

REQUIRES REPLACING. ZINC PLATED, GRADE 5 CARBON STEEL HARDWARE CAN

BE USED FOR GROUNDING CONNECTIONS. REUTILIZE EXISTING BOLTING

HARDWARE UNLESS IT IS FOUND TO BE DAMAGED. UTILIZE TORQUE SEAL

MARKER (ITEM 8) TO MARK BOLTING HARDWARE AFTER TORQUING TO

SPECIFICATION. TORQUE 3/8" SILICONE BRONZE HARDWARE TO 2O FT LBS AND

1/2" SILICONE BRONZE TO 40 FT LBS. TORQUE 3/8" GRADE 5 STEEL HARDWARE

TO 20 FT LBS AND 1/2" GRADE 5 STEEL TO 48 FT LBS.

11. PCM'S BEING REMOVED HAVE INLET AND OUTLET 2" COOLING LINES WHICH ARE

ALL LESS THAN 5' IN LENGTH THAT REQUIRE DISCONNECTION AT FLANGE

ADJACENT TO LOCAL SHUTOFF VALVE. FABRICATE OR PURCHASE AND INSTALL

BLIND FLANGES WHERE INLET/OUTLET EQUIPMENT COOLING LINES ARE REMOVED.

FOR COMPACT POWER WATER LINE REMOVAL BE SURE TO REMOVE THE INLET

WATER FILTER ASSEMBLY AND STORE WITH COMPACT POWER.

12. CABLES BEING REMOVED ARE ALL GENERALLY BEING REMOVED FROM EXISTING

OVERHEAD TRAY. ALL TRAY SHALL BE LEFT IN PLACE FOR FUTURE USE.

13. ALL REMOVED EQUIPMENT SHALL BE PLACED IN A LAYDOWN AREA AS

INSTRUCTED BY THE NSWCPD CONSTRUCTION MANAGER.

(+) = WHT AND GRN

(-) = BLK AND RED

NOTES:

14. DISCONNECT EXISTING CIRCUIT 2BB1S-10P-3BB1S AT 2BB1S END ONLY. INSULATE

ENDS OF THIS CABLE AND LAY IN OVERHEAD TRAY FOR FUTURE CONNECTION TO

MPDU.

15. DISCONNECT EXISTING CIRCUIT 2BB1S-10P-DCJB1 AT DCJB1 END ONLY. REROUTE

CIRCUIT AS INDICATED IN DASHED LINES ON SHEET 9 AND RECONNECT IN DCJB1. CUT

CABLE TO LENGTH. UTILIZE NEW LUGS, BREAKOUT BOOTS, AND SLEEVING (ITEMS 1

THRU 4). SEE NOTE 6 FOR ADDITIONAL INSTRUCTIONS. REFERENCE 5 SHOWS

SHIPBOARD CABLE PREPARATION PROCEDURE. CABLE IS REROUTED TO KEEP THIS

CIRCUIT OUT OF CABLEWAY TO BE USED FOR 4KV CIRCUITS IN THE FUTURE.

16. TEMPORARILY MOVE ANY FENCE, PIPES, STAIRS, ETC THAT INTERFERES WITH

EQUIPMENT REMOVAL.

17. NSWCPD SHALL PERFORM INSULATION RESISTANCE TEST OF MODIFIED CIRCUITS AT

JOB'S END TO VERIFY ACCEPTABLE COMPLETION OF WORK. ISOLATE REQ'D

COMPONENTS PRIOR TO INSULATION RESISTANCE TESTING.

18. ALL COMPACT POWER AND COMPACT POWER PRECHARGE CABINET CABLES BEING

REMOVED SHALL BE REMOVED BACK TO THEIR TERMINATION POINTS INSIDE

ENCLOSURES. REMOVED CABLES FOR THIS EQUIPMENT CAN NOT BE JUST CUT OFF

AND LEFT CONNECTED INSIDE EQUIPMENT.

19. FOR EQUIPMENT BEING REMOVED, PLEASE MAKE SURE ALL CABLES INCLUDING

CONTROL CABLING AND SEALTITE ARE REMOVED IN THEIR ENTIRETY.

20. ALL ITEMS REFERRED TO IN THE NOTES ABOVE CAN BE FOUND IN THE LIST OF

MATERIALS IN THIS DRAWING.

ELECTRIC PLANT INSTALLATION METHODS FOR SURFACE

SHIPS

5 MIL-STD-2008

NAVAL SURFACE WARFARE CENTER, PHILADELPHIA DIVISION

PHILADELPHIA, PA 19112-5083

IFTP RECONFIGURATION FOR FLT III, PHASE 26 EHQ10771

N. Silva

A. Cairns

3/16/16

3/23/16

TECH REVIEW

PROG MGR

ALL

A

MINOR VERBIAGE CHANGES MADE THROUGHOUT

DRAWING FOR CLARITY.

PREPARED: B. EVERLING 11/15/16

CHECKED: R. CHRANOWSKI 11/16/16

PROJ. MGR: M. LAMBERTO 11/17/16

TECH REVIEW

PROG MGR

A. Cairns

11/23/16

N. Silva

11/28/16

B

B

INCORPORATED USACE COMMENTS OF 4/14/17

AND 4/18/17.

PREPARED: D. MERLINO 4/25/17

CHECKED: R. CHRANOWSKI 4/25/17

PROJ MGR: M. LAMBERTO 4/28/17

ALL

TECH REVIEW

T.CHECCHIO

PROG MGR

A. CAIRNS

4/28/2017

4/29/2017

IFTP FLT III RECONFIGURATION

PLAN VIEW & ISO, PHASE 3

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 2

89256D EHQ10886 B

D

C

B

A

D

C

B

A

910111213141516

910111213141516

PLAN VIEW 14A

IFTP FLT III LBTS RECONFIGURATION, PHASE 3

BUILDING KEY PLAN

SCALE: NONE

NORTH

ISOMETRIC VIEW 10B

LOOKING NORTHWEST

IFTP FLT III LBTS RECONFIGURATION, PHASE 3

SCALE: NONESEE PLAN VIEW 21A

IFTP FLT III EQPT REMOVAL

ARRGMNT PAD LEVEL, PHASE 3

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 3

89256D EHQ10886 B

D

C

B

A

D

C

B

A

1718192021222324

1718192021222324

REMOVE 2-PCM4 AUX SWITCH

WITH FDN STEEL

REMOVE COMPACT PWR PHASE III PCM

(SEE FULL DETAILS ON SH 8, 10)

B

24232221

PLAN VIEW 21A

IFTP FLT III LBTS RECONFIGURATION,

PHASE 3, PAD LEVEL EQUIPMENT

SCALE: 1/4"=1'-0"

NORTH

REMOVE 1BB1P

REMOVE 1PCM4 WITH FDN STEEL

REMOVE 2PCM4

WITH FDN STEEL

REMOVE 1BB1S

RP1

A

3BB1P

GRAPHIC SCALE 1/4"=1'-0"

0 2'1' 3' 4' 5' 10' 15'

REMOVE 2BB1P REMOVE 2BB1S

3BB1S

JB2

IFTP CONTROL ROOM

7S SWBD

PP4BTSPP2

DCJB1

2X ABT

3PP2

3PP1

2PP2

2PP1

1PP3

1PP2

1PP1 1MBT1

2MBT1

3MBT1

PNCC IB

REMOVE 3BB2

JB3

JB1

REMOVE 2BB2

REMOVE 1BB2

XFMR2

XFMR3

ONLY REMOVE PIPING THAT

IS PART OF PCM EQUIPMENT

(SEE NOTE 11)

REMOVE BUT SAVE FOR

FLT III SHORE POWER

IFTP FLT III EQPT REMOVAL

ARRGMNT 13'-6" LEVEL, PHASE 3

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 4

89256D EHQ10886 B

D

C

B

A

D

C

B

A

B

24232221

PLAN VIEW 29A

IFTP FLT III LBTS RECONFIGURATION,

PHASE 3, 13'-6" LEVEL EQUIPMENT

SCALE: 1/4"=1'-0"

NORTH

A

GRAPHIC SCALE 1/4"=1'-0"

0 2'1' 3' 4' 5' 10' 15'

IFTP CONTROL ROOM

PAD LEVEL EQUIPMENT

NOT SHOWN

OVHD TRAY,

ELEVATION 11'-5"

13'-6" LEVEL EQUIPMENT PREVIOUSLY

REMOVED USING NSWCPD

2526272829303132

2526272829303132

IFTP FLT III 1000VDC ONE LINE

RECONFIGURATION, PHASE 3

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 5

89256D EHQ10886 B

D

C

B

A

D

C

B

A

(3) LSFSGU-200

INSTALLED PER REF 1

LB2 2000KW

DCJB2

DCJB1

LB1 2000KW

(4) LSFSGU-200

(DCJB2-S)-10DC-LB1

(4) LSFSGU-200

DCJB1-10DC-(DCJB2-S)

(4) LSFSGU-200

(DCJB2-P)-10DC-LB2 (4) LSFSGU-200

DCJB1-10DC-(DCJB2-P)

PORT

STBD

4SG

4160VAC

P

S

(2PCM4)

P

S

CAPS CR2

(1PCM4)

2000 KW

(1BB1P)

COMPACT PWR

PH III PCM SYSTEM, 1.5MW

4160VAC - 1000VDC

INSTALLED PER REF 1

6S SWBD - 4160V

6S-CB4

1000 KW

(3BB1P) (2BB1P)

(3BB1S) (2BB1S) (1BB1S)

AFT CC

MAIN BUS

PREVIOUSLY REMOVED CABLE (REF 1)

EXISTING CABLES

NEW JUMPER CABLES

LEGEND

REMOVE CABLE & EQPT

(5) LSFSGS-200

(5) LSFSGU-200

(5) LSFSGU-200

INTERNAL CABINET

JUMPERS (TYP)

2P1P-10P-FWD

1BB1S-10P-2BB1S

2BB1P-10P-3BB1P

INTERNAL CABINET

JUMPERS (TYPICAL) 2BB1S-10P-3BB1S

(5) LSFSGS-200

3BB1P-10P-LB1

(5) LSFSGS-200

3BB1S-10P-DCJB1

(5) LSFSGS-200

(2) LSFSGS-200

2P4-1OP-2BB1S

(5) LSFSGS-200

1PCM4-10P-S

2P4-10P-AUXSWIN

(2) LSFSGS-200

(5) LSFSGS-200

1PCM4-1OP-P

(2) LSFSGS-200

2P4-10P-2BB1P

SEE NOTE 14

3334353637383940

3334353637383940

REMOVE PREVIOUSLY

DISCONNECTED CABLE

IFTP FLT III 800VDC & 450VAC

ONE LINE RECONFIG, PHASE 3

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 6

89256D EHQ10886 B

D

C

B

A

D

C

B

A

PREVIOUSLY REMOVED CABLE (REF 1)

EXISTING CABLES

NEW JUMPER CABLES

LEGEND

REMOVE CABLE & EQPT

MTG CLG FAN CAB (DDG1000 18'-0" LVL)

TO PNCC

IB

MTG2

F2

MTG2

F1

MTG MOD

CLG FAN VSD

80 HP80 HP

CLG FANCLG FAN

DISC, CONTROLLER &

COOLING WATER

7S

(SEE REF 2)

S P

2PP2

2PP1

A

C

L

C

21PP3

1PP2

1PP1

3PP3

3PP2

3PP1

A

C

L

C

7S

(SEE REF2)

3BB2

PP4

2MBT1

PUMP 2 DISC, CONTROLLER &

COOLING WATER

PP4

1MBT1

PUMP MOTOR 1DISC, PUMP DISC,

COOLING WATER

PP4

CONTROLLER,

& PUMP 33MBT1

3PCM REMAINING RELATED EQUIPMENT

SEE REF 4, 5 & 6 FOR CONNECTIONS PREVIOUSLY REMOVED

2PCM REMAINING RELATED EQUIPMENT

SEE REF 4, 5, & 6 FOR CONNECTIONS

PREVIOUSLY REMOVED

1PCM REMAINING RELATED EQUIPMENT

SEE REF 4, 5 & 6 FOR CONNECTIONS

PREVIOUSLY REMOVED

2BB2

PP2

IFTP ROUTER/SW

PP2

IFTP ROUTER/SW

PP2

IFTP ROUTER/SW

1BB2

1P 1P

T O D

D X

(1 L S F S G U

1P C M 1S

D C A

(1 L S F S G U

NOTE:

FOR PP2 ONE LINE DIAGRAM

RECONFIGURATION SEE SHEET 12.

IFTP CONTROL

ROOM

4142434445464748

4142434445464748

IFTP FLT III PHASE 3 COMPACT

PWR REMOVAL BLK DIAGRAM

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 7

89256D EHQ10886 B

D

C

B

A

D

C

B

A

A1J3A1J3COMPACT PWR PH III

4160VAC SWGR TEST

(PRECHARGE CABINET)

REFERENCE 4

4160V

IN

4160V

OUT

3-1C-4/0, 7.5KV

TYPE AWM (EXISTING)

CPPH3PC-40P-CPPH3PCM

1-LS5KVTSSGSG-250

4SGA-40P-CPPH3PC

1-LS5KVTSSGSG-250

OPEN/CLOSE EMERG PWR REMOVAL (REAR)

4160V

IN (REAR)

PRECHARGE CABINET

CONNECTION BOX

1000VDC

OUT (REAR)

IFTP TEST SITE

JUNCTION BOX 3BB1P

CPPH3PCM-10DC-3BB1P

(3) LSFSGU-200

COMPACT POWER PH III

PCM - 1.5MW

A1J1

A1J2

IFTP 440VAC

PP2

CB6

440V IN (REAR)

EMERG PWR REMOVAL (REAR)

COMPACT PWR PH III

LOAD PERM TEST FIXTURE

(IFTP CONTROL ROOM)

A1J4A1J4

K-CPPH3-3

1-6C-#16AWG, 600V

TYPE S00W

LOAD PERM/E-STOP (REAR)

A1J5 REMOTE E-STOP (REAR)

IFTP CONTROL ROOM

LAPTOP

(IFTP CONTROL ROOM)

A1J6. K-CPPH3-5

ETHERNET CABLE

MAINTENANCE ETHERNET (FRONT)

A1J7 COMPUTER LOGIC USB PORT (FRONT)

A1J8

(N/A FOR TEST SITE)

MCS ETHERNET PORT (REAR)

(N/A FOR TEST SITE)

3-1C-4/0, 7.5KV

TYPE AWM (EXISTING)

FIXTURE

4160V 4SG SWBD, BRKR 1

4950515253545556

4950515253545556

VERIFY ALL CABLES CONNECTED TO COMPACT POWER

PH III HAVE BEEN REMOVED AT CONCLUSION OF WORK.

ANY CABLES STILL CONNECTED MUST BE REMOVED IN

THEIR ENTIRETY.

PWR REMOVAL ARRANGEMENT

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 8

89256D EHQ10886 B

D

C

B

A

D

C

B

A

5758596061626364

5758596061626364

IPS IFTP 6S

SWITCHBOARD

COMPACT PWR PH III PCM (CPPH3) 1.5MW (SEE NOTE 18)

B

CPPH3PC-40P-CPH3PCM & K-CPPH3-2

EXISTING 4160V

CABLE TRAY

3X CPPH3PCM OUTPUT CABLES

DOWN TO PCM CONNECTION

REMOVE CPPPH3PCM OUTPUT

CABLES DOWN TO 3BB1P

CONNECTION

REMOVE 1BB1P

4SGA-40P-CPPH3PC (1) LS5KVTSSGSG-250 & (1) SPARE

LS5KVTSSGSG-250 DISCONNECTED AT BOTH ENDS & INSULATED

1000VDC POWER CABLE TRAY.

REMOVE CPPH3PCM-10DC-3BB1P

(3) LSFSGU-200

PP2CB6-4P-CPPH3TF,

ATTACHED TO BOTTOM

FLANGE OF EXST TRAY

SUPPORT STEEL USING

BEAM CLAMPS & TIE-WRAPS

POWER PANEL PP2

A

3BB1P

PRECHARGE CABINET CONNECTION BOX

CPPH3 PRECHARGE CABINET (SEE NOTE 18)

REMOVE K-CPPH3-5, K-CPPH3-3

EXST 1000V CABLE TRAY

K-CPPH3-2 (EXISTING W/EXISTING A1J1)

K-CPPH3-3 (EXST A1J4)

K-CPPH3-5, EXISTING A1J6

CPPH3 LOAD PERMISSIVE TEST FIXTURE

EXISTING A1J4

LAPTOP

ROUTE ETHERNET CABLE

UNDER RAISED FLOOR

TO VICINITY OF 4SG SWBD - (2) 4KV CABLES

(ADDITIONAL 150 FT OF CABLE TO BE

REMOVED IN TRAY)

PARTIAL PLAN VIEW 57B

CPPH3 PCM CABLE ROUTING

SCALE: 1/2"=1'-0"

NORTH

COMPACT PWR PH III PCM

(CPPH3PCM) - 1.5MW

EXISTING A1J1 & A1J2

SEE PARTIAL PLAN

VIEW 57B FOR

ADDITIONAL CABLE

DETAILS

GRAPHIC SCALE 1/2"=1'-0"

0 6" 2' 3' 4' 5' 10'1'

SEE PARTIAL PLAN

VIEW 77B FOR FDN

REMOVAL AFTER

EQUIPMENT REMOVAL

PARTIAL PLAN VIEW 61A

CPPH3 PCM CABLE ROUTING

SCALE: 1/4"=1'-0"

NORTH

GRAPHIC SCALE 1/4"=1'-0"

0 2'1' 3' 4' 5' 10' 15'

REMOVE 2BB1P REMOVE 2BB2

REMOVE 1BB2 REMOVE 1BB1S

REMOVE 2BB1S

REMOVE 3BB2

EXISTING A1J5

IFTP FLT III CABLE REWORK &

REMOVAL ARRGMT, PHASE 3

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 9

89256D EHQ10886 B

D

C

B

A

D

C

B

A

B

24232221

PLAN VIEW 69A

IFTP FLT III LBTS RECONFIGURATION, PHASE 3,

CABLE REWORK & REMOVAL ARRANGEMENT PAD LEVEL

SCALE: 1/4"=1'-0"

NORTH

A

GRAPHIC SCALE 1/4"=1'-0"

0 2'1' 3' 4' 5' 10' 15'

3BB1S

IFTP CONTROL ROOM

2BB1P-10P-3BB1P

2BB1S-10P-3BB1S, DISCONNECT

CABLE AT 2BB1S END ONLY

SEE NOTE 14

EXISTING OVERHEAD CABLE

TRAY, ELEVATION 11'-5"

3BB1P

6566676869707172

6566676869707172

REMOVE 1BB1P REMOVE 2BB1P REMOVE 2BB2

REMOVE 1BB2 REMOVE 1BB1S

REMOVE 2BB1S

REMOVE 3BB2

JB1

JB2

LEGEND

REMOVE CABLE

CABLE TO REMAIN

CABLE REROUTED

3BB1P-10P-LB1

3BB1S-10P-DCJB1. SEE NOTE 15

3BB1S-10P-DCJB1

REROUTED AS

SHOWN. SEE

NOTE 15

2P1P-10P-FWD1PCM4-10P-P

3/4" SEALTITE TO JB1

2P4-10P-2BB1P

3/4" SEALTITE TO JB2

3/4" SEALTITE TO JB1

3/4" SEALTITE TO JB1

2P4-10P-2BB1S

1BB1S-10P-2BB1S

1PCM4-10P-S

2" SEALTITE W/CONT WIRING

2P4-10P-AUXSWIN

(1) 4KV CABLE

DCJB1PNCCIB

REMOVE COMPACT POWER

(SEE SH7 AND SH8 FOR COMPACT

POWER CABLE REMOVALS) REMOVE 2PCM-4 AUX SW

REMOVE 2PCM-4 REMOVE 1-PCM4

PWR AREA FDN REMOVAL

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 10

89256D EHQ10886 B

D

C

B

A

D

C

B

A

7374757677787980

7374757677787980

PARTIAL PLAN VIEW 77B

CPPH3 EQPT FOUNDATION & DIAMOND PLATE

REMOVAL

SCALE: 1 1/2"=1'-0"

20'-0"

2'-2 "4'-0

"6"

2'-3

6'-6"

4'-7"

GRAPHIC SCALE 1 1/2"=1'-0"

0 3" 6" 9" 2' 3' 4'1'

REMOVE EXISTING DIAMOMD PL

REMOVE EXISTING EQUIPMENT STRUCTURE

IFTP FLT III EQUIPMENT/TRAY

ARRANGEMENT AFTER PHASE 3

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 11

89256D EHQ10886 B

D

C

B

A

D

C

B

A

GRAPHIC SCALE 1/4"=1'-0"

0 2'1' 3' 4' 5' 10' 15'

B

24232221

PLAN VIEW 85A

IFTP FLT III LBTS RECONFIGURATION, PHASE 3,

CABLE INSTALLATION ARRGMT PAD LEVEL

SCALE: 1/4"=1'-0"

NORTH

A

IFTP CONTROL ROOM

EXISTING OVERHEAD CABLE

TRAY, ELEVATION 11'-5"

EXISTING OVERHEAD CABLE

TRAY, ELEVATION 11'-5"

PP4

BTS

PP2

2X ABT

3PP2

3PP1

2PP2

2PP1

1PP3

1PP2

1PP1 1MBT1

2MBT1

3MBT1

RP1

3BB1P

3BB1S

JB2

7S SWBD

DCJB1PNCC IB

JB3

JB1

XFMR2

XFMR3

8182838485868788

8182838485868788

IFTP FLT III LIST OF MATERIALS,

PP2 ONE LINE RECONFIGURATION

DWG NO.CAGE CODESIZE REV

SCALE : AS NOTED SHEET 12

89256D EHQ10886 B

D

C

B

A

D

C

B

A

100A, 3P

20A, 3P

20A, 3P

20A, 3P

20A, 3P

20A, 3P

30A, 3P 30A, 3P

30A, 3P

20A, 3P

20A, 3P

20A, 3P

20A, 3P

PP2-4P-1

PP2-4P-3

(1) LSTSGU-9

PP2-4P-4

(1) LSTSGU-9

PNCC

2PCM4 1PCM4

SPARE

SPARE

SPARE

TO PP6A

DETAIL 91B

PP2 - 450VAC, 3Φ

ONE LINE DIAGRAM

SCALE: NONE

8990919293949596

8990919293949596

SPARE

SPARE

SPARE

LIST OF MATERIAL

ITEM QTY DESCRIPTION MATERIAL SPECIFICATION REMARKS

1 25

COPPER COMPRESSION LUG, 1 HOLE w/INSPECTION

WINDOW, 4/0 AWG, 200 NAVY, 3/8" STUD, LONG

BARREL, 35kV, 90° C, TIN PLATED COPPER, 2.95"

LENGTH, UL LISTED, CSA CERTIFIED

TIN PLATED

COPPER

COMMERCIAL

USE WITH LSFSGU-200 CABLE. INCLUDES 5

SPARE.

2 6

BREAKOUT BOOT, 4 WAY, CABLE END MAX = 2.35"

WITH SHRINK TO 1.00" MIN, CONDUCTOR LEGS MAX =

1.00" WITH SHRINK TO .35" MIN

POLYOLEFIN DOD-STD-2003-1

NSN 5970-01-554-6791

INCLUDES 1 SPARE.

ROLL

TUBING, SHRINKABLE FIT, 1.0" MAX TO .5" MIN WITH

SHRINK, -55°C TO 135°C, BLACK 50' ROLL,

INSULATION SLEEVING, ELECTRICAL, HEAT SHRINKABLE,

POLYOLEFIN, FLEXIBLE, CROSSLINKED

X LINK

POLYOLEFIN

MIL-DTL-23053/5

ROLL

TUBING, SHRINKABLE FIT, 1.0" MAX TO .5" MIN WITH

SHRINK, -55°C TO 135°C, WHITE 50' ROLL

INSULATION SLEEVING, ELECTRICAL, HEAT SHRINKABLE,

POLYOLEFIN, FLEXIBLE, CROSSLINKED

X LINK

POLYOLEFIN

MIL-DTL-23053/5

5 18 STUFFING TUBE PLUG, SIZE 8 NEOPRENE MIL-S-19622

NSN 5975-00-296-3857.

INCLUDES 5 SPARE.

6 5 STUFFING TUBE PLUG, SIZE 4 NEOPRENE MIL-S-19622

NSN 5975-00-296-3861.

INCLUDES 3 SPARE.

7 1 DIAMOND PLATE, 1/4" THICK 10' X 4'-7" CARBON STEEL ASTM A36 CUT TO SUIT

8 2

TORQUE SEAL, TAMPER PROOF MARKER, -20°F TO

450°F, .5 OZ TUBE, ORANGE, MADE FOR MARKING

ELECTRICAL BOLTED CONNECTIONS 120V-4160V AND

COMPATIBLE WITH VARIOUS METAL SURFACES

SUCH AS COPPER, TIN PLATED COPPER, ZINC PLATED

CARBON STEEL, AND SILICON BRONZE.

VARIOUS COMMERCIAL

SPARE

SPARE

SPARE

SPARE

B

B

B

B

B

EHQ10886-01
EHQ10886-02
EHQ10886-03
EHQ10886-04
EHQ10886-05
EHQ10886-06
EHQ10886-07
EHQ10886-08
EHQ10886-09
EHQ10886-10
EHQ10886-11
EHQ10886-12

File details come from the government source that posted it. Updated .